HomeMy WebLinkAboutAGENDA REPORT 1993 1103 CC REG ITEM 11D� r
ITEM II•D•
AGENDA REPORT ct''
CITY OF MOORPARK :,)c;I IV' _:' ;
TO: The Honorable City Council
FROM: Ken Gilbert, Director of Public Works
DATE: October 25, 1993 (Meeting of 11 -3 -93) 6�� 7M�
SUBJECT: Consider Bids for the Construction of a Storm
Drain and Street Improvements on Charles
Street Between Bard Street and Spring Road
[Charles Street Phase III.
OVERVIEW
This presents a summary of the bids received for the subject
project and recommends award of a contract for said construction.
BACKGROUND
On August 4, 1993 the City Council approved the revised plans for
this project and authorized staff to advertise for receipt of bids.
DISCUSSION
A. Project Design
The full project design includes all of that portion of Charles
Street from Moorpark Avenue to Spring Road. As discussed in
previous reports to the City Council, limited funds did not
allow construction of the entire project at one time. The
project was, therefore, separated into phases. Phase I
construction extended from Moorpark Avenue to a point just east
of Bard Street and was completed in April of 1993. Phase II
will complete the originally planned work from Bard Street to
Spring Road.
The Phase II project includes the following:
• the construction of a storm drain between Bard Street and
Magnolia Street;
• reconstruction of the street;
• new curb & gutter and sidewalk;
• new cross gutters, handicap ramps and driveway aprons;
• tree wells with root barriers; and
• related improvements.
Charles Street
November 1993
Page 2
Due to the elevation difference between the north parkway and
the south parkway, the curb height on the north side of the
street will be 8" high and the south curb will be 6" high.
On August 4, 1993, the City Council approved a change to the
project design allowing for the placement of the sidewalk
adjacent to the curb in that portion of the project east of
Bonnie View Street. This design change has eliminated several
conflicts with existing improvements resulting in construction
cost savings of approximately $30,000.
As with the Phase I project, this phase of the construction will
preserve existing street trees. The plans call for only one
tree to be removed because of conflicts with proposed required
improvements. It may be necessary to remove additional trees if
other conflicts become apparent during construction. The plans
call for the planting of ten (10) new street trees.
B. Bid Summary
On October 18, 1993, bids were received, opened and tabulated.
A summary of the bid results is attached as Exhibit 1.
C. Oualification
The apparent low bidder is R &H Paving Inc., with a bid of
$209,522.78. This firm is experienced in the type of work
called for in the specifications and has performed many other
public works construction projects for the City. R &H Paving has
confirmed that their bid prices are valid and that they are
prepared to proceed with the construction of the project.
D. Fiscal Impact
1. Project Funding: This project is funded by Community
Development Block Grant (CDBG) funds which have been
allocated for infrastructure improvements, with ineligible
costs to be funded by the Moorpark Redevelopment Agency
(MRA).
2. Budget Amendment: With the opening of bids it is now
possible to more accurately estimate final project costs. It
is recommended, therefore, that the appropriations and budget
for this project be revised.
Charles Street
November 1993
Page 3
3. Summary: Total project costs and recommended adjustments to
the budget for this project are summarized as follows:
3. MRA: It will be necessary for the Moorpark Redevelopment
Agency to confirm funding of the MRA portion of projected
project costs.
E. Project Schedule
It is anticipated that the construction of the project will
commence in November, with completion in approximately three
months.
RECOMMENDATION
Staff recommends that the City Council take the following actions:
1) Approve an appropriation of funds and amendment to the FY
1993/94 Budget as follows: a) 18- 118 - 903 -0259: from $200,000
to $233,125 ($33,125 increase); b) 70- 170 - 903 -0259: from
$200,000 to $50,000 ($150,000 decrease);
Phase II
GRAND
Element
Actual Phase I
}IRA
_ CDBG
Total
TOTAL
Design
41,000
15,500
15,500
56,500
Construction
239,700
209,523
209,523
449,223
Construction
0
23,602
23,602
23,602
Contingency
Other
4,500
4,500
4,500
Contract Admin &
33,600
30,000
30,000
63,600
Inspection
TOTAL
314,300
50,000
233,125
283,125
597,425
FY 93/94 BUDGET
200,000
200,000
400,000
Budget Amendment
- 150,000
33,125
- 116,875
Revised Budget
50,000
233,125
283,125
Available CDBG Construction Funds
............
233,125
3. MRA: It will be necessary for the Moorpark Redevelopment
Agency to confirm funding of the MRA portion of projected
project costs.
E. Project Schedule
It is anticipated that the construction of the project will
commence in November, with completion in approximately three
months.
