City of Moorpark
AGENDA REPORT
TO: The Honorable City Council
FROM: Christine Adams, Director of Community
DATE: February 27, 1995 (Meeting of March 15,
I T E • s
•3 / X,S
Service
1995}
SUBJECT: Consider Design Modifications for Poindexter Park
BACKGROUND
The City Council approved a contract with T.I. Maloney to complete
construction plans and specifications for Poindexter Park. The
design team from Maloney has reviewed the conceptual design
developed by Harris & Associates, and approved by the Council back
in November, 1994. Maloney i;as made the following design
modification recommendations for 'le Courcil to consider:
1. The preliminary soils test,3 for the park site indicate
that there will be neec:7ed
at _east eight feet removal
and recompaction of dirt
f,)r underneath any structures
(restrooms and concession
bui= .,rings) and parking lots.
This information ind:i(,<1tes
that the construction work
for two parking lots, ct
)rig=_nally proposed, could be
quite costly. Malone,,
wits staff's concurrence is
recommending one ;a
larg( -�r parking lot, with
approximately 65 spaces,
irstead of two smaller lots of
30 and 33 spaces, respect
_vel / The parking lot, as
shown on the design
prc>po ;_.aLl attached, is still
centrally located at
thc�> p,zrk site, and will be
convenient for all par!<
i, ;er, . In addition, the one
parking lot w
'7F b, -tter vehicle traffic
circulation, with a
entrance and exit provided.
2. Staff has requested t.hcc
:1e Mission Beil Plaza, Phase
II, which is located d
t Y e south of the park, have a
fire lane located near
-,he scithwest end of the park.
Maloney has designed a
`i x e access road that will tie
into this fire lane at
he pa--k boundary. This access
will be limited to fii(
and sheriff vehicles, and will
have bollards or othe7
�e a ;ur(, 3 to keep other vehicles
from having access.
3. Picnic Barn area is pzo�osed tD be moved closer to the
street, and move the pj" y areas toward the interior of
the park. This also aL_ow: for better pedestrian
circulation. and beta 3aff -ty and visibility for
children as it keeps 1e ch1_dren's play areas from
being too close to veh i � e -ia't c in the street. Entry
00159
ways to the play area., w ill have trellace archways,
continuing the farm agricult,_rre theme.
4. The large lattice roof .shelter has been replaced with
two lattice roof p.icsaic gazebos in the veteran's
memorial grove area. Again, the park theme is still
carried out, but will y- ro,7ide more shaded picnicking
areas for smaller group.
The City has obtained engineering Lnformation from Ramseyer &
Associates, who is doing the civil engineering work for Ventura
Pacific Capital Group. This Lnf %_)rmation will provide staff the
elevation of the north curb of La.�sen Road. This will be given to
T.I.Maloney who has agreed at no :_barge to design top of curb at
the highest possible elevation (arid still below the park) for the
north /south street, in order to ccrtinue design of the park. This
information will be submitted -o the City Engineer for plan
checking prior to completing the c:esign. The westerly boundary of
the park and curb elevations at tl.<._ nortr /south main street of the
tract are critical to the drairiag- design. of the park. The final
design of the street could then cone =,t a later, date.
It is apparent that the park wl,i preceed construction of the
housing project. The design work from Maloney will need to be
integrated with the design from AAi,x0ott f.r the north /south street
and utilities as part of their ,ntrac: with the Redevelopment
Agency for the dsign of th(= re °sid -ntlal subdivision and
improvement plans.
RECOMMENDATION
Approve the design modifications fo_- the downtown park site as
recommended by the landscape arch ect.
Attachments
Preliminary Cost Estimate from T.'. Malor:ey
Modified Park Design
0016,0
.-r
CO
O
O
3/9/95
Page: 1
PRELIMINARY COST ESTIMATE
DATE: 03/09/95
PROJECT NAME: POINDEXTER PARK
PROJECT # 950104
DESCRIPTION
DEMOLITION AND CLEARING
CLEAR AND GRUB
GRADING/ DRAINAGE
GRADING
CATCH BASIN
6" DRAINLINE (C.M.P.)
EROSION CONTROL
TEMP CHAINLINK FENCE
ESTIMATE BY: BOB TAFT
UNIT TOTAL
QTY. UNIT COST COST
335500 S F
$0.03
$10,065
ALLOW
$32,000.00
$32,000
6 EACH
$1,500.00
$9,000
1200 L.F
$14.00
$16,800
ALLOW
$2,000.00
$2,000
1650 L F
$1.00
$1,650
CONSTRUCTION
PLAY GROUND
PLAY EQUIPMENT
ALLOW
$60,000.00
$60,000
PLAY AREA CONC CURB 12 "X?
505
L. F
$22.50
$11,363
PLAY AREA SAND (18" DEEP)
6
C.Y
$20.00
$120
FIBAR
6980
S F
$3.00
$20,940
BASEBALL
PLAYERS BENCH - ALUMINUM
8
EACH
$275.00
$2,200
BACKSTOP
2
EACH
$4,500.00
$9,000
SIDELINE FENCE (10')
300
L.F
$18.00
$5,400
DUGOUT FENCE (6')
160
L.F
$13.50
$2,160
BRICKDUST
25810
S.F
$1.10
$28,391
BLEACHERS
4
EACH
$3,000.00
$12,000
SITE FEATURES
PICNIC TABLE
20
EACH
$850.00
$17,000
PICNIC TABLE PAD - 4" CONCR
400
SF
$2.75
$1,100
PICNIC SHELTER -HEX 20'
2
EACH
$14,000.00
$28,000
PICNIC SHELTER - 40'x 60'
1
EACH
$23,000.00
$23,000
BAR -B -Q GRILL - STANDARD
4
EACH
$300.00
$1,200
BAR -B -Q GRILL - DOUBLE
4
EACH
$470.00
$1,880
GAME TABLE
2
EACH
$400.00
$800
TRASH RECEPTACLE
15
EACH
$400.00
$6,000
DRINKING FOUNTAIN (HANDIC,
3
EACH
$2,000.00
$6,000
BENCH - RECYCLED PLASTIC
6
EACH
$300.00
$1,800
SIGNS
1
EACH
$5,000.00
$5,000
BIKE RACK
1
EACH
$485.00
$485
WALLS /FENCES
SEAT WALL 18" S.F B.
