HomeMy WebLinkAboutAGENDA REPORT 1992 1007 CC REG ITEM 11F799 Moorpark Avenue Moorpark, California 93021
MEMORANDUM
TO: The Honorable City Council
FROM: Ken Gilbert, Director of Public Works
DATE: September 29, 1992 (Meeting of 10 -7 -92)
ITEM It# F
(805) 529 -6864
SUBJECT: 1) Authorization to Advertise for Receipt of
Bids for the Construction of a Community
Building at Arroyo Vista Community Park:
2) Consider Revision to Architect's Fee for
the Design of Said Project
BACKGROUND
-ORPARK. CA 1
City counc "I mse".n;3
of
ACTION: in. • C`
BY
The City has retained the services of Wolf, Lang, Christopher,
Architects, Inc., to prepare the design and contract documents for
the construction of a 15,000 square foot Community Building and
Gymnasium at Arroyo Vista Community Park. On August 19, 1992 the
City Council approved the Design Development Phase of the design
contract.
DISCUSSION
A. Design Complete
A summary of the project design, prepared by the architect, is
attached as Exhibit 1. The Architect has completed the
Construction Documents Phase of the design contract. A copy of
the plans and specifications have been made available to the
City Council for review.
B. Building Plan Checking
The plans and specification have been submitted to the Building
and Safety Department for plan checking. It is requested that
the City Council authorize advertisement for receipt of bids at
this time in order to expedite this project. It is not
anticipated that any substantive changes will result the plan
checking effort; but if any should occur they will be brought
back to the City Council for approval and added to the bid
documents (by addendum if necessary) before the bid opening.
PAUL W. LAWRASON JR. JOHN E. WOZNIAK SCOTT MONTGOMERY BERNARDO M. PEREZ ROY E. TALLEY JR.
Mayor Mayor Pro Tem Councilmember Councilmember Councilmember
Printed On Recycled Paoer
Arroyo Vista Community Park Building
October 1992
Page 2
C. Schedule
It is anticipated th
completed within one (
will then be placed on
been set for November
for November 18, 1992.
with completion prior
D. Architect's Fee
Lat the plan checking effort will be
)r two weeks. Plans and specifications
sale. A tentative bid opening date has
10, with consideration of bids scheduled
Construction should start in December
to July 1993.
In October of 1991, the City Council retained the architect to
prepare a design for the subject project. In January of 1992,
the size of the building was increased from 100,000 s.f. to
150,000 s.f. The architects fee was increase from $75,000 to
$100,000 (an increase of $25,000) to cover this increased
effort. Last June the City Council approved another increase,
not to exceed $4,300 (actual cost increase for this item was
$1,635), for the design of the westerly two parking lots.
Staff has been advised by the architect that the $25,000 fee
increase first quoted for the additional design effort required
for the increase in the size of the building, was only a
preliminary estimate. The actual fee increase being requested
is $37,361.25. This amount is $12,361.25 more than the amount
approved last January. Including the reduction in the actual
fee amount for the parking lot design, the net fee increase to
the contract is $9,696.25.
The fee increase being requested is approximately 50% of the
original $75,000 fee. This corresponds to the 50% increase in
the size of the building authorized by the City Council. Staff
recommends approval of the requested fee adjustment. A re -cap of
the fee adjustment is as follows:
Item
Original Fee
Increase in Size of
Building
Parking Lots
Total
E. Fiscal Impact
Current Fee Revised Fee Change
75,000.00
25,000.00
75,000.00
37,361.25
W
12,361.25
4,300.00 1,635.00 (2,665.00)
104,300.00 113,996.25 9,696.25
--- 1. Total Project: A cost estimate for the entire park
improvement project is attached as Exhibit 3.
Arroyo Vista Community Park Building
October 1992
Page 3
2. Community Building: The Architect's estimate for the
construction of the Community Building is as follows:
Building $1,620,000.00
Less Possible Deduct
Alternates 250,000.00
Net 1,370,000.00
Inspection and Other
Related Costs 120.000.00
TOTAL $1,490,000.00
CONTINGENCY 10% 149.000.00
TOTAL $1,639,000.00
3. Project Funding: The funding source for this project is
the Community Zone of Fund 05, including $1,000,000 from
Urban West Communities.
F. Committee Review
This matter will be discussed by the Public Works / Facilities
Committee at their regular meeting scheduled for October 5,
1992. Input from the Committee, if any, will be provided prior
to Council action on this matter.
Subject to concurrence by the Public Works/ Facilities Committee,
staff recommends that City Council take the following actions:
1. Approve the plans and specifications for the subject project,
provided any substantive revisions to come from building plan
checking are approved by the City Council.
