HomeMy WebLinkAboutAGENDA REPORT 1993 1103 CC REG ITEM 11D� r ITEM II•D• AGENDA REPORT ct'' CITY OF MOORPARK :,)c;I IV' _:' ; TO: The Honorable City Council FROM: Ken Gilbert, Director of Public Works DATE: October 25, 1993 (Meeting of 11 -3 -93) 6�� 7M� SUBJECT: Consider Bids for the Construction of a Storm Drain and Street Improvements on Charles Street Between Bard Street and Spring Road [Charles Street Phase III. OVERVIEW This presents a summary of the bids received for the subject project and recommends award of a contract for said construction. BACKGROUND On August 4, 1993 the City Council approved the revised plans for this project and authorized staff to advertise for receipt of bids. DISCUSSION A. Project Design The full project design includes all of that portion of Charles Street from Moorpark Avenue to Spring Road. As discussed in previous reports to the City Council, limited funds did not allow construction of the entire project at one time. The project was, therefore, separated into phases. Phase I construction extended from Moorpark Avenue to a point just east of Bard Street and was completed in April of 1993. Phase II will complete the originally planned work from Bard Street to Spring Road. The Phase II project includes the following: • the construction of a storm drain between Bard Street and Magnolia Street; • reconstruction of the street; • new curb & gutter and sidewalk; • new cross gutters, handicap ramps and driveway aprons; • tree wells with root barriers; and • related improvements. Charles Street November 1993 Page 2 Due to the elevation difference between the north parkway and the south parkway, the curb height on the north side of the street will be 8" high and the south curb will be 6" high. On August 4, 1993, the City Council approved a change to the project design allowing for the placement of the sidewalk adjacent to the curb in that portion of the project east of Bonnie View Street. This design change has eliminated several conflicts with existing improvements resulting in construction cost savings of approximately $30,000. As with the Phase I project, this phase of the construction will preserve existing street trees. The plans call for only one tree to be removed because of conflicts with proposed required improvements. It may be necessary to remove additional trees if other conflicts become apparent during construction. The plans call for the planting of ten (10) new street trees. B. Bid Summary On October 18, 1993, bids were received, opened and tabulated. A summary of the bid results is attached as Exhibit 1. C. Oualification The apparent low bidder is R &H Paving Inc., with a bid of $209,522.78. This firm is experienced in the type of work called for in the specifications and has performed many other public works construction projects for the City. R &H Paving has confirmed that their bid prices are valid and that they are prepared to proceed with the construction of the project. D. Fiscal Impact 1. Project Funding: This project is funded by Community Development Block Grant (CDBG) funds which have been allocated for infrastructure improvements, with ineligible costs to be funded by the Moorpark Redevelopment Agency (MRA). 