RECOMMENDATION
Staff recommends that the City Council take the following actions:
1) Approve an appropriation of funds and amendment to the FY
1993/94 Budget as follows: a) 18- 118 - 903 -0259: from $200,000
to $233,125 ($33,125 increase); b) 70- 170 - 903 -0259: from
$200,000 to $50,000 ($150,000 decrease);
Charles Street
November 1993
Page 4
2) Recommend that the Moorpark Redevelopment Agency approve the
funding of this project in the amount of $50,000;
3) Award a contract in the amount of $209,522.78 to R &H Paving,
Inc. for the construction of the subject project;
4 ) Approve a ten per cent contingency for the project and authorize
the City Manager to approve additional work, if required, for an
amount not to exceed ten per cent of the contract; and,
5) Authorize the Mayor to sign necessary contract documents.
wp\rpt\chas8
CITY OF MOORPARK
BID RESULTS
CHARLES PHASE II
BASE BID
Date: 18- Oct -93
BID
ITEM DESCRIPTION
1 AC
2 6" P.M.B.
3 6" Curb & Gutter
4 8" Curb & Gutter
5 4" PCC Sidewalk
6 5' Cross Gutter
7 Sidewalk Ramp
8 6" Drive Approach
9 Adj. meter box to grade
10 Adjust Manhole to grade
1 1 Adj. cover to grade
12 3' ribbon gutter
13 Earthwork
14 Remove exist. AC & Base
15 Remove existing curb
16 Remove existing concrete
Bidder
TOTAL
CONTRACT
NAME:
$49,720.00
ADRESS:
$28,281.00
CITY, STATE:
PHONENUMBER
EST.
$13,630.00
QTY.
UNITS
$4.50
$3,366.00
1 130
Tons
857
CY
1240
LF
1363
LF
7364
SF
748
SF
600
SF
7092
SF
33
EA
4
EA
7
EA
330
SF
1
LS
1427
GY
2603
LF
80
CY
EXHIBIT 1
ESTIMATE
UNIT
BID PRICE
TOTAL
CONTRACT
$44.00
$49,720.00
$33.00
$28,281.00
$9.00
$11,160.00
$10.00
$13,630.00
$3.50
$25,774.00
$4.50
$3,366.00
$3.50
$2,100.00
$3.50
$24,822.00
$100.00
$3,300.00
$300.00
$1,200.00
$150.00
$1,050.00
$4.50
$1,485.00
$9,500.00
$9,500.00
$26.00
$37,102.00
$5.00
$13,015.00
$30.00
$2,400.00
Page 1
Bidder No. 1
R & H Paving
5625 East Vineyard Ave.
1497 Los Angeles
Ave.
Saticoy, CA 93004
(805) 647 -3286
TOTAL
UNIT
TOTAL
BID PRICE
CONTRACT
$29.00
$32,770.00
$24.25
$20,782.25
$6.25
$7,750.00
$6.50
$8,859.50
$2.00
$14,728.00
$6.50
$4,862.00
$3.65
$2,190.00
$2.45
$17,375.40
$69.00
$2,277.00
$345.00
$1,380.00
$195.00
$1,365.00
$6.45
$2,128.50
$6,000.00
$6,000.00
$15.15
$21,619.05
$0.80
$2,082.40
$49.90
$3,992.00
Bidder No. 2
Chaparral Construction
5625 East Vineyard Ave.
Oxnard, Ca 93030
(805) 647 -8606
UNIT
TOTAL
BID PRICE
CONTRACT
$31.00
$35,030.00
$22.00
$18,854.00
$8.00
$9,920.00
$8.50
$11,585.50
$1.75
$12,887.00
$4.00
$2,992.00
$4.50
$2,700.00
$2.50
$17,730.00
$105.00
$3,465.00
$350.00
$1,400.00
$200.00
$1,400.00
$4.00
$1,320.00
$25,000.00
$25,000.00
$5.00
$7,135.00
$2.00
$5,206.00
$30.00
$2,400.00
CITY OF MOORPARK
BID RESULTS
CHARLES PHASE II
BASE BID
Date: 18- Oct -93
BID
UNITS
ITEM
DESCRIPTION
17
Traff ic Striping
18
Salvage & Replace Signs
19
18" RCP
20
24" RCP
21
36 "RCP
22
Local Dep. for CB W =3.5'
23
Local Dep. for CB W =7'
24
Manhole
25
Concrete Collar
26
Remove Plug
27
Grind Exist AC .125 Deep
28
Install 4" drain & grate
29
J.S. #4
30
Survey
31
Clear & grubbing
32
Relocate fence
EXHIBIT 1
Bidder ESTIMATE
NAME:
ADRESS:
CITY, STATE:
PHONE NUMBER
EST.
QTY.
UNITS
UNIT
BID PRICE
TOTAL
CONTRACT
1286
LF
$0.42
$540.12
4
Ea
$50.00
$200.00
66
LF
$46.50
$3,069.00
121
LF
$61.50
$7,441.50
23
LF
$89.00
$2,047.00
1
EA
$500.00
$500.00
1
EA
$500.00
$500.00
1
EA
$1,500.00
$1,500.00
2
EA
$500.00
$1,000.00
1
EA
$250.00
$250.00
189
SY
$2.00
$378.00
3
EA
$235.00
$705.00
1
EA
$500.00
$500.00
1
LS
$7,000.00
$7,000.00
1
LS
$500.00
$500.00
30
LF
$2.70
$81.00
Page 2
BIDDER No. 1
R & H Paving
5625 East Vineyard Ave.
1497 Los Angeles
Ave.
