Loading...
HomeMy WebLinkAboutAGENDA REPORT 1995 0503 CC REG ITEM 11DITEM MEMORANDUM s-- TO: The Honorable City Council 4:_ FROM: Jaime Aguilera, Director of Community Developme Paul Porter, Senior Planner DATE: April 10, 1995 (CC meeting of May 3, 1995) SUBJECT: MINOR MODIFICATION NO. 1 TO MAJOR MODIFICATION NO. 2 OF CPD 89 -1 Background On September 7, 1994, the City Council approved the application filed by Ventura Pacific Capital Group VI requesting approval of Major Modification No. 2 to CPD 89 -1., PM 4961 and Variance 94 -1 for the following: Major Modification No. 2 to CPD 89 -1 was for approved to revise the site plan to include a market, shops, free standing commercial buildings and a theater. The approved revisions are as follows: Net Site Area: Approximately 15.30 acres (666,800 sq. ft.) Major "A "(market) 50,320 sq. ft. Major "B "(theater) 35,000 sq. ft. Shops 111 11(7,000 sq. ft. food use) 14,850 sq. ft. Pad "A" 26,800 5,500 sq. ft. Pad "B" (food use) 3,000 sq. ft. Pad "C" 3,500 sq. ft. Pad "D" (3,500 sq. ft. food use) 5.000 sq. ft. GROSS FLOOR AREA 117,170 sq. ft. Tentative Parcel Map No. 4961 was approved to subdivide the property to correspond to the various uses within CPD 89 -1 as follows: Parcel Area Sq Ft _ Acres 1 (Pad A) 30,400 0.70 2 (Pad B) 25,400 0.58 3 (Market) 205,000 4.71 4 (Pad C) 30,600 0.70 5 (Pad D) 30,000 0.69 6 (Shops) 26,800 0.62 7 (Theater) 318,600 7.31 Total 666,800 15.31 PPO4:10 :9519:16a A: \19APR95.CC 1 00685 Variance 94 -1 to allow 125 compact parking spaces on the proposed theater parcel only was denied. The City Council subsequently and as a separate action, amended the City's Zoning Ordinance to allow up to 15% of the required parking spaces for theaters to be compact parking spaces. Discussion: On April 7, 1995, Ventura Pacific Capital Group VI applied for Minor Modification No. 1 of Major Modification No. 2 to CPD 89 -1 for the following: The purpose of this Minor Modification No.l to Major Modification No.2 to CPD 89 -1, was to: 1) Request deletion of Condition 42; 2) Incorporate changes to the Site Plan; 3) Submit elevations for the Pad buildings; 4) Revise the elevations of Shop Building No. 1; and 5) Art work in lieu of Art in. Public Places fee. 1. Deletion of Cond. #42 which stages: 42. All of the compact parking spaces located along the westerly portion of the site adjacent to the single family residences shall be converted -o regular 9 X 20 parking spaces. The intent of this condition was to eliminate the compact stalls along the west property line and convert them to standard 9' x 20' stalls. Staff reasoned and the Council concurred that the loss of 9 parking spaces was less important than the provision of standard size stalls. For the reasons explained in No. 2 below, the sidewalk in front of the theater has been reduced from an average width of approximately 30 feet to approximately 7 feet. Staff now believes that it is more important to expand the width of the sidewalk than to conserve the standard stall width along the west property line. By allowing the 8' x 16' compact stalls, as originally proposed, and narrowing the planter along the west property line from 12' to 10', the Theater sidewalk can be increased from 7' to 11', and the area directly in front of the Lobby will increase from 12' to 161. (See Site Plan /Sheet SD2) 2. Incorporate changes to the site plan: a) Due to the change in occupancy designation from a Type B -2 to Type A -2.1 for the Theater, the Sideyard Agreement that was executed between Ventura Pacific and MacLeod could not be applied to the Theater setback requirement. (A Type A -2.1 building requires a larger setback from other buildings because of the higher occupancy load). In other words, the existing setback between K -Mart and PM:10 :9519:16a" : \19APR95.CC K 00086 Albertson's of 22 feet is not sufficient pursuant to the Uniform Building Code. Meetings with Building and Safety, County Fire and Community Development Departments resulted in the solution of expanding the building separation between the Supermarket and the Theater from 10.5' to 40' and going to a Type III building (The setback for Type III building may be reduced from 60' to 40' because the fire separation walls have a higher fire retardant rating) for the Theater and Shop One Building, while maintaining 60' sideyards to the north, west and south. (See Site Plan /Sheet SD2) A condition of approval has been placed on the Minor Modification preventing both the 22 foot buffer located east of