MEMORANDUM f
ACTION: GJ
TO: The Honorable City Council
By
DATE: September 29, 1992 (Meeting of 10 -7 -92)
FROM:
Ken Gilbert, Director of Public Work
SUBJECT: Consideration of Bids for Award of a Contract
for the Construction of Phase I Storm Drain
and Street Improvements on Charles Street
OVERVIEW
This presents a summary of the bids received for the subject
project and recommends award of a contract for said construction.
BACKGROUND
On July 1, 1992, the City Council approved the revised plans for
this project and authorized staff to advertise for receipt of bids.
DISCUSSION
A. Project Design
The full project design includes all of that portion of Charles
Street from Moorpark Avenue to Spring Road. As discussed in
previous reports to the City Council, limited funds do not allow
us to construct the entire project at this time. The project
has, therefore, been separated into phases. Phase I
construction will extend from Moorpark Avenue to a point just
east of Bard Street.
The project includes the following:
• the construction of a storm drain between Bard Street and
Walnut Street;
• reconstruction of the street;
• new curb & gutter and sidewalk;
• new cross gutters, handicap ramps and driveway aprons;
• tree wells with root barriers; and
• related improvements.
PAUL W. LAWRASON JR. JOHN E. WOZNIAK SCOTT MONTGOMERY BERNARDO M. PEREZ ROY E. TALLEY JR.
Mayor Mayor Pro Tern Councilmember Councilmember Councilmember
Printed On Recycled Paper
Charles Street
October 1992
Page 2
Due to the elevation difference from the north parkway to the
south parkway, the curb height on the north side of the street
will be 8" high and the south curb will be 6" high.
The goal of the project is to salvage all of the trees possible.
Two trees have been targeted for removal because of conflicts
with the improvements. It may be necessary to remove additional
trees to accommodate the proposed improvements. At least five
new trees are to be planted as shown on the plans.
B. Delay
A you recall, an abandoned underground fuel tank was discovered
in the street right -of -way in the area of the proposed project.
The City undertook efforts to have this tank removed and the
soils in the area of the tank tested for residual contamination.
The advertisement of the project was delayed for a number of
weeks until the City received a final determination that the
soils tests were acceptable.
— C. Bid Summary
On September 15, 1992, bids were received, opened and tabulated.
A summary of the bid results is attached as Exhibit 1.
D. Bid Error
The actual total bid price is based on the UNIT PRICE bids.
Each bidder multiplies the UNIT PRICES he /she has entered, by
the quantities provided by the City. The bid item totals are
then added to obtain the Total Bid Price. Subsequent to the bid
opening, staff checks all of the calculations and corrects any
errors, including the amount entered for the total bid.
At the time of the bid opening, R & H Paving, Inc. was the
apparent second lowest bidder. It was later determined that
R & H Paving made a clerical error in the preparation of their
bid. Although a bid amount for Item # 27 of $2,470.50 was
included in calculating the total bid, the space provided for
that item was left blank. Entering a zero bid for that item,
would yield a total bid price of $254,441.90, making that firm
the low bidder.
R & H Paving has requested (Exhibit 3) that they be allowed to
withdraw their bid due to this clerical error. If approved, the
apparent low bidder at the time of the bid opening (O'Keefe
Engineering) remains unchanged. Staff recommends concurrence
with the request made by R & H Paving.
Charles Street
October 1992
Page 3
E. Oualification
If the above request is approved, the apparent low bidder
remains O'Keefe Engineering, Inc., with a bid of $256,912.40.
This firm is experienced in the type work called for in the
specifications. Inquiries made to previous employers have been
favorable. They have confirmed that the bid prices are valid
and that they are prepared to proceed with the construction of
the project.
F. Fiscal Impact
1. Project Cost Estimate: Total project costs are summarized
on page 1 of Exhibit 2 (attached). A summary of those
figures is as follows:
Fiscal Year Amount
Prior Years 9,850
FY 1991/92 47,153
FY 1992/93 360,470
TOTAL 417,473
2. Project Funding: Page 1 of Exhibit 2 also shows the funding
sources for these expenditures. The major funding source is
Community Development Block Grant (CDBG) funds. A detail
summary of the accumulation of CDBG funds now available for
this project is set forth on page 2 of Exhibit 2. Total CDBG
activity on this project is summarized as follows:
Maximum
Prior Future
Description Claims Claims TOTAL
Total CDBG Funds 400,020
Claims Made 39,550 360,470 400,020
Charles Street
October 1992
Page 4
3. Budget Amendment: Based on the above summary of available
CDBG funds and the estimated project costs, it is recommended
that the FY 1992/93 Budget be amended as follows:
Fund Account #
018 131 - 903 -0258
018 131- 903 -0259
051 142 - 903 -0250
Total
G. Project Schedule
Current
Proposed
Revised
Budget
Change
Budget
180,000
0
180,000
150,000
30,470
180,470
30.000
- 30.000
0
360,000
470
360,470
It is anticipated that the construction of the project will
commence by November 1 with completion in approximately three
months.
RECOMMENDATION
Staff recommends that the City Council take the following actions:
1. Approve a budget amendment and appropriation as described in
Section E -3 above.
