Loading...
HomeMy WebLinkAboutAGENDA REPORT 1995 0802 CC REG ITEM 08GAGENDA REPORT (= = TY OF MOORPARK TO: The Honorable City Council FROM: Kenneth C. Gilbert, Director of Public DATE: July 21, 1995 (Council Meeting 8 -2 -95) IT[ -1 A "aORPARK, CAUFORNIA City Il�leeting -:f 199 ACTION: Works l SUBJECT: Consider Change to the Estimated Cost for the 1995 Street Reconstruction Project On June 21, 1995, the City Council approved the award of a contract to Security Paving Company, Inc. for the rehabilitation of the following streets: • Poindexter Avenue between Moorpark Avenue and Gabbert Road; • Everett Street between Moorpark Avenue and Magnolia Avenue; • Magnolia Avenue between Everett Street and Charles Street; • Bard Street between High Street and Charles Street; and, • Walnut Street between High Street and Everett Street. The project plans call for the complete reconstruction of certain streets. On Poindexter Avenue, however, the method of rehabilitation calls for a combination of techniques ranging from complete reconstruction to a simple asphalt overlay, depending on the condition of the street. At the time the project design was prepared, the design engineers had made an attempt to keep construction costs under control by limiting, where ever possible, the amount of street reconstruction by specifying the less costly approach of only constructing an asphalt overlay. Upon commencement of construction activities it was noticed that the current condition of the pavement in certain areas which had been designated to receive only an asphalt overlay, had deteriorated significantly since the time the pavement analysis was performed and the design was prepared. It was determined that the most cost effect approach to use in resurfacing this street would be to amend the plans by increasing the amount of pavement removal and replacement by including these distressed areas. reoon95.co j)0 ()0G5 Street Reconstruction Project August 1995 Page 2 B. Fiscal Impact 1. Cost Increase: The above described field change will have the effect of decreasing the quantities for certain bid items pertaining to only the construction of an asphalt overlay, and increasing the quantities for bid items pertaining to complete removal and reconstruction. It is anticipated that the net effect of this change will increase the total contract costs approximately $50,000. 2. Construction Cost Estimate: A summary of the anticipated increase in the final contract cost resulting from this change is summarized as follows: Item Bid Amt. (S) Contract Price 901,569.75 Contingency 93,430.00 Total Constr. 994,999.75 50,030.25 Revised Total (S) 951,600.00 M�-'-*Ykn 55,000.25 1,050,000.00 3. Total Project Cost Estimate: An estimate of the revised total project costs is as follows: Element Design Misc. Costs Construction Contingency (10 %) Contract Admin. & Inspection (15 %) Total 172,143 1,857 0 0 174,000 0 0 951,600 98,400 1,140,000 172,143 1,857 951,600 98,400 90,000 1,314,000 4. Budget: It is not recommended that the budget for the project be revised at this time. Other factors could result in increases or decreases to the final project costs. As you are aware, the City retains ten percent (10 %) of the cost of the work completed until after the project has been accepted. Keeping these deferred costs in mind, it is the intent of staff to bring a report to the City Council requesting any required adjustment to the budget and the appropriations for this project, prior to the date total expenditures exceed the amount now approved. reoon98.eo 0000ss Street Reconstruction Project August 1995 Page 3 A re -cap of the required budget resulting from the change described in this report, is as follows: Current Proposed Revised Account bo et C n o t 15-142-903 -0356 [SB-821 Grant] 411000 0 41,000 14- 142-903 -0356 [STTPP Grant] 171,000 0 171,000 01- 170- 903 -0356 [Local Share] 78 8,000 - 50,000 928,000 Total 1,090,000 50,000 1,140,000 LION Staff recommends that the City Council approve the increase in the scope and cost of work as described in this report. r®ccn95.co MOM?