Saticoy, CA
93004
(805) 647 -3286
BID PRICE
UNIT
TOTAL
BID PRICE
CONTRACT
$0.63
$810.18
$650.00
$2,600.00
$46.00
$3,036.00
$60.00
$7,260.00
$102.00
$2,346.00
$195.00
$195.00
$235.00
$235.00
$1,750.00
$1,750.00
$245.00
$490.00
$115.00
$115.00
$16.00
$3,024.00
$660.00
$1,980.00
$345.00
$345.00
$7,500.00
$7,500.00
$1,375.00
$1,375.00
$50.00
$1,500.00
Bidder No. 2
Chaparral Construction
5625 East Vineyard Ave.
Oxnard, Ca 93030
(805) 647 -8606
UNIT
TOTAL
BID PRICE
CONTRACT
$0.75
$964.50
$300.00
$1,200.00
$58.00
$3,828.00
$65.00
$7,865.00
$95.00
$2,185.00
$350.00
$350.00
$650.00
$650.00
$3,000.00
$3,000.00
$400.00
$800.00
$125.00
$125.00
$10.00
$1,890.00
$95.00
$285.00
$400.00
$400.00
$6,700.00
$6,700.00
$3,000.00
$3,000.00
$17.00
$510.00
EXHIBIT 1
Page 3
CITY OF MOORPARK
Bidder
ESTIMATE
BIDDER No. 1
BIDDER No. 2
R & H Paving
Chaparral Construction
BID RESULTS NAME:
CHARLES PHASE II
ADRESS:
1497 Los Angeles Ave.
5625 East Vineyard
Ave.
CITY, STATE:
Saticoy, CA
93004
Oxnard, Ca 93030
Date:
18-Oct-93
PHONE NUMBER
(805) 647 -3286
(805) 647 -8606
BID
EST.
UNIT
TOTAL
UNIT
TOTAL
UNIT
TOTAL
ITEM
DESCRIPTION
OTY.
UNITS
BID PRICE
CONTRACT
BID PRICE
CONTRACT
BD PRICE
CONTRACT
33
Traff ic control
1
LS
$4,000.00
$4,000.00
$4,600.00
$4,600.00
$4,000.00
$4,000.00
34
Tree Root Barrier
330
LF
$22.00
$7,260.00
$16.10
$5,313.00
$15.00
$4,950.00
35
Tree wells
3
EA
$200.00
$600.00
$75.00
$225.00
$150.00
$450.00
36
Tree Planting
12
EA
$250.00
$3,000.00
$172.50
$2,070.00
$175.00
$2,100.00
37
Tree trimming & removal
1
LS
$3,000.00
$3,000.00
$1,675.00
$1,675.00
$3,000.00
$3,000.00
38
C.B. W =3.5'
1
EA
$1,485.00
$1,485.00
$1,675.00
$1,675.00
$2,000.00
$2,000.00
39
C.B. W =7'
1
EA
$1,825.00
$1,825.00
$2,875.00
$2,875.00
$3,000.00
$3,000.00
40
Concrete & Asphalt Testing
1
LS
$9,000.00
$9,000.00
$1,725.00
$1,725.00
$2,700.00
$2,700.00
41
Stop Bar & Legend
150
SF
$3.50
$525.00
$3.15
$472.50
$3.00
$450.00
42
Blue reflectors
4
EA
$5.00
$20.00
$17.25
$69.00
$16.00
$64.00
44
Tree mounds
6
EA
$200.00
$1,200.00
$100.00
$600.00
$90.00
$540.00
45
Tree Grate 48" diameter
2
EA
$1,500.00
$3,000.00
$1,125.00
$2,250.00
$500.00
$1,000.00
46
Tree Grate 6" diameter
1
EA
$500.00
$500.00
$1,250.00
$1,250.00
$300.00
$300.00
49
Release contract
1
LS
$1.00
$1.00
$1.00
$1.00
$1.00
$1.00
TOTAL
$289,532.62
$209,522.78
$217,332.00
Page 3
EXHIBIT 1
Page 4
CITY OF MOORPARK
Bidder
BIDDER No.
6
BIDDER No. 7
BIDDER No. 8
S.P. Milling Co.
Payne Engineering, Inc
O'Keefe Construction
Inc.
BID RESULTS NAME:
CHARLES PHASE II
ADRESS:
3555 Vineyard Ave.
4496 Industrial St.
4761 Lincoln Ave.
BASE BID
CITY, STATE:
Oxnard, CA 93030 -1082
Simi Valley, CA
93063
Cypress, CA 90630
Date:
18- Oct -93
PHONE NUMBER
(805) 485 -3101
(805) 581 -5255
(714) 826 -7827
BID
EST.
UNIT
TOTAL
UNIT
TOTAL
UNIT
TOTAL
ITEM
DESCRIPTION
QTY.
UNITS
BID PRICE
CONTRACT
BID PRICE
CONTRACT
BID PRICE
CONTRACT
1
AC
1130
Tons
$32.50
$36,725.00
$33.00
$37,290.00
$33.00
$37,290.00
2
6" P.M.B.
