TO: The Honorable City Council
FROM: Ken Gilbert, Director of Public Works
DATE: May 5, 1995 (Meeting of 5-17-95)
SUBJECT: Consider Approval of a Project to Reconstruct the Parkway
Landscaping on the West Side of Spring Road South of
Peach Hill Road
DISCUSSION
Background
At a number of locations, the existing parkway trees on the west
side of Spring Road south of Peach Hill Road have lifted the
sidewalk causing a potential pedestrian safety problem. The
width of the sidewalk in this area is only seven feet (71) wide.
Parkway trees street are not recommended on an arterial street
when the sidewalk/parkway is less than ten feet (101) wide. It
is recommended, therefore, that the fourteen (14) parkway trees
between Peach Hill Road and Monte Vista Park be removed, that the
tree wells filled -in and that a two feet (21) wide landscaped
area be constructed adjacent to the block wall. It is the intent
of staff that the trees to be removed be replaced with a like
number to be planted in Monte Vista Park.
Project Description
Exhibit 'A' shows the location of this project. Also shown is a
cross section illustrating the design for the proposed two feet
(21) wide parkway to be located adjacent to the block wall.
Listed below is a summary of the proposed scope of work, cost
sprgprkwy.ad
00083
Spring Road Parkway
May 1995
Page 2
estimate, funding source and the proposed resources (in—house or
contract services) to be utilized to perform the work.
Cost
Funding
Est. No.
Element
Est.
Source
Assigned to:
of Manhours
Design
0
N/A
N/A
N/A
Tree Removal
3,000
AD84-2
Tree
N/A
Contractor
Sidewalk Removal and Replacement: Remove
and replace lifted sidewalk, plus remove a
two feet (2') wide area adjacent to the
block wall.
Labor
0
Public Works
64
Equipment Rental
230
Gas Tax
Materials
1,700
Gas Tax
"
Irrigation & Landscaping: Drip system;
625
AD84-2
L/S Maint.
Contract
water source and controller at SW corner
Contractor
Supervision
of Spring & Peach Hill; Plants: vines and
Only
shrubs.
Estimated Total Cost
5,555
Maintenance Cost
It is anticipated that the net maintenance costs will be reduced as
the result of constructing this project. Past and anticipated
future maintenance costs are summarized as follows:
Past Future
Maintenance Maintenance
Cost Factors Cost Cost Change
Annual Tree Maintenance 750 0 (750)
Costs: 14 trees
Annual Contract Maintenance 0 480 480
Costs
Annual Water Costs 0 100 100
Total Cost 750 580 (170)
sprgprkwy.ad
00084
Spring Road Parkway
May 1995
Page 3
Fiscal Impact
The recommended funding for this project is identified as follows:
Element Amount Source Remarks
Tree removal and 3,625
installation of
irrigation and
landscaping
Contingency
Sub -total
Concrete removal &
replacement
Total Project Cost
RECOMMENDATION
375
4,000 AD84-2 There are sufficient funds remaining
in Account No. 023-400-642 for FY
1994/95 to perform this work. No
additional appropriation or budget
amendment is necessary.
2,000 Gas Tax It is proposed to fund this project
from the $10,000 budgeted for
sidewalk removal and replacement
[03-142-903-0328]
6,000
Staff recommends that City Council approve the subject project, as
described in this report, for a total cost not to exceed $6,000.