Loading...
HomeMy WebLinkAboutAGENDA REPORT 1993 1103 CC REG ITEM 08D ITEM • City of Moorpark AGENDA REPORT 771P.RK, CALIFORNIA Council Meeting TO: The Honorable City Council /r 3 199-3 FROM: Christine Adams, Director of Community Services rC7loN: q� DATE: October 22, 1993 (Meeting of November 3, 1993) By SUBJECT: Consider Acceptance of Repairs of Tierra Rejada Slope, and Authorize Additional Appropriation of Funds for Proiect BACKGROUND The City awarded a contract to R & H Paving for the construction work required to repair the slope failure along Tierra Rejada Road. All of the work has been completed and has been reviewed by the City Engineer' s office and the soils engineer of Geolabs, Inc. located in Woodland Hills . Geolabs also did the original study of the slope failure and provided much of the data used for the contract specifications . The City is currently in discussion with R & H Paving regarding the total quantities that were removed. The results of this discussion should determine the exact cost for construction work, which will affect the final budget . The cost of construction will not exceed $24539 . Staff had recommended a figure of $31, 000 for the slope repair, to be charged to the Assessment District AD84-2 . The original bid by R & H Paving was $25, 850 for construction work only. Total costs, including design work, administration, inspection and landscaping, are expected to exceed this amount by $1256 , depending on the final quantities that are agreed to by the City and R & H Paving. There was a savings of $678 in landscaping costs, due to the 17 trees and 100 shrubs being obtained through the City ' s lease agreement with Boething Treeland Nurseries . Staff is requesting that the City Council authorize an additional appropriation of $1256, to be transferred from the Sunnyslope Access Road Improvement project, which is part of the surplus from the assessment district Zone of Benefit #2 . The attached cost breakdown is provided for your information. RECOMMENDATION 1 . Accept the work as completed, subject to final approval by the City Manager of the final quantities; 2 . Direct the City Clerk to file a Notice of Completion subsequent to said approval of the City Manager; a ' Slope Repair Report November 3, 1993 Page 2 3 . Appropriate $1256 in contingency through a transfer from the CIP surplus from Assessment District AD 84-2, Zone of Benefit #2 . 4 . Authorize the release of the retention upon satisfactory clearance of the thirty (30) day lien period. Slope Repair Report November 3 , 1993 Page 3 Tierra Reiada Slope Repair Costs Description Design $3300* Construction (Based on City Engineer' s Quantities) 19881 Contingency for Disputed Quantities 4658 Administration and Inspection 6000 Landscaping 417 TOTAL 34256 Less Budgeted Amount 31000 Additional Appropriation Requested 3256* * $2000 in design costs was expended in FY 92/93 , therefore only $1256, not $3256 additional appropriation is needed.