HomeMy WebLinkAboutAGENDA REPORT 1995 0301 CC REG ITEM 11DITEM
AGENDA REPORT
CITY OF MOORPARK
To: The Honorable Cit y Council !f - S
From: Dirk Lovett, Assistant City Engineer
�y
Date: February 15, 1995 (CC meeting of March 1, 1994)
Subject: 1995 Street Reconstruction Projects
. .
In April 1991 the City of Moorpark authorized the City Engineer to design
the reconstruction of Walnut Street between High and Charles. In October
the City Engineer was also authorized to proceed with the design for the
improvements of various other City streets including: Walnut (north of
Charles), Everett (between Moorpark and Magnolia), Magnolia (north of
Charles), Bard (between High and Charles), and Poindexter. A preliminary
survey and pavement evaluation has been performed on each of these
streets and reconstruction has been determined to be the best option.
Plans for the section of Walnut between High and Charles were
subsequently developed and submitted to the City Council. Recently, at
the Council's direction, the City Engineer was directed to redesign this
part of Walnut to provide angled instead of parallel parking. This would
allow additional parking capacity to replace the existing head -in parking.
Location maps showing the limits of each of the above is attached as
Exhibit `A'.
Submitted for the Council's review is a brief discussion, with cross
sections (Exhibit `B'), of the major design elements of each of the subject
1
00078
streets. Under a separate cover will be submitted the preliminary plans.
The Council's input on the preliminary plans is requested at this time to
facilitate the accelerated schedule by which the award of this
construction contract and, as such, the final design is required. To utilize
the State and Local Transportation Partnership funds this contract must
be awarded by June 30, 1995. Again, the plans are preliminary at this time
and are submitted for reference only in relation to locations of curbs,
sidewalks, driveways, catch basins, property lines, encroachments and the
associated removals and relocations. Some details have not yet been
included and some may be in error.
Proposed Schedule
-City Council review and comments of preliminary plans 3/1/95
-City Council to review and approve final plans and
authorize staff to advertize for public bids 4/5/95
-Plans and specifications on sale 4/15/95
-Bid opening date 5/22/95
-City Council to award contract 6/7/95
Design Criteria
Walnut (between High and Charles):
On September 7, 1994 the City Council approved the reconstruction
and widening of the entire street from 46 to 63 with parkway widths
of 2 feet (adjacent to the curbs) and sidewalk widths of 6 feet, to
provide angled parking on both sides. Reconstruction of catch basins
are necessary. One Edison pole will need to be relocated. Two Pepper
trees at the southwest corner of Charles and Magnolia will require
removal and one small palm tree on the west side will be relocated.
Construction easements will likely be required for relocation of
driveways and drain lines on private property.
Walnut (north of Charles):
Full reconstruction of the entire street including curb, gutter,
sidewalk, driveways, pavement, etc. Pavement width will not change.
The new sidewalk is proposed to be located at the back of the right -
of -way. To accommodate the sidewalk in this location trees
N
00079
conflicting with the sidewalk on the east side will need to be removed
and walls, fences and hedges on both sides will require removal
and /or relocation to the property lines. Construction easements will
be necessary.
Everett (between Moorpark and Magnolia):
Full reconstruction of the entire street including curb, gutter,
sidewalk, driveways, pavement, etc. Due to parkway elevations, the
curb on the north side is proposed to be 8 inches high and that on the
south side to be 6 inches. The design also includes the up- sizing of a
catch basin at the easterly end of Everett per the Downtown Master
Drainage Study and the installation of two new catch basins just east
of Walnut. Trees at the southwest corner of Everett and Magnolia and
some trees along the vacant property along the north side of the
street will require removal. Pavement width will not change. Fences
along three property frontages encroach into the right -of way and will
require relocation to property lines. Construction easements will be
necessary. No additional right -of way will be necessary, on either
side of the street, to make these improvements.
Magnolia (North of Charles):
Full reconstruction of the entire street including curb, gutter,
sidewalk, driveways, pavement, etc. Wall encroachments protrude
into the City right of way. It is proposed that the encroachments on
the west side of the street be relocated to property lines to allow full
width sidewalk improvements and, that the lesser encroachments on
the east be allowed to remain, with sidewalk constructed up against
them. Some temporary construction easements will be necessary.
Pavement width will not change.