2. Approve the request from R & H Paving, Inc. to withdraw their
bid due to clerical error.
3. Award a contract for the construction of the subject project to
the lowest responsive bidder, O'Keefe Engineering, Inc., for the
bid amount of $256,377.05.
4. Approve a ten per cent (10 %) contingency for the project and
authorize the City Manager to approve additional work, if
required, for an amount not to exceed ten per cent (100) of the
contract price.
5. Authorize the Mayor to sign necessary contract documents.
wp\rpt \chas4
CITY OF MOORPARK
Bid Results
Charles Street I
1992
15- Sep -92
---------------- - - - - --
ITEM DESCRIPTION
----------------------
1 A/C
2 6" PMB
Bidder
NAME:
ADDRESS:
CITY, STATE:
PHONE NUMBER:
CONTACT PERSON
--------------- - --
Est Qty Unit
--------------- - --
833 T
643 cy
3
6" Curb & Gutter
843
if
4
8" Curb & Gutter
955
if
5
Sidewalk
4,459
sf
6
Xgutter & Spandral
861
sf
7
H/C Ramp
2,098
sf
8
6" driveway apron
5,352
sf
9
Adj Meter Box
17
ea
10
Relocate Meter Box
13
ea
11
Adjust Manhole
3
ea
12
Adjust Valve Cover
6
ea
13
Recnst 14' CB
2
ea
14
Recnst 7' CB
1
ea
15
Earthwork
1
L S
16
Remove A/C & Base
1,285
cy
17
Remove Exist Curb
1,700
if
18
1 Remove Exist PCC
108
cy
Engineer's Estimate
--------------- - - --
UNIT S I TOTAL BID
44.00 36,652.00
33.00 21,219.00
9.00 7,587.00
10.00 9,550.00
3.50 15,606.50
4.50 3,874.50
3.50 7,343.00
3.50 18,732.00
100.00 1,700.00
150.00 1,950.00
300.00 900.00
150.00 900.00
4,850.00 9,700.00
3,550.00 3,550.00
7,500.00 7,500.00
26.00 33,410.00
5.00 8,500.00
26.00 2,808.00
VENDOR 1
O'Keefe Eng., Inc.
4761 Lincoln Ave
Cypress, CA 90630
(714) 826 -7827
Mary O'Keefe
--------------- - - --
UNIT $ 1 TOTAL BID
41.60 34,652.80
18.00 11,574.00
11.00 9,273.00
11.50 10,982.50
1.75 7,803.25
3.00 2,583.00
3.00 6,294.00
3.25 17,394.00
45.00 765.00
150.00 1,950.00
300.00 900.00
200.00 1,200.00
1,400.00 2,800.00
1,000.00 1,000.00
20,000.00 20,000.00
15.00 19,275.00
3.50 5,950.00
70.00 7,560.00
VENDOR 2
R & H PAving, Inc.
1497 L. A. Ave.
Saticoy, CA 93010
(805) 647 -3286
Charles Rasey
--------------- - - --
UNIT S I TOTAL BID
31.70 26,406.10
17.70 11,381.10
8.30 6,996.90
8.10 7,735.50
2.00 8,918.00
4.00 3,444.00
1.75 3,671.50
2.20 11,774.40
82.00 1,394.00
190.00 2,470.00
500.00 1,500.00
290.00 1,740.00
3,465.00 6,930.00
2,205.00 2,205.00
9,170.00 9,170.00
11.00 14,135.00
3.50 5,950.00
40.00 4,320.00
VENDOR 3
Berry General Eng.
4045 N. South Bank Rd
Oxnard, CA 93031
(805) 485 -9826
Dan Berry
--------------- - - --
UNIT $ 1 TOTAL BID
37.15
30,945.95
23.60
15,174.80
7.80
6,575.40
9.20
8,786.00
1.50
6,688.50
4.60
3,960.60
2.00
4,196.00
2.25
12,042.00
83.00
1,411.00
185.00
2,405.00
395.00
1,185.00
210.00
1,260.00
3,502.00
7,004.00
2,228.00
2,228.00
29,576.00
29,576.00
4.65
5,975.25
2.40
4,080.00
83.00
8,964.00
VENDOR 4
----------------- - - - - --
Granite Constr. Co.