857
CY
$28.00
$23,996.00
$25.00
$21,425.00
$32.00
$27,424.00
3
6" Curb & Gutter
1240
LF
$10.40
$12,896.00
$9.90
$12,276.00
$11.00
$13,640.00
4
8" Curb & Gutter
1363
LF
$10.70
$14,584.10
$11.00
$14,993.00
$11.50
$15,674.50
5
4" PCC Sidewalk
7364
SF
$2.15
$15,832.60
$1.80
$13,255.20
$1.80
$13,255.20
6
5' Cross Gutter
748
SF
$6.50
$4,862.00
$4.00
$2,992.00
$4.00
$2,992.00
7
Sidewalk Ramp
600
SF
$4.00
$2,400.00
$3.30
$1,980.00
$4.00
$2,400.00
8
6" Drive Approach
7092
SF
$3.10
$21,985.20
$2.75
$19,503.00
$3.25
$23,049.00
9
Adj. meter box to grade
33
EA
$95.00
$3,135.00
$50.00
$1,650.00
$100.00
$3,300.00
10
Adjust Manhole to grade
4
EA
$320.00
$1,280.00
$250.00
$1,000.00
$500.00
$2,000.00
11
Adj. cover to grade
7
EA
$200.00
$1,400.00
$50.00
$350.00
$100.00
$700.00
12
3' ribbon gutter
330
SF
$6.50
$2,145.00
$4.50
$1,485.00
$5.00
$1,650.00
13
Earthwork
1
LS
$17,200.00
$17,200.00
$29,600.00
$29,600.00
$18,000.00
$18,000.00
14
Remove exist. AC & Base
1427
GY
$27.00
$38,529.00
$30.00
$42,810.00
$18.00
$25,686.00
15
Remove existing curb
2603
LF
$2.90
$7,548.70
$4.50
$11,713.50
$3.50
$9,110.50
16
Remove existing concrete
80
CY
$57.00
$4,560.00
$30.00
$2,400.00
$70.00
$5,600.00
Page 4
CITY OF MOORPARK
BID RESULTS
CHARLES PHASE II
BASE BID
Date: 18- Oct -93
BID
Payne Engineering,
ITEM
DESCRIPTION
NAME:
Simi Valley, CA 93063
17
Traff ic Striping
18
Salvage & Replace Signs
19
18" RCP
20
24" RCP
21
36 "RCP
22
Local Dep. for CB W =3.5'
23
Local Dep. for CB W =7'
24
Manhole
25
Concrete Collar
26
Remove Plug
27
Grind Exist AC .125 Deep
28
Install 4" drain & grate
29
J.S. #4
30
Survey
31
Clear & grubbing
32
Relocate fence
EXHIBIT 1
Bidder
Payne Engineering,
BIDDER No.
6
NAME:
Simi Valley, CA 93063
S.P. Milling Co.
ADRESS:
TOTAL
3555 Vineyard Ave.
$1.05
CITY, STATE:
Oxnard, CA 93030 -1082
PHONE NUMBER
(805) 485 -3101
$3,960.00
EST.
$7,260.00
UNIT
TOTAL
QTY.
UNITS
BID PRICE
CONTRACT
1286
LF
$1.10
$1,414.60
4
Ea
$175.00
$700.00
66
LF
$53.20
$3,511.20
121
LF
$55.50
$6,715.50
23
LF
$95.00
$2,185.00
1
EA
$320.00
$320.00
1
EA
$585.00
$585.00
1
EA
$2,800.00
$2,800.00
2
EA
$400.00
$800.00
1
EA
$110.00
$110.00
189
SY
$12.00
$2,268.00
3
EA
$100.00
$300.00
1
EA
$400.00
$400.00
1
LS
$6,900.00
$6,900.00
1
LS
$2,300.00
$2,300.00
30
LF
$15.00
$450.00
Page 5
BIDDER No. 7
Payne Engineering,
Inc
4496 Industrial St.
Simi Valley, CA 93063
(805) 581 -5255
UNIT
TOTAL
BID PRICE CONTRACT
$1.05
$1,350.30
$150.00
$600.00
$60.00
$3,960.00
$60.00
$7,260.00
$75.00
$1,725.00
$300.00
$300.00
$500.00
$500.00
$1,850.00
$1,850.00
$350.00
$700.00
$100.00
$100.00
$16.00
$3,024.00
$75.00
$225.00
$375.00
$375.00
$7,800.00
$7,800.00
$3,500.00
$3,500.00
$10.00
$300.00
BIDDER No. 8
O'Keefe Construction Inc.
4761 Lincoln Ave.
Cypress, CA 90630
(714) 826 -7827
UNIT
BID PRICE
$1.00
$160.00
$68.00
$58.00
$60.00
$800.00
$1,000.00
$2,800.00
$200.00
$200.00
$20.00
$200.00
$1,200.00
$7,000.00
$10,000.00
$10.00
TOTAL
CONTRACT
$1,286.00
$640.00
$4,488.00
$7,018.00
$1,380.00
$800.00
$1,000.00
$2,800.00
$400.00
$200.00
$3,780.00
$600.00
$1,200.00
$7,000.00
$10,000.00
$300.00
EXHIBIT 1
Page 6
CITY OF MOORPARK
Bidder
BIDDER No.
