Loading...
HomeMy WebLinkAboutAGENDA REPORT 2018 0418 CCSA REG ITEM 09C CITY OF MOORPARK, CALIFORNIA City of Moorpark of April 18, 2018 ACTION Approved staff recommendation. By M. Benson Item: 9.C. MOORPARK CITY COUNCIL AGENDA REPORT TO: Honorable City Council FROM: Jeremy Laurentowski, Parks and Recreation Director PREPARED BY: Jessica Sandifer, Community Services Manager DATE: April 5, 2018 (CC Meeting of 04118118) SUBJECT: Consider Request for Proposal for Architect and LEED Certification Level for New Library Project BACKGROUND On May 15, 2007 a conceptual Master Plan was approved by the City Council for the future Civic Center project The concept included a 35,000 square foot City Hall structure, parking improvements, and improvements on High Street In addition, the concept included an option to create a new 25,000 square foot library, south of where the existing library stands today However, at the time the concept was presented, the City was still evaluating the need for a larger library facility In July, 2007 the City hired a library consultant to prepare a space needs study for a future library The study indicated that in order to provide the amount of space necessary to accommodate the ideal levels of service for current and future library patrons, the building would need to be approximately 33,000 square feet in size This was larger than the size of the building that was provided in the Master Plan In consideration of the costs to construct such a large building, as well as the associated maintenance and staffing costs, the City opted to conduct a voter opinion survey in the fall of 2007 The results of the survey did not substantiate that a ballot measure would be supported by the Moorpark voters to raise the necessary funding for a new library building After the survey was completed, efforts on the Civic Center project stalled due to other priorities In 2009, the undergrounding of the open storm drain channel to the west of the proposed Civic Center created additional design opportunities related to the Civic Center project The City was also expected to acquire about five acres west of and adjacent to the current civic center site as part of the Development Agreement with Essex Moorpark Owner, L P The covered channel would allow for potential expanded parking to the west of the site, as well as an opportunity to explore a new approach to the Civic Center project and inclusion of the library, particularly since funding would not be available for an expanded library as proposed in the 2007 study The project Architects were directed to design a Civic Center Master Plan concept with a single- story City Hall building and incorporating the existing library building, which would be 38 expanded and renovated. The library was proposed to be expanded from its current footprint of about 7,000 sq. ft. to approximately 15,800 sq. ft. Concurrently with these planning efforts, the Environmental Impact Report (EIR) for the Civic Center Master Plan was being prepared. For many reasons, including the historic Tanner Wall and future traffic constraints on High Street and Moorpark Avenue, the EIR preparation was turning into a lengthy and time consuming process. In January 2012, the City Council approved moving forward with the design of the expansion of the existing library while the EIR document was being completed. This way the library part of the project would not be further delayed, as the library expansion could be designed and constructed separate from the City Hall. Unfortunately in February 2012, the Redevelopment Agency was eliminated which caused a further delay in the project while the property ownership issues were resolved through the Redevelopment dissolution process. On December 7, 2016, the City Council selected a site for the library on the north side of High Street, across from the Post Office, and authorized staff to move forward with the design of a new 18,000 sq. ft. City library. The recommended size of the library is consistent with the current population of Moorpark, as many experts agree that the size of a library should be proportionate to the City’s population. The industry standard is one square foot of library space for every two residents. If we apply this calculation to Moorpark’s current population of approximately 35,000 residents, an 18,000 sq. ft. library would be appropriate. Subsequent to the City Council’s approval of the library site, staff had a geotechnical report prepared to determine the characteristics of the soil and what effect they would have during a seismic event. The soils report indicated that the Civic Center soils are susceptible to liquefaction and dry seismic settlement. These potential conditions can result in soil settlement and will most likely require soil improvement to mitigate potential settlement. The report indicated that ground improvement would be required to a depth of approximately fifty feet, resulting in additional cost to the library construction project. On December 20, 2017, the City Council created an Ad Hoc Committee to select the library architect and approved an agreement with Linda Demmers, Library Consultant to assist staff with the architect selection process, community engagement process, building space planning, programming, architecture review and consultation through construction. The consultant will ensure that the ultimate layout and function of the library will meet the City’s and community’s needs. Ms. Demmers began working on the library project in February 2018. A community input survey has been prepared and will be released April 13th. 39 DISCUSSION Staff, with Ms. Demmers assistance, has drafted a Request for Qualifications and Proposals (RFQ/P) for Design Development Services for the New Library. The RFQ/P defines the scope of services, identifies the known site constraints, and requests information regarding the Architectural Firms’ qualifications related to experience, particularly with Library facilities, and the proposed project design team. There is a secondary request for proposal where the Architectural Firms will provide a projected design cost based on the scope as described. Once received the proposal reviews will be based on the following criteria: 1. The firm’s understanding of the project 2. The Architect's approach and methodology for the project 3. The schedule for the project's development 4. The relevant experience of the firm 5. The Architect’s consideration for the site conditions and concern 6. The Architect's creativity and sensitive to the City's needs. 7. The Architect’s suggested use of creative energy conservation and maintenance efficiency measures. 8. Stated exceptions to the City's proposed contract for services. 9. The overall presentation provided by the proposal. The proposals will be evaluated by a Review Committee, consisting of the Ad Hoc Committee members (Mayor Parvin and Councilmember Simons), the library consultant and staff. The firms will be ranked based on the above criteria and interviews will be scheduled with the top-ranked firms. The firm selected as the most qualified to provide the requested services will be invited to negotiate a final Agreement. If an agreement is not reached, negotiations may be terminated and commenced with the next most qualified firm. The City reserves the right to conduct additional interviews after the cost proposals are opened. Careful attention to the provisions included in this solicitation, particularly the use of creative energy conservation and maintenance efficiency measures will be given extra consideration. In addition to review of the RFQ/P staff is looking to confirm the Leadership in Energy and Environmental Design (LEED) Certification desired by the City Council for the Library building. LEED is a green building rating system that provides a framework to create healthy, highly efficient and cost-saving green buildings. Projects pursuing LEED certification earn points across several categories, including energy use and air quality. Based on the number of points achieved, a project then earns one of four LEED rating levels: Certified, Silver, Gold or Platinum. It should be noted that there is a potential for LEED Certification to increase construction costs, depending upon the types of materials and features incorporated into the design to obtain the certification. The U.S. Green Building Council states that on average across all levels of certification, LEED certification increases construction costs approximately 2%. However, the savings in utility and maintenance costs, realized by incorporating these features, generally covers this increase in costs. In previous discussions regarding the Civic Center, the City 40 Council had determined that a LEED Certification level of Gold should be obtained for the Civic Center building. Staff would like to confirm that LEED Gold certification is still the desired level of certification for the Library building. As previously mentioned, staff anticipates that the library project will take approximately three years to complete. The following is an updated project schedule: Selection of architect & consulting team January 2018 May 2018 Development of Building Program February 2018 May 2018 Architecture Conceptual Plans/Schematics June 2018 Aug 2018 Architecture Design Development Package October 2018 February 2019 Architecture Construction Documents February 2019 September 2019 Project Bid October 2019 December 2019 Project Construction January 2020 December 2020 The Ad Hoc Committee had some concerns regarding future planning efforts for the Civic Center. Staff will be bringing an item to the City Council in the near future to discuss options and obtain direction on issues relevant to the future master planning for the Civic Center. The library and future civic center planning will be parallel efforts. Staff does not believe that the Library project will eliminate any options regarding the ultimate layout and location of the future Civic Center. However, if the Library project gets too far ahead of the Civic Center planning, it can be delayed to allow those efforts to be incorporated into the final plan for the Library. FISCAL IMPACT The City’s library consultant has provided staff with updated construction cost estimates based on recent library projects. The cost of the library including architectural, consulting costs, site improvement costs, utility improvements, construction and furniture, fixtures and equipment is estimated to be $18,000,000. Staff will return to the City Council with a detailed construction budget once an architect has been selected and the site constraints have been fully evaluated. STAFF RECOMMENDATION 1. Approve and Authorize release of Request for Qualifications and Proposal for Design Development Services for New Library; and 2. Direct staff to obtain LEED Gold Certification for the New Library. Attachment – RFQ/P New Library Architect 41 REQUEST FOR QUALIFICATIONS AND PROPOSAL for DESIGN DEVELOPMENT SERVICES NEW LIBRARY FOR THE CITY OF MOORPARK JEREMY LAURENTOWSKI PARKS AND RECREATION DIRECTOR CITY OF MOORPARK 799 MOORPARK AVENUE MOORPARK, CA. 93021 805-517-6216 April 2018 42 INDEX PAGE I INTRODUCTION ..........................................................................................3 II SCOPE OF SERVICES ................................................................................3 III BACKGROUND ............................................................................................3 IV PROPOSAL CONTENT & FORMAT ............................................................5 V PROPOSAL EVALUATION & SELECTION .................................................7 VII GENERAL PROPOSAL TERMS & CONDITIONS .......................................7 APPENDIX I. Site Parcel Map II. General Guidelines III. Sample Agreement (includes Exhibits A, B & C) IV. Geotechnical Report V. Site Survey 43 I. INTRODUCTION The City of Moorpark is requesting proposals for architectural services for Building Program, Schematic Design, Design