2. Budget Amendment: With the opening of bids it is now possible to more accurately estimate final project costs. It is recommended, therefore, that the appropriations and budget for this project be revised. Charles Street November 1993 Page 3 3. Summary: Total project costs and recommended adjustments to the budget for this project are summarized as follows: 3. MRA: It will be necessary for the Moorpark Redevelopment Agency to confirm funding of the MRA portion of projected project costs. E. Project Schedule It is anticipated that the construction of the project will commence in November, with completion in approximately three months. RECOMMENDATION Staff recommends that the City Council take the following actions: 1) Approve an appropriation of funds and amendment to the FY 1993/94 Budget as follows: a) 18- 118 - 903 -0259: from $200,000 to $233,125 ($33,125 increase); b) 70- 170 - 903 -0259: from $200,000 to $50,000 ($150,000 decrease); Phase II GRAND Element Actual Phase I }IRA _ CDBG Total TOTAL Design 41,000 15,500 15,500 56,500 Construction 239,700 209,523 209,523 449,223 Construction 0 23,602 23,602 23,602 Contingency Other 4,500 4,500 4,500 Contract Admin & 33,600 30,000 30,000 63,600 Inspection TOTAL 314,300 50,000 233,125 283,125 597,425 FY 93/94 BUDGET 200,000 200,000 400,000 Budget Amendment - 150,000 33,125 - 116,875 Revised Budget 50,000 233,125 283,125 Available CDBG Construction Funds ............ 233,125 3. MRA: It will be necessary for the Moorpark Redevelopment Agency to confirm funding of the MRA portion of projected project costs. E. Project Schedule It is anticipated that the construction of the project will commence in November, with completion in approximately three months. RECOMMENDATION Staff recommends that the City Council take the following actions: 1) Approve an appropriation of funds and amendment to the FY 1993/94 Budget as follows: a) 18- 118 - 903 -0259: from $200,000 to $233,125 ($33,125 increase); b) 70- 170 - 903 -0259: from $200,000 to $50,000 ($150,000 decrease); Charles Street November 1993 Page 4 2) Recommend that the Moorpark Redevelopment Agency approve the funding of this project in the amount of $50,000; 3) Award a contract in the amount of $209,522.78 to R &H Paving, Inc. for the construction of the subject project; 4 ) Approve a ten per cent contingency for the project and authorize the City Manager to approve additional work, if required, for an amount not to exceed ten per cent of the contract; and, 5) Authorize the Mayor to sign necessary contract documents. wp\rpt\chas8 CITY OF MOORPARK BID RESULTS CHARLES PHASE II BASE BID Date: 18- Oct -93 BID ITEM DESCRIPTION 1 AC 2 6" P.M.B. 3 6" Curb & Gutter 4 8" Curb & Gutter 5 4" PCC Sidewalk 6 5' Cross Gutter 7 Sidewalk Ramp 8 6" Drive Approach 9 Adj. meter box to grade 10 Adjust Manhole to grade 1 1 Adj. cover to grade 12 3' ribbon gutter 13 Earthwork 14 Remove exist. AC & Base 15 Remove existing curb 16 Remove existing concrete Bidder TOTAL CONTRACT NAME: $49,720.00 ADRESS: $28,281.00 CITY, STATE: PHONENUMBER EST. $13,630.00 QTY. UNITS $4.50 $3,366.00 1 130 Tons 857 CY 1240 LF 1363 LF 7364 SF 748 SF 600 SF 7092 SF 33 EA 4 EA 7 EA 330 SF 1 LS 1427 GY 2603 LF 80 CY EXHIBIT 1 ESTIMATE UNIT BID PRICE TOTAL CONTRACT $44.00 $49,720.00 $33.00 $28,281.00 $9.00 $11,160.00 $10.00 $13,630.00 $3.50 $25,774.00 $4.50 $3,366.00 $3.50 $2,100.00 $3.50 $24,822.00 $100.00 $3,300.00 $300.00 $1,200.00 $150.00 $1,050.00 $4.50 $1,485.00 $9,500.00 $9,500.00 $26.00 $37,102.00 $5.00 $13,015.00 $30.00 $2,400.00 Page 1 Bidder No. 1 R & H Paving 5625 East Vineyard Ave. 1497 Los Angeles Ave. Saticoy, CA 93004 (805) 647 -3286 TOTAL UNIT TOTAL BID PRICE CONTRACT $29.00 $32,770.00 $24.25 $20,782.25 $6.25 $7,750.00 $6.50 $8,859.50 $2.00 $14,728.00 $6.50 $4,862.00 $3.65 $2,190.00 $2.45 $17,375.40 $69.00 $2,277.00 $345.00 $1,380.00 $195.00 $1,365.00 $6.45 $2,128.50 $6,000.00 $6,000.00 $15.15 $21,619.05 $0.80 $2,082.40 $49.90 $3,992.00 Bidder No. 2 Chaparral Construction 5625 East Vineyard Ave. Oxnard, Ca 93030 (805) 647 -8606 UNIT TOTAL BID PRICE CONTRACT $31.00 $35,030.00 $22.00 $18,854.00 $8.00 $9,920.00 $8.50 $11,585.50 $1.75 $12,887.00 $4.00 $2,992.00 $4.50 $2,700.00 $2.50 $17,730.00 $105.00 $3,465.00 $350.00 $1,400.00 $200.00 $1,400.00 $4.00 $1,320.00 $25,000.00 $25,000.00 $5.00 $7,135.00 $2.00 $5,206.00 $30.00 $2,400.00 CITY OF MOORPARK BID RESULTS CHARLES PHASE II BASE BID Date: 18- Oct -93 BID UNITS ITEM DESCRIPTION 17 Traff ic Striping 18 Salvage & Replace Signs 19 18" RCP 20 24" RCP 21 36 "RCP 22 Local Dep. for CB W =3.5' 23 Local Dep. for CB W =7' 24 Manhole 25 Concrete Collar 26 Remove Plug 27 Grind Exist AC .125 Deep 28 Install 4" drain & grate 29 J.S. #4 30 Survey 31 Clear & grubbing 32 Relocate fence EXHIBIT 1 Bidder ESTIMATE NAME: ADRESS: CITY, STATE: PHONE NUMBER EST. QTY. UNITS UNIT BID PRICE TOTAL CONTRACT 1286 LF $0.42 $540.12 4 Ea $50.00 $200.00 66 LF $46.50 $3,069.00 121 LF $61.50 $7,441.50 23 LF $89.00 $2,047.00 1 EA $500.00 $500.00 1 EA $500.00 $500.00 1 EA $1,500.00 $1,500.00 2 EA $500.00 $1,000.00 1 EA $250.00 $250.00 189 SY $2.00 $378.00 3 EA $235.00 $705.00 1 EA $500.00 $500.00 1 LS $7,000.00 $7,000.00 1 LS $500.00 $500.00 30 LF $2.70 $81.00 Page 2 BIDDER No. 1 R & H Paving 5625 East Vineyard Ave. 1497 Los Angeles Ave. Saticoy, CA 93004 (805) 647 -3286 BID PRICE UNIT TOTAL BID PRICE CONTRACT $0.63 $810.18 $650.00 $2,600.00 $46.00 $3,036.00 $60.00 $7,260.00 $102.00 $2,346.00 $195.00 $195.00 $235.00 $235.00 $1,750.00 $1,750.00 $245.00 $490.00 $115.00 $115.00 $16.00 $3,024.00 $660.00 $1,980.00 $345.00 $345.00 $7,500.00 $7,500.00 $1,375.00 $1,375.00 $50.00 $1,500.00 Bidder No. 2 Chaparral Construction 5625 East Vineyard Ave. Oxnard, Ca 93030 (805) 647 -8606 UNIT TOTAL BID PRICE CONTRACT $0.75 $964.50 $300.00 $1,200.00 $58.00 $3,828.00 $65.00 $7,865.00 $95.00 $2,185.00 $350.00 $350.00 $650.00 $650.00 $3,000.00 $3,000.00 $400.00 $800.00 $125.00 $125.00 $10.00 $1,890.00 $95.00 $285.00 $400.00 $400.00 $6,700.00 $6,700.00 $3,000.00 $3,000.00 $17.00 $510.00 EXHIBIT 1 Page 3 CITY OF MOORPARK Bidder ESTIMATE BIDDER No. 1 BIDDER No. 2 R & H Paving Chaparral Construction BID RESULTS NAME: CHARLES PHASE II ADRESS: 1497 Los Angeles Ave. 5625 East Vineyard Ave. CITY, STATE: Saticoy, CA 93004 Oxnard, Ca 93030 Date: 18-Oct-93 PHONE NUMBER (805) 647 -3286 (805) 647 -8606 BID EST. UNIT TOTAL UNIT TOTAL UNIT TOTAL ITEM DESCRIPTION OTY. UNITS BID PRICE CONTRACT BID PRICE CONTRACT BD PRICE CONTRACT 33 Traff ic control 1 LS $4,000.00 $4,000.00 $4,600.00 $4,600.00 $4,000.00 $4,000.00 34 Tree Root Barrier 330 LF $22.00 $7,260.00 $16.10 $5,313.00 $15.00 $4,950.00 35 Tree wells 3 