6
BIDDER No. 7
BIDDER No. 8
S.P. Milling Co.
Payne Engineering,
Inc
O'Keefe Construction
Inc.
BID RESULTS NAME:
CHARLES PHASE 11
ADRESS:
3555 Vineyard Ave.
4496 Industrial St.
4761 Lincoln Ave.
CITY, STATE:
Oxnard, CA 93030 -1082
Simi Valley, C93004
Cypress, CA 90630
Date:
18- Oct -93
PHONE NUMBER
(805) 485 -3101
(805) 581 -5255
(714) 826 -7827
BID
EST.
UNIT
TOTAL
UNIT
TOTAL
UNIT
TOTAL
ITEM
DESCRIPTION
QTY.
UNITS
BID PRICE
CONTRACT
BID PRICE CONTRACT
BID PRICE
CONTRACT
33
Traff ic control
1
LS
$2,400.00
$2,400.00
$3,500.00
$3,500.00
$4,000.00
$4,000.00
34
Tree Root Barrier
330
LF
$19.00
$6,270.00
$12.00
$3,960.00
$15.00
$4,950.00
35
Tree wells
3
EA
$150.00
$450.00
$125.00
$375.00
$300.00
$900.00
36
Tree Planting
12
EA
$315.00
$3,780.00
$300.00
$3,600.00
$300.00
$3,600.00
37
Tree trimming & removal
1
LS
$5,500.00
$5,500.00
$4,500.00
$4,500.00
$4,000.00
$4,000.00
38
C.B. W =3.5'
1
EA
$1,800.00
$1,800.00
$1,750.00
$1,750.00
$3,000.00
$3,000.00
39
C.B. W =7'
1
EA
$2,660.00
$2,660.00
$3,500.00
$3,500.00
$4,000.00
$4,000.00
40
Concrete & Asphalt Testin,
1
LS
$2,200.00
$2,200.00
$3,000.00
$3,000.00
$3,500.00
$3,500.00
41
Stop Bar & Legend
150
SF
$3.20
$480.00
$3.30
$495.00
$4.00
$600.00
42
Blue reflectors
4
EA
$11.00
$44.00
$11.50
$46.00
$11.00
$44.00
44
Tree mounds
6
EA
$80.00
$480.00
$100.00
$600.00
$150.00
$900.00
45
Tree Grate 48" diameter
2
EA
$1,375.00
$2,750.00
$1,000.00
$2,000.00
$1,500.00
$3,000.00
46
Tree Grate 6" diameter
1
EA
$1,375.00
$1,375.00
$500.00
$500.00
$1,500.00
$1,500.00
49
Release contract
1
LS
$1.00
$1.00
$1.00
$1.00
$1.00
$1.00
TOTAL
$271,027.90
$276,119.00
$278,658.20
Page 6
EXHIBIT 1
Page 7
CITY OF MOORPARK
Bidder
Bidder No. 3
Bidder No. 4
Bidder No. 5
C.A. Rasmussen, Inc.
D.W. Burhoe Const.,
Inc.
Berry General Engineering
BID RESULTS NAME:
CHARLES PHASE II
ADRESS:
2360 Shasta Way
270 Quail Ct.
4045 N. South
Bank Rd.
BASE BID
CITY, STATE:
Simi Valley, CA
93065
Santa Paula, CA
93060
Oxnard, Ca
93030
Date:
18- Oct -93
PHONE NUMBER
(805) 527 -9330
(805) 525 -8243
(805) 485 -9826
BID
EST.
UNIT
TOTAL
UNIT
TOTAL
UNIT
TOTAL
ITEM
DESCRIPTION
QTY.
UNITS
I BID PRICE
CONTRACT
I BID PRICE
CONTRACT
BID PRICE
CONTRACT
1
AC
1130
Tons
$32.70
$36,951.00
$31.69
$35,809.70
$31.00
$35,030.00
2
6" P.M.B.
