1. In February of 1995 the City Council approved the subject
project and authorized staff to proceed with the project
design.
2. In June 1995, the City Council was provided with a copy of the
preliminary design for the area immediately south of Los
Angeles Avenue.
3. In September of 1995 the City Council approved the plans and
specifications for the subject project.
DISCUSSION
A. Design
The subject project calls for the construction of certain
traffic modifications on Spring Road south of Los Angeles
generally summarized as follows:
• the construction of a raised center median from Los Angeles
Avenue to a point approximately two hundred thirty feet
(2301) to the south;
• the relocation of the centerline easterly and the
re- striping of the street to provide for a double left turn
lane for north -to -west left turners;
• the restriping of Spring Road north of the intersection to
match the new lane line alignment south of the intersection;
• the installation of track lines through the intersection to
assist traffic flow; and,
• the relocation of the traffic loop detectors and the
restriping of the street as required.
sp_meQ. awd 000U5l
%5 - /b_-�-
I TE3I
i
AGENDA REPORT -- • �•r � -
C = TY OF MOORPARK
TO: The Honorable City Council _
FROM: Kenneth C. Gilbert, Director of Public Works
DATE: December 11, 1995 (Council Meeting 12- 20 -95) �sL
SUBJECT: Consider Award of Contract for the Construction of a
Double Left Turn Lane (North -to -West Traffic) and a
Raised Center Median on Spring Road South of Los Angeles
Avenue
1. In February of 1995 the City Council approved the subject
project and authorized staff to proceed with the project
design.
2. In June 1995, the City Council was provided with a copy of the
preliminary design for the area immediately south of Los
Angeles Avenue.
3. In September of 1995 the City Council approved the plans and
specifications for the subject project.
DISCUSSION
A. Design
The subject project calls for the construction of certain
traffic modifications on Spring Road south of Los Angeles
generally summarized as follows:
• the construction of a raised center median from Los Angeles
Avenue to a point approximately two hundred thirty feet
(2301) to the south;
• the relocation of the centerline easterly and the
re- striping of the street to provide for a double left turn
lane for north -to -west left turners;
• the restriping of Spring Road north of the intersection to
match the new lane line alignment south of the intersection;
• the installation of track lines through the intersection to
assist traffic flow; and,
• the relocation of the traffic loop detectors and the
restriping of the street as required.
sp_meQ. awd 000U5l
%5 - /b_-�-
Spring Road Median
December 1995
Page 2
B. Caltrans Permit
Staff has received a preliminary Encroachment Permit from
Caltrans, which amply describes all of the construction
requirements to the bidders. Caltrans will issue the final
permit upon receipt of a revised composite traffic signal plan.
That plan is being prepared and will be presented to Caltrans
in the near future. It is anticipated that the issuance of the
permit will delay City issuance of the Notice to Proceed.
C. Bid Results
Bids for the subject project were received and opened on
December 11, 1995. A tabulation of the bid results is attached
as Exhibit 1.
D. Oualifications
It has been determined that the apparent low bidder, G. T.
Equipment, Inc., is qualified to construct the subject project.
Said bidder has confirmed that their bid is valid and that they
are prepared to proceed with the construction of the project.
E. Fiscal Impact
1. Total Project Cost Estimate:
Element Cost Est. (S)
Design 11,788
Construction 29,860
Construction Contingency (20 %) ** 6,352
Admin & Inspection 4,000
Total 52,000
Note: Twenty percent (20 %) contingency requested due to possible additional requirements by
Caltrans.
2. Budget: The staff report which accompanied City Council
action authorizing the project
design
to proceed,
recommended that
project funding be
provided
by the L. A.
Avenue AOC. That
report recommended
that the
actual change
to the appropriation and an approved budget for this project
be deferred until
the award of contract.
Accordingly,
the
following changes
are recommended:
Current
Revised
Account #
Budget
Chan a
Bud et
003 - 142 - 903 -0416
60,000
(60,000)
0
027 - 142 - 903 -0416
0
52,000
52,000
Total
60,000
(8,000)
52,000
sp_ned2.awd
000052
Spring Road Median
December 1995
Page 3
F. Schedule
It is anticipated that construction of the subject project will
begin in January and be completed in February.