2. improve the Construction Documents Phase of the architects
contract.
3. Approve an increase to the Architect's fee as defined above.
4. Authorize staff to advertise for receipt of bids for the subject
project.
wp\rpt\avp bad
VISTA
0 MIN:Tu CE''TE
THE NEW COMMUNITY CENTER 15 A MULTI- PHASED FACILITY UJI41CH WILL PROVIDE THE
CITY OF MOORPARK A RECREATIONAL CENTER LOCATED IN ITS NEW COMMUNITY PARK
WHEN ALL PHASES ARE COMPLETED THE CENTER WILL CONTAIN A FULL GYMNASIUM,
TWO 5WIMMING POOLS WITH THEIR RELATED LOCKER FACILITIES, MULTI- PURP05E /ACTIVITY
ROOMS, A FULL PREPARATION KITCHEN, ADMINISTRATIVE OFFICES, TOILET AND STORAGE ROOMS.
THE FIRST PHASE OF THE PROJECT WHICH THE BOARD NOW HAS FOR APPROVAL CONTAINS
THE FOLLOWING ELEMENTS:
GYMNASIUM (PORTION 1)
MULTI - PURPOSE
ACTIVITYr ROOM
KITCHEN
OFF i CE /50TORAGE/T01:.E-
C RCU_, ATION (APPROX.)
TOTAL
8000 SF
2400 SF
1800 5F
960 SIF
2000 SF
.040 5F
:'0,200 SF
• -HE BUILDING 15 TO BE CONSTRUCTED OF CONCRETE BLOCK MASONRY, STEEL STRUCTURE
AND A STANDING SEAM METAL ROOF TO PROVIDE THE CITY AND C;T:ZENS WITH A LONG -
' ASTING, r- +IGl-;LY DURABLE FACILITY. T�4=_ PROJECT WAS BUDGETED AT s100 /6F AND $"ALL
THEREFORE HAVE A CON5TRUC ; ON C05-1 OF APPROXIMATELY $1.62 MILLION.
IN DESIGN, COLOR AND STYLE, THE NEW COMM LAITY CENTER IS INTENDED TO PROVIDE
THE COMMUNITY WITH AN ELEGANT BUILDINC IN AN UPDATED 'ROMAN` STY! E. THE HISTORICAL
BASIS FOR ALL MODERN RECREATIONAL FACILITIES INCL UDING GYMNASIUMS, S "LUIMm NG- POOLS
AND MULTI -USE ROOMS CAN BE FOUND ►N Ti4E ARC 41TECTURE OF CLASSIC ROME.
THE BUILDING SHOULD START CONSTRUCTION IN NOVEMBER AND WAS A SEVEN MONTH
CONSTRUCTION 5CHEDLI:LE OPENING- FOR OPEiRATiONS ON JULY 3, 1992 CTHE 20TH ANN' IVERSAR'.'
OF THE CITY OF MOORPARK).
wpt 28, 1992 - 08.. M 30 PP'EXT
r}
lLarry Woltf, A.I.A.
Dale Lang, A.I.A.
1 1 Gaylaird Chcistopber, A.I.A. E 1l F t\ 17 t Z
George N. Wiens, A.LA.
I'll James P. DiCamUlo, A.I.A.
I' Robert N. Simons, A.I.A.