585 W. Beach Street
Watsonville, CA 95077
(408) 724 -1011
R. C. Allbtitton
UNIT S I TOTAL BID
34.00 28,322.00
34.00 21,862.00
11.00 9,273.00
12.00 11,460.00
3.00 13,377.00
7.00 6,027.00
4.00 8,392.00
4.00 21,408.00
200.00 3,400.00
300.00 3,900.00
400.00 1,200.00
200.00 1,200.00
2,500.00 5,000.00
2,300.00 2,300.00
20,027.00 20,027.00
11.00 14,135.00
3.00 5,100.00
60.00 6,480.00
0
oC)
CITY OF MOORPARK
Bid Results
Sidewalk Repairs
1992
24- Jul -92
-------------------- - - - - --
ITEM DESCRIPTION
--------------------------
19 Traffic Striping
20 Thermoplastic
21 Salvage/Repl Signs
22 18" RCP
23 24" RCP
24 30" RCP
I
25
26
27
28
29
30
31
32
33
34
35
36
Lcl Dprssion (10')
Lcl Dprssion (141)
Manhole
Junction Structure
8 1lx24" plug
Grind Pavement
Trim bushes
4" PVC drain /grate
Clean -out Assy
Saddle connection
Const. survey
Clearing & grubbing
Bidder
NAME:
ADDRESS:
CITY, STATE:
PHONE NUMBER:
CONTACT PERSON
Est Qty Unit
1,053 if
144 sf
10 ea
30 if
235
294
1
1
1
1
1
152
1
1
4
4
1
1
if
if
ea
ea
ea
ea
ea
sy
LS
ea
ea
ea
LS
LS
Engineer's Estimate
UNIT
0.42
3.50
50.00
46.50
61.50
75.50
500.00
700.00
1,500.00
1,600.00
500.00
2.00
100.00
235.00
650.00
500.00
4,666.00
200.00
TOTAL BID
442.26
504.00
500.00
1,395.00
14,452.50
22,197.00
500.00
700.00
1,500.00
1,600.00
500.00
304.00
100.00
235.00
2,600.00
2,000.00
4,666.00
200.00
VENDOR 1
O'Keefe Eng., Inc.
UNIT $
2.20
9.85
155.00
50.00
40.00
50.00
500.00
750.00
1,800.00
825.00
175.00
11.00
200.00
150.00
375.00
350.00
5,500.00
2,500.00
TOTAL BID
2,316.60
1,418.40
1,550.00
1,500.00
9,400.00
14,700.00
500.00
750.00
1,800.00
825.00
175.00
1,672.00
200.00
150.00
1,500.00
1,400.00
5,500.00
2,500.00
VENDOR 2
-----------------------
R & H Paving, Inc.
UNIT $
0.80
8.40
210.00
113.00
57.00
80.80
630.00
735.00
2,470.503
1,260.00
105.00
7.00
265.00
475.00
450.00
1,950.00
6,300.00
2,800.00
TOTAL BID
842.40
1,209.60
2,100.00
3,390.00
13,395.00
23,755.20
630.00
735.00
2,470.50
1,260.00
105.00
1,064.00
265.00
475.00
1,800.00
7,800.00
6,300.00
2,800.00
VENDOR 3
----------------- - - - - --
Berry General Eng.
UNIT $
0.80
8.50
215.00
115.00
57.30
81.00
640.00
745.00
2,495.00
1,275.00
105.00
13.00
1,950.00
225.00
450.00
1,960.00
4,902.00
10,625.00
TOTAL BID
842.40
1,224.00
2,150.00
3,450.00
13,465.50
23,814.00
640.00
745.00
2,495.00
1,275.00
105.00
1,976.00
1,950.00
225.00
1,800.00
7,840.00
4,902.00
10,625.00
VENDOR 4
----------------- - - - - --
Granite Constr. Co.
UNIT $
2.00
9.00
150.00
35.00
40.00
50.00
600.00
700.00
2,500.00
2,000.00
200.00
20.00
500.00
100.00
400.00
200.00
6,000.00
16,560.00
F
TOTAL BID
2,106.00
1,296.00
1,500.00
1,050.00
9,400.00
14,700.00
600.00
700.00
2,500.00
2,000.00
200.00
3,040.00
500.00
100.00
1,600.00
800.00
6,000.00
16,560.00
n
o x
CITY OF MOORPARK
Bid Results
Charles Street I
1992
Bidder
NAME:
ADDRESS:
CITY, STATE:
PHONE NUMBER:
CONTACT PERSON
Engineer's Estimate
UNIT $
2.70
3,000.00
22.00
200.00
250.00
1,550.00
500.00
1,000.00
3,750.00
4,250.00
N/A
3.50
5.00
N/A
200.00
2,000.00
800.00
1,000.00
TOTAL BID
364.50
3,000.00
7,700.00
1,600.00
2,000.00
1,550.00
500.00
1,000.00
3,750.00
4,250.00
0.00
595.00
10.00
0.00
600.00
2,000.00
800.00
2,000.00
VENDOR 1
----------------- - - - - --
O'Keefe Eng., Inc.
UNIT $
7.50
4,500.00
12.00
200.00
275.00
2,875.00
500.00
1,000.00
3,460.00
4,300.00
N/A
9.90
22.00
N/A
120.00
3,600.00
1,300.00
1,300.00
TOTAL BID
1,012.50
4,500.00
4,200.00
1,600.00
2,200.00
2,875.00
500.00
1,000.00
3,460.00
4,300.00
0.00
1,683.00
44.00
0.00
360.00
3,600.00
1,300.00
2,600.00
VENDOR 2
-----------------------
R & H Paving, Inc.
UNIT
10.50
8,000.00
30.00
430.00
210.00
525.00
500.00
400.00
3,045.00
3,990.00
N/A
3.15
10.00
N/A
170.00
3,700.00
1,600.00
1,600.00
TOTAL BID
1,417.50
8,000.00
10,500.00
3,440.00
1,680.00
525.00
500.00
400.00
3,045.00
3,990.00
0.00
535.50
20.00
0.00
510.00
3,700.00
1,600.00
3,200.00
VENDOR 3
----------------- - - - - --
Berry General Eng.