the Albertson's and the 40 foot separation between the Albertson's and the Theater from being used for storage. b) The northern most boundary separating the project from the future park and housing has been modified to conform to the current City plans for the MRA property between Poindexter Avenue and the Lassen Avenue terminus. Provisions for vehicular access off Sierra, emergency vehicular access into the park parking lot, pedestrian access points at the park parking lot and at the end of Lassen Avenue have been made. In addition, an easement has been granted to the City for the right to parking on thirty stalls at the north property line behind Albertson's and the Theater for overflow parking (See Site Plan /Sheet SD2). c) The hardscape plans for the 22' and 40' separations between Kmart and Albertson's and Albertson's and the Theater, respectively along with the area just south of the Theater and north of the outdoor seating area for Shop 1 have been tied together in theme to create a plaza or portico atmosphere to encourage the community's use and enjoyment of the project. (See Site Plan /Sheet SD2 and Sheet HDl) A feature of this hardscape are two sculpted stone fountains that are connected by a stone path and surrounded by a decorative patterned concrete. These stone elements are introduced throughout the above referenced areas to provide an artistic and unique element to this project and is more aptly described in the narrative. (See Exhibit A) A model has also been provided for Council review d) The eight foot wall along the west property line has been terminated approximately 55' north of Pad A. This change has been proposed to accommodate the adjacent property and it's future development, the design for which has not yet been submitted. (See Site Plan /Sheet SD2) pp" :10:9519:16a=&:\19APR95.CC 3 0008", e) The applicant is requesting the ability to build out 29,000 s.f. of the total 35,000 s . f . during the first phase of construction. The applicant intends to have the 6,000 s.f. that is not built during the first phase of construction appropriately landscaped and planted to be compatible with the surrounding hardscape and landscape elements, until such time they decide to build on it. Because plans have been submitted showing a building on the 6,000 s.f., there should be no need to return for approval of another Minor Modification if and when the applicant wishes to expand. (See Sheet 9 & Site Plan /SD 3. Submit Elevations for the Pad Buildings: The three pad buildings (A,C and D) are being submitted for architectural approval. The applicant proposes that all three buildings be built with the rest of the project since most of the space is now pre- leased. The same basic elements have been used and incorporated into the architectural design. (See Sheet 8) 4. To revise the Elevations to Shop Building No. 1: Ventura Pacific is requesting, on behalf of Bauducco's Restaurant and Italian Market, approval of a modification to the south, north and west storefront elevations at the end of Shop Building No. 1. This would also include the separate hardscape and fountain area immediately adjacent to the southwest corner of this building for outdoor seating for the Bauducco's Restaurant. This request does alter the building elevations slightly to accommodate the window heights and architectural elements of the restaurant. The storefront replaces the aluminum mullion and storefront glass system with an upgraded and unique European storefront design that is in keeping with the theme and decor of Bauducco's and complimentary to the building itself. Incorporation of this storefront has required an approximate 2' lift in the south and west elevations, which will actually articulate the elevations while maintaining the same design originally approved by Council. The east elevation has also been revised to eliminate a facade and continues the canopy element going south from the theater. The developer has deemed this change appropriate in consideration of the other building architectural elements and tenancies, as they've become known. (See Sheet 7). PPO4:1 O :95/9 :16M". \1 Up1?95 . CSC 4 5. Ventura Pacific is requesting Council approval to apply the 'Art in Public Places' fees of both Phase I and II toward the procurement of the stone monoliths and construction of the fountains, providing Moorpark with what could be it's first public artwork displays. A cost breakdown for the stone, sculpting and installation is provided in Exhibit B. Disposition