Loading...
HomeMy WebLinkAboutAGENDA REPORT 1995 0315 CC REG ITEM 11Ia 69 7. 3 ITEMJ to 1:0 TO: FROM: DATE: SUBJECT: BACKGROUND CITY OF MOORPARK AGENDA REPORT The Honorable City Council Christine Adams, Director of Community Servic4l!�JN March 9, 1995 (Meeting of March 15, 1995) Consider Cost Estimates for Park Improvements for Phase II of Arroyo Vista Community Park. The City Council appropriated funding to make park improvements to the Arroyo Vista Community Park, Phase II. These improvements are to include two softball diamonds, with lights for one, with fencing, bleachers, dugouts, and infields; a rollerhockey rink; a restroom and concession building; a tot lot, and a picnic shelter and tables. The City has contracted with Picon to serve as Contract Administrator, and Phil Vein has been assisting staff in getting plans prepared, bidding and new cost estimates for the facility improvements. These estimates have been collected and are listed below for the Council's review. Financial Overview In May, 1993, the Council appropriated $946,337.20 from the Central Zone (downtown park area) to Arroyo Vista Community Park for construction of the Recreation Center, leaving a balance in that zone as of April 30, 1994 in Central Zone of $1,228,885 for Poindexter Park improvements. When preparing the budget for 1994/95 park improvements for Arroyo Vista Community Park, Phase II, staff identified the following funding sources: GANN Funds $ 97,000 G & S $ 40,000 Building Savings $190,000 Zone 3 Loan $ 85,000 AYSO Donation $ 5,000 TOTAL $417,000 Staff has gathered new cost estimates based on bid proposals received and this new information is listed here: 00165 Original Est. Water Well $70,000 Ballfields (2) $50,000 Ball Lights (1) $60,000 Restroom/Concession $50,000 Play Equipment $40,000 Hardscape $15,000 Rollerhockey $85,000 Picnic Shelter $20,000 Tables, Benches, BBQ's, Drinking Fountains, Trash Cans $27,700 TOPO/ Survey $ 0 Soils Test $ 0 Architect for Restroom $ 0 Sewer/Water/Hydrant $ 0 + Blue Prints $ 0 Construction Admin. $ 0 +Sod/Irrigation Removal (force account) $ 0 Road Oil Treatment $ 0 Fencing $ 0 Well Pump Repair TOTAL $417,700 Still need ActL $ 8C $11S $ 97 $ 8- $ 6E $ 2c $ 62 $ 2 J, V V V $ 35,000 $ 700 * $ 1,500 * $ 3,400 * $ 65,000 $ 1,000 $ 15,100 $ 2,500 $ 5,600 ** (*) $ 4,500 ** $ 15,000 ** $713,800 $296,100 * Completed ** Approved by Council after original budget submitted, as additional items. + Estimated - no bid at this time. Some alternative reductions could be 1) eliminate concrete walk to ball diamonds and tot lots and 1/2 of concrete work at ball diamonds for a possible savings of $35,000, 2) reduce specification of concrete flat work for sidewalks and go to 3.5" concrete with mesh for a possible savings of $22,789, and 3) omit all flat work by ball fields, with the exception of the block walls and bleacher concrete, for a possible savings of $10,587. Total possible savings of $68,376. Staff anticipates that there could be other savings by using force account labor on the sidewalk work, and through contributions and in -kind services from the local sports groups. The ballfield fencing is also being rebid. Combined, this could increase the possible savings to $80,000. The Public Works, Facilities, and Solid Waste Committee has reviewed the improvement cost estimates prepared by staff, and recommended that staff look at ways of reducing costs, which are identified above. The Committee further 00166 recommended that the City Council consider taking a loan from the Central Zone for $250,000 to fund the balance of the improvements, and if needed, use additional Redevelopment Agency funds to pay for the park improvements at Poindexter Park. There was a balance of $1,575,726, in the Central Zone for Poindexter Park, $500,000 which was used for the park land acquisition. Currently, there is a fund balance of $1,075,726 for the park improvements at Poindexter Park. Interest allocation to each zone within Fund 5 for 1993/94 and 1994/95 still needs to be done. This information should be available by March 15. Preliminary cost estimates for park improvements is approximately $1,000,000. If this recommended action by the Committee is not approved by the City Council, staff would recommend that the City Council prioritize the major improvements at the park and direct staff to reduce scope of project as necessary to allow a modified Phase II to go forward. Staff would recommend that the City Council provide direction in order to allow the improvements in April, and stay on schedule in order to complete the improvements to bid by August, 1995. RECOMMENDATION (Roll Call vote) 1) Appropriate $250,000 as a loan from the Central Zone of the Park Improvement Fund (Fund 5) to fund the balance of the improvements at Arroyo Vista Community Park; and 2) Direct staff to place an item on April 5 Redevelopment Agency Agenda to consider funding for improvements at Poindexter Park. 00167