UNIT $
20.00
3,910.00
29.75
306.00
215.00
531.00
500.00
1,200.00
3,077.00
4,032.00
N/A
3.20
20.00
N/A
205.00
4,899.00
1,265.00
1,265.00
TOTAL BID
2,700.00
3,910.00
10,412.50
2,448.00
1,720.00
531.00
500.00
1,200.00
3,077.00
4,032.00
0.00
544.00
40.00
0.00
615.00
4,899.00
1,265.00
2,530.00
VENDOR 4
----------------- - - - - --
Granite Constr. Co.
UNIT $
10.00
4,000.00
25.00
500.00
200.00
500.00
500.00
100.00
6,000.00
6,200.00
N/A
9.00
20.00
N/A
100.00
500.00
500.00
500.00
TOTAL BID
1,350.00
4,000.00
8,750.00
4,000.00
1,600.00
500.00
500.00
100.00
6,000.00
6,200.00
0.00
1,530.00
40.00
0.00
300.00
500.00
500.00
1,000.00
6
-0
0 1
t
i
15- Sep -92
----------------------------------------
ITEM
DESCRIPTION
Est Qty
Unit
37
Relocate fence
135
if
38
Traffic Control
1
L S
39
Root Barriers
350
if
40
Tree wells
8
ea
41
Tree Planting
8
EA
42
Tree Trim / Remove
1
L S
43a
Caltrans Permit
1
L S
43b
Caltrans Permit
1
L S
44
10' CB
1
ea
45
14' CB
1
ea
46
Concrete & A/C Test
1
L S
47
STOP & Bar
170
sf
48
Blue Reflectors
2
ea
49
Relocate Gas Main
1
L S
50
Tree Mound
3
ea
51
79" tree grate
1
ea
52
24" tree grate
1
ea
53
30" tree grate
2
1 ea
Engineer's Estimate
UNIT $
2.70
3,000.00
22.00
200.00
250.00
1,550.00
500.00
1,000.00
3,750.00
4,250.00
N/A
3.50
5.00
N/A
200.00
2,000.00
800.00
1,000.00
TOTAL BID
364.50
3,000.00
7,700.00
1,600.00
2,000.00
1,550.00
500.00
1,000.00
3,750.00
4,250.00
0.00
595.00
10.00
0.00
600.00
2,000.00
800.00
2,000.00
VENDOR 1
----------------- - - - - --
O'Keefe Eng., Inc.
UNIT $
7.50
4,500.00
12.00
200.00
275.00
2,875.00
500.00
1,000.00
3,460.00
4,300.00
N/A
9.90
22.00
N/A
120.00
3,600.00
1,300.00
1,300.00
TOTAL BID
1,012.50
4,500.00
4,200.00
1,600.00
2,200.00
2,875.00
500.00
1,000.00
3,460.00
4,300.00
0.00
1,683.00
44.00
0.00
360.00
3,600.00
1,300.00
2,600.00
VENDOR 2
-----------------------
R & H Paving, Inc.
UNIT
10.50
8,000.00
30.00
430.00
210.00
525.00
500.00
400.00
3,045.00
3,990.00
N/A
3.15
10.00
N/A
170.00
3,700.00
1,600.00
1,600.00
TOTAL BID
1,417.50
8,000.00
10,500.00
3,440.00
1,680.00
525.00
500.00
400.00
3,045.00
3,990.00
0.00
535.50
20.00
0.00
510.00
3,700.00
1,600.00
3,200.00
VENDOR 3
----------------- - - - - --
Berry General Eng.
UNIT $
20.00
3,910.00
29.75
306.00
215.00
531.00
500.00
1,200.00
3,077.00
4,032.00
N/A
3.20
20.00
N/A
205.00
4,899.00
1,265.00
1,265.00
TOTAL BID
2,700.00
3,910.00
10,412.50
2,448.00
1,720.00
531.00
500.00
1,200.00
3,077.00
4,032.00
0.00
544.00
40.00
0.00
615.00
4,899.00
1,265.00
2,530.00
VENDOR 4
----------------- - - - - --
Granite Constr. Co.
UNIT $
10.00
4,000.00
25.00
500.00
200.00
500.00
500.00
100.00
6,000.00
6,200.00
N/A
9.00
20.00
N/A
100.00
500.00
500.00
500.00
TOTAL BID
1,350.00
4,000.00
8,750.00
4,000.00
1,600.00
500.00
500.00
100.00
6,000.00
6,200.00
0.00
1,530.00
40.00
0.00
300.00
500.00
500.00
1,000.00
6
-0
0 1
t
i
CITY OF MOORPARK Bidder
Bid Results --- ----- -- - - --
NAME:
Sidewalk Repairs ADDRESS:
1992 CITY, STATE:
PHONE NUMBER:
CONTACT PERSON
24- Jul -92
ITEM
54
55
56
57
58
59
60
61
62
63
---------------------
DESCRIPTION
---------------------
48" tree grate
6" tree grate
84" tree grate
4" tree grate
36" tree grate
8" Temp A/C berm
Relocate Water Main
Move Water /Gas Ser
8' xgutter /spandral
Release
Est Qty
1
1
1
1
1
100
1
1
476
1
Unit
ea
ea
ea
ea
ea
if
LS
LS
sf
LS
Engineer's Estimate
UNIT $
1,500.00
500.00
2,000.00
500.00
1,100.00
6.50
N/A
N/A
4.50
1.00
TOTAL BID
1,500.00
500.00
2,000.00
500.00
1,100.00
650.00
0.00
0.00
2,142.00
1.00
VENDOR 1
----------------- - - - - --
O'Keefe Eng., Inc.