Development, Construction Documents, and Construction Support for a new 18,000 sq. ft. City library to be located on a 42,000 sq.ft, portion of city-owned property on High Street in Moorpark, California (see Appendix I). II. BACKGROUND SITE AND AREA DESCRIPTION The project site lies within the Moorpark Downtown Specific Plan Area south of the existing library, north of High Street, and west of the Cesar’s Carpet Building on the corner of Moorpark Avenue and High Street. The property is presently zoned Commercial Old Town, C-OT. The property includes a primary parcel containing approximately 2 acres, of which 42,000 sq. ft. are available for use for the Library. The Library will serve as a part of the western civic facility anchor for the High Street downtown corridor with the east anchor already established with the construction of the Police Services Center and Ruben Castro Human Services Center. KNOWN SITE CONDITIONS Soil Liquefaction - Local geological, geotechnical, and ground water conditions in this area of Moorpark indicate a high potential for permanent ground displacement (liquefaction) and differential settlement requiring mitigation. Recent geotechnical studies for projects in the downtown area have confirmed severe liquefaction issues on adjacent sites. In response to these reports, the City conducted a geotechnical study of the library site, which indicated ground improvement measures would be needed up to a depth of fifty feet. It is important that the responding architect select geotechnical and civil engineering firms familiar with design of foundations with these types of soil conditions. The geotechnical report is included with this RFQ/RFP as Appendix IV. Closed Storm Drain Channel – On the west side of the site there is a covered box channel and associated easement with the Ventura County Flood Control District. This area should be avoided when site planning. Vehicular Access – Ingress and egress for the site is available from High Street and through the existing Civic Center driveway on Moorpark Avenue. High Street will be widened in the near future, so the Architect will be taking that into consideration when site planning for the Library. Utilities – Adequate utility services are generally available to serve the site. Some modification may be required to deliver appropriate fire flows and some utilities may need to be re-located. 44 Proximity to Railroad – The selected Library site is within 150’ of an active railroad corridor, crossing site, and rail storage yard. There is significant noise that occurs from the activity of the trains. Mitigation measures will be needed to decrease the external noise from the railroad from inside the Library. III. SCOPE OF SERVICES Architectural and engineering services shall consist of all items of work necessary for verification of building program, site planning, schematic design, city review, design development, city development review, construction documents, plan submittal, contract documents, and construction administration for an approximately 18,000 square foot Library. Architect should be aware that budget constraints may reduce the size of the Library as the planning process commences. The architect selected for this project will complete a conceptual and final building program. The City is working with a library consultant who will conduct a community engagement program, prepare a library building program, and will continue as a consultant on the project to assist with program validation and assist with furniture and equipment selection. The following list includes a brief description of the tasks for the Architectural Firm to perform including but not limited to: • Complete Architectural design services • Site planning for the proposed library, including consideration of a potential layout for the City’s Civic Center master plan. • Grading and Drainage Plan including geotechnical data and surface run-off LISTED TWICE, SEE BELOW) • Schematic Design using architectural styles consistent with the City’s Downtown Specific Plan, which can be obtained on the City’s website here: http://moorparkca.gov/documentcenter/view/86 • Determine parking and landscape requirements • Submittal of the schematic design to the City Community Development Department for review • Design Development • Submittal of the approved Design Development to the City Community Development Department development for approval • Management of all engineering and specialty consultants • Mechanical Engineering • Electrical Engineering • Audio-visual consultant to design sound, projection, and other media requirements • Technology consultant responsible for coordination with City’s IT department on all low voltage requirements 45 • Signage consultant to design turnkey signage package for informational, directional, site, and fire and life safety signage • Structural Engineering including Seismic Analysis • Lighting consultant/engineer for both interior and site lighting • Acoustical consultant to mitigate excessive site noise • Grading and Drainage Plan including geotechnical data and surface run-off calculations • Plumbing Engineering and design • LEED Building Design. The City Council has determined that the LEED Certification for the New Library should be Gold Level • Saving by Design process, sustainability, team collaboration, and energy efficiency • Landscape Architectural design services • Selection of interior and exterior materials, finishes, and fixtures (subject to City approval) • Interior Design Services, layout and furniture recommendations only. To save costs, the City would like to explore purchase of furniture and fixtures through CMAS or other similar contracts. • Cost Estimating is to be included with the Pre-Design, Schematic Design, Design Development, and Construction Document phases. • Design Schedule is to be included with the Pre-Design, Schematic Design, Design Development, and Construction Document phases • Construction Schedule is to be included with the Pre-Design, Schematic Design, Design Development, and Construction Document phases. More detailed information on each task is provided below. IV. DETAILED TASK BREAKDOWN Describe the time schedule for each proposed task and subtask. Indicate proposed work periods, milestones, and proposed completion dates, as well as anticipated meeting periods. The proposal shall show a lump sum cost estimate for each task identified. Break down tasks by hours and hourly cost. In addition, sub-consultants should be identified in the scope of work. Provide cost estimate for each subtask by classifications, providing hourly billing rates for personnel, with the estimated total based on hourly estimates. The estimate shall include all clerical, administrative, and support functions. The cost estimate shall include provisions for meeting with the agency to report progress of the work. Task 1: Overall project Management – Pre-Design • Study in detail the Downtown Specific Plan. • Review draft building program provided by City’s Library Consultant. • Obtain and review available reports, maps, design survey, and utility information. 46 • Conduct a field reconnaissance to assess existing conditions near the project site. Firm's field review of the project site should focus on factors that could affect the project. • Research the existing underground and overhead utilities in the project site. • Develop a Project Development Team (PDT) and set monthly Project Development Team Meeting schedule. Members of the PDT shall include the Consultant and sub- consultants, City staff, County staff, and Library Consultant. • Prepare Monthly Progress reports and supporting data. The progress report shall include accomplished tasks for the month, anticipated progress for the next month, pending issues and schedule completion target dates. • In conjunction with the City’s Library Consultant, finalize Building Program and provide City with confirmed proposed area for proposed library. • Provide a quality control plan in effect during the entire course of the project. • Attend public meeting and prepare exhibits. • Determine codes, standard, and LEED design for the project. • Determine schedule and submittals. • Start the Southern California Edison "Saving by Design" process and schedule. • Determine the initial architectural styles for study by providing architectural elevation sketches and comments to aid City to determine style for project. • Provide an initial construction estimate based on building program and initial studies. Task 2: Schematic Building Design and Preliminary Site Design • Provide further design to determine the architectural style for the project. Assume City will go forward with a minimum of two styles require elevation and floor plans at the schematic phase. • Determine site plan for a stand-alone library with parking and landscaping, and consider the future construction of a City Hall building on the site in proximity to the Library. Consideration of the future City Hall building will be limited to looking at how the building would fit on the site with the library building. • Determine preliminary site drainage and grading. • Generate initial elevations based on the architectural styles provided in the specific plan. • Generate initial floor plans based on the building program and initial cost analysis. • Analyze initial floor plans for LEED, efficiency, and cost. • Analyze initial floor plans for accessibility and any fire and life safety concerns. • Generate key building sections, major elevation elements, materials, and compliance with the specific plan. • Select structural systems, materials, generate preliminary framing plan, and generate foundation plan. • Select mechanical systems, determine preliminary unit and duct size. In addition, generate diagrammatic layout of the system. 47 • Propose basic power plan, and lighting plan. In addition, locate and size electrical and communications rooms. • Generate preliminary plumbing load calculations and identify points of connection. In addition, identify meter size and location. • Propose preliminary landscaping and irrigation plan. • Generate preliminary energy model, review project with LEED commissioning agent. In addition, review targeted credits. • All design work shall be coordinated with the City and all approving Agencies. • The City has had a geotechnical report prepared to study the potential for liquefaction on the site. The report is included in this RFP as Appendix IV . Architect should plan on preparing any additional geotechnical investigations of the site needed to complete the design of the building. • Determine the FEMA floodway to set the pad elevation above the 100-year flood plain, if required. • Prepare floor plans and elevations for review and approval by City. (including furniture, bookstacks, and equipment) • Complete necessary design and construction approvals for the project to the City's Planning Development Review Committee. In addition, provide all necessary plan check copies required for development review. • Coordinate with utility companies the size and location of utility service to the proposed library. • Map existing utilities on project base plans based on as built obtained from utility companies. In addition, advise and support the City in utility relocations. • Prepare preliminary grading and drainage plan, adjust grades as necessary to accommodate uses, circulation and to comply with ADA requirements. • Conduct meetings with development team and utility companies to review project schedules, concepts, plans, and specifications. In addition, prepare meeting minutes. • Provide the City with a copy of all collected survey and utility information, as well as all correspondence. • Prepare preliminary storm water runoff analysis subject to NPDES permit. • Prepare and evaluate LEED project checklist, comply with "Saving by Design process. • Provide and update construction cost estimate based on the City approved schematic design. In addition, the cost estimate shall include total cost, and subtotals for each category of work. • Provide an updated design schedule and construction schedule prior to starting the design development phase. • Conduct meeting with Project Development Team to resolve the architectural style prior to starting the design and development phase. • Submit the Final Schematic Design and site plan to the Community Development Department's development review process prior to starting design development. 