EA $200.00 $600.00 $75.00 $225.00 $150.00 $450.00 36 Tree Planting 12 EA $250.00 $3,000.00 $172.50 $2,070.00 $175.00 $2,100.00 37 Tree trimming & removal 1 LS $3,000.00 $3,000.00 $1,675.00 $1,675.00 $3,000.00 $3,000.00 38 C.B. W =3.5' 1 EA $1,485.00 $1,485.00 $1,675.00 $1,675.00 $2,000.00 $2,000.00 39 C.B. W =7' 1 EA $1,825.00 $1,825.00 $2,875.00 $2,875.00 $3,000.00 $3,000.00 40 Concrete & Asphalt Testing 1 LS $9,000.00 $9,000.00 $1,725.00 $1,725.00 $2,700.00 $2,700.00 41 Stop Bar & Legend 150 SF $3.50 $525.00 $3.15 $472.50 $3.00 $450.00 42 Blue reflectors 4 EA $5.00 $20.00 $17.25 $69.00 $16.00 $64.00 44 Tree mounds 6 EA $200.00 $1,200.00 $100.00 $600.00 $90.00 $540.00 45 Tree Grate 48" diameter 2 EA $1,500.00 $3,000.00 $1,125.00 $2,250.00 $500.00 $1,000.00 46 Tree Grate 6" diameter 1 EA $500.00 $500.00 $1,250.00 $1,250.00 $300.00 $300.00 49 Release contract 1 LS $1.00 $1.00 $1.00 $1.00 $1.00 $1.00 TOTAL $289,532.62 $209,522.78 $217,332.00 Page 3 EXHIBIT 1 Page 4 CITY OF MOORPARK Bidder BIDDER No. 6 BIDDER No. 7 BIDDER No. 8 S.P. Milling Co. Payne Engineering, Inc O'Keefe Construction Inc. BID RESULTS NAME: CHARLES PHASE II ADRESS: 3555 Vineyard Ave. 4496 Industrial St. 4761 Lincoln Ave. BASE BID CITY, STATE: Oxnard, CA 93030 -1082 Simi Valley, CA 93063 Cypress, CA 90630 Date: 18- Oct -93 PHONE NUMBER (805) 485 -3101 (805) 581 -5255 (714) 826 -7827 BID EST. UNIT TOTAL UNIT TOTAL UNIT TOTAL ITEM DESCRIPTION QTY. UNITS BID PRICE CONTRACT BID PRICE CONTRACT BID PRICE CONTRACT 1 AC 1130 Tons $32.50 $36,725.00 $33.00 $37,290.00 $33.00 $37,290.00 2 6" P.M.B. 857 CY $28.00 $23,996.00 $25.00 $21,425.00 $32.00 $27,424.00 3 6" Curb & Gutter 1240 LF $10.40 $12,896.00 $9.90 $12,276.00 $11.00 $13,640.00 4 8" Curb & Gutter 1363 LF $10.70 $14,584.10 $11.00 $14,993.00 $11.50 $15,674.50 5 4" PCC Sidewalk 7364 SF $2.15 $15,832.60 $1.80 $13,255.20 $1.80 $13,255.20 6 5' Cross Gutter 748 SF $6.50 $4,862.00 $4.00 $2,992.00 $4.00 $2,992.00 7 Sidewalk Ramp 600 SF $4.00 $2,400.00 $3.30 $1,980.00 $4.00 $2,400.00 8 6" Drive Approach 7092 SF $3.10 $21,985.20 $2.75 $19,503.00 $3.25 $23,049.00 9 Adj. meter box to grade 33 EA $95.00 $3,135.00 $50.00 $1,650.00 $100.00 $3,300.00 10 Adjust Manhole to grade 4 EA $320.00 $1,280.00 $250.00 $1,000.00 $500.00 $2,000.00 11 Adj. cover to grade 7 EA $200.00 $1,400.00 $50.00 $350.00 $100.00 $700.00 12 3' ribbon gutter 330 SF $6.50 $2,145.00 $4.50 $1,485.00 $5.00 $1,650.00 13 Earthwork 1 LS $17,200.00 $17,200.00 $29,600.00 $29,600.00 $18,000.00 $18,000.00 14 Remove exist. AC & Base 1427 GY $27.00 $38,529.00 $30.00 $42,810.00 $18.00 $25,686.00 15 Remove existing curb 2603 LF $2.90 $7,548.70 $4.50 $11,713.50 $3.50 $9,110.50 16 Remove existing concrete 80 CY $57.00 $4,560.00 $30.00 $2,400.00 $70.00 $5,600.00 Page 4 CITY OF MOORPARK BID RESULTS CHARLES PHASE II BASE BID Date: 18- Oct -93 BID Payne Engineering, ITEM DESCRIPTION NAME: Simi Valley, CA 93063 17 Traff ic Striping 18 Salvage & Replace Signs 19 18" RCP 20 24" RCP 21 36 "RCP 22 Local Dep. for CB W =3.5' 23 Local Dep. for CB W =7' 24 Manhole 25 Concrete Collar 26 Remove Plug 27 Grind Exist AC .125 Deep 28 Install 4" drain & grate 29 J.S. #4 30 Survey 31 Clear & grubbing 32 Relocate fence EXHIBIT 1 Bidder Payne Engineering, BIDDER No. 6 NAME: Simi Valley, CA 93063 S.P. Milling