UNIT
1,300.00
1,300.00
3,600.00
1,300.00
1,300.00
11.00
N/A
N/A
3.00
1.00
TOTAL BID
1,300.00
1,300.00
3,600.00
1,300.00
1,300.00
1,100.00
0.00
0.00
1,428.00
1.00
VENDOR 2
-----------------------
R & H Paving, Inc.
UNIT $
1,600.00
1,600.00
3,700.00
1,600.00
1,600.00
7.35
N/A
N/A
5.20
1.00
TOTAL BID
1,600.00
1,600.00
3,700.00
1,600.00
1,600.00
735.00
0.00
0.00
2,475.20
1.00
VENDOR 3
----------------- - - - - --
Berry General Eng.
UNIT $
1,265.00
1,200.00
5,057.00
1,200.00
1,265.00
5.65
N/A
N/A
7.30
1.00
TOTAL BID
1,265.00
1,200.00
5,057.00
1,200.00
1,265.00
565.00
0.00
0.00
3,474.80
1.00
VENDOR 4
----------------- - - - - --
Granite Constr. Co.
UNIT $
500.00
500.00
500.00
500.00
500.00
6.00
N/A
N/A
10.00
1.00
TOTAL BID
500.00
500.00
500.00
500.00
500.00
600.00
0.00
0.00
4,760.00
1.00
II Total IIXXXXXXXXXXI 285,990.26 1 IXXXXXXXXXXI 256,377.05 1IX)OOQO j 256,912.40 1I MXXM=l 286,432.70 1 IXXXXXXM I 292,246.00 11
;0- �-o
On
CITY OF MOORPARK
Bid Results
Charles Street I
1992
Bidder
NAME:
ADDRESS:
CITY, STATE:
PHONE NUMBER:
CONTACT PERSON
15- Sep -92
----------------------------------------
ITEM DESCRIPTION Est Qty Unit
1 A / C 833 T
2 6" PMB 643 cy
3 6" Curb & Gutter 843 if
4 8" Curb & Gutter 955 if
5 Sidewalk 4,459 sf
6 Xgutter & Spandral 861 sf
7 H/C Ramp 2,098 sf
8 6" driveway apron 5,352 sf
9 Adj Meter Box 17 ea
10 Relocate Meter Box 13 ea
11 Adjust Manhole 3 ea
12 Adjust Valve Cover 6 ea
13 Recnst 14' CB 2 ea
14 Recnst 7' CB i ea
15 Earthwork 1 L S
16 Remove A/C & Base 1,285 cy
17 Remove Exist Curb 1,700 if
18 Remove Exist PCC 108 1 cy
VENDOR 5
A -C Construction
4875 Spring Road
Moorpark, CA 93021
(805) 529 -3220
J. Douglas Cowle
----------------- - - - - --
UNIT $ TOTAL BID
---- - - - - -- ------ - - - - --
40.02 33,336.66
44.82 28,819.26
8.90 7,502.70
9.21 8,795.55
1.80 8,026.20
3.81 3,280.41
2.93 6,147.14
2.83 15,146.16
50.00 850.00
600.00 7,800.00
200.00 600.00
50.00 300.00
3,800.00 7,600.00
2,900.00 2,900.00
14,687.02 14,687.02
22.66 29,118.10
4.01 6,817.00
22.66 2,447.28
VENDOR 6
Union Engineering
3658 N. Ventura Ave
Ventura, CA 93001
(805) 648 -3373
Rebecca Elkins
----------------- - - - - --
UNIT $ TOTAL BID
---- - - - - -- ------ - - - - --
47.70 39,734.10
26.20 16,846.60
8.10 6,828.30
8.70 8,308.50
1.90 8,472.10
6.60 5,682.60
3.10 6,503.80
2.80 14,985.60
130.10 2,211.70
130.10 1,691.30
195.00 585.00
195.20 1,171.20
538.50 1,077.00
1,026.00 1,026.00
33,530.00 33,530.00
21.80 28,013.00
3.80 6,460.00
60.50 6,534.00
VENDOR 9
SP Milling
3555 Vineyard Ave
Oxnard, CA 93030 -1082
(805) 485 -7923
Ronald Pierson
----------------- - - - - --
UNIT $ TOTAL BID
---- - - - - -- ------ - - - - --
33.00 27,489.00
34.00 21,862.00
10.00 8,430.00
10.90 10,409.50
2.20 9,809.80
8.50 7,318.50
4.00 8,392.00
3.20 17,126.40
80.00 1,360.00
180.00 2,340.00
510.00 1,530.00
310.00 1,860.00
3,385.00 6,770.00
2,155.00 2,155.00
26,000.00 26,000.00
16.00 20,560.00
4.50 7,650.00
60.00 6,480.00
VENDOR
Burns- Pacific Const
888 Thousnad Oaks Blvd.
Thousand Oaks, CA 91360
(805) 371 -4171
Paul Burns
----------------- - - - - --
UNIT $ TOTAL BID
---- - - - - -- ------ - - - - --
39.00 32,487.00
29.00 18,647.00
7.00 5,901.00
7.00 6,685.00
1.60 7,134.40
5.50 4,735.50
2.60 5,454.80
2.35 12,577.20
80.00 1,360.00
200.00 2,600.00
500.00 1,500.00
275.00 1,650.00
3,600.00 7,200.00
2,400.00 2,400.00
48,000.00 48,000.00
11.00 14,135.00
2.92 4,964.00
60.00 6,480.00
VENDORS
----------------- - - - - --
Brandt Construction
P. 0. Box 1138
Moorpark, CA 93021
523 -7818
Michael Fricke
--------------- - - --
UNIT $ 1 TOTAL BID
43.30 36,068.90
30.15 19,386.45
12.75 10,748.25
12.75 12,176.25
2.50 11,147.50
5.30 4,563.30
3.80 7,972.40
3.80 20,337.60
50.00 850.00
150.00 1,950.00
275.00 825.00
200.00 1,200.00
2,000.00 4,000.00
1,400.00 1,400.00
34,850.00 34,850.00
22.00 28,270.00
5.70 9,690.00
55.50 5,994.00
tn m
o �
oc� r-
CITY OF MOORPARK
Bid Results
Sidewalk Repairs
1992
Bidder
NAME:
ADDRESS:
CITY, STATE:
PHONE NUMBER:
CONTACT PERSON
24- Jul -92
-------------------- - - - - --
ITEM DESCRIPTION
-------------------------
19 Traffic Striping
20 Thermoplastic
21 Salvage /Reel Signs
22 18" RCP
23
24
25
26
27
28
29
30
31
32
33
34
35
- - -36-
24" RCP
30" RCP
Lcl Dprssion (10')
Lcl Dprssion (14')
Manhole
Junction Structure
8 "x24" plug
Grind Pavement
Trim bushes
4" PVC drain /grate
Clean -out Assy
Saddle connection
Const. survey
- Clearing &- grubbing
Est Qty Unit
---------------
1,053 if
144 sf
10 ea
30 if
235
294
1
1
1
1
1
152
1
1
4
4
1
if
if
ea
ea
ea
ea
ea
sy
LS
ea
ea
ea
LS
- -L S
VENDOR 5
-----------------------
A-C Construction
UNIT $
2.25
10.00
200.00
48.00
52.00
79.00
393.46
432.60
2,800.00
1,000.00
500.00
12.56
3,000.00
600.00
200.00
300.00
5,234.46
- 2,111_50-
TOTAL BID
2,369.25
1,440.00
2,000.00
1,440.00
12,220.00
23,226.00
393.46
432.60
2,800.00
1,000.00
500.00
1,909.12
3,000.00
600.00
800.00
1,200.00
5,234.46
- - -- 2,111_50
VENDOR 6
----------------- - - - - --
Union Engineering
--------------- - - --
UNIT $ I TOTAL BID
1.00 1,053.00
10.40 1,497.60
260.20 2,602.00
63.40 1,902.00
64.20 15,087.00
72.90 21,432.60
565.00 565.00
630.00 630.00
1,631.00 1,631.00
2,035.00 2,035.00
520.00 520.00
17.30 2,629.60
325.00 325.00
116.00 116.00
231.00 924.00
130.00 520.00
6,010.00 6,010.00
- -- 5-204_00----- 5,204_00-
VENDORS
-----------------------
SP Milling
UNIT
0.80
8.25
205.00
110.00
56.00
77.00
615.00
720.00
2,410.00
1,230.00
105.00
12.00
255.00
90.00
435.00
1,900.00
4,800.00
--- 3,800_00-
TOTAL BID
842.40
1,188.00
2,050.00
3,300.00
13,160.00
22,638.00
615.00
720.00
2,410.00
1,230.00
105.00
1,824.00
255.00
90.00
1,740.00
7,600.00
I 4,800.00
- - -- 3,800_00
VENDOR'?