Bard (between High and Charles):
Full reconstruction of the entire street including curb, gutter,
sidewalk, driveways, pavement, etc. The design also includes storm
drain and catch basin upgrades per the Downtown Master Drainage
Study. Two large healthy pepper trees along the west side protrude
into the curb line. It is Proposed that the curb flare around the tree
trunks in an effort to save the trees. It will be attempted to relocate
a small 3 -inch tree on the east side of the street rather than meander
3
000.80
the curb around it. Pavement width will not change.
Poindexter:
A portion of Poindexter (from approximately 1200 feet east of
Gabbert to approximately 450 feet east of Sierra) has been
determined to require a full street section reconstruction while the
remainder requires only an overlay. In addition, the south side of the
street will be widened full width (pavement will vary from 32 to 40
feet) with curb, gutter and sidewalk where it is currently missing in
front of the West America, City Redevelopment Agency, and Gisler
owned properties. This widening will require additional right of way
along these property frontages. Poindexter will not be widened along
the Spencer property at this time but the reconstruction plans will
account for this future widening with a phased plan. Not yet shown on
the plans is the widening (approximately 7 feet) of the north side of
Poindexter from roughly the westerly school boundary to the west
side of Sierra Avenue to facilitate Chaparral Middle School pedestrian
and vehicular traffic. This widening (pavement width of 40 feet) will
include curb, gutter, sidewalk, and bike lanes (between Sierra and
Cornett). Irrigation and Edison crossover conduit will be installed for
future use. Trees on both sides will be removed where the widened
portions necessitate.
All street trees are proposed to be saved, where possible, on each of
the above streets. Where trees cannot be saved it is proposed that
they be replaced at ratio of 3 to 1 of species to be specified by the
City's landscape architect.
Fiscal Impact
The preliminary cost estimates and the proposed funding for the
construction of these streets is provided as an attachment in Exhibit `C'
and is summarized below:
Total Project Cost Estimate
Construction and design cost
4
$ 1,251,211
00081
Proposed Budget /Appropriations Amendment
City Funds Grants
M AA S 821 SLTPP Total
$1,042,211 $41,000 $168,000 $ 1,251,211
It is recommended that the City Council amend the City budget following
the award of the contract, when real costs are known.
Recommendation
It is recommended that the City Council review the preliminary plans and
design criteria, comment and revise as desired (including the addition or
deletion of portions of work), and direct staff to proceed with the final
design.
cc:
chron
84.530
DFA
00082
0L)
CHARLES
HIGH
CITY OF AVORPARK
L
2-
QTHY
SCALE P = 300
21 PM ii b
EMT 1 1111
MOORPARK
COMMUN ITY
POINDEXTER SUBDIVISION SCHOOL
5 MR 5
O
1111 1
■ MONT TR
MINN.'
iMR 39
.Q. w
INS
■
MEA
IIIIIIIIIIIIIN La
Em i;m
p am
C4,11EST
POINDE am amv
1 F! 22 MR 87
A
24 1�s 86
F-RFMONr 7R.
���_.. + ®� � X1111111111 *�
► s,
�l A
Otis.
:t
150
sty
�/• PA
_.rC L
WILY
R/W
�3 "AL ON 9'A8
TYPICAL SECTION
6-VaET-r
�kelrl. k400u-y-v HVENu�io NAfinioUA� S(M1�
ELY
R/W
L— VARIES FROM 0.88% TO 2.38%
6' CF
VFif�l[�J 1 1 \VI�1 1 /O I V J.I J /O
\6A NUT F j
FRvA H I C- �+ moo
00084
i
soft _ %.
0
0
00
q3
4a' 01
16' 24 0 24' 16'
3 "Ac ON '?"AB
x
s
0
• - TYPI CAL. SECTION
Lk� A L N UT 6"TRE 6� T
"QOM CNRw -6S EvE¢_ETT 574t--ET
4
30, WFO 9,114)
lob(
Igq
` na
AG ON 17 ft A 001
• TYPICAL SECTION=
T���7r MAetIPA �S
TV C-Voa_67-1 �"'
M.
40
Ar. ON kA 13
"iT��Y==PKAL SECTioN=.