Co. ADRESS: TOTAL 3555 Vineyard Ave. $1.05 CITY, STATE: Oxnard, CA 93030 -1082 PHONE NUMBER (805) 485 -3101 $3,960.00 EST. $7,260.00 UNIT TOTAL QTY. UNITS BID PRICE CONTRACT 1286 LF $1.10 $1,414.60 4 Ea $175.00 $700.00 66 LF $53.20 $3,511.20 121 LF $55.50 $6,715.50 23 LF $95.00 $2,185.00 1 EA $320.00 $320.00 1 EA $585.00 $585.00 1 EA $2,800.00 $2,800.00 2 EA $400.00 $800.00 1 EA $110.00 $110.00 189 SY $12.00 $2,268.00 3 EA $100.00 $300.00 1 EA $400.00 $400.00 1 LS $6,900.00 $6,900.00 1 LS $2,300.00 $2,300.00 30 LF $15.00 $450.00 Page 5 BIDDER No. 7 Payne Engineering, Inc 4496 Industrial St. Simi Valley, CA 93063 (805) 581 -5255 UNIT TOTAL BID PRICE CONTRACT $1.05 $1,350.30 $150.00 $600.00 $60.00 $3,960.00 $60.00 $7,260.00 $75.00 $1,725.00 $300.00 $300.00 $500.00 $500.00 $1,850.00 $1,850.00 $350.00 $700.00 $100.00 $100.00 $16.00 $3,024.00 $75.00 $225.00 $375.00 $375.00 $7,800.00 $7,800.00 $3,500.00 $3,500.00 $10.00 $300.00 BIDDER No. 8 O'Keefe Construction Inc. 4761 Lincoln Ave. Cypress, CA 90630 (714) 826 -7827 UNIT BID PRICE $1.00 $160.00 $68.00 $58.00 $60.00 $800.00 $1,000.00 $2,800.00 $200.00 $200.00 $20.00 $200.00 $1,200.00 $7,000.00 $10,000.00 $10.00 TOTAL CONTRACT $1,286.00 $640.00 $4,488.00 $7,018.00 $1,380.00 $800.00 $1,000.00 $2,800.00 $400.00 $200.00 $3,780.00 $600.00 $1,200.00 $7,000.00 $10,000.00 $300.00 EXHIBIT 1 Page 6 CITY OF MOORPARK Bidder BIDDER No. 6 BIDDER No. 7 BIDDER No. 8 S.P. Milling Co. Payne Engineering, Inc O'Keefe Construction Inc. BID RESULTS NAME: CHARLES PHASE 11 ADRESS: 3555 Vineyard Ave. 4496 Industrial St. 4761 Lincoln Ave. CITY, STATE: Oxnard, CA 93030 -1082 Simi Valley, C93004 Cypress, CA 90630 Date: 18- Oct -93 PHONE NUMBER (805) 485 -3101 (805) 581 -5255 (714) 826 -7827 BID EST. UNIT TOTAL UNIT TOTAL UNIT TOTAL ITEM DESCRIPTION QTY. UNITS BID PRICE CONTRACT BID PRICE CONTRACT BID PRICE CONTRACT 33 Traff ic control 1 LS $2,400.00 $2,400.00 $3,500.00 $3,500.00 $4,000.00 $4,000.00 34 Tree Root Barrier 330 LF $19.00 $6,270.00 $12.00 $3,960.00 $15.00 $4,950.00 35 Tree wells 3 EA $150.00 $450.00 $125.00 $375.00 $300.00 $900.00 36 Tree Planting 12 EA $315.00 $3,780.00 $300.00 $3,600.00 $300.00 $3,600.00 37 Tree trimming & removal 1 LS $5,500.00 $5,500.00 $4,500.00 $4,500.00 $4,000.00 $4,000.00 38 C.B. W =3.5' 1 EA $1,800.00 $1,800.00 $1,750.00 $1,750.00 $3,000.00 $3,000.00 39 C.B. W =7' 1 EA $2,660.00 $2,660.00 $3,500.00 $3,500.00 $4,000.00 $4,000.00 40 Concrete & Asphalt Testin, 1 LS $2,200.00 $2,200.00 $3,000.00 $3,000.00 $3,500.00 $3,500.00 41 Stop Bar & Legend 150 SF $3.20 $480.00 $3.30 $495.00 $4.00 $600.00 42 Blue reflectors 4 EA $11.00 $44.00 $11.50 $46.00 $11.00 $44.00 44 Tree mounds 6 EA $80.00 $480.00 $100.00 $600.00 $150.00 $900.00 45 Tree Grate 48" diameter 2 EA $1,375.00 $2,750.00 $1,000.00 $2,000.00 $1,500.00 $3,000.00 46 Tree Grate 6" diameter 1 EA $1,375.00 $1,375.00 $500.00 $500.00 $1,500.00 $1,500.00 49 Release contract 1 LS $1.00 $1.00 $1.00 $1.00 $1.00 $1.00 TOTAL $271,027.90 $276,119.00 $278,658.20 Page 6 EXHIBIT 1 Page 7 CITY OF MOORPARK Bidder Bidder No. 3 Bidder No. 4 Bidder No. 5 C.A. Rasmussen, Inc. D.W. Burhoe Const., Inc. Berry General Engineering BID RESULTS NAME: CHARLES PHASE II ADRESS: 2360 Shasta Way 270 Quail Ct. 4045 N. South Bank Rd. BASE BID CITY, STATE: Simi Valley, CA 