----------------- - - - - --
Burns- Pacific Const
UNIT $
2.20
10.00
165.00
112.00
58.00
83.00
770.00
880.00
2,600.00
1,300.00
110.00
22.50
275.00
33.00
450.00
2,000.00
5,100.00
-- 20,600_00-
TOTAL BID
2,316.60
1,440.00
1,650.00
3,360.00
13,630.00
24,402.00
770.00
880.00
2,600.00
1,300.00
110.00
3,420.00
275.00
33.00
1,800.00
8,000.00
5,100.00
_-- 20,600_00-
-- - - - - -- VENDOR g'
----------------- - - - - --
Brandt Construction
UNIT $
3.50
9.00
110.00
60.00
75.00
100.00
2,200.00
2,600.00
2,800.00
1,000.00
350.00
17.25
400.00
1,500.00
1,000.00
750.00
2,300.00
- 1,900_00-
TOTAL BID
3,685.50
1,296.00
1,100.00
1,800.00
17,625.00
29,400.00
2,200.00
2,600.00
2,800.00
1,000.00
350.00
2,622.00
400.00
1,500.00
4,000.00
3,000.00
2,300.00
1,900.00
6'1
0
1�
on
CITY OF MOORPARK
Bid Results
Charles Street I
1992
Bidder
NAME:
ADDRESS:
CITY, STATE:
PHONE NUMBER:
CONTACT PERSON
VENDOR 5
A -C Construction
----------------- - - - - --
UNIT $ TOTAL BID
5.00 675.00
2,266.00 2,266.00
3.00 1,050.00
600.00 4,800.00
600.00 4,800.00
1,500.00 1,500.00
500.00 500.00
1,500.00 1,500.00
3,200.00 3,200.00
3,600.00 3,600.00
N/A 0.00
10.50 1,785.00
25.00 50.00
N/A 0.00
50.00
15- Sep -92
3,000.00
3,000.00
----------------------------------------
ITEM
DESCRIPTION
Est Qty
Unit
----------------------------------------
37
Relocate fence
135
if
38
Traffic Control
1
L S
39
Root Barriers
350
if
40
Tree wells
8
ea
41
Tree Planting
8
EA
42
Tree Trim / Remove
1
L S
43a
Caltrans Permit
1
L S
43b
Caltrans Permit
1
L S
44
10' CB
1
ea
45
14' CB
1
ea
46
Concrete & A/C Test
1
L S
47
STOP & Bar
170
sf
48
Blue Reflectors
2
ea
49
Relocate Gas Main
1
L S
50
Tree Mound
3
ea
51
79" tree grate
1
ea
52
24" tree grate
1
ea
53
30" tree grate
2
1 ea
VENDOR 5
A -C Construction
----------------- - - - - --
UNIT $ TOTAL BID
5.00 675.00
2,266.00 2,266.00
3.00 1,050.00
600.00 4,800.00
600.00 4,800.00
1,500.00 1,500.00
500.00 500.00
1,500.00 1,500.00
3,200.00 3,200.00
3,600.00 3,600.00
N/A 0.00
10.50 1,785.00
25.00 50.00
N/A 0.00
50.00
150.00
3,000.00
3,000.00
3,000.00
3,000.00
3,000.00
6,000.00
VENDOR 6
----------------- - - - - --
Union Engineering
UNIT $
32.50
7,806.00
36.40
97.60
260.30
651.00
500.00
6,505.00
2,459.00
2,602.00
N/A
3.90
13.00
N/A
260.30
2,155.00
1,439.00
1,337.50
TOTAL BID
4,387.50
7,806.00
12,740.00
780.80
2,082.40
651.00
500.00
6,505.00
2,459.00
2,602.00
0.00
663.00
26.00
0.00
780.90
2,155.00
1,439.00
2,675.00
-- - - - - -- VENDOR Of - - --
-----------------------
SP Milling
UNIT $
7.00
4,000.00
29.00
170.00
205.00
500.00
500.00
500.00
2,975.00
3,900.00
N/A
310.00
10.25
N/A
170.00
8,800.00
1,900.00
1,900.00
TOTAL BID
945.00
4,000.00
10,150.00
1,360.00
1,640.00
500.00
500.00
500.00
2,975.00
3,900.00
0.00
52,700.00
20.50
0.00
510.00
8,800.00
1,900.00
3,800.00
VENDOR'Y
----------------- - - - - --
Burns- Pacific Const
UNIT $
7.40
18,000.00
31.00
100.00
230.00
550.00
500.00
750.00
3,200.00
4,200.00
N/A
10.00
22.00
N/A
75.00
5,000.00
1,375.00
1,400.00
TOTAL BID
999.00
18,000.00
10,850.00
800.00
1,840.00
550.00
500.00
750.00
3,200.00
4,200.00
0.00
1,700.00
44.00
0.00
225.00
5,000.00
1,375.00
2,800.00
VENDOR 15
----------------- - - - - --
Brandt Construction
UNIT $
24.44
15,000.00
23.25
100.00
300.00
3,000.00
500.00
500.00
2,800.00
3,200.00
N/A
3.38
12.50
N/A
250.00
1,000.00
1,000.00
1,000.00
TOTAL BID
3,300.00
15,000.00
8,137.50
800.00
2,400.00
3,000.00
500.00
500.00
2,800.00
3,200.00
0.00
574.60
25.00
0.00
750.00
1,000.00
1,000.00
2,000.00
� m
� 1i
CITY OF MOORPARK
Bid Results
Sidewalk Repairs
1992
ITEM
54
55
56
57
58
59
60
61
62
63
24- Jul -92
---------------------
DESCRIPTION
--------------------
-
48" tree grate
6" tree grate
84" tree grate
4" tree grate
36" tree grate
8" Temp A/C berm
Relocate Water Main
Move Water /Gas Ser
8' xgutter /spandral
Release
Bidder
NAME:
ADDRESS:
CITY, STATE:
PHONE NUMBER:
CONTACT PERSON
Est Qty Unit
-------- - - - - --
1 ea
1 ea
1 ea
1 ea