June 23, 1992
CALLXHATION OF FEE FOR INCREASED SCOPE OF WORK
(Additional Services)
Moorpark Community Center
Project No. 8921400.00
1. Building Square Footage
(Original)
10,000 SF
(Revised)
16,642 SF
Difference
6,642 SF
2. Estimated Construction Costs ($100.00 /SF):
(Original)
$1,000,000.00
(Revised)
1,664,200.00
Difference
$664,200.00
3. Fee Percentage:
75% of $1,000,000.00
75,000.00
(Original)
Fee on Increase:
75% of 7.5% or
37,361.25
5.625% of $664,200.00
4. Fee for Civil Engineering of Parking Lots:
(Amendment No. 1, No Mark Up)
1,635.00
5. Fee for Landscaping around Building:
(We will Absorb -No Charge)
0.00
TOTAL REVISED ARCHITECTURAL FEE:
$113,99625
DL /vlr
921400x8.1tr
Virginia Dare Tower
10470 Foothill Boulevard, Rancho Cucamonga. Cali:. rnia 91730 -3754
(714)987 090Q 1'r-x (714)980 -9980
MT T
Arroyo Vista Park Phase I
Project Cost Summary
Chart Description
- - - -- ----------------------------------
----- ----------------------------------
B MISCELLANEOUS COSTS
C INFRASTRUCTURE / SITE IMPROVEMENTS
D PARK IMPROVEMENTS
E BUILDING IMPROVENENTS
Total
exN�s�T 3
Plus
Cost Estimate Possible Add Cost Estimate
Minimum Alternates Maximum
-------- - - - - -- -------- - - - - -- -------- - - - - --
-------------- -------- - - - - -- -------- - - - - --
165,635 0 165,635
514,367 0 514,367
765,386 243,998 1,009,384
1,697,496 225,500 1,922,996
-------- - - - - -- -------- - - - - -- -------- - - - - --
3,142,884 469,498 3,612,382
29- Sep -92
T 3
zoK5
°-` Chart B: Miscellaneous Expenses 29- Sep -92
------------------------------------------------- - - - - --
Contract
Description
---------------------- - - - - --
Admin. Other
------ - - - - -- ---- - - - - --
TOTAL
----- - - - - --
Remarks
----------------------
----------------------------
PRIOR EXPENSES
------ - - - - -- ---- - - - - --
----- - - - - --
---------------- - - - - --
Contract Administration
10,000
10,000
Picon
0
0
Sub -Total
10,000
FUTURE EXPENSES
Contract Administration
30,000
30,000
Picon
Fees & Permits
Water Connection Fees
13,335
13,335
WW 11
Water Connection Fees
60,000
60,000
Calleguas
Water Meters
4,000
4,000
Blueprints
1,500
1,500
Street Lighting Energy Charges
19,200
19,200
less UWC credit
(6,000)
(6,000)
Permit /Plan Checking /Inspection
10,600
10,600
Building
Permit /Plan Checking /Inspection
8,000
8,000
Water Sewer
Sewer Connection Fees
15,000
15,000
Sub -Total 155,635
TOTAL 165,635
Chart C: Infrastructure and Site Improvements
--------------------------------------------------- - - - - --
Description
---------------------- - - - - --
Design
---- - - - - --
PRIOR EXPENSES
Preliminary Engineering
Aerial Topo
8,250
Hydrology Study
10,000
Hydrology Addendum
1,500
Design
Survey
600
Rough Grading Plan
25,386
Street, Storm drain, etc
46,168
Parking Lot
1,635
Construction
UWC Road
Deposit from UWC
Sub -total
FUTURE EXPENSES
Construction Cost Estimate
Anticipated Change Orders (Est.)
10% Contingency
Sub -Total
TOTAL
3 G% S
Accum
Construction Inspection TOTAL Total Remarks
409,193
20,000
5,830
(5,830)
10,000
8,250
10,000
1,500
600
25,386
46,168
1,635
5,830
(5,830)
93,539
419,193
20,000
41,919
----- - - - - --
420,828
514,367
514,367
29- Sep -92
Western Aerial Surveys
Hawks
Hawks
CAA (91 -37)
CAA (92 -04)
By Wolff /Lang
CAA (91 -39)
— Chart D: Park Improvements
Description
------------------ - - - - --
PRIOR EXPENSES
Landscape Architect
Fee
Reimburseables (est)
Added design
Less Fee Reduction
FUTURE EXPENSES
CONSTRUCT
Minimum Scope
10$ Contingency
Sub -Total
Possible Add Alternates
Slope
Maintenance Phase
Sub -Total
10% Contingency
Sub -Total
TOTAL
Design Construction Inspection Sub -Total
56,370
5,630
11,900
73,900
(21,450)
52,450
52,450
638,124 10,000 648,124
64,812
712,936
139,169 2,000 141,169
80,647 80,647
-- - - - - -- ----- - - - - --
219,816 221,816
22,182
243,998
956,934
TOTAL
E% 3
4-6s
29- Sep -92
Cost Estimate Range
--------------------- - - - - --
Low Eign
-- - - - - -- ------- - - - - --
52,450
712,936
52,450
956,934
765,386 1,009,384
•'° Chart E: Building Improvements
------------------------ - - - - --
Description Design Construction Inspection TOTAL
PRIOR EXPENSES
Architectural Design 113,996
Reimbursables 5,000
118,996 118,996
FUTURE EXPENSES
Construction
Per Design 1,620,000 20,000 1,640,000
10$ Contingency 164,000
1,804,000
Less All Possible Deduct Alternates (200,000) (5,000) (205,000)
Contingency Reduction (20,500)
(225,500)
1,578,500
BHO i 3
Sakt5
29- Sep -92
Cost Estimate Range
--------------------- - - - - --
Low Hign
118,996 118,996
1,804,000
1,578,500
1,697,496 1,922,996