370
L F
$38.00
$14,060
CHAINLINK FENCE 6'
380
L F
$13.50
$5,130
SPLIT RAIL FENCE - CONCRET
230
` F
$15.00
$3,450
00162
MAR 9 '95 11 :49 9093694039 PAGE.002
319195
Page: 2
PROJECT NAME: POINDEXTER PARK
PROJECT #: 950104
UNIT TOTAL
DESCRIPTION QTY UNIT COST COST
HARDSCAPE
MOWSTRIP 6"
MOWSTRIP 12"
CURB AND GUTTER
WHEELCHAIR RAMP (CURB CL
CONCRETE PAVING - 4"
ASPHALT PAVING (2.5 ")
W /SEAL COAT & 6" BASE
6" AGGREGATE BASE
DECOMPOSED GRANITE
3' CROSS - GUTTER
LANDSCAPING
SOIL PREP /FINE GRADING
WEED ABATEMENT
90 DAY MAINTENANCE PERIOE
TREES (36" BOX)
TREES (24" BOX)
TREES (15 GAL)
SHRUBS (5 GAL)
SHRUBS (1 GAL)
VINES (15 GAL)
VINES (1 GAL)
GROUNDCOVER (12" O.C.)
TURF HYDROSEED
REDWOOD HEADER
IRRIGATION/ WATER/ SEWER
WATER METER 2"
BACKFLOW PREVENTER
AUTOMATIC IRRIGATION SYSTEM
LARGE AREAS
SMALL AREAS
TENSIOMETER HYDROVISOR
1" DOMESTIC METER
DOMESTIC BACKFLOW
CONTROLLER
4" V.C.P. SEWER
SEWER HOOK -UP FEES
2" DOMESTIC LINE
ARCHITECTURE
REST ROOM FACILITY
1150
L.F
$6.00
$6,900
320
L
$9.00
$2,880
1200
L F
$15.00
$18,000
1
EACH
$200.00
$200
6500
S F
$2.00
$13,000
25200
S.F
$1.50
$37,800
17420
S.F
$0.75
$13,065
X50
C
$42.00
$23,100
rf o
f
$12.00
$4,800
227500
S. F
$0.18
$40,950
227500
S.F
$0.03
$6,825
227500
S.F
$0.06
$13,650
30
EACH
$575.00
$17,250
90
EACH
$250.00
$22,500
85
EACH
$85.00
$7,225
750
EACH
$14.00
$10,500
100
EACH
$5.00
$2,000
2
EACH
$5.00
$10
Fi0
EACH
$5.00
$250
58150
S F
$0.25
$14,688
164216
S. F
$0.05
$8,211
1 1!00
_ _
$3.50
$6,650
1
EACH
$7,000.00
$7,000
1
EACH
$2,000.00
$2,000
150660
S.;
$0.35
$52,731
72308
S.F
$0.25
$18,077
6
EACH
$150.00
$900
1
EACH
$3,000.00
$3,000
1
EACH
$1,000.00
$1,000
1
EACH
$2,500.00
$2,500
1 '! 50
L. F
$14.00
$16,100
ALLOW
$2,900.00
$2,900
11?100
L
$2.00
$2,400
625
S
$115.00
$71,875
LIGHTING/ ELECTRICAL
SERVICE /MAIN SWITCHBOARE
1
ALLOW
$15,000
$15,000
SECURITY WALKWAY /LIGHTS
25
EACH
$2,000.00
$50,000
PARK SIGN LIGHTS
2
EACH
$500.00
$1,000
PARKING LOT LIGHTS
5
EACH
$2,500.00
$12,500
1 "TELEPHONE CONDUIT
450
L.F
$2.75
$1,238
2" ELECTRICAL CONDUIT
450
L F
$3.50
$1,575
TELEPHONE SERVICE
ALLOW
$300.00
$1,650
00163
MAR 9 '95 11:50 9093694039 PAGE.003
PROJECT NAME: POINDEXTER PARK
PROJECT #: 950104
* * * * ** SUBTOTAL $874,242
## ## 10.00% GENERAL CONTRACTOR OVERHEAD & PROFIT $87,424
#### 10-00% CONTINGENCY $87,424
*** *— GRAND TOTAL $1,049,091
POINDEXT.XL
N.I.C. - STREET IMPROVEMENTS
319195
Page: 3
0016+
MAR 9 '95 11:51 9093694039 PAGE.004
UNIT
TOTAL
DESCRIPTION
QTY. UNIT COST
COST
PHONE BOOTH
1 EACH $1,650.00
$1,650
MISCELLANEOUS
STRIPING
1400 f= $0.50
$700
* * * * ** SUBTOTAL $874,242
## ## 10.00% GENERAL CONTRACTOR OVERHEAD & PROFIT $87,424
#### 10-00% CONTINGENCY $87,424
*** *— GRAND TOTAL $1,049,091