of the fee paid for Phase I is not the subject of this modification to Phase II. It would need to be considered by the City Council as a separate action. Director's Decision The Director of Community Development has decided to defer the decision to the City Council because he believes that waiving the Art in Public Places Fee in lieu of artwork is solely within the purview of the City Council. Analysis Staff concurs with all of the applicant's proposed changes with the exception of Item 2(d) which terminates the eight foot wall along the west property line approximately 55' north of Pad A. The applicant indicates that this change has been proposed to accommodate the adjacent property and it's future development. Staff believes that the wall should not be eliminated and that whoever develops the property first should construct the wall. Recommendation Staff recommends approval of the attached City Council Resolution approving Minor Modification No. 1 to Major Modification No. 2 of CPD 89 -1 with conditions. Attachments: Mission Bell Plaza II Sculpture Garden Study Sheet SD -2 Sheet HD1 Elevations Schematic Floor Plan Exhibit A Exhibit B Resolution approving Minor Modification No. 1 PP04:10:95/9:16aM:\1911PR95.CC 55 00089 EXHIBIT A Proposal for Art at Mission Bell Mission Bell Art Plaza or Sculpture Garden, inspired by the works of Noguchi, is a collaborative effort between artist and landscape architect. A 40 by 300 ft, space defined by building walls on the east and south and open to pedestrian access on the north and south is composed of patterned concrete, circular fountains, carved stone sculptures, stone mosaic floor patterns, and a grove of deciduous trees within a defined lawn panel. All of these elements have been integrated into one unified composition. The result is the creation of a compelling space, a space that is specific to Mission Bel-1 Plaza. Artist Paul Lindhard, not a traditional Carver, has hand selected eleven stones for this piece. They are all from the same geologic family of travertine, limestone and onyx, all are rich in warm southwest earth colors. Linhards' unique carving technique is to peal back portions oil the stones' outer skin or rind exposing the inner gemlike quality. Each stone receives a unique carving and finish treatment as the artist responds to the individual inherent quality of the stone., Once they have been carved the artist will carefully place each stone to create one compositional piece specific to this place. The primary image is a nine foot high carved monolith of travertine onyx set adjacent to a four foot carved "water stone ", they are compositionaly placed in the northern circular water feature. A stone mosaic bar of rocky mountain quartzite three feet wide visually connects this piece to the front or southern fountain feature where a nine foot: limestone monolith has been sliced in half and placed horizont:3l , t-hf! sliced inner portion honed and polished. Other stones of the same geologic family are selected to compliment each other. (for discussion they have been numbered 1 thru 6 on the plan exhibit) When entering the space from the north the first stone, no. 1, _just, begins to emerge from the ground, an eighteen inch high travertine, slightly carved. The no. 2 stone is a four foot high pink colored travertine slightly carved to reveal its inner rich pattern. This stone complements the no. 3 travertine which is slightly carved and "sitable ". The six foot high no.4 stone of limestone and onyx, its figurative image has been created to visually extend the composition of the northern fountain element. The ne, 5 stone is a "sitable" light colored limestone with an accent, s >t:cne no. 6. The entire collection of eleven stories are individual works of art and at the same time, because of their compositional arrangement and sculptural treatment, become one unified piece. "ART IS THE REPLACING OF INPI.FFERENCE WITH ATTENTION" 0 0G9() EXHIBIT B Art City 31 Peking Street Ventura, CP, 9 3 00 _L Mission Bell II Sculptural Garden Cost Estimate Materials: 1. Garden and Carving Stones, ('Pravertine,Onyx,Limestone) 171000 LBS. 2. Rocky Mountain Quartzite Flags for mosaic. 3. Pins and sleeves. 4. Sealers. Total Material Cost ............... ..$10,200.00 Labor: 1. Sculpting / finishing. 2. Quartzite flagstone mosaic 3. Site prep and hardware placement. 4. Delivery and sculpture placement. Total Labor cost .................. ..$7,800.00 Total Cost ........................ . „$18,000.00 0 0,191