SUBJECT: Consider Authorization to Advertise for Receipt of Bids
for the Reconstruction of First Street and the
Reconstruction of Bard Street from Second St. to the
Metrolink Parking Lot
DISCUSSION
A. Design
This project provides for the reconstruction of FIRST STREET
from Moorpark Avenue to Bard Street, and the reconstruction of
BARD STREET from Second Street northerly to the end of the
street at the Metrolink parking lot. The scope of street
reconstruction efforts include the following:
• removal and reconstruction of the roadway pavement and
base;
• reconstruction of curb and gutter to improve drainage;
• construction of new driveway aprons;
• construction of a four feet (41) wide sidewalk;
• planting of parkway trees; and,
• installation of sleeves under sidewalks and driveways to
facilitate future parkway landscaping.
Note: It should be pointed out that this project will not
resolve the "ponding" problem at the intersection of
First Street and Moorpark Avenue. That and other
drainage problems will be resolved when the Moorpark
Avenue storm drain project is constructed. With this
exception, the new curbs and gutters to be constructed
by the subject project will improve drainage on these
streets.
B. Relocation of Encroaching Private Improvements
lat ad
Attached as Exhibit 'A' is a copy of the cross section for the
proposed street improvements on First Street. This cross
section fully defines the width of the street, parkways and
sidewalks. As shown on this cross section, the plan calls for
the utilization of the full width of the street right -of -way
for the construction of the proposed improvements. The
implementation of this design will require the relocation of
most of the front property line fences on First Street which
11
First Street & Bard Street Reconstruction
November 1994
Page 2
now encroach into the street right -of -way by approximately
three feet (31). The cost of this element of the project is
approximately $40,000.
Prior to proceeding with this design the Transportation and
Streets Committee sought input from the affected property
owners.
C. Committee Review
The Transportation and Streets Committee (Mayor Pro tem Hunter
and Councilmember Wozniak) has reviewed and discussed the
design for this project on a number of occasions. Some of the
Committee meetings at which this was discussed were held in the
First Street neighborhood with residents of the area.
Subsequent to discussion with, and receipt of input from, area
residents, the Committee recommends that the project design
include the following elements:
• that the design for the parkways and sidewalks remain
unchanged and that the encroaching fence improvements be
relocated to the property line (street right -of -way line)
at no cost to the property owners;
• that irrigation sleeves be installed under the sidewalk at
each property to facilitate installation of irrigation
lines to the parkway from the dwelling;
• that irrigation sleeves be installed under all of the
driveways to allow for a future retro -fit project for a
unified irrigation system f-or the entire street, if deemed
neccessary by the City;
• that all relocated walls be constructed in a manner
compatible with existing side property walls;
• that, where required, side property line walls be
reconstructed to provide for a uniform spacing of
pilasters; and,
• that, if requested, the City would make payment to the
property owner of an amount equal to the cost of relocating
the existing fence (as determined by the bid results), to
allow the property owner_ to construct a new fence at their
own cost.
The above comments were included in, or have been added to, the
project design.
D. Plans and Specifications
lot—ad
A set of the plans and specifications for this project have
been placed in the City Council office for review and comment.
First Street & Bard Street Reconstruction
November 1994
Page 3
E. Fiscal Impact
1. Construction Cost Estimate: The estimated amount of
construction cost is $401,000. A detailed breakdown of
this cost estimate is attached as Exhibit 'B'.
2. Project Cost Estimate: A summary of the total project
costs is as follows:
Element _ Cost Est. ($)
Design 50,520
Construction 401,797
Construction Contingency (10 %) 40,483
Contract Admin & Insp. 48,200
Total 541,000
3. Budget: In order to fully fund this project, it will be
necessary to amend the appropriations and budget amount.
A preliminary estimate of that amendment is as follows:
It is recommended that the above described amendments be
deferred until the consideration of bids.
4. CDBG Funding: Staff anticipates approval of the CDBG
(Community Development Block Grant) funding by the U.S.
Department of Housing and Urban Development (HUD) within
one month.
F. Schedule
The anticipated schedule for the implementati
is as follows:
Advertise for bids . . . . . . . . December
Bid Opening . . . . . . . . . . . January
Award Contract . . . . . . . . . . January
Commence Construction . . . . . . February
Construction completed . . . . . . . . May
Sst_sd
on of this project
1
5
18
1
1
00090
Current
Increase
Revised
Funding Source
Budget
( (Decrease)
Budget
MRA [01 -170- 903 -0330]
100,000
(100,000)
0
MRA [01-170- 903 -0347]
0
217,469
217,469
CDBG [18- 142 - 903 -0347]
288,581
34,950
323,531
Total
388,581
152,419
541,000
It is recommended that the above described amendments be
deferred until the consideration of bids.
4. CDBG Funding: Staff anticipates approval of the CDBG
(Community Development Block Grant) funding by the U.S.
Department of Housing and Urban Development (HUD) within
one month.