48 Task 3: Design Development • Ensure the design development addresses the comments from the Community Development Department development review. • Architect will assist City with processing plans through the Planning Review process, including presentation and approvals by the Planning Commission and City Council. • Architect will assist City with preparation of a site location for a public art project, including presentation and review by the Arts Commission and City Council. • Develop plans including dimensions, colors, materials, details, refine elevations, wall sections, and specifications. In addition, select preliminary schedules including doors, windows, hardware, and finishes. • Develop building systems including structural calculations, framing plans, foundation plans, size framing members, and coordination with other systems. • Develop signage package including all informational, directional, site, and fire and life safety signage. • Develop mechanical systems including size ducts, locate runs, and identify equipment manufacture and equipment size. • Develop electrical power and data plan; lighting and fixtures plan; coordinate with utility companies; and develop low voltage plans. • Prepare casework plans for significant architectural elements • Prepare detailed furniture plans for all public, staff, meeting, and support spaces. Coordinate clearances and access to power and data at individual stations. • Provide isometrics indicating light level on horizontal surfaces for user and staff workstations and vertically at several heights on the face of bookstack units. • Select plumbing fixtures sizes, pipe sizes, and coordinate points of connections. • Identify acoustical areas of concern and propose mitigations. • Develop landscape and irrigation including complete plant selection, hardscape, and components for irrigation system, consistent with City Landscape Design Guidelines and State Model Water Efficiency Landscape Ordinance. • Develop site parking, drainage, and grading plan. In addition, submit geotechnical report for building and parking to City Engineering Section. • Check status of LEED credits, enroll project with USGBC, set up on-line reporting site, and update energy model and commissioning. • Develop the "Saving by Design" based on the approved City Design development approval. • The design development plans for the library and site shall be submitted to the City Community Development Department for development review and approval prior to the construction document phase. • Coordinate input from all sub-consultants and City for quality control check. • Revise design schedule and construction cost estimate based on the Design Development plans. • Provide a digital 3-dimensional model of the library and site plan. 49 • Present the approved Design Development plans to City and Community. Task 4: Construction Documents and Plan Review • Submit for City plan review plans at 35%, 75%, and 90% completion phases of the design. • Submit at all phases of City plan review draft drawing, and draft specification. • Submit at all phases of City plan review updated design schedule, construction schedule, and estimated construction cost. • Submit to the City Engineering Development Division the precise grading plan and geotechnical report for engineering approval no later than the 90% plan review. • Meet with City staff at all phases of City plan review to review design issues, path of travel, architectural design. • Submit 90% plan review' to City Building Department including all calculations for building department plan check for initial review. Task 5: Construction Documents and Plan Check Submittal • Deliver details, waterproofing, roofing, signage, plan check architectural drawing, and complete construction specifications. • Submit for Building Department Plan Check the complete plan check submittals for architectural, structural, mechanical, electrical, plumbing, irrigation, landscaping, site civil, acoustical, and LEED. • Submit the precise grading plan to the City Engineer Development Division for engineering approval. • Update the energy model and confirm targeted credits. • Update the construction cost estimate and construction schedule. • Perform quality control check. Task 6: Construction Documents 100% Complete • Finalize drawings and specifications for architectural and building systems. • Make Building and Engineering Division plan corrections. • Make final coordination of the bid documents with City standard and contract. • Perform Final Quality Control Check. • Finalize LEED coordination • Finalize "Savings by Design” • Update the construction cost estimate. • Update the construction schedule. • Obtain the Building Permit • Obtain Grading Plan approval Task 7: Bidding • Attend Pre-Bid conference 50 • Respond to Bidders questions. • Write addendums in response to bidder questions and design changes. Task 8: Construction Administration and Support • Attend Partnering Meeting • Attend Pre-Construction Meeting • Attend regular jobsite meetings and regular job inspection visits • Respond to RFI's and review submittals and shop drawings • Review contractors request for construction change order including cost estimating • Review contractor's application for progress payments • Complete the LEED documentation and submittal • Complete the "Savings by Design" documentation and submittal • Complete punch list • Prepare Record Documents/as-built plans • Perform project closeout Task 9: Post Occupancy Review • Conduct a project walk with City staff and General Contractor after 10 months to review any items subject to warranties. Task 10: Additional Tasks to Consider In addition to the tasks listed above, the Consultant shall also conduct the following services: • Meet with the City approximately once a month to report on the progress of the work. A brief written summary of these meetings shall be prepared by the Consultant and submitted to the Project Manager. • Provide electronic copy of all documents developed during the contracted period with the City. Drawings are to be submitted to City in AutoCAD 2012 or earlier, and documents shall be prepared utilizing Microsoft programs, i.e., "Word," "Excel," "PowerPoint," and "Project." The City expects the Consultant to prepare a comprehensive proposal with recommendations, actions, and procedures to accomplish the objectives set forth above. The City seeks a Consultant who is committed to providing high-quality work in a reasonable timeframe that meets all applicable state and federal regulations. The City shall provide all relevant data in its possession that pertains to this project in support of the Consultant's professional services. The City assumes no responsibility whatsoever with respect to the sufficiency or accuracy of any information supplied. The Consultant shall be responsible for evaluation of all information supplied by the City. 51 The City's Project Manager will direct and coordinate this Project. The Consulting Project Manager shall receive, coordinate and transmit reports and documents to and from the Consulting team and act as liaison. V. PROPOSAL CONTENT/FORMAT The architect shall submit a Technical Qualifications Proposal and a Detailed Cost Proposal. The two proposals should be provided in a sealed envelope and marked on the outside of the envelope “NEW LIBRARY PROPOSAL” - with the name of the firm. Six (6) copies of the Proposal are required. Submit proposals to: City of Moorpark 799 Moorpark Avenue Moorpark, CA. 93021 Attention: Jeremy Laurentowski Parks and Recreation Director PROPOSALS MUST BE RECEIVED BY THE CITY NO LATER THAN 5:00 P.M., ON ________________________. Technical Qualifications Proposal Content The Technical Qualifications Proposal must follow the format identified below, and be numbered accordingly. 1. Name and address of firm 2. Principal(s) of firm, Project Architect, Project Team members and how long proposed project team has worked together. 3. Experience of firm in providing requested scope of services, specifically referencing at least three (3) public library facilities, especially if the project was of a similar size to this project. Include the date of the project, project budget, and contact person for the agency that may provide information regarding the architect’s work. 4. A listing of other projects and references that the architect believes would further support their qualifications for this assignment. 5. Experiences of the Project Architect, particularly involving library projects the Architect has managed and number of years the Architect has worked for their current firm. 6. A listing of the architectural firm’s current projects. 52 7. A listing of all sub-contractors or consultants proposed by the architect for this project. After the proposal deadline, substitution of consultants may only be made by permission of the City. Identify experience of consultant and provide a list of relevant projects and references demonstrating their qualifications for this work. As previously mentioned, engineering firms with experience dealing with liquefaction soil conditions is important to the City. Experience with library facilities is required. 8. A listing of any pending or previous litigation over the past five years related to your firm’s work in the architectural field. 9. General Proposal Terms and Conditions are attached to this RFP/RFQ; submittal of a proposal by the architect signifies the architect understands, and will abide by these Terms & Conditions. 10. Exceptions - The City reserves the right, without obligation, to grant exceptions to the RFP /RFQ. However, the architect must note any exceptions, and their reasons, in their proposal. Exceptions taken will be considered during the evaluation process. 11. A general narrative, not to exceed one page, describing why the architect is qualified for this assignment. Also, provide a statement of overall approach and methodologies the architect proposes to undertake in order to meet the needs of the City. 12. Provide a schedule of completion for the Scope of Work contained in the RFP including any suggested additional work believed by the Architect to be necessary to achieve the City’s goal for Preliminary Site Development of the Project suitable for environmental review. Cost Proposal Content The Architect shall provide a separate fee proposal for the requested services. The actual dollar fee paid to Architect shall be fixed. The cost proposal should provide a list of reimbursable expenses the architect will submit as part of their work on the project, including any overhead and markup (see “reimbursable” section of sample contract form for allowed reimbursements). The architect’s cost proposal shall also include all fees to be paid to the Architect’s consultants. In addition to the fixed fee for the project, the architect shall provide a schedule of hourly billing rates for the various levels of staff who may participate in the project, should the need for extra services arise. No additional markup will be allowed on fees quoted. The cost proposal shall be submitted with the Technical Qualifications Proposal in a separate, sealed envelope marked “NEW LIBRARY- COST PROPOSAL”, with the architectural firm name. Six (6) copies of the cost proposal are required. 