TO: The Honorable City Council
FROM: Kenneth C. Gilbert, Director of Public Works /
DATE: November 19, 1993 (Council Meeting 12 -1 -93) 111
SUBJECT: Consider Approval of Additional Improvements to the
Arroyo Vista Community Park Buildings for the
Installation of a Clock in Community Building Tower and
the Installation of Cabinets
BACKGROUND
1. Cabinets: The plans and specification for the Arroyo Vista
Community Park Buildings includes cabinets in several areas.
Some of these cabinets were deleted from the scope of the
construction contract, to be installed under a separate
contract to possibly save money and to allow for some
flexibility in the scope of work.
2. Clock: One of the architectural features of the Arroyo Vista
Park Community Building is a tower (see Exhibit). Recently,
the building architect suggested that the addition of a clock
to that tower would be a valuable architectural enhancement to
the building.
DISCUSSION
A. Cabinets
Staff has solicited bids for the installation of cabinets in
various rooms in the two buildings. The cabinets to be
installed fall into three categories generally described as
follows:
1. Office /Activity Rooms: Permanent cabinets. It is the
recommendation of the architect that formica clad cabinets,
with colors from the approved color palette, should be
placed in these rooms.
avpclok
Arroyo Vista Park
December 1993
Page 2
2. Kitchen: Cabinets to be installed in the kitchen are to
enable use of this facility on an interim basis (duration
undetermined) for the serving of food prepared off -site.
The design of the kitchen allows for future conversion to
a full service kitchen when the need and funds allow. At
that time the interim cabinets will be replaced with full
stainless steel kitchen facilities.
3. Maintenance/Utility /Storage Rooms: Cabinets installed in
these rooms are not in public view and are, therefore,
utilitarian in nature.
A summary of the bids received is set forth in the Chart
attached as Exhibit 1. The recommended type of cabinets and
suppliers of same shown on page 3 of that exhibit. The total
cost of the required cabinets will not exceed $17,000 ($15,876
plus contingency).
B. Clock
If the City is to proceed with the installation of a clock on
the Community Building tower, the building architect recommends
installation of the clock shown on Exhibit 2. This clock is
three feet in diameter. At the request of the Public Works,
Facilities and Solid Waste Committee (Councilmembers Montgomery
and Wozniak), staff investigated the cost of providing for an
internally illuminated clock face. The cost for this item is
summarized as follows:
Electrical service
Clock
Rear Lighting
Delivery
Tax
Sub -Total
Contingency
Total
Rear Lit Face
270
3,115
2,000
200
360
5,585
515
6,100
Standard Face
270
3,115
200
225
3,790
210
M
The Committee recommended that we proceed with the standard
clock face, but that staff investigate the feasibility of
providing exterior lighting.
avpclok
Arroyo Vista Park
December 1993
Page 3
C. Committee
1. Clock: The Public Works, Facilities and Solid Waste
Committee was advised that the cost of the basic clock
would be in the range of $2,500. The Committee recommended
approval of the addition of the clock based on that
information. As you can see from the above summary, the
more refined cost estimate for this item is slightly higher
than the figure discussed by the Committee. Absent
objection from the Committee, staff would recommend
approval of this addition.
As stated above, the Committee also suggested a rear lit
face for the Clock. The manufacturer stated that this was
possible. However, the additional improvements required to
provide rear lighting could cost in the range of an
additional $2,000. The recommendation set forth below does
not include this additional expense.
2. Cabinets: The Public Works, Facilities and Solid Waste
Committee (Councilmembers Montgomery and Wozniak) reviewed
the staff recommended cabinet installation and recommend
approval.
RECOMMENDATIONS
Staff and the Public Works, Facilities and Solid Waste Committee
recommend that the City Council take the following actions:
1. Authorize the City Manager to approve a Change Order to the
Prime Contract for the installation of a clock in the Community
Building tower for an amount Not to Exceed $4,000;
2. Authorize the City Manager to approve one or more contracts for
the installation of cabinets in the Community Building and
Gymnasium as described in this report, for a cost not to exceed
$17,000.
avpc'_ok
Chart 'A'
Arroyo Vista Community Park
Community Building Cabinets and Counter Tops
November 15, 1993
Room
Bid Amount (S)
Craft Cabinets
Custom Design
(Intl 15.5% for Gen Contr)
Coyle Construction
No.