;,T -ro cj4AI�-4,-c—% meor
00087
88000
tv
Owe Qf- $�O+O V.,45 IHO-d,-4
cpm
�b
� E
11Z
s 7 �
Z
1e
,oz
(g )-,)
Ig,
X kj
0
�/w
v
r.
rm
} J
i
1
_ \1
2
no
!Sol
h C5ftoc ,
I
t Cat► -d&
TY sic r�or�1I
�'OfrSDEKr�? f1UEN't�E
51L Y
AN
f P-6 4A 27 ( 4o sT
?•24
00689
e k ki Ali t'� ,
C�
NAi
Re
J�Pcse
Y P�GRL
ncoDa
Ec T/ 0
sr (4M,41 fo
ip"XA srtf 267- 5, 71 4
<) t "M. SCR-, 3 ++)FI. T4- -i�D
„ vwee , fe *too r�
fFVE/V
tAD
be-
bz c�Qeri
,zo¢Z4, 7
97f69 (r
5kr'_�' 00090
E x � (� -If I �,
(? 0� 5)
NTY
�4w
--FY
�or�rx�
r
vl�
�GvoN
14 V61
.00 .10 97-,4 A5
00691
26000
S9 *2 + L x'.1.5 at- �T� ' L o+:t?P W
Jv�✓�b a��x2a��o.
oIN
r l `
Exhibit
1995 Street Reconstruction Project
Project Cost Analysis
I. Total Project Cost Estimate
Element
---------------------------------------
Construction
WALNUT: South of Charles
WALNUT: North of Charles
EVERETT: Moorpark Avenue to Magnolia
MAGNOLIA: North of Charles
BARD: South of Charles
POINDEXTER
Contingency
127,321
45,836
198,698
56,561
92,086
486,964
included
Total Remarks
10- Feb -95
Page 1
WALNUT: South of Charles
WALNUT: North of Charles
EVERETT: Moorpark Avenue to Magnolia
MAGNOLIA: North of Charles > 01-170- 903 -346
BARD: South of Charles 01- 170 - 903 -356
POINDEXTER / 14- 142 - 903 -356 * 0
14- 142 - 903 -356 * 168,820 * **
0 168,820
REVISED BUDGET
TOTAL
(300,000) (300,000)
783,211 783,211
0
168,820
483,211 652,031
41,000 168,820 1,042,211 1,252,031
00093
1,007,466
>> Tot. Constr.:
1,007,466
Design
Less Ineligible:
(135,009)
ASA 94 -20 Pavement Analysis
61,681
--------
- - - - --
ASA 94 -45 Project Design
112,884
Eligible Costs:
872,457
- - - - ---
Grant Share:
0.1935
174,565
--------
- - - - --
*** Grant Amount:
$168,820
Construction Administration & Inspection
70,000
TOTAL PROJECT COST ESTIMATE
1,252,031
-----------------------------------------------------------------.-...-----------_--------------------------------------------------
II. Proposed Budget / Appropriations Amendment
SB -821
State & Local
Bicycle
Transportation
Pedestrian
Partnership
Description
--------------------------------- - - - - --
Acc. Number
--------- - - - - --
Program *
Program **
MRA
Total
CURRENT BUDGET
------------------
- -- -- -
-------- - - - - --
-------- - - - - -- --------
- - - - --
------------------
EVERETT: Moorpark Ave to Magnolia
01- 170 - 903-346
300,000
300,000
POINDEXTER
01- 170 - 903 -356
259,000
259,000
POINDEXTER
14- 142 - 903 -356 *
4x.,000
0
41,000
PROPOSED CHANGE
4:,,000
0
559,000
600,000
WALNUT: South of Charles
WALNUT: North of Charles
EVERETT: Moorpark Avenue to Magnolia
MAGNOLIA: North of Charles > 01-170- 903 -346
BARD: South of Charles 01- 170 - 903 -356
POINDEXTER / 14- 142 - 903 -356 * 0
14- 142 - 903 -356 * 168,820 * **
0 168,820
REVISED BUDGET
TOTAL
(300,000) (300,000)
783,211 783,211
0
168,820
483,211 652,031
41,000 168,820 1,042,211 1,252,031
00093
Gk ,\1 aV 16 \ -S ;
1995
Street Reconstruction Project
[300' x