53 Payments to the architect shall be made on a monthly basis and shall be in proportion to services performed. The architect shall not be reimbursed for travel expenses associated with work on this project unless the City specifically authorizes certain out-of-town travel. Travel to City offices, the project site, material manufacturers, and jurisdictional agencies are not considered “out of town” travel. VI. DESIGN REQUIREMENTS The building design shall conform to the latest edition of the California Building Code, California Mechanical and Plumbing Code, California Electrical Code, California Energy Regulations, the American Disabilities Act (CalDaag Manual) for accessibility. Site work shall conform to the latest edition of the Standard Specifications for Public Works Construction. VII. PROPOSAL EVALUATION AND SELECTION All proposals properly received before the aforementioned date and time will be evaluated by a Review Committee. Based on the following Criteria: 1. The firm’s understanding of the project 2. The Architect's approach and methodology for the project 3. The schedule for the project's development 4. The relevant experience of the firm 5. The architects consideration for the site conditions and concern 6. The architect's creativity and sensitive to the City's needs. 7. The Architects suggested use of creative energy conservation and maintenance efficiency measures. 8. Stated exceptions to the City's proposed contract for services. 9. The overall presentation provided by the proposal. The firms will be ranked and interviews will be scheduled with the top-ranked firms, as deemed necessary. The firm selected as the most qualified to provide the requested services will be invited to negotiate a final Agreement. If an agreement is not reached, negotiations may be terminated and commenced with the next most qualified firm. The City reserves the right to conduct additional interviews after the cost proposals are opened. Careful attention to the provisions included in this solicitation particularly the use of creative energy conservation and maintenance efficiency measures will be given extra consideration. The City reserves the right to negotiate the specific requirements and costs using the selected proposal as a basis. The City reserves the right to reject any or all proposals at its sole discretion. 54 The City is not liable for any costs incurred by the architect or their consultants in preparing the proposal. VIII. GENERAL PROPOSAL TERMS AND CONDITIONS Contract Requirement - The architect to whom the contract is awarded shall execute a written contract with the City within ten (10) calendar days after notice of the award has been sent by electronic mail to the architect at the e-mail address given in the proposal. The contract shall be made in the form adopted by the City and incorporated in this RFP/RFQ. The architect warrants that it possesses, or has arranged through subcontracts, all capital and other equipment, labor and materials to carry out and complete the work hereunder in compliance with all applicable federal, state, county, and City laws, ordinances, statutes and regulations. Contract Assignment - The architect shall not assign, transfer, convey or otherwise dispose of the contract, or its right, title or interest, or its power to execute such a contract, to any individual or business entity of any kind without prior written consent of the City. Non-Discrimination - In the performance of the terms of this contract, the architect agrees that it will not engage in, nor permit such subcontractors as it may employ to engage in, discrimination in employment of persons because of age, race, color, sex, national origin or ancestry, gender or gender identify, or religion of such person(s). Communications Regarding RFQ & RFP - If a firm is in doubt as to the meaning or intent of any part of the Request for Qualifications, or discovers discrepancies in or omissions from the Request for Qualifications, it may submit a written request for an interpretation or correction thereof to Jessica Sandifer, Community Services Manager, City of Moorpark. Interpretation or correction of the Request for Qualifications shall be made only by addendum duly issued by the Parks and Recreation Director. A copy of any such addendum will be mailed or delivered to each person receiving the Request for Qualifications, and such addendum shall be considered a part of the Request for Qualifications and shall be incorporated therein. All timely requests for information submitted in writing will receive a written response from the City. Telephone communication with members of City staff is not encouraged, but will be permitted. However, any such oral communication shall not be binding on the City. Payment Terms - The City’s payment terms are 35 (thirty-five) days from the receipt of an original invoice and City acceptance of the quantity and quality of the services being billed. Ownership of Reports and Data - The originals of all studies, reports, exhibits, documents, data and/or other work material(s) prepared and/or used to comply with any section/condition of this Request for Qualifications, including any copies of same required by the agreement to be furnished to the City, shall be public records, which shall be open to inspection by the public and shall become and remain the property of the City. 55 Modification or Withdrawal of Submittals - Any proposal received prior to the date and time specified for receipt of proposals may be withdrawn or modified by written request of the architect. To be considered, however, the modified proposal must be received by the time and date originally specified. Property Rights - Proposals received within the prescribed deadline become the property of the City and all rights to the contents therein become those of the City. Confidentiality - Prior to award of the contract, all proposals will be designated confidential to the extent permitted by the California Public Records Act. After award of the contract, or if not awarded, after rejection of all proposals, all responses will be regarded as public records and will be subject to review by the public. Any language purported to render confidential all or portions of the proposals will be regarded as non-effective and will be disregarded. Amendments to Request for Qualifications - The City reserve the right to amend the Request for Qualifications by addendum at least 5 (or 7) days prior to the final proposal submittal date. Non-Exclusive Contract - The City reserves the right to contract with other firms during the contract term or to issue multiple contracts for individual aspects of the project as may deemed in the best interests of the City. Insurance – See sample Agreement document for insurance requirements. Non-Commitment of City - This Request for Qualifications/Proposals does not commit the City to award a contract, to pay any costs incurred in the preparation of a proposal responding to this request, or to procure or contract for services. The City reserves the right to accept or reject any or all proposals received as a result of this request, to negotiate with any qualified firm, or to modify or cancel in part or in its entirety the Request for Qualifications/Proposal, if it is in the best interest of the City to do so. Public Domain - All products used or developed in the execution of any contract resulting from this Request for Qualifications/Proposal will remain in the public domain at the completion of the contract. Termination - The City reserves the right to terminate the agreement, once executed, upon thirty (30) calendar days written notice to the Architect. Architect may terminate the Agreement with thirty (30) days written notice for City’s breach only -(See Agreement – Appendix III). Conflicts of Interest – The architect agrees to promptly notify City whenever a client or consultant has an interest in any project referred to Architect for professional services. In particular, architect shall disclose any financial interest or relationship with any construction 56 company that might submit a bid on the resulting construction project. Such project may be withdrawn by the City, with no compensation due, if the consultant has a conflicting interest. Conflict of Interest Disclosure - In accordance with California Government Code Section 87306, the architect awarded a contract may be required to file a Conflict of Interest Statement, Form 730. If such a requirement is made, the filing must be no later than thirty (30) days after the execution of the contract, annually thereafter prior to April 1st of each year for the duration of the contract, and within thirty (30) days of termination of the contract. Failure to file any required statements will result in withholding payment for services rendered. Inspections City reserves the right to inspect the work being done by architect and/or the architect’s subcontractors at any time. 57 APPENDIX I Site Map 58 APPENDIX II GENERAL GUIDELINES ARCHITECTURE The principal architectural characteristics and layout are to be compatible with the surrounding area and structures. The Moorpark Library shall be designed for maximum efficiency and security and those areas to be accessible to the general public including the public entry areas and public parking facilities shall be designed for convenience and presenting an attractive, friendly and comfortable atmosphere.. The approximate construction budget (hard costs) shall not exceed $12 million. 1. All applicable federal, state and local building, health, and fire codes/ordinances shall be adhered to in the building’s design and construction. 2. The building and site design shall meet the program requirements with respect to development of all spaces and conformance to the area requirements including the recommendations contained in the soils report and other City requirements 3. Building materials and finishes shall be durable and as vandal resistant as possible while maintaining architectural integrity. 4. Site layout shall accommodate required and extra parking spaces and design shall adhere to the City of Moorpark parking lot design standards. 5. Site layout/design shall indicate vehicular traffic patterns, facility service access, and ADA paths of travel. 6. Site layout/design shall indicate landscape and irrigation detail. 7. Landscaping will enhance the project yet be reasonably easy to maintain and consistent with other public facility landscaping in the community. 8. Provide for exterior walkway lighting and security lighting where appropriate. 9. The building and site shall include provisions for security, including digital security cameras. 10. Prior to submitting a proposal, the Architect and consultants shall examine the site and submit in writing any request for clarifications to the City of Moorpark’s designated representatives. 59 APPENDIX III SAMPLE AGREEMENT PROFESSIONAL SERVICES AGREEMENT BETWEEN THE CITY OF MOORPARK AND___________ FOR ARCHITECTURAL SERVICES RELATED TO A NEW LIBRARY THIS AGREEMENT, made and effective as of this _______ day of_________, 2018, between the City of Moorpark, a municipal corporation (“City”) and - ______________, a corporation (“Consultant”). In consideration of the mutual covenants and conditions set forth herein, the parties agree as follows: WHEREAS, City has the need for architectural services; and WHEREAS, Consultant specializes in providing such services and has the proper work experience, certifications, and background to carry out the duties involved; and WHEREAS, Consultant has submitted to City a Proposal dated_________, which is attached hereto as Exhibit ______. NOW, THEREFORE, in consideration of the mutual covenants, benefits, and premises herein stated, the parties hereto agree as follows: 1. TERM The term of this Agreement shall be from the date of execution to completion of the work identified in the Scope of Services and in conformance with Exhibit , unless this Agreement is terminated or suspended pursuant to this Agreement. 