1 ea
100 if
1 LS
1 LS
476 sf
1 LS
VENDOR 5
A -C Construction
UNIT $
3,000.00
3,000.00
3,000.00
1,000.00
3,000.00
8.65
N/A
N/A
3.81
1.00
TOTAL BID
3,000.00
3,000.00
3,000.00
1,000.00
3,000.00
865.00
0.00
0.00
1,813.56
1.00
VENDOR 6
Union Engineering
UNIT $
1,439.00
1,439.00
2,155.00
1,439.00
1,439.00
0.80
N/A
N/A
6.60
1.00
------- - - - - -I
TOTAL BID
1,439.00
1,439.00
2,155.00
1,439.00
1,439.00
80.00
0.00
0.00
3,141.60
1.00
-------------------------
VENDORI
-----------------------
SP Milling
UNIT $
1,900.00
1,900.00
8,800.00
1,900.00
1,900.00
12.80
N/A
N/A
6.00
1.00
TOTAL BID
-----------
1,900.00
1,900.00
8,800.00
1,900.00
1,900.00
1,280.00
0.00
0.00
2,856.00
1.00
VENDOR .X
----------------- - - - - --
Burns- Pacific Const
UNIT $
1,750.00
1,250.00
5,000.00
1,250.00
1,400.00
9.00
N/A
N/A
5.50
1.00
TOTAL BID
1,750.00
1,250.00
5,000.00
1,250.00
1,400.00
900.00
0.00
0.00
2,618.00
1.00
-- - - - - -- VENDOR � - - --
-----------------------
Brandt Construction
UNIT $
1,000.00
1,000.00
1,000.00
1,000.00
1,000.00
18.00
N/A
N/A
7.50
1.00
TOTAL BID
1,000.00
1,000.00
1,000.00
1,000.00
1,000.00
1,800.00
0.00
0.00
3,570.00
1.00
II Total IIXXXXXXXXXX 1300,405.43 IIXXXXXXXXXXI 313,730.80 11XXXxxXXXXX1 370,647.10 IIXXXXXXXXXXI 342,599.50 RM'X= 1 346,366.25 II
°() rfl
d �
Exhibit 2 (1 of 2)
Charles Street Improvements -- Phase I 02- Oct -92
Cost History and Projection
------------------------------------ - - - - -- Funding Source
------------------------------------
Description Design Construction Inspection TOTAL Gas Tax - -- Gann - -- - CDBG - --
Prior Years' Expenses
----------------------------
Survey (Willdan) 9,850 9,850 9,850
FY 1991/92
Design (CAA: 91-024) 40,222
CAA: 91 -024 - printing 491
40,713
Tree Inspection (CAA: 91 -044) 180
Tree Inspection (CAA: 91 -046) 2,000
Tank Removal (PW Env.)
FY 1991/92 Sub -Total
FY 1992/93
Bidding Phase (92 -026)
Printing
VCFCD Permit
Construction
Contract Administration
Inspection
Contingency
FY 1991/92 Sub-Total
PROJECT TOTAL
4,260
---- - - - - -- ------ - - - - -- ---- - - - - --
83,606 4,260 0
2,100
600
285,990
1,000
13,000
22,000
---- - - - - -- ------------ ----------
2,700 285,990 36,000
---- - - - - -- ------ - - - - -- - - --
96,156 290,250 36,000
40,713
180
2,000
4,260
47,153
2,100
600
1,000
285,990
13,000
22,000
35,780
360,470
417,473
1,163
180
2,000
4,260
39,550
7,603 0 39,550
2,100
600
1,000
285,990
13,000
22,000
35,780
- - - - - -- ---- - - - - -- --- - - - - --
0 0 360,470
- - - - - -- ---- - - - - -- --- - - - - --
17,453 0 400,020
Exhibit 2
Page 2
The following spread sheet describes the sources of
Conunity Developient Block Grant funds available for
Charles Street improvements.
All of the funds re- approriated by the Council in FY 1991/92
are eligble for expenses on this project.
From the
Amount
Current
Past Prograz
Available for
Grant Year Prograt ID
Appropriation for...
Charles St. Const.
1987 B3.1b
Virginia Colony Streets
1795
1988 CM
Boys and Girls Club
100000
Boys and Girls Club
5266
1989 D3.7
Boys and Girls Club
44734
1990 E3.2
Charles Street Design *
17808
(includes balance of Ralip Proj., $3,568)
1991 F3.2
No Change
81773
1992 G3.2
No Change
109094
------------------------------------------------------------------------------------------------
Total Asount Available
360470
* The Charles Street Designs used $39,550 of the original 1990 appropriation.
The balance available is shown here including the surplus handicap ralip funds.
RECEIVED
51f 2 2 M2
1497 LOS ANGELES AVE- • P. O. BOX 4456 • SATICOY, CA 93003 • (805) 647 -3286
September 21, 1992
Ken Gilbert
City of Moorpark
799 Moorpark Avenue
Moorpark, CA 93021
RE: Charles Street Repairs
Dear Mr. Gilbert:
We are requesting at this time to withdraw our bid for the above referenced
project due to a clerical error.
If you have any questions please feel free to call me.
Very truly yours
2ZU
Charles R Rasey
Secretary /Treasurer
CRRsr