REMO(ENDATION ( Roll Call Vote)
Staff recommends that the City Council take the following actions:
1. Approve changes to the appropriation and budget amount for the
subject project as follows:
Acc #003 - 142 - 903 -0416: from $60,000 to $0 ($60,000 decrease)
Acc #027- 142 - 903 -0416: from $0 to $52,000 ($52,000 increase)
2. Award a contract to G. T. Equipment, Inc. in the amount of
$29,860.00;
3. Approve a construction contingency of approximately twenty
percent (20%) for the project and authorize the City Manager to
approve additional work, if required, for an amount not to
exceed ten per cent of the contract; and,
4. Authorize the Mayor to sign necessary contract documents.
sp_ned2.awd
000053
Exhibit 1
CITY OF MOORPARK
Bid Results
Spring Road Median
& Double Left Tirn Lane
December 11, 1995
------------------ - - - - --
ITEM DESCRIPTION
1
2
3
4
5
6
7
8
9
10
11
12
13
Traffic Control
Sawcutting
Patterned Concrete
Concrete Curb
Signing & Striping
Remove A/C & Base
Earthwork
Aggregate Base
A/C Pavement
Caltrans Permit
Constr. Surveying
Traffic Loops
Release
Bidder
---------------
NAME:
ADDRESS:
CITY, STATE:
PHONE NUMBER:
CONTACT PERSON:
Est Qty -- Units
1 LS
476 LF
119 SF
476 IF
1 LS
36 CY
1 LS
476 SF
678 SF
1 LS
1 LS
1 IS
1 IS
----------------------
Engineer's Estimate
---------------- - - - - --
-UNIT $__I TOTAL BID
2,000.00
2.00
3.50
9.00
3,250.00
25.00
110.00
0.80
0.75
3,000.00
1,000.00
1,000.00
1.00
2,000.00
952.00
416.50
4,284.00
3,250.00
900.00
110.00
380.80
508.50
3,000.00
1,000.00
1,000.00
1.00
VENDOR 1
G T Equipment
18828 Strathern St [B]
Reseda, Ca 91335
(818) 996 -3811
Greg Thornhill
UNIT $ 1 TOTAL BID
4,000.00
1.26
11.00
8.00
6642.00
88.00
800.00
1.05
5.00
709.00
133.00
4800.00
1.00
4,000.00
600.00
1,309.00
3,808.00
6,642.00
3,168.00
800.00
500.00
3,390.00
709.00
133.00
4,800.00
1.00
11001 l
CNM Paving, Inc. #499
2510 "G" Las Posas Rd
Camarillo, CA 93010
(805) 389 -1307
Matt Ludlow
UNIT $ I TOTAL BID
1550
1
20.00
12.00
6175.00
50.00
1350.00
1.35
5.68
450.00
700.00
5255.00
1.00
1,550.00
476.00
2,380.00
5,712.00
6,175.00
1,800.00
1,350.00
642.60
3,851.04
450.00
700.00
5,255.00
1.00
VENDOR 3
-----------------------
R&H Paving, Inc.
1497 Los angeles ave
Saticoy, CA 93004
(805) 389 -1307
Roy Williams
UNIT $ 1 TOTAL BID - -'
6,000.00
1.25
14.00
10.50
6500.00
65.00
2000.00
4.00
3.00
675.00
1350.00
8125.00
1.00
6,000.00
595.00
1,666.00
4,998.00
6,500.00
2,340.00
2,000.00
1,904.00
2,034.00
675.00
1,350.00
8,125.00
1.00
VENDOR 4
----------------------
E & M Contractors
14581 Tyler St
Sylmar, Ca 91342
(818) 362 -9811
Alfred Padilla
UNIT $ I TOTAL BID -
13000.00
2.00
15.00
9.00
5542.00
75.00
1500.00
5.00
7.00
450.00
1500.00
4500.00
1.00
13,000.00
952.00
1,785.00
4,284.00
5,542.00
2,700.00
1,500.00
2,380.00
4,746.00
450.00
1,500.00
4,500.00
1.00
Total 17,802.80 29,860.00 30,342.64 38,188.00 43,340.00