93065 Santa Paula, CA 93060 Oxnard, Ca 93030 Date: 18- Oct -93 PHONE NUMBER (805) 527 -9330 (805) 525 -8243 (805) 485 -9826 BID EST. UNIT TOTAL UNIT TOTAL UNIT TOTAL ITEM DESCRIPTION QTY. UNITS I BID PRICE CONTRACT I BID PRICE CONTRACT BID PRICE CONTRACT 1 AC 1130 Tons $32.70 $36,951.00 $31.69 $35,809.70 $31.00 $35,030.00 2 6" P.M.B. 857 CY $30.50 $26,138.50 $33.40 $28,623.80 $21.00 $17,997.00 3 6" Curb & Gutter 1240 LF $7.00 $8,680.00 $7.88 $9,771.20 $7.70 $9,548.00 4 8" Curb & Gutter 1363 LF $7.50 $10,222.50 $8.29 $11,299.27 $8.50 $11,585.50 5 4" PCC Sidewalk 7364 SF $2.00 $14,728.00 $1.51 $11,119.64 $1.45 $10,677.80 6 5' Cross Gutter 748 SF $4.70 $3,515.60 $3.82 $2,857.36 $4.75 $3,553.00 7 Sidewalk Ramp 600 SF $4.00 $2,400.00 $1.87 $1,122.00 $2.25 $1,350.00 8 6" Drive Approach 7092 SF $2.30 $16,311.60 $2.00 $14,184.00 $2.40 $17,020.80 9 Adj. meter box to grade 33 EA $85.00 $2,805.00 $91.00 $3,003.00 $35.00 $1,155.00 10 Adjust Manhole to grade 4 EA $400.00 $1,600.00 $311.00 $1,244.00 $320.00 $1,280.00 11 Adj. cover to grade 7 EA $315.00 $2,205.00 $210.00 $1,470.00 $190.00 $1,330.00 12 3' ribbon gutter 330 SF $3.10 $1,023.00 $3.50 $1,155.00 $6.75 $2,227.50 13 Earthwork 1 LS $19,000.00 $19,000.00 $21,000.00 $21,000.00 $23,700.00 $23,700.00 14 Remove exist. AC & Base 1427 CY $13.00 $18,551.00 $16.53 $23,588.31 $21.00 $29,967.00 15 Remove existing curb 2603 LF $2.50 $6,507.50 $2.32 $6,038.96 $2.25 $5,856.75 16 Remove existing concrete 80 CY $85.00 $6,800.00 $29.57 $2,365.60 $62.00 $4,960.00 Page 7 EXHIBIT 1 CITY OF MOORPARK Bidder Bidder No. 3 Bidder No. 4 Bidder No. 5 C.A. Rasmussen, Inc. D.W. Burhoe Const., Inc. Berry General Engineering BID RESULTS NAME: CHARLES PHASE II ADRESS: 2360 Shasta Way 270 Ouail Ct. 4045 N. South Bank Rd. BASE BID CITY, STATE: Simi Valley, CA 93065 Santa Paula, CA 93060 Oxnard, Ca 93030 Date: 18- Oct -93 PHONE NUMBER (805) 527 -9330 (805) 525 -8243 (805) 485 -9826 BID EST. UNIT TOTAL UNIT TOTAL UNIT TOTAL ITEM DESCRIPTION CITY. UNITS BID PRICE CONTRACT I BID PRICE CONTRACT BID PRICE CONTRACT 17 Traffic Striping 1286 LF $0.65 $835.90 $1.10 $1,414.60 $0.60 $771.60 18 Salvage & Replace Signs 4 Ea $400.00 $1,600.00 $160.00 $640.00 $305.00 $1,220.00 19 18" RCP 66 LF $74.00 $4,884.00 $53.16 $3,508.56 $53.00 $3,498.00 20 24" RCP 121 LF $76.00 $9,196.00 $55.28 $6,688.88 $55.00 $6,655.00 21 36 "RCP 23 LF $78.00 $1,794.00 $95.00 $2,185.00 $95.00 $2,185.00 22 Local Dep. for CB W =3.5' 1 EA $350.00 $350.00 $320.00 $320.00 $320.00 $320.00 23 Local Dep. for CB W =7' 1 EA $400.00 $400.00 $585.00 $585.00 $585.00 $585.00 24 Manhole 1 EA $2,650.00 $2,650.00 $2,800.00 $2,800.00 $2,825.00 $2,825.00 25 Concrete Collar 2 EA $450.00 $900.00 $400.00 $800.00 $400.00 $800.00 26 Remove Plug 1 EA $250.00 $250.00 $110.00 $110.00 $105.00 $105.00 27 Grind Exist AC .125 Deep 189 SY $15.00 $2,835.00 $20.00 $3,780.00 $8.00 $1,512.00 28 Install 4" drain & grate 3 EA $250.00 $750.00 $150.00 $450.00 $180.00 $540.00 29 J.S. #4 1 EA $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 30 Survey 1 LS $7,000.00 $7,000.00 $7,000.00 $7,000.00 $7,000.00 $7,000.00 31 Clear & grubbing 1 LS $3,700.00 $3,700.00 $4,420.00 $4,420.00 $15,700.00 $15,700.00 32 Relocate fence 30 LF $11.00 $330.00 $31.00 $930.00 $1.10 $33.00 Page 8 EXHIBIT 1 CITY OF MOORPARK