Description
Cabinet Descriptions
Base Bid
Add Corian
Base Bid
Add Corian
Base Bid
Add Corian
Option
'A'
106
Office
WIC 3 -102L 4 ft. Formica Clad
No Bid
2,467
1,339
No Bid
112
Activity Rm
WIC 8 -102L 4 ft. Formica Clad
No Bid
6,580
357
No Bid
WIC 2 -101L 2 ft. Formica Clad
No Bid
822
352
No Bid
Sub -Total
9,869
2,048
Total
11,917
Option
'B'
106
Office
Prefinished Oak Chatsworth Doors
880
No Bid
2,573
1,339
No Bid
Backs & Concealed Hinges
112
Activity Rm
Same
2,525
No Bid
7,719
4,018
No Bid
Add for Kortron or equiv. Interiors
445
No Bid
Equiv Incl
N/A
No Bid
Sub -Total
3,850
10,292
5,357
Total
15,649
Option
'C'
106
Office
Sunrise by Karman Flush Panel Door
No Bid
No Bid
3,229
1,652
Duratex Finish
112
Activity Rm
Same
No Bid
No Bid
9,363
5,092
Add for Kortron of equiv. Interiors
Incl
N/A
Sub -Total
12,592
6,744
Total
19,336
Chart 'A'
Page 2
Bid Amount ($)
Custom Design
Room
Craft Cabinets
(Inc[ 15.5% for Gen Contr)
Coyle Construction
No. Description
Cabinet Descriptions
Base Bid Add Corian
Base Bid Add Corian
Base Bid Add Corian
Other Rooms
101 Kitchen
32 L.F. lower and upper cabinets.
3,617 N/A
8,309 N/A
6,850 N/A
Prefinished stain grade Oak.
Finger pull self closing hinges.
Std. drw. guides. all unfinished.
Deduct amount for omitting 20 L. f.
-550
-2,115
No Bid
of upper cabinet.
Sub -Total
3,067
6,194
Add Amount for Kortron Interiors
525
Inc(.
N/A
Total 32' w/ Kortron
4,142
8,309
6,850
Total 12' w/ Kortron
3,592
6,194
No Bid
110 Storage Rm\
Paint Grade H.C. Maisonette R /P,
114 Storage Rm >
3/411 Pine frames, tops and backs.
1,780 N/A
3,005 N/A
2,050 N/A
115 Storage Rm/
Six shelves plus broom section
Add Amount for Adjustable Shelves
85
305
No Bid
Total
1,865
3,305
see above
Chart 'A'
Page 3
Room
Description I Cabinet Descriptions
Recommendations:
Craft Cabinets
Bid Amount ($
Custom Design
(IncL 15.5% for Gen Contr)
1. Roams 106 & 112: Option 'A'
Bidder: Custom Designs
No Corean
Price ...................... ............................... !9,869
2. Kitchen: Bidder: Craft's Cabinets
Length: 321; with Kortron Interiors
Price: ..................... ............................... $4,142
3. Storage Roams: Bidder: Craft's Cabinets
Utility cabinets with adjustable shelves
Price: ..................... ............................... $1,865
TOTAL............................. ............................... .......... $15,876
Coyle Construction
cw`o��
r
'l
r�
�L
r
F F'i =11'?
E.E. Ib_11iIF:F'Nr _Clrr_,T. TI
f
C55 Wateybuty Clock
F'. 01
L .yfL
13 C3
11 [03
�•TM
�V
•
y�
�j lR �fl1�i�'1
silt
V1
CfleSlIj 12 c:)li.+C/ �sr ..A�NCQ4tJlE
�L"
�t ��
F'. 01
L .yfL
13 C3
11 [03
�1cuaC Tf�1�E ^VA,L..t°b4r.
MAT
{ t�t.�'rc1.G1�►t..,:tn'� is��tirrt. t�s
CF'T1G�tS-
tc stil3s•y+bw►.• qp:� ;�s^t �r�;C:� r�rn,,,
G►r�vndrr� X,tr .autis++� o Dtv� d7 ��• Lac
P.Q
•
y�
�j lR �fl1�i�'1
�.�'i��1 • Gl �1'_it ��Ll?.
V1
CfleSlIj 12 c:)li.+C/ �sr ..A�NCQ4tJlE
�L"
�t ��
• f.'�L•K'IRArtXIJG��i�fT� fir_ -c +�t ; t;✓`�K
��'
•fit s't
iJ c�u� � ���Q , ��
ow
Z
�.:..�
�Afs'Sf'tZG GtFr �)
�1cuaC Tf�1�E ^VA,L..t°b4r.
MAT
{ t�t.�'rc1.G1�►t..,:tn'� is��tirrt. t�s
CF'T1G�tS-
tc stil3s•y+bw►.• qp:� ;�s^t �r�;C:� r�rn,,,
G►r�vndrr� X,tr .autis++� o Dtv� d7 ��• Lac
P.Q