F. Schedule
The anticipated schedule for the implementati
is as follows:
Advertise for bids . . . . . . . . December
Bid Opening . . . . . . . . . . . January
Award Contract . . . . . . . . . . January
Commence Construction . . . . . . February
Construction completed . . . . . . . . May
Sst_sd
on of this project
1
5
18
1
1
00090
First Street & Bard Street Reconstruction
November 1994
Page 4
Staff recommends that City Council approve the plans and
specifications for the subject project and authorize staff to
advertise for receipt of bids upon receipt of HUD approval of CDBG
funding of the project.
let—ad
00091
30' 301
1 0
WALK WALK
i .I I%MIN 0.14'- F I F2,CJT 65T
�!*P
o*c-
FIF?-OT ArP-✓ff FF-OM OTA'. Ott TO OTA. �tlZ
O
ID
co
tv
IT
Y
ENGINEER'S ESTIMATE
SCHEDIILE OF WORK AND PRICES
FIRST STREET AND BARD STREET REHABILITATION
ITEM ITEM
NO. DESCRIPTION
UNITS
OTY.
PAYMENT
REFERENCE
.UNIT
PRICE
1
A.C.
Ton
826
605 -8
$
45.00
2
10'x4"
Cl.
CY
2,094
611 -3
$
36.00
II A.B.
3
8" Curb and
LF
2,586
606 -2
$
12.00
Gutter
4
40 P.C.C.
SF
6,125
606 -2
$
3.50
Sidewalk
5
Sidewalk
SF
216
606 -2
$
3.50
Ramp
6
6" Drive
SF
5,910
606 -2
$
4.00
Approach
7
Adjust Meter
Each
23
603 -3
$
100.00
Box to Grade
8
Relocate
Each
2
603 -3
$
150.00
Meter Box
9
Adjust
Manhole to
Each
5
603 -3
$
300.00
Grade
10
Adjust
Valve Cover
Each
7
603 -3
$
150.00
to Grade
11
Earthwork
LS
1
604 -2
$
9,500.00
12
Remove
Existing
CY
2,539
602 -2
$
26.00
A.C. & Base
13
Remove
Existing
LF
3,178
602 -2
$
5.00
Curb
14
Remove
Existing
CY
81
602 -2
$
26.00
P.C.C.
ITEM
COST
$37,180.00
$75,384.00
$31,032.00
$21,438.00
$ 756.00
$23,640.00
$ 2,300.00
$ 300.00
$ 1,500.00
$ 1,050.00
$ 9,500.00
$66,014.00
$15,890.00
$ 2,106.00
00093
ENGINEER'S ESTIMATE
SCHRDUL$ OF WORK AND PRICES
FIRST STREET AND BARD STREET REHABILITATION
ITEM
ITEM
PAYMENT
UNIT
NO.
DESCRIPTION
UNITS
OTY.
REFERENCE
PRICE
15
Traffic
LS
1
607 -4
$
650.00
Striping and
Marking
16
Salvage and
Each
1
607 -4
$
50.00
Replace
Traffic Signs
17
Construction
LS
1
610 -2
$
5,000.00
Survey
18
Clearing and
LS
1
609 -3
$
650.00
Grubbing
19
Traffic
LS
1
608 -9
$
3,000.00
Control
20
Tree Root
LF
1,130
613 -4
$
22.00
Barrier
21
Tree Planting
Each
36
612 -2
$
250.00
22
Tree Trimming
LS
1
612 -2
$
1,000.00
and Removal
23
Concrete and
LS
1
606 -2
$
9,000.00
Asphalt Testing
605 -8
24
Two Way Blue
Each
2
607 -4
$
5.00
Reflective
Markers
25
Tree Mound
Each
8
612 -2
$
200.00
26
8' Cross
SF
280
606 -2
$
5.00
Gutter and
Spandrel
27
Relocate
LF
862
614 -1
$
10.00
Existing Fence
28
Relocate
LF
295
614 -1
$
35.00
Existing Wall
29
Construct 6"
LF
468
606 -2
$
10.00
Curb & Gutter
2 �s 3
ITEM
COST
$ 650.00
$ 50.00
$ 5,000.00
$ 650.00
$ 3,000.00
$22,860.00
$ 9,000.00
$ 1,000.00
$ 9,000.00
$ 10.00
$ 1,600.00
$ 1,400.00
$ 8,620.00
$10,325.00
$ 4,680.00
00094
TOTAL: $M,977.00
00195
ENGINEER'S ESTIMATE
SCHEDULE OF
WORK AND
PRICES
FIRST
STREET
AND BARD
STREET
REHABILITATION
30
3• PVC
LF
1,701
615 -2
$ 8.00
$13,608.00
Sleeves
31
2" & 1"
LF
312
615 -2
$ 10.00
$ 3,120.00
PVC Sleeves
32
Mobilization
5%
1
-
$19,133.00
$19,133.00
33
Release on
LS
1
9 -4
$ 1.00
$ 1.00
Contract
34
Contingency
10%
1
-
$40,180.00
$40,180.00
TOTAL: $M,977.00