Cost Estimate
Qty
AMOUNT
:TEM
------------------------------------
DESCRIPTION
Unit $
Units
1
Removals
15.00
LF
2
Replace
3.00
SF
3
Fabric
0.11
SF
4
Grind
0.08
SF
5
Base (8 ")
0.64
SF
300
Base (12 ")
0.96
SF
6
Asphalt (2 ")
0.40
SF
Asphalt (3 ")
0.60
SF
Asphalt (4 ")
0.80
SF
7
Curb & Gutter
12.50
LF
8
Catch Basin
3000
EA
9
Man Hole
5000
EA
10
RCP
50.00
LF
11
Sidewalk
4.00
SF
12
Stripping
0.63
LF
1
Walnut S/0
Chas
[300' x
561]
Qty
AMOUNT
1,200
18,000
2
I
0
1
0
50
0
3,168
0
16,800
16,128
0
0
16,800
13,440
600
7,500
4
12,000
2
10,000
300
15,000
2,400
9,600
300
189
2
Walnut. N/0 Chas
30(" x 4011
Qt! AMOUNT
O 4,' )00
i
I
i
12,000 7, 1.)80
i C
i
12,000 7,200
0
n00 7,500
u
2,400 9,600
00 89
i
a
Everett: Mpk to Mag
Qty AMOUNT
1,584 23,760
0
0
0
47,520 30,413
0
10- Feb -95
Page 2
4
Magnolia: N/0 Chas
[1056' x 441]
Qty AMOUNT
---------------------
1,200 18,000
1,200 3,600
12,000 1,320
3,000 240
0
0
12,000 4,800
0
0
600 7,500
0
0
0
2,400 9,600
300 189
Sub -total 101,857 36,(;69 158,959 45,249
I �
Contingency (25 %) 25,464 9,167 39,740 11,312
Total 127,321 45,836 198,698 56,561
00694
0
0
47,520
38,016
3,168
39,600
2
I
6,000
1
5,000
50
2,500
3,168
12,672
1,584
998
10- Feb -95
Page 2
4
Magnolia: N/0 Chas
[1056' x 441]
Qty AMOUNT
---------------------
1,200 18,000
1,200 3,600
12,000 1,320
3,000 240
0
0
12,000 4,800
0
0
600 7,500
0
0
0
2,400 9,600
300 189
Sub -total 101,857 36,(;69 158,959 45,249
I �
Contingency (25 %) 25,464 9,167 39,740 11,312
Total 127,321 45,836 198,698 56,561
00694
k� 10- Feb -95
Page 3
- - --------------------------------------
1995 Street Reconstruction Project 5 6 Less Estimated Total
Cost Estimate P Bard: S/0 Chas Poindexter Poindexter Eligible
[530' x 4011 Ineligible Portion Construction Cost
ITEM DESCRIPTION Unit $ Units Qty AMOUNT Qtly AMOUNT Qty AMOUNT Qty AMOUNT
1
2
3
4
5
6
7
8
9
10
11
12
Removals
15.00
LF
Replace
3.00
SF
Fabric
0.11
SF
Grind
0.08
SF
Base (8 ")
0.64
SF
Base (12 ")
0.96
SF
Asphalt (2 ")
0.40
SF
Asphalt (3 ")
0.60
SF
Asphalt (49)
0.80
SF
Curb & Gutter
12.50
LF
Catch Basin
3000
EA
Man Hole
5000
EA
RCP
50.00
LF
Sidewalk
4.00
SF
Stripping
0.63
LF
300
12,000
12,000
600
4
2
300
2,400
300
4,500
0
0
0
7,680
0
0
7,200
0
7,500
12,000
10,000
15,000
9,600
189
3,800
1,200
160,000
5,')00
;,,�0
271,'100
250
57,000
3,600
17,600
100
4.928
0
217;360
28,125
ah
(785)
(285)
(50,000)
(1,190)
(7,700)
(63,350)
(1,840)
0
C,
14,100 56,400 (2,510)
6,600 4,158 (1,800)
Ii
I'
(11,775)
(855)
(5,500)
(95)
(4,928)
0
0
0
(50,680)
(23,000)
0
0
0
(10,040)
(1,134)
7,599
2,115
122,000
6,810
71,520
16,800
12,000
24,000
272,670
5,978
10
5
650
24,358
7,584
113,985
6,345
13,420
545
45,773
16,128
4,800
14,400
218,136
74,725
30,000
25,000
32,500
97,432
4,778
- - - - -- - - - - -- -- _ ----- - - - - -- ----- - - - - --
Sub -
total
I
73,669 389 571 108 ' 007
( , ) 697,967
Contingency I
9 Y 25% ; ( 1 18,417 ! 97,393
2 002 174,492
Total 92,086 486,964 (135,009) 872,458
00 r;9";