2. SCOPE OF SERVICES City does hereby retain Consultant, as an independent contractor, in a contractual capacity to provide architectural services, as set forth in Exhibit ______. In the event there is a conflict between the provisions of Exhibit _______ and this Agreement, the language contained in this Agreement shall take precedence. Consultant shall perform the tasks described and set forth in Exhibit ______. Consultant shall complete the tasks according to the schedule of performance which is also set forth in Exhibit ______. Compensation for the services to be performed by Consultant shall be in accordance with___________. Compensation shall not exceed the rates or total contract value ____________ dollars ($__________) as stated in__________, without a written 60 Amendment to the Agreement executed by both parties. Payment by City to Consultant shall be in accordance with the provisions of this Agreement. 3. PERFORMANCE Consultant shall at all times faithfully, competently and to the best of their ability, experience, standard of care, and talent, perform all tasks described herein. Consultant shall employ, at a minimum, generally accepted standards and practices utilized by persons engaged in providing similar services as are required of Consultant hereunder in meeting its obligations under this Agreement. 4. MANAGEMENT The individual directly responsible for Consultant’s overall performance of the Agreement provisions herein above set forth and to serve as principal liaison between City and Consultant shall be _______________, and no other individual may be substituted without the prior written approval of the City Manager. The City’s contact person in charge of administration of this Agreement, and to serve as principal liaison between Consultant and City, shall be the City Manager or the City Manager’s designee. 5. PAYMENT Taxpayer ID or Social Security numbers must be provided by Consultant on an IRS W-9 form before payments may be made by City to Consultant. The City agrees to pay Consultant monthly, in accordance with the payment rates and terms and the schedule of payment as set forth in ________, based upon actual time spent on the above tasks. This amount shall not exceed _________ dollars ($________) for the total term of the Agreement unless additional payment is approved as provided in this Agreement. Consultant shall not be compensated for any services rendered in connection with its performance of this Agreement, which are in addition to those set forth herein, unless such additional services and compensation are authorized, in advance, in a written amendment to this Agreement executed by both parties. The City Manager, if authorized by City Council, may approve additional work not to exceed ten percent (10%) of the amount of the Agreement. Consultant shall submit invoices monthly for actual services performed. Invoices shall be submitted on or about the first business day of each month, or as soon thereafter as practical, for services provided in the previous month. Payment shall be made within thirty (30) days of receipt of each invoice as to all non-disputed fees. Any expense or reimbursable cost appearing on any invoice shall be accompanied by a receipt or other 61 documentation subject to approval of the City Manager or the City Manager’s designee. If the City disputes any of Consultant’s fees or expenses, City shall give written notice to Consultant within thirty (30) days of receipt of any disputed fees set forth on the invoice. 6. TERMINATION OR SUSPENSION WITHOUT CAUSE This is covered above on page 15. Language is consistent in both locations. The City may at any time, for any reason, with or without cause, suspend, or terminate this Agreement, or any portion hereof, by serving upon the Consultant at least ten (10) days prior written notice. Upon receipt of said notice, the Consultant shall immediately cease all work under this Agreement, unless the notice provides otherwise. If the City suspends or terminates a portion of this Agreement, such suspension or termination shall not make void or invalidate the remainder of this Agreement. The Consultant may terminate this Agreement only by providing City with written notice no less than thirty (30) days in advance of such termination. In the event this Agreement is terminated or suspended pursuant to this Section, the City shall pay to Consultant the actual value of the work performed up to the time of termination or suspension, provided that the work performed is of value to the City. Upon termination or suspension of the Agreement pursuant to this Section, the Consultant will submit an invoice to the City pursuant to this Agreement. 7. DEFAULT OF CONSULTANT The Consultant’s failure to comply with the provisions of this Agreement shall constitute a default. In the event that Consultant is in default for cause under the terms of this Agreement, City shall have no obligation or duty to continue compensating Consultant for any work performed after the date of default and can terminate or suspend this Agreement immediately by written notice to the Consultant. If such failure by the Consultant to make progress in the performance of work hereunder arises out of causes beyond the Consultant’s control, and without fault or negligence of the Consultant, it shall not be considered a default. If the City Manager or his/her designee determines that the Consultant is in default in the performance of any of the terms or conditions of this Agreement, he/she shall cause to be served upon the Consultant a written notice of the default. The Consultant shall have seven ( 7) days after service upon it of said notice in which to cure the default by rendering a satisfactory performance. In the event that the Consultant fails to cure its default within such period of time, the City shall have the right, notwithstanding any other provision of this Agreement, to terminate this Agreement without further notice and without prejudice to any other remedy to which it may be entitled at law, in equity or under this Agreement. 62 8. LIQUIDATED DAMAGES If the Consultant fails to complete the work, or any portion thereof, within the time period required by this Agreement, or as duly extended in writing by the City Manager, Consultant shall forfeit and pay to the City, as liquidated damages, the sum of fifty dollars ($50) per day for each calendar day the work, or portion thereof, remains uncompleted after the above specified completion date. Liquidated damages shall be deducted from any payments due or to become due to the Consultant under the terms of this Agreement. Progress payments made by the City after the above specified completion date shall not constitute a waiver of liquidated damages by the City. 9. OWNERSHIP OF DOCUMENTS Consultant shall maintain complete and accurate records with respect to sales, costs, expenses, receipts, and other such information required by City that relate to the performance of services under this Agreement. Consultant shall maintain adequate records of services provided in sufficient detail to permit an evaluation of services. All such records shall be maintained in accordance with generally accepted accounting principles and shall be clearly identified and readily accessible. Consultant shall provide free access to the representatives of City or the City’s designees at reasonable times to such books and records; shall give the City the right to examine and audit said books and records; shall permit City to make transcripts therefrom as necessary; and shall allow inspection of all work, data, documents, proceedings, and activities related to this Agreement. Notification of audit shall be provided at least thirty (30) days before any such audit is conducted. Such records, together with supporting documents, shall be maintained for a period of 10 (ten) years after receipt of final payment. Upon completion of, or in the event of termination or suspension without cause of this Agreement, all original documents, designs, drawings, maps, models, computer files, surveys, notes, and other documents prepared in the course of providing the services to be performed pursuant to this Agreement shall become the sole property of the City and may be used, reused, or otherwise disposed of by the City without the permission of the Consultant. With respect to computer files, Consultant shall make available to the City, at the Consultant’s office and upon reasonable written request by the City, the necessary computer software and hardware for purposes of accessing, compiling, transferring, and printing computer files. 10. INDEMNIFICATION AND HOLD HARMLESS Indemnification and Defense for Design Professional, as defined in California Civil Code Section 2782.8: To the fullest extent permitted by law, Consultant shall indemnify, defend and hold harmless City and any and all of its officials, employees and agents (“Indemnified Parties”) from and against any and all claims, losses, liabilities, damages, costs and expenses, including attorney’s fees and costs, to the extent they arise out of, 63 pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant. Consultant’s duty to defend shall consist of reimbursement of defense costs incurred by City in direct proportion to the Consultant’s proportionate percentage of fault. Consultant’s percentage of fault shall be determined, as applicable, by a court of law, jury or arbitrator. In the event any loss, liability or damage is incurred by way of settlement or resolution without a court, jury or arbitrator having made a determination of the Consultant’s percentage of fault, the parties agree to mediation with a third party neutral to determine the Consultant’s proportionate percentage of fault for purposes of determining the amount of indemnity and defense cost reimbursement owed to the City. For all other liabilities: Notwithstanding the foregoing and without diminishing any rights of City in the preceding paragraph of Section 10, for any liability, claim, demand, allegation against City arising out of, related to, or pertaining to any act or omission of Consultant, but which is not a design professional service, Consultant shall defend, indemnify, and hold harmless City, its officials, employees, and agents (“Indemnified Parties”) from and against any and all damages, costs, expenses (including reasonable attorney fees and expert witness fees), judgments, settlements, and/or arbitration awards, whether for personal or bodily injury, property damage, or economic injury, and arising out of, related to, any concurrent or contributory negligence on the part of the City, except for the sole or active negligence of, or willful misconduct of the City. Consultant agrees to obtain executed indemnity agreements with provisions identical to those set forth here in this Section from each and every subcontractor, or any other person or entity involved by, for, with, or on behalf of Consultant in the performance of this Agreement. In the event Consultant fails to obtain such indemnity obligations from others as required here, Consultant agrees to be fully responsible according to the terms of this Section. Failure of City to monitor compliance with these requirements imposes no additional obligations on City and will in no way act as a waiver of any rights hereunder. This obligation to indemnify and defend City as set forth here is binding on the successors, assigns, or heirs of Consultant and shall survive the termination of this Agreement or this Section. City does not and shall not waive any rights that it may have against Consultant by reason of this Section, because of the acceptance by City, or the deposit with City, of any insurance policy or certificate required pursuant to this Agreement. The hold harmless and indemnification provisions shall apply regardless of whether or not said insurance policies are determined to be applicable to any losses, liabilities, damages, costs, and expenses described in this Section. 