857
CY
$30.50
$26,138.50
$33.40
$28,623.80
$21.00
$17,997.00
3
6" Curb & Gutter
1240
LF
$7.00
$8,680.00
$7.88
$9,771.20
$7.70
$9,548.00
4
8" Curb & Gutter
1363
LF
$7.50
$10,222.50
$8.29
$11,299.27
$8.50
$11,585.50
5
4" PCC Sidewalk
7364
SF
$2.00
$14,728.00
$1.51
$11,119.64
$1.45
$10,677.80
6
5' Cross Gutter
748
SF
$4.70
$3,515.60
$3.82
$2,857.36
$4.75
$3,553.00
7
Sidewalk Ramp
600
SF
$4.00
$2,400.00
$1.87
$1,122.00
$2.25
$1,350.00
8
6" Drive Approach
7092
SF
$2.30
$16,311.60
$2.00
$14,184.00
$2.40
$17,020.80
9
Adj. meter box to grade
33
EA
$85.00
$2,805.00
$91.00
$3,003.00
$35.00
$1,155.00
10
Adjust Manhole to grade
4
EA
$400.00
$1,600.00
$311.00
$1,244.00
$320.00
$1,280.00
11
Adj. cover to grade
7
EA
$315.00
$2,205.00
$210.00
$1,470.00
$190.00
$1,330.00
12
3' ribbon gutter
330
SF
$3.10
$1,023.00
$3.50
$1,155.00
$6.75
$2,227.50
13
Earthwork
1
LS
$19,000.00
$19,000.00
$21,000.00
$21,000.00
$23,700.00
$23,700.00
14
Remove exist. AC & Base
1427
CY
$13.00
$18,551.00
$16.53
$23,588.31
$21.00
$29,967.00
15
Remove existing curb
2603
LF
$2.50
$6,507.50
$2.32
$6,038.96
$2.25
$5,856.75
16
Remove existing concrete
80
CY
$85.00
$6,800.00
$29.57
$2,365.60
$62.00
$4,960.00
Page 7
EXHIBIT 1
CITY OF MOORPARK
Bidder
Bidder No. 3
Bidder No. 4
Bidder No. 5
C.A. Rasmussen, Inc.
D.W. Burhoe Const., Inc.
Berry General
Engineering
BID RESULTS NAME:
CHARLES PHASE II
ADRESS:
2360 Shasta Way
270 Ouail Ct.
4045 N. South Bank Rd.
BASE BID
CITY, STATE:
Simi Valley, CA
93065
Santa Paula, CA
93060
Oxnard, Ca
93030
Date:
18- Oct -93
PHONE NUMBER
(805) 527 -9330
(805) 525 -8243
(805) 485 -9826
BID
EST.
UNIT
TOTAL
UNIT
TOTAL
UNIT
TOTAL
ITEM
DESCRIPTION
CITY.
UNITS
BID PRICE
CONTRACT
I BID PRICE
CONTRACT
BID PRICE
CONTRACT
17
Traffic Striping
1286
LF
$0.65
$835.90
$1.10
$1,414.60
$0.60
$771.60
18
Salvage & Replace Signs
4
Ea
$400.00
$1,600.00
$160.00
$640.00
$305.00
$1,220.00
19
18" RCP
66
LF
$74.00
$4,884.00
$53.16
$3,508.56
$53.00
$3,498.00
20
24" RCP
121
LF
$76.00
$9,196.00
$55.28
$6,688.88
$55.00
$6,655.00
21
36 "RCP
23
LF
$78.00
$1,794.00
$95.00
$2,185.00
$95.00
$2,185.00
22
Local Dep. for CB W =3.5'
1
EA
$350.00
$350.00
$320.00
$320.00
$320.00
$320.00
23
Local Dep. for CB W =7'
1
EA
$400.00
$400.00
$585.00
$585.00
$585.00
$585.00
24
Manhole
1
EA
$2,650.00
$2,650.00
$2,800.00
$2,800.00
$2,825.00
$2,825.00
25
Concrete Collar
2
EA
$450.00
$900.00
$400.00
$800.00
$400.00
$800.00
26
Remove Plug
1
EA
$250.00
$250.00
$110.00
$110.00
$105.00
$105.00
27
Grind Exist AC .125 Deep
189
SY
$15.00
$2,835.00
$20.00
$3,780.00
$8.00
$1,512.00
28
Install 4" drain & grate
3
EA
$250.00
$750.00
$150.00
$450.00
$180.00
$540.00
29
J.S. #4
1
EA
$400.00
$400.00
$400.00
$400.00
$400.00
$400.00
30
Survey
1
LS
$7,000.00
$7,000.00
$7,000.00
$7,000.00
$7,000.00
$7,000.00
31
Clear & grubbing
1
LS
$3,700.00
$3,700.00
$4,420.00
$4,420.00
$15,700.00
$15,700.00
32
Relocate fence
30
LF
$11.00
$330.00
$31.00
$930.00
$1.10
$33.00
Page 8
EXHIBIT 1
CITY OF MOORPARK
Bidder
Bidder No. 3
Bidder No. 4
Bidder No. 5
C.A. Rasmussen, Inc.
D.W. Burhoe Const., Inc.
Berry General
Engineering
BID RESULTS NAME:
CHARLES PHASE II
ADRESS:
2360 Shasta Way
270 Quail Ct.
4045 N. South Bank Rd.
CITY, STATE:
Simi Valley, CA
93065
Santa Paula, CA
93060
Oxnard, Ca
93030
Date:
18- Oct -93
PHONE NUMBER
(805) 527 -9330
(805) 525 -8243
(805) 485 -9826
BID
EST.
UNIT
TOTAL
UNIT
TOTAL
UNIT
TOTAL
ITEM
DESCRIPTION
QTY.