Bidder Bidder No. 3 Bidder No. 4 Bidder No. 5 C.A. Rasmussen, Inc. D.W. Burhoe Const., Inc. Berry General Engineering BID RESULTS NAME: CHARLES PHASE II ADRESS: 2360 Shasta Way 270 Quail Ct. 4045 N. South Bank Rd. CITY, STATE: Simi Valley, CA 93065 Santa Paula, CA 93060 Oxnard, Ca 93030 Date: 18- Oct -93 PHONE NUMBER (805) 527 -9330 (805) 525 -8243 (805) 485 -9826 BID EST. UNIT TOTAL UNIT TOTAL UNIT TOTAL ITEM DESCRIPTION QTY. UNITS BID PRICE CONTRACT BID PRICE CONTRACT BID PRICE CONTRACT 33 Traffic control 1 LS $4,000.00 $4,000.00 $12,800.00 $12,800.00 $2,650.00 $2,650.00 34 Tree Root Barrier 330 LF $16.00 $5,280.00 $19.00 $6,270.00 $19.25 $6,352.50 35 Tree wells 3 EA $150.00 $450.00 $31.00 $93.00 $265.00 $795.00 36 Tree Planting 12 EA $180.00 $2,160.00 $318.00 $3,816.00 $320.00 $3,840.00 37 Tree trimming & removal 1 LS $3,000.00 $3,000.00 $4,800.00 $4,800.00 $2,500.00 $2,500.00 38 C.B. W =3.5' 1 EA $2,000.00 $2,000.00 $1,800.00 $1,800.00 $1,825.00 $1,825.00 39 C.B. W =7' 1 EA $3,550.00 $3,550.00 $2,660.00 $2,660.00 $2,675.00 $2,675.00 40 Concrete & Asphalt Testin 1 LS $500.00 $500.00 $1,170.00 $1,170.00 $2,500.00 $2,500.00 41 Stop Bar & Legend 150 SF $3.00 $450.00 $3.20 $480.00 $2.95 $442.50 42 Blue reflectors 4 EA $20.00 $80.00 $42.50 $170.00 $16.00 $64.00 44 Tree mounds 6 EA $200.00 $1,200.00 $63.00 $378.00 $80.00 $480.00 45 Tree Grate 48" diameter 2 EA $1,350.00 $2,700.00 $1,050.00 $2,100.00 $920.00 $1,840.00 46 Tree Grate 6" diameter 1 EA $1,200.00 $1,200.00 $744.00 $744.00 $1,220.00 $1,220.00 49 Release contract 1 LS $1.00 $1.00 $1.00 $1.00 $1.00 $1.00 TOTAL $241,884.60 $247,965.88 $248,572.95 Page 9 EXHIBIT 1 Page 10 CITY OF MOORPARK Bidder ESTIMATE BIDDER No. 9 Bidder No. 10 BID RESULTS NAME: J & H General Engineering Chaparral Construction CHARLES PHASE II ADRESS: 79 Daily Drive 5625 East Vineyard Ave. BASE BID CITY, STATE: Camarillo, CA 93004 Oxnard, Ca 93030 Date: 18- Oct -93 PHONENUMBER (805) 647 -3286 (805) 647 -8606 BID EST. UNIT TOTAL UNIT TOTAL UNIT TOTAL ITEM DESCRIPTION QTY. UNITS BID PRICE CONTRACT BID PRICE CONTRACT BID PRICE CONTRACT 1 AC 1 130 Tons $44.00 $49,720.00 $33.00 $37,290.00 $37.00 $41,810.00 2 6" P.M. B. 857 CY $33.00 $28,281.00 $33.00 $28,281.00 $30.00 $25,710.00 3 6" Curb & Gutter 1240 LF $9.00 $11,160.00 $15.00 $18,600.00 $11.00 $13,640.00 4 8" Curb & Gutter 1363 LF $10.00 $13,630.00 $15.00 $20,445.00 $12.00 $16,356.00 5 4" PCC Sidewalk 7364 SF $3.50 $25,774.00 $2.50 $18,410.00 $3.00 $22,092.00 6 5' Cross Gutter 748 SF $4.50 $3,366.00 $7.00 $5,236.00 $8.00 $5,984.00 7 Sidewalk Ramp 600 SF $3.50 $2,100.00 $6.00 $3,600.00 $9.00 $5,400.00 8 6" Drive Approach 7092 SF $3.50 $24,822.00 $2.20 $15,602.40 $4.50 $31,914.00 9 Adj. meter box to grade 33 EA $100.00 $3,300.00 $100.00 $3,300.00 $95.00 $3,135.00 10 Adjust Manhole to grade 4 EA $300.00 $1,200.00 $250.00 $1,000.00 $315.00 $1,260.00 11 Adj. cover to grade 7 EA $150.00 $1,050.00 $100.00 $700.00 $190.00 $1,330.00 12 3' ribbon gutter 330 SF $4.50 $1,485.00 $7.00 $2,310.00 $7.00 $2,310.00 13 Earthwork 1 LS $9,500.00 $9,500.00 $20,000.00 $20,000.00 $23,367.00 $23,367.00 14 Remove exist. AC & Base 1427 CY $26.00 $37,102.00 $15.00 $21,405.00 $8.00 $11,416.00 15 Remove existing curb 2603 LF $5.00 $13,015.00 $5.00 $13,015.00 $5.00 $13,015.00 16 Remove existing