11. INSURANCE Consultant shall maintain prior to the beginning of and for the duration of this Agreement insurance coverage as specified in Exhibit A attached hereto and incorporated herein by this reference as though set forth in full. 64 12. INDEPENDENT CONSULTANT Consultant is and shall at all times remain as to the City a wholly independent Contractor. The personnel performing the services under this Agreement on behalf of Consultant shall at all times be under Consultant’s exclusive direction and control. Neither City nor any of its officers, employees, or agents shall have control over the conduct of Consultant or any of Consultant’s officers, employees, or agents, except as set forth in this Agreement. Consultant shall not at any time or in any manner represent that it or any of its officers, employees, or agents are in any manner officers or employees, or agents of the City except as set forth in this Agreement. Consultant shall not incur or have the power to incur any debt, obligation, or liability against City, or bind City in any manner. No employee benefits shall be available to Consultant in connection with the performance of this Agreement. Except for the fees paid to Consultant as provided in the Agreement, City shall not pay salaries, wages, or other compensation to Consultant for performing services hereunder for City. City shall not be liable for compensation or indemnification to Consultant for injury or sickness arising out of performing services hereunder. 13. LEGAL RESPONSIBILITIES The Consultant shall keep itself informed of local, state, and federal laws and regulations which in any manner affect those employed by it or in any way affect the performance of its service pursuant to this Agreement. The Consultant shall at all times observe and comply with all such laws and regulations, including but not limited to the Americans with Disabilities Act and Occupational Safety and Health Administration laws and regulations. The Consultant shall comply with and sign Exhibit B, the Scope of Work Requirement for Professional Services Agreements Compliance with California Government Code Section 7550, when applicable. The City, and its officers and employees, shall not be liable at law or in equity occasioned by failure of the Consultant to comply with this Section. 14. ANTI DISCRIMINATION Neither the Consultant, nor any subconsultant under the Consultant, shall discriminate in employment of persons upon the work because of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, genetic information, marital status, sex, gender, gender identity, gender expression, age, sexual orientation, or military and veteran status; or any other basis protected by applicable federal, state, or local law, except as provided in Section 12940 of the Government Code. Consultant shall have responsibility for compliance with this Section. 15. UNDUE INFLUENCE 65 Consultant declares and warrants that no undue influence or pressure is used against or in concert with any officer or employee of the City in connection with the award, terms, or implementation of this Agreement, including any method of coercion, confidential financial arrangement, or financial inducement. No officer or employee of the City will receive compensation, directly or indirectly from Consultant, or any officer, employee, or agent of Consultant, in connection with the award of this Agreement or any work to be conducted as a result of this Agreement. Violation of this Section shall be a material breach of this Agreement entitling the City to any and all remedies at law or in equity. 16. NO BENEFIT TO ARISE TO LOCAL EMPLOYEES No member, officer, or employee of the City, or their designees or agents, and no public official who exercises authority over or responsibilities with respect to the Services during his/her tenure or for one year thereafter, shall have any interest, direct or indirect, in any agreement or sub-agreement, or the proceeds thereof, for work to be performed in connection with the Services performed under this Agreement. 17. CONFLICT OF INTEREST Consultant covenants that neither they nor any officer or principal of their firm have any interests, nor shall they acquire any interest, directly or indirectly, which will conflict in any manner or degree with the performance of their services hereunder. Consultant further covenants that in the performance of this Agreement, they shall employ no person having such interest as an officer, employee, agent, or subconsultant. Consultant further covenants that Consultant has not contracted with nor is performing any services directly or indirectly, with the developer(s) and/or property owner(s) and/or firm(s) and/or partnership(s) and/or public agency(ies) owning property and/or processing an entitlement application for property in the City or its Area of Interest, now or within the past one (1) year, and further covenants and agrees that Consultant and/or its subconsultants shall provide no service or enter into any contract with any developer(s) and/or property owner(s) and/or firm(s) and/or partnership(s) and/or public agency(ies) owning property and/or processing an entitlement application for property in the City or its Area of Interest, while under contract with the City and for a one (1) year time period following termination of this Agreement. 18. NOTICE Any notice to be given pursuant to this Agreement shall be in writing, and all such notices and any other document to be delivered shall be delivered by personal service or by deposit in the United States mail, certified or registered, return receipt requested, with postage prepaid, and addressed to the party for whom intended as follows: 66 To: City Manager City of Moorpark 799 Moorpark Avenue Moorpark, CA 93021 To: __________________ __________________ __________________ __________________ Either party may, from time to time, by written notice to the other, designate a different address or contact person, which shall be substituted for the one above specified. Notices, payments and other documents shall be deemed delivered upon receipt by personal service or as of the third (3rd) day after deposit in the United States mail. 19. CHANGE IN NAME Should a change be contemplated in the name or nature of the Consultant's legal entity, the Consultant shall first notify the City in order that proper steps may be taken to have the change reflected in the Agreement documents. 20. ASSIGNMENT Consultant shall not assign this Agreement or any of the rights, duties, or obligations hereunder. It is understood and acknowledged by the parties that Consultant is uniquely qualified to perform the services provided for in this Agreement. 21. LICENSES At all times during the term of this Agreement, Consultant shall have in full force and effect, all licenses required of it by law for the performance of the services in this Agreement. 22. VENUE AND GOVERNING LAW This Agreement is made, entered into, and executed in Ventura County, California, and any action filed in any court or for arbitration for the interpretation, enforcement or other action of the terms, conditions, or covenants referred to herein shall be filed in the applicable court in Ventura County, California. The City and Consultant understand and agree that the laws of the state of California shall govern the rights, obligations, duties, and liabilities of the parties to this Agreement and also govern the interpretation of this Agreement. 67 23. COST RECOVERY In the event any action, suit or proceeding is brought for the enforcement of, or the declaration of any right or obligation pursuant to this Agreement or as a result of any alleged breach of any provision of this Agreement, the prevailing party shall be entitled to recover its costs and expenses, including attorneys’ fees, from the losing party, and any judgment or decree rendered in such a proceeding shall include an award thereof. 24. ARBITRATION Cases involving a dispute between City and Consultant may be decided by an arbitrator if both sides agree in writing, with costs proportional to the judgment of the arbitrator. 25. ENTIRE AGREEMENT This Agreement and the Exhibits attached hereto contain the entire understanding between the parties relating to the obligations of the parties described in this Agreement. All prior or contemporaneous agreements, understandings, representations, and statements, oral or written, are merged into this Agreement and shall be of no further force or effect. Each party is entering into this Agreement based solely upon the representations set forth herein and upon each party’s own independent investigation of any and all facts such party deems material. 26. CAPTIONS OR HEADINGS The captions and headings of the various Articles, Paragraphs, and Exhibits of this Agreement are for convenience and identification only and shall not be deemed to limit or define the content of the respective Articles, Paragraphs, and Exhibits hereof. 27. AMENDMENTS Any amendment, modification, or variation from the terms of this Agreement shall be in writing and shall be effective only upon approval by both parties to this Agreement. 28. PRECEDENCE In the event of conflict, the requirements of the City’s Request for Proposal, if any, and this Agreement shall take precedence over those contained in the Consultant’s Proposal. 29. INTERPRETATION OF AGREEMENT Should interpretation of this Agreement, or any portion thereof, be necessary, it is deemed that this Agreement was prepared by the parties jointly and equally, and shall not 68 be interpreted against either party on the ground that the party prepared the Agreement or caused it to be prepared. 30. WAIVER No waiver of any provision of this Agreement shall be deemed, or shall constitute, a waiver of any other provision, whether or not similar, nor shall any such waiver constitute a continuing or subsequent waiver of the same provision. No waiver shall be binding unless executed in writing by the party making the waiver. 31. AUTHORITY TO EXECUTE The person or persons executing this Agreement on behalf of the Consultant warrants and represents that he/she has the authority to execute this Agreement on behalf of the Consultant and has the authority to bind Consultant to the performance of obligations hereunder. IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed the day and year first above written. CITY OF MOORPARK CONSULTANT _________________________________ __________________________________ Troy Brown, City Manager NAME, TITLE Attest: _________________________________ Maureen Benson, City Clerk 69 Exhibit A INSURANCE REQUIREMENTS Prior to the beginning of and throughout the duration of Work, Consultant will maintain insurance in conformance with the requirements set forth below. Consultant will use existing coverage to comply with these requirements. If that existing coverage does not meet requirements set forth here, Consultant agrees to amend, supplement, or endorse the existing coverage to do so. Consultant acknowledges that the insurance coverage and policy limits set forth in this section constitute the minimum amount of coverage required. Any insurance proceeds available to the City in excess of the limits and coverage required in this Agreement and which is applicable to a given loss, will be available to the City. Consultant shall provide the following types and amounts of insurance: Commercial General Liability Insurance using Insurance Services Office (ISO) “Commercial General Liability” policy form CG 00 01 or the exact equivalent. Defense costs must be paid in addition to limits. There shall be no cross liability exclusion for claims or suits by one insured against another. Limits are subject to review but in no event less than $1,000,000 per occurrence for all covered losses and no less than $2,000,000 general aggregate. Business Auto Coverage on ISO Business Auto Coverage form CA 00 01 including symbol 1 (Any Auto) or the exact equivalent. Limits are subject to review, but in no event to be less than $1,000,000 per accident. If Consultant owns no vehicles, this requirement may be satisfied by a non-owned auto endorsement to the general liability policy described above. If Consultant or Consultant’s employees will use personal autos in any way on this project, Consultant shall provide evidence of personal auto liability for each such person. Workers’ Compensation on a state-approved policy form providing statutory benefits