UNITS
BID PRICE
CONTRACT
BID PRICE
CONTRACT
BID PRICE
CONTRACT
33
Traffic control
1
LS
$4,000.00
$4,000.00
$12,800.00
$12,800.00
$2,650.00
$2,650.00
34
Tree Root Barrier
330
LF
$16.00
$5,280.00
$19.00
$6,270.00
$19.25
$6,352.50
35
Tree wells
3
EA
$150.00
$450.00
$31.00
$93.00
$265.00
$795.00
36
Tree Planting
12
EA
$180.00
$2,160.00
$318.00
$3,816.00
$320.00
$3,840.00
37
Tree trimming & removal
1
LS
$3,000.00
$3,000.00
$4,800.00
$4,800.00
$2,500.00
$2,500.00
38
C.B. W =3.5'
1
EA
$2,000.00
$2,000.00
$1,800.00
$1,800.00
$1,825.00
$1,825.00
39
C.B. W =7'
1
EA
$3,550.00
$3,550.00
$2,660.00
$2,660.00
$2,675.00
$2,675.00
40
Concrete & Asphalt Testin
1
LS
$500.00
$500.00
$1,170.00
$1,170.00
$2,500.00
$2,500.00
41
Stop Bar & Legend
150
SF
$3.00
$450.00
$3.20
$480.00
$2.95
$442.50
42
Blue reflectors
4
EA
$20.00
$80.00
$42.50
$170.00
$16.00
$64.00
44
Tree mounds
6
EA
$200.00
$1,200.00
$63.00
$378.00
$80.00
$480.00
45
Tree Grate 48" diameter
2
EA
$1,350.00
$2,700.00
$1,050.00
$2,100.00
$920.00
$1,840.00
46
Tree Grate 6" diameter
1
EA
$1,200.00
$1,200.00
$744.00
$744.00
$1,220.00
$1,220.00
49
Release contract
1
LS
$1.00
$1.00
$1.00
$1.00
$1.00
$1.00
TOTAL
$241,884.60
$247,965.88
$248,572.95
Page 9
EXHIBIT 1
Page 10
CITY OF MOORPARK
Bidder
ESTIMATE
BIDDER No. 9
Bidder No. 10
BID RESULTS
NAME:
J & H General Engineering
Chaparral Construction
CHARLES PHASE II
ADRESS:
79 Daily Drive
5625 East Vineyard Ave.
BASE BID
CITY, STATE:
Camarillo, CA 93004
Oxnard, Ca
93030
Date:
18- Oct -93
PHONENUMBER
(805) 647 -3286
(805) 647 -8606
BID
EST.
UNIT
TOTAL
UNIT
TOTAL
UNIT
TOTAL
ITEM
DESCRIPTION
QTY.
UNITS
BID PRICE
CONTRACT
BID PRICE
CONTRACT
BID PRICE
CONTRACT
1
AC
1 130
Tons
$44.00
$49,720.00
$33.00
$37,290.00
$37.00
$41,810.00
2
6" P.M. B.
857
CY
$33.00
$28,281.00
$33.00
$28,281.00
$30.00
$25,710.00
3
6" Curb & Gutter
1240
LF
$9.00
$11,160.00
$15.00
$18,600.00
$11.00
$13,640.00
4
8" Curb & Gutter
1363
LF
$10.00
$13,630.00
$15.00
$20,445.00
$12.00
$16,356.00
5
4" PCC Sidewalk
7364
SF
$3.50
$25,774.00
$2.50
$18,410.00
$3.00
$22,092.00
6
5' Cross Gutter
748
SF
$4.50
$3,366.00
$7.00
$5,236.00
$8.00
$5,984.00
7
Sidewalk Ramp
600
SF
$3.50
$2,100.00
$6.00
$3,600.00
$9.00
$5,400.00
8
6" Drive Approach
7092
SF
$3.50
$24,822.00
$2.20
$15,602.40
$4.50
$31,914.00
9
Adj. meter box to grade
33
EA
$100.00
$3,300.00
$100.00
$3,300.00
$95.00
$3,135.00
10
Adjust Manhole to grade
4
EA
$300.00
$1,200.00
$250.00
$1,000.00
$315.00
$1,260.00
11
Adj. cover to grade
7
EA
$150.00
$1,050.00
$100.00
$700.00
$190.00
$1,330.00
12
3' ribbon gutter
330
SF
$4.50
$1,485.00
$7.00
$2,310.00
$7.00
$2,310.00
13
Earthwork
1
LS
$9,500.00
$9,500.00
$20,000.00
$20,000.00
$23,367.00
$23,367.00
14
Remove exist. AC & Base
1427
CY
$26.00
$37,102.00
$15.00
$21,405.00
$8.00
$11,416.00
15
Remove existing curb
2603
LF
$5.00
$13,015.00
$5.00
$13,015.00
$5.00
$13,015.00
16
Remove existing concrete
80
CY
$30.00
$2,400.00
$10.00
$800.00
$100.00
$8,000.00
Page 10
EXHIBIT 1
Page 11
CITY OF MOORPARK
Bidder
ESTIMATE
BIDDER
No. 9
Bidder
No. 10
Date:
BID RESULTS
CHARLES PHASE II
BASE BID
18- Oct -93
NAME:
ADRESS:
CITY, STATE:
PHONE NUMBER
J & H General Engineering
79 Daily Drive
Camarillo, CA 93004
(805) 647 -3286
Chaparral Construction
5625 East Vineyard Ave.
Oxnard, Ca 93030
(805) 647 -8606
BID
EST.