concrete 80 CY $30.00 $2,400.00 $10.00 $800.00 $100.00 $8,000.00 Page 10 EXHIBIT 1 Page 11 CITY OF MOORPARK Bidder ESTIMATE BIDDER No. 9 Bidder No. 10 Date: BID RESULTS CHARLES PHASE II BASE BID 18- Oct -93 NAME: ADRESS: CITY, STATE: PHONE NUMBER J & H General Engineering 79 Daily Drive Camarillo, CA 93004 (805) 647 -3286 Chaparral Construction 5625 East Vineyard Ave. Oxnard, Ca 93030 (805) 647 -8606 BID EST. UNIT TOTAL TOTAL TOTAL ITEM DESCRIPTION QTY. UNITS BID PRICE CONTRACT I CONTRACT I CONTRACT 17 Traffic Striping 1286 LF $0.42 $540.12 $0.55 $707.30 $2.00 $2,572.00 18 Salvage & Replace Signs 4 Ea $50.00 $200.00 $150.00 $600.00 $50.00 $200.00 19 18" RCP 66 LF $46.50 $3,069.00 $40.00 $2,640.00 $52.00 $3,432.00 20 24" RCP 121 LF $61.50 $7,441.50 $45.00 $5,445.00 $55.00 $6,655.00 21 36 "RCP 23 LF $89.00 $2,047.00 $70.00 $1,610.00 $93.00 $2,139.00 22 Local Dep. for CB W =3.5' 1 EA $500.00 $500.00 $275.00 $275.00 $315.00 $315.00 23 Local Dep. for CB W =7' 1 EA $500.00 $500.00 $375.00 $375.00 $575.00 $575.00 24 Manhole 1 EA $1,500.00 $1,500.00 $1,800.00 $1,800.00 $2,770.00 $2,770.00 25 Concrete Collar 2 EA $500.00 $1,000.00 $350.00 $700.00 $395.00 $790.00 26 Remove Plug 1 EA $250.00 $250.00 $200.00 $200.00 $105.00 $105.00 27 Grind Exist AC .125 Deep 189 SY $2.00 $378.00 $17.00 $3,213.00 $17.00 $3,213.00 28 Install 4" drain & grate 3 EA $235.00 $705.00 $500.00 $1,500.00 $300.00 $900.00 29 J. S. #4 1 EA $500.00 $500.00 $1,500.00 $1,500.00 $400.00 $400.00 30 Survey 1 LS $7,000.00 $7,000.00 $8,000.00 $8,000.00 $6,800.00 $6,800.00 31 Clear & grubbing 1 LS $500.00 $500.00 $15,000.00 $15,000.00 $8,605.00 $8,605.00 32 Relocate fence 30 LF $2.70 $81.00 $10.00 $300.00 1 $10.00 $300.00 Page 11 EXHIBIT 1 CITY OF MOORPARK Bidder ESTIMATE BIDDER No. 9 BIDDER No.10 J & H General Engineering Granite Construction BID RESULTS NAME: CHARLES PHASE II ADRESS: 79 Daily Drive 585 West Beach St. CITY, STATE: Camarillo, CA 93010 Watsonville, CA 95077 -5085 Date: 18- Oct -93 PHONE NUMBER (805) 647 -3286 (408) 724 -1011 BID EST. UNIT TOTAL UNIT TOTAL UNIT TOTAL ITEM DESCRIPTION QTY. UNITS BID PRICE CONTRACT BID PRICE CONTRACT BID PRICE CONTRACT 33 Traffic control 1 LS $4,000.00 $4,000.00 $3,000.00 $3,000.00 $5,832.00 $5,832.00 34 Tree Root Barrier 330 LF $22.00 $7,260.00 $20.00 $6,600.00 $14.00 $4,620.00 35 Tree wells 3 EA $200.00 $600.00 $250.00 $750.00 $400.00 $1,200.00 36 Tree Planting 12 EA $250.00 $3,000.00 $600.00 $7,200.00 $450.00 $5,400.00 37 Tree trimming & removal 1 LS $3,000.00 $3,000.00 $7,500.00 $7,500.00 $3,000.00 $3,000.00 38 C.B. W =3.5' 1 EA $1,485.00 $1,485.00 $1,500.00 $1,500.00 $1,785.00 $1,785.00 39 C.B. W =7' 1 EA $1,825.00 $1,825.00 $2,800.00 $2,800.00 $2,625.00 $2,625.00 40 Concrete & Asphalt Testin 1 LS $9,000.00 $9.000.00 $2,000.00 $2,000.00 $2,200.00 $2,200.00 41 Stop Bar & Legend 150 SF $3.50 $525.00 $2.75 $412.50 $2.00 $300.00 42 Blue reflectors 4 EA $5.00 $20.00 $20.00 $80.00 $5.00 $20.00 44 Tree mounds 6 EA $200.00 $1,200.00 $100.00 $600.00 $350.00 $2,100.00 45 Tree Grate 48" diameter 2 EA $1,500.00 $3,000.00 $800.00 $1,600.00 $700.00 $1,400.00 46 Tree Grate 6" diameter 1 EA $500.00 $500.00 $200.00 $200.00 $600.00 $600.00 49 Release contract 1 LS $1.00 $1.00 $1.00 $1.00 $1.00 $1.00 TOTAL $289,532.62 $288,103.20 $297,593.00 Page 12