Loading...
HomeMy WebLinkAboutAGENDA REPORT 1993 0922 CC REG ITEM 08FA G E N D A R E P O R T C I T Y O F M O O R P A R R ITEM - 'OPPA ?K, CAUF07N",, Cou II Meotna cf 2 i- 399 F,CTION: By TOO The Honorable City Council FROM: Jaime Aguilera, Director of Community Development Prepared by Deborah S. Traffenstedt, Senior Planner :�DST DA September 16, 1993 (CC Meeting of 9- 22 -93) SUB CT: CONSIDER IMPLEMENTATION OF A CONTRACT WITH A CONSULTING FIRM TO USE, MAINTAIN, AND UPDATE THE MOORPARK TRAFFIC MODEL A Coi tmunity Development Department objective for the 1993 -94 fiscal year is the implementation and monitoring of a contract with a cons lting firm to utilize the traffic model for specific projects. Sinca Austin -Foust Associates, Inc., (AFA) is the consulting firm that developed the Moorpark Traffic Model in conjunction with the rece t update to the General Plan Circulation and Land Use Elem nts, staff has obtained a proposal from AFA to provide traffic mode ing support for the City. A draft contract and AFA's proposal Lett r are attached. The ttached letter from AFA identifies that traffic model runs woul be carried out by AFA on a time and materials basis for the foll wing "not -to- exceed" fee per run: $500.00 per run for circulation analysis $750.00 per run for land use or land use /circulation analysis A ci culation analysis typically only involves processing the model 's traffic assignment component. A land use analysis involves proc ssing the trip generation, trip distribution, and traffic assi nment components of the model. The cost for processing mult, le runs for a project may be less per run since preparation task do not necessarily need to be repeated once a first run has been ompleted. To f cilitate effective use of the City's traffic model, staff inten s to work with the City Engineer to develop revised traffic study guidelines and procedures that address use of the traffic model. For example, the City of Oxnard utilizes its traffic model dat- 08- 1i- 9312: 32pmC:\WP5I\STFRPT\TRAF- MDL.CTR The Honorable Sepi ember 16, Page 2 City Council 1993 to ake a preliminary determination if a significant impact to an int rsection level of service (LOS) will occur. If the preliminary mod 1 run indicates a significant LOS impact resulting from a pro osed project, the applicant is required to submit a traffic Stu which includes updated traffic count data at specified int sections. The updated traffic count data is then incorporated int the traffic model and another model run is completed. The City Engineer /Traffic Engineer will still have the same res nsibilities for reviewing traffic studies and preparation of conditions of approval for projects. The traffic model data obtained from AFA will be incorporated into traffic studies and /or used by the City Engineer /Traffic Engineer to determine appropriate conditions of approval and mitigation measures for projects. The eneral procedure for use and maintenance of the City Traffic Mode is outlined in Exhibit "B" of the attached contract. Exhibit "C" dentifies information and services to be provided by the City to A in regard to updated traffic count and land use data. RECO NDATION Appr ve a contract agreement with AFA for traffic engineering and tran portation planning services related to the use, maintenance, and ipdating of the Moorpark Traffic Model, subject to final langi age approval by the City Manager and City Attorney, and auth rize the City Manager to sign the agreement. Attachment: Draft Contract (includes AFA letter dated 8 -6 -93) dst- 08- 179312: 32pmC:\WP5I\STFRPT\TRAF- MDL,cTR