UNIT
TOTAL
TOTAL
TOTAL
ITEM
DESCRIPTION
QTY.
UNITS
BID PRICE
CONTRACT
I
CONTRACT
I
CONTRACT
17
Traffic Striping
1286
LF
$0.42
$540.12
$0.55
$707.30
$2.00
$2,572.00
18
Salvage & Replace Signs
4
Ea
$50.00
$200.00
$150.00
$600.00
$50.00
$200.00
19
18" RCP
66
LF
$46.50
$3,069.00
$40.00
$2,640.00
$52.00
$3,432.00
20
24" RCP
121
LF
$61.50
$7,441.50
$45.00
$5,445.00
$55.00
$6,655.00
21
36 "RCP
23
LF
$89.00
$2,047.00
$70.00
$1,610.00
$93.00
$2,139.00
22
Local Dep. for CB W =3.5'
1
EA
$500.00
$500.00
$275.00
$275.00
$315.00
$315.00
23
Local Dep. for CB W =7'
1
EA
$500.00
$500.00
$375.00
$375.00
$575.00
$575.00
24
Manhole
1
EA
$1,500.00
$1,500.00
$1,800.00
$1,800.00
$2,770.00
$2,770.00
25
Concrete Collar
2
EA
$500.00
$1,000.00
$350.00
$700.00
$395.00
$790.00
26
Remove Plug
1
EA
$250.00
$250.00
$200.00
$200.00
$105.00
$105.00
27
Grind Exist AC .125 Deep
189
SY
$2.00
$378.00
$17.00
$3,213.00
$17.00
$3,213.00
28
Install 4" drain & grate
3
EA
$235.00
$705.00
$500.00
$1,500.00
$300.00
$900.00
29
J. S. #4
1
EA
$500.00
$500.00
$1,500.00
$1,500.00
$400.00
$400.00
30
Survey
1
LS
$7,000.00
$7,000.00
$8,000.00
$8,000.00
$6,800.00
$6,800.00
31
Clear & grubbing
1
LS
$500.00
$500.00
$15,000.00
$15,000.00
$8,605.00
$8,605.00
32
Relocate fence
30
LF
$2.70
$81.00
$10.00
$300.00 1
$10.00
$300.00
Page 11
EXHIBIT 1
CITY OF MOORPARK
Bidder
ESTIMATE
BIDDER No. 9
BIDDER No.10
J & H General Engineering
Granite Construction
BID RESULTS NAME:
CHARLES PHASE II
ADRESS:
79 Daily Drive
585 West Beach
St.
CITY, STATE:
Camarillo, CA
93010
Watsonville, CA
95077 -5085
Date:
18- Oct -93
PHONE NUMBER
(805) 647 -3286
(408) 724 -1011
BID
EST.
UNIT
TOTAL
UNIT
TOTAL
UNIT
TOTAL
ITEM
DESCRIPTION
QTY.
UNITS
BID PRICE
CONTRACT
BID PRICE
CONTRACT
BID PRICE
CONTRACT
33
Traffic control
1
LS
$4,000.00
$4,000.00
$3,000.00
$3,000.00
$5,832.00
$5,832.00
34
Tree Root Barrier
330
LF
$22.00
$7,260.00
$20.00
$6,600.00
$14.00
$4,620.00
35
Tree wells
3
EA
$200.00
$600.00
$250.00
$750.00
$400.00
$1,200.00
36
Tree Planting
12
EA
$250.00
$3,000.00
$600.00
$7,200.00
$450.00
$5,400.00
37
Tree trimming & removal
1
LS
$3,000.00
$3,000.00
$7,500.00
$7,500.00
$3,000.00
$3,000.00
38
C.B. W =3.5'
1
EA
$1,485.00
$1,485.00
$1,500.00
$1,500.00
$1,785.00
$1,785.00
39
C.B. W =7'
1
EA
$1,825.00
$1,825.00
$2,800.00
$2,800.00
$2,625.00
$2,625.00
40
Concrete & Asphalt Testin
1
LS
$9,000.00
$9.000.00
$2,000.00
$2,000.00
$2,200.00
$2,200.00
41
Stop Bar & Legend
150
SF
$3.50
$525.00
$2.75
$412.50
$2.00
$300.00
42
Blue reflectors
4
EA
$5.00
$20.00
$20.00
$80.00
$5.00
$20.00
44
Tree mounds
6
EA
$200.00
$1,200.00
$100.00
$600.00
$350.00
$2,100.00
45
Tree Grate 48" diameter
2
EA
$1,500.00
$3,000.00
$800.00
$1,600.00
$700.00
$1,400.00
46
Tree Grate 6" diameter
1
EA
$500.00
$500.00
$200.00
$200.00
$600.00
$600.00
49
Release contract
1
LS
$1.00
$1.00
$1.00
$1.00
$1.00
$1.00
TOTAL
$289,532.62
$288,103.20
$297,593.00
Page 12