as required by law with employer’s liability limits no less than $1,000,000 per accident or disease. Professional Liability or Errors and Omissions Insurance as appropriate shall be written on a policy form coverage specifically designed to protect against acts, errors or omissions of the Consultant and “Covered Professional Services” as designated in the policy must specifically include work performed under this Agreement. The policy limit shall be no less than $1,000,000 per claim and in the aggregate. The policy must “pay on behalf of” the insured and must include a provision establishing the insurer’s duty to defend. The policy retroactive date shall be on or before the effective date of this Agreement. Excess or Umbrella Liability Insurance (Over Primary) if used to meet limit requirements, shall provide coverage at least as broad as specified for the underlying coverages. Coverage shall be provided on a “pay on behalf” basis, with defense costs payable in 70 addition to policy limits. Policy shall contain a provision obligating insurer at the time insured’s liability is determined, not requiring actual payment by the insured first. There shall be no cross liability exclusion precluding coverage for claims or suits by one insured against another. Coverage shall be applicable to the City for injury to employees of Consultant, subconsultants, or others involved in the Work. The scope of coverage provided is subject to approval by the City following receipt of proof of insurance as required herein. Limits are subject to review. Insurance procured pursuant to these requirements shall be written by insurers that are admitted carriers in the State of California and with an A.M. Bests rating of A- or better and a minimum financial size of VII. General conditions pertaining to provision of insurance coverage by Consultant. Consultant and the City agree to the following with respect to insurance provided by Consultant: 1. Consultant agrees to have its insurer endorse the third party general liability coverage required herein to include as additional insureds the City, its officials, employees, and agents, using standard ISO endorsement CG 2010 with an edition prior to 1992. Consultant also agrees to require all contractors and subcontractors to do likewise. 2. No liability insurance coverage provided to comply with this Agreement shall prohibit Consultant, or Consultant’s employees, or agents, from waiving the right to subrogation prior to a loss. Consultant agrees to waive subrogation rights against the City regardless of the applicability of any insurance proceeds, and to require all contractors and subcontractors to do likewise. 3. All insurance coverage and limits provided by Contractor and available or applicable to this Agreement are intended to apply to the full extent of the policies. Nothing contained in this Agreement or any other agreement relating to the City or its operation limits the application of such insurance coverage. 4. None of the coverages required herein will be in compliance with these requirements if they include limiting endorsement of any kind that has not been first submitted to the City and approved in writing. 5. No liability policy shall contain any provision or definition that would serve to eliminate so-called “third party action over” claims, including any exclusion for bodily injury to an employee of the insured or of any contractor or subcontractor. 6. All coverage types and limits required are subject to approval, modification, and additional requirements by the City, as the need arises. Consultant shall not make any reductions in scope of coverage (e.g. elimination of contractual liability or reduction of discovery period) that may affect the City’s protection without the City’s prior written consent. 71 7. Proof of compliance with these insurance requirements, consisting of certificates of insurance evidencing all of the coverages required and an additional insured endorsement to Consultant’s general liability policy, shall be delivered to city at or prior to the execution of this Agreement. In the event such proof of any insurance is not delivered as required, or in the event such insurance is canceled or reduced at any time and no replacement coverage is provided, the City has the right, but not the duty, to obtain any insurance it deems necessary to protect its interests under this or any other Agreement and to pay the premium. Any premium so paid by the City shall be charged to and promptly paid by Consultant or deducted from sums due Consultant, at the City’s option. 8. Certificate(s) are to reflect that the insurer will provide thirty (30) days notice to the City of any cancellation or reduction of coverage. Consultant agrees to require its insurer to modify such certificates to delete any exculpatory wording stating that failure of the insurer to mail written notice of cancellation or reduction of coverage imposes no obligation, or that any party will “endeavor” (as opposed to being required) to comply with the requirements of the certificate. 9. It is acknowledged by the parties of this Agreement that all insurance coverage required to be provided by Consultant or any subcontractor, is intended to apply first and on a primary, non-contributing basis in relation to any other insurance or self- insurance available to the City. 10. Consultant agrees to ensure that subcontractors, and any other party involved with the Work who is brought onto or involved in the Work by Consultant, provide the same minimum insurance required of Consultant. Consultant agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this section. Consultant agrees that upon request, all agreements with subcontractors and others engaged in the Work will be submitted to the City for review. 11. Consultant agrees not to self-insure or to use any self-insured retentions or deductibles on any portion of the insurance required herein and further agrees that it will not allow any contractor, subcontractor, Architect, Engineer, or other entity or person in any way involved in the performance of Work contemplated by this Agreement to self-insure its obligations to the City. If Consultant’s existing coverage includes a deductible or self-insured retention, the deductible or self-insured retention must be declared to the City. At that time, the City shall review options with the Consultant, which may include reduction or elimination of the deductible or self- insured retention, substitution of other coverage, or other solutions. 12. The City reserves the right at any time during the term of the Agreement to change the amounts and types of insurance required by giving the Consultant ninety (90) days advance written notice of such change. If such change results in substantial 72 additional cost to the Consultant, the City will negotiate additional compensation proportional to the increased benefit to the City. 13. For purposes of applying insurance coverage only, this Agreement will be deemed to have been executed immediately upon any party hereto taking any steps that can be deemed to be in furtherance of or towards performance of this Agreement. 14. Consultant acknowledges and agrees that any actual or alleged failure on the part of the City to inform Consultant of non-compliance with an insurance requirement in no way imposes any additional obligations to the City nor does it waive any rights hereunder in this or any other regard. 15. Consultant will renew the required coverage annually as long as the City, or its employees or agents face an exposure from operations of any type pursuant to this Agreement. This obligation applies whether or not the Agreement is canceled or terminated for any reason. Termination of this obligation is not effective until the City executes a written statement to that effect. 16. Consultant shall provide proof that policies of insurance required herein expiring during the term of this Agreement have been renewed or replaced with other policies providing at least the same coverage. Proof that such coverage has been ordered shall be submitted prior to expiration. A coverage binder or letter from Consultant’s insurance agent to this effect is acceptable. A certificate of insurance and/or additional insured endorsement as required in these specifications applicable to the renewing or new coverage must be provided to the City within five days of the expiration of coverage. 17. The provisions of any Workers’ Compensation or similar act will not limit the obligations of Consultant under this Agreement. Consultant expressly agrees not to use any statutory immunity defenses under such laws with respect to the City, its employees, officials and agents. 18. Requirements of specific coverage features or limits contained in this section are not intended as limitations on coverage, limits, or other requirements nor as a waiver of any coverage normally provided by any given policy. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue, and is not intended by any party or insured to be limiting or all-inclusive. 19. These insurance requirements are intended to be separate and distinct from any other provision in this Agreement and are intended by the parties here to be interpreted as such. 20. The requirements in this section supersede all other sections and provisions of this Agreement to the extent that any other section or provision conflicts or impairs the provisions of this section. 73 21. Consultant agrees to be responsible for ensuring that no contract used by any party involved in any way with the Work reserves the right to charge the City or Consultant for the cost of additional insurance coverage required by this Agreement. Any such provisions are to be deleted with reference to the City. It is not the intent of the City to reimburse any third party for the cost of complying with these requirements. There shall be no recourse against the City for payment of premiums or other amounts with respect thereto. 22. Consultant agrees to provide immediate notice to City of any claim or loss against Consultant arising out of the work performed under this Agreement. The City assumes no obligation or liability by such notice, but has the right (but not the duty) to monitor the handling of any such claim or claims if they are likely to involve the City. 74 Exhibit B CITY OF MOORPARK Scope of Work Requirement for Professional Services Agreements Compliance with California Government Code Section 7550 Consultant shall sign and include this page in any document or written reports prepared by Consultant for the City of Moorpark (City) to which California Government Code Section 7550 (Government Code §7550) applies. Government Code §7550 reads: “(a) Any document or written report prepared for or under the direction of a state or local agency, that is prepared in whole or in part by nonemployees of the agency, shall contain the numbers and dollar amounts of all contracts and subcontracts relating to the preparation of the document or written report; if the total cost for the work performed by nonemployees of the agency exceeds five thousand dollars ($5,000). The contract and subcontract numbers and dollar amounts shall be contained in a separate section of the document or written report. (b) When multiple documents or written reports are the subject or product of the contract, the disclosure section may also contain a statement indicating that the total contract amount represents compensation for multiple documents or written reports.” For all Professional Services Agreement with a total dollar value in excess of $5,000, a signed and completed copy of this form must be attached to all documents or completed reports submitted to the City pursuant to the Scope of Work. Does the dollar value of this Professional Services Agreement exceed $5,000?  Yes  No If yes, then the following information must be provided in compliance with Government Code § 7550: 1. Dollar amount of Agreement/Contract: $ ____________ 2. Dollar amount of Subcontract: $ ____________ 3. Does the total contract amount represent compensation for multiple documents or written reports?  Yes  No I have read the foregoing Code section and will comply with Government Code §7550. Consultant Name Signature, Title Date 75 EXHIBIT C SCOPE OF WORK Architect acknowledges that it has read and understands the New Library Component Specifications, General Guideline Specifications, RFP and contract for Services and has visited the site. Architect shall provide architectural and related design services for the preliminary and final site development of the New Library with all accessory facilities and site improvements, including any evaluation needed to comply with the California Environmental Quality Act (CEQA). Preliminary and final cost estimates based on current construction cost data will also be prepared. The individual directly responsible for Architect’s overall performance of the Agreement provisions and to serve as principal liaison between City and Architect during performance of all work under the Agreement shall be ___________________________ Upon written agreement of the parties other individual (s) may be substituted in the above capacity. The individuals directly responsible for the City shall be Jeremy Laurentowski, Parks and Recreation Director and Jessica Sandifer, Community Services Manager, City of Moorpark. The architectural services will include all services performed by the architect, architect’s employees, and the architect’s consultants. They include without limitation, all responsibilities outlined in the scope of work and typically required for design and construction of a facility of this nature. The architect will retain the services for all necessary consultants. The Architect will prepare preliminary conceptual plans for all on site work including, but not limited to, grading, and utilities to serve the project, structural improvements, public walkways including those along High Street, parking lot improvements, exterior lighting, fencing, landscaping and driveways. The Architect may include with the proposal for services, a detailed Scope of Work and Schedule which will be attached to and be a part of this Exhibit. ATTACH FINAL SCOPE OF WORK 76 EXHIBIT D COMPENSATION SCHEDULE Total fixed contract amount for the project is __________ ($________) Periodic billings will occur on the percentage of work completed. The above amounts include all of Architect’s and consultants’ fees and travel time. Payments will be made, per the Agreement, based upon actual percentage of work approved by the City as completed for the pay period requested. Percentages of work completed by Architect’s consultants’ must be included within Architect’s pay requests. Separate invoicing by Architect’s consultant(s) will not be accepted by City. HOURLY RATES (The Architects current, published hourly rate schedule may be substituted for the information requested below.) In the event City requests additional work, such work shall be authorized in writing prior to commencing any work and shall be at the following rates: All Applicable Rates (including Architect’s consultants) Per Hour (complete) Principal $ _________ Staff Architect (Project Architect) _________ Specifications/Designer/Planning/ _________ Programming/Field Administration _________ Technical IV - CAD Design Operator _________ Technical III - Senior Draftsperson/Project Captain _________ Technical II - Intermediate Draftsperson _________ Technical I - Junior Draftsperson _________ Support II - Administration/Accounting/Word Processing _________ Support I - Clerical and General Office _________ Consultants - Hourly Rates _________ (Add any additional categories) _________ All prices shall remain firm under this contract through completion of all work under this contract. Additional services required of Architect’s Consultants, and authorized by the City, shall be billed at cost plus 15%. All plan check, processing fees, permit fees and special district fees will be paid by the City. The City may require a model of the proposed facility. The Architect should include the costs to model the building as an optional item in their proposal. Architect will furnish City electronic copies of drawings and specifications of the final approved site plan, design, and construction drawings. 77 REIMBURSABLES All prints and reproduction charges for documents used by Architect and their consultants for their “in house” use are included in the contract price. The City prefers electronic copies of any prints for City check sets, progress sets and all plans required for City plan checks. If paper copies are needed they will be requested specifically by the City and will be considered reimbursable expenses. An allowance of $2,000 is included in the fee. All such reimbursable expenses shall receive prior authorization from the City. Travel, phone calls, faxes and delivery charges are included in the contract price. If the City orders special overnight delivery, the charges will be reimbursed at one hundred ten percent (110%) of the documented cost. 78 EXHIBIT E SUPPLEMENTAL GENERAL CONDITIONS In addition to the conditions set forth in the Request for Qualifications and Proposal, the following Supplemental Conditions shall be included in this Agreement. A. City shall not be called upon to assume any liability for the direct payment of any salary, wage or other compensation to any person employed by Architect performing services hereunder for City. B. Architect at his/her sole cost, shall furnish City reproducible plans and copies of documents, reports, diskettes and other items mentioned above upon request of City during the evolution of work and at the completion of the various stages of work as directed under this Agreement. C. City reserves the right to delay any post-termination payment until completion or confirmed abandonment of the project, as may be determined in the City sole discretion, so as to permit a full and complete accounting of costs. In no event shall Architect be entitled to receive in excess of the compensation quote in its proposal/bid. D. The City has established a construction budget for the Project (hard costs) not to exceed twelve million dollars ($12,000,000). The Architect has assured the City that they will design the project within the budget and the City is relying on Architect’s expertise in this regard and in the execution of all work under this Agreement. During planning process, Architect will notify City of any design plans, requests, or issues that will have the potential to increase the construction budget and City will advise Architect accordingly. E. Architect shall use consultants listed in Architect’s listing provided with this contract. Any change in consultants must receive prior written approval from the City. F. Non-Exclusive Contract - The City reserves the right to contract with other firms for any and all aspects of this project during the contract term, as may be deemed advantageous to the City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• -LDD8IPF=JF@C8E;>IFLE;N8K<I:FE;@K@FEJ<E:FLEK<I<; • &F>JF=*.8E;;I@CC?FC<<OGCFI8K@FEJ • !<FCF>@::IFJJJ<:K@FEJ;<G@:K@E>@EK<IGI<K<;JL9JLI=8:<:FE;@K@FEJ • &89FI8KFIPK<JK;8K8 • M8CL8K@FEF=J<@JD@: I<C8K<;?8Q8I;J@E:CL;@E>=8LCKILGKLI<C@HL<=8:K@FE;IPJ<@JD@: J<KKC<D<EK8E;C8K<I8CJGI<8;@E> • *FK<EK@8CE<<;=FI>IFLE;@DGIFM<D<EK • *I<C@D@E8IP;<J@>EG8I8D<K<IJ=FIJF@C9<8I@E>8E;<JK@D8K<;J<KKC<D<EK8E;C8K<I8C <8IK?GI<JJLI<J • -L@K89@C@KPF=FEJ@K<JF@C=FILJ<8J=@CC8E;J<C<:K=@CCD8K<I@8C • EK@:@G8K<;<O:8M8K@FE:FE;@K@FEJ8E; •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• @<C;-*.( M8CL<JI8E><;=IFD89FLKKF 9CFNJG<I=FFK9G==IFDK?<>IFLE; JLI=8:<KF8;<GK?F=89FLK=<<K8E; KF9G==IFD89FLKKF=<<K9<CFN K?< >IFLE; JLI=8:< GG<E;@O    .?< -*. ( M8CL<J @E;@:8K< K?< >I8ELC8I JF@CJ :C8JJ@=P8JM<IPCFFJ<KFCFFJ<@EK?<LGG<I=<<K8E;CFFJ<KFD<;@LD;<EJ<=IFD KF=<<K .?<=@E< >I8@E<;J@CK8E;:C8PJF@CC8P<IJ><E<I8CCP:C8JJ@=P8JD<;@LD JK@==N@K?K?<<O:<GK@FEF=8M<IPJF=KC8P<I8K8;<GK?F= =<<K@E"  • 'F@JKLI<:FEK<EKJ><E<I8CCPI8E><;=IFD89FLKKFG<I:<EK@EK?<>I8ELC8I8CCLM@8C ;<GFJ@KJ 89FM< K?< >IFLE;N8K<I C<M<C 89FM<  =<<K 8E; =IFD 89FLK  KF  G<I:<EK9<CFNK?<<E:FLEK<I<;>IFLE;N8K<IC<M<C  • IP;<EJ@K@<JF=K?<>I8ELC8IJF@C@EK?<LGG<I =<<KF=K?<J@K<I8E><;=IFDKF GFLE;JG<I:L9@:=FFKG:=8E;K?<;<EJ@K@<JF=@EK<I9<;;<;JF@CJ=IFD KF =<<KI8E><;=IFD KF G:=  • .?<I<JLCKJF=>I8@EJ@Q<8E8CPJ<J@E;@:8K<=@E<J:FEK<EKJG<I:<EKG8JJ@E>(F   J@<M<I8E>@E>=IFD89FLKKFG<I:<EK=FIK?<K<JK<;>I8ELC8IJF@CJ8DGC<J8E; =IFD89FLK KFG<I:<EK=FI:F?<J@M<D8K<I@8CJ  • KK<I9<I>&@D@KK<JKJ@E;@:8K<K?<K<JK<;=@E< >I8@E<;J8E;P:C8PC8P<IJ?8M<C@HL@; C@D@KJF= KF8E;GC8JK@:@KP@E;<O<JF=KF .?FJ<JF@CJ:C8JJ@=P8JCFNGC8JK@:@KP J8E;P:C8P8E;J8E;PKFJ@CKP:C8PGG<E;@O  • .?< ?P;IF:FEJFC@;8K@FE :FCC8GJ< GFK<EK@8C =FI K?I<< J@CKP J8E; JF@C J8DGC<J =IFD ;<GK?JF= 8E; =<<KN8JK<JK<;@E8::FI;8E:<N@K?-.''<K?F; 88 @KPF='FFIG8IB *IFA<:K(F      A !#!$    .?<K<JKI<JLCKJ8I<GI<J<EK<;@EGG<E;@O .?<J8DGC<JN<I<J<C<:K<;=FI K<JK@E> 98J<; FE LE@K N<@>?K ;<>I<< F= J8KLI8K@FE MF@; I8K@F 8E; =@E<J :FEK<EK G<I:<EK G8JJ@E> (F    J@<M<   .?< K<JK I<JLCKJ @E;@:8K< ?P;IF:FEJFC@;8K@FE GFK<EK@8CJF= G<I:<EK8K =<<K G<I:<EK8K=<<K8E; G<I:<EK8K  =<<K GG<E;@O  • .?<E<8IJLI=8:<JF@CD8K<I@8CJ:FEJ@JKF=J@CKPJ8E;N@K?8E, M8CL<F= 8E;8E 8EK@:@G8K<;CFN<OG8EJ@FE@E;<O#F=C<JJK?8E   •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•.?<J<@JD@:>IFLE;DFK@FE @J >=FI8G<I:<EK GIF989@C@KPF=<O:<<;8E:<@E  P<8IJ=FIK?<GIFA<:KJ@K<  • "@JKFI@:?@>?>IFLE;N8K<IC<M<CF= =<<K9<CFNK?<>IFLE;JLI=8:<  • *.<M8CL8K@FELJ@E>K?<GIF:<;LI<I<:FDD<E;<;9P,F9<IKJFE   • -*. ;8K8 <M8CL8K@FE LJ@E> K?< GIF:<;LI< I<:FDD<E;<; 9P FLC8E><I 8E; #;I@JJ   )M<I8CCK?<C@HL<=8:K@FE8E8CPJ<J@E;@:8K<K?<M<IPCFFJ<KFCFFJ<>I8ELC8IJF@CJ8KK?< J@K<8I<JLJ:<GK@9C<KFC@HL<=8:K@FE9<CFNK?<>IFLE;N8K<I8E;;IPJ<@JD@:J<KKC<D<EK89FM<K?< >IFLE;N8K<I .?<<JK@D8K<;M<IK@:8CC@HL<=8:K@FE8E;;IPJ<@JD@:J<KKC<D<EKJ8I<JLDD8I@Q<;@E .89C<  -<@JD@:8CCP@E;L:<;J<KKC<D<EKFI:FCC8GJ<:8EF::LI@EJF@CJK?8K8I<CFFJ<JF=KFIK?8K 8I<DF;<I8K<CP;<EJ<9LKN<8BCP:<D<EK<; .?<FEJ@K<M<IPCFFJ<KFCFFJ<>I8ELC8I8E;J@CKP JF@CJ89FM<K?<>IFLE;N8K<I8I<JLJ:<GK@9C<KFJ<@JD@:8CCP@E;L:<;J<KKC<D<EK .?<<JK@D8K<; J<@JD@:8CCP@E;L:<;J<KKC<D<EK@EK?<LGG<I =<<KF=J@K<@JJLDD8I@Q<;@E.89C< 1<EFK< K?<>IFLE;N8K<I@J8JJLD<;KF9<8K =<<KK?<I<=FI<JF@CJ9<CFNK?8K;<GK?8I<JL9A<:KKF C@HL<=8:K@FEGFK<EK@8C@EK?<8E8CPJ<J<M<EK?FL>?K?<>IFLE;N8K<I;<GK?<E:FLEK<I<;9PFLI <OGCFI8K@FEJN8J89FLK=<<K9<CFNK?<>IFLE;JLI=8:<  93 @KPF='FFIG8IB *IFA<:K(F       A !#!$   %,-70$@88,=D:1>?48,?0/'0=?4.,7$04>84.$0??70809? C;7:=,?4:9 :.,?4:9 >?48,?0/ 4<@01,.?4:9 $0??70809? 49.30> >?48,?0/=D $04>84. $0??70809? 49.30> %:?,7>?48,?0/ $04>84. $0??70809? 49.30> >?48,?0/,?0=,7 4>;7,.0809? 49.30> *.       @E:?<J *.       @E:?<J *.       @E:?<J *.       @E:?<J *.       @E:?<J "      @E:?<J "     @E:?<J #,92049.30>      F   A0=,20',7@0 49.30>        ,?,$@88,=D ,<M@<NF=K?<;8K8GCFKJ@EGG<E;@O@E;@:8K<J • .?<C@HL<=8:K@FE8E;;IPJ<@JD@:J<KKC<D<EKJ<JK@D8K<;=IFDK?<=@M<*.J8;M8E:<; =FIK?@JJKL;P8I<=8@ICP:FEJ@JK<EKI8E>@E>=IFDKF @E:?<J8E;KF@E:?<J I<JG<:K@M<CP  • .?<<JK@D8K<;C@HL<=8:K@FE8E;;IPJ<@JD@:J<KKC<D<EK<JK@D8K<;=IFDK?<-*.;8K8 I8E><J   KF   @E:?<J 8E;   KF  @E:?<J I<JG<:K@M<CP  .?< <JK@D8K<; C@HL<=8:K@FEJ<KKC<D<EKJ=IFDK?<-*.;8K88I<=8@ICP:FEJ@JK<EKN@K?*.;8K8N@K?8 JC@>?KCP?@>?<IM8CL<=FI<JK@D8K<;J<KKC<D<EK@E" N?@:?<OK<E;<;KF=<<K =<<K;<<G<IK?8E"   • .?< GIF:<;LI<J =FI <JK@D8K@E> ;IP J<@JD@: J<KKC<D<EK =IFD 9CFN:FLEK ;8K8 8I< J<EJ@K@M<KFCFN( M8CL<JJL:?8JN8J<E:FLEK<I<;@EK?<E<8IJLI=8:<JF@C@E"  #E "  8 K?I<< =FFK K?@:B QFE< =IFD   KF   =<<K N@K? 8E -*. ( M8CL< F=  8::FLEKJ=FI?8C= @E:?<JF=K?<<JK@D8K<;;IPJ<@JD@:J<KKC<D<EK@EK?8K;I@CC?FC<  • .?<8E8CPJ<JGI<J<EK<;@EGG<E;@O@E;@:8K<K?<CFFJ<>I8ELC8IJF@CJ8E;JF=KCFN GC8JK@:@KP J@CK :C8P C8P<IJ ?8M< 8 J<@JD@: =8:KFI F= J8=<KP F=C<JJ K?8E  8E; 8E 8JJF:@8K<;C@HL<=8:K@FEGFK<EK@8CKF8;<GK?F==<<KD8O@DLD;<GK?<OGCFI<;  • D8AFI@KPF=K?<<JK@D8K<;J<KKC<D<EK=IFDK?<*.;8K8F::LIJ9<KN<<EK?<>IFLE; JLI=8:<8E;8;<GK?F=89FLK KF =<<K  • JK@D8K<;C@HL<=8:K@FEJ<KKC<D<EK9<CFN8;<GK?F=89FLK =<<K@J89FLKKF @E:?<J98J<;FEK?<*.;8K8GG<E;@O  •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• !<E<I8CCP>I8ELC8IJ8E;8E;J@CKPJ8E;JF@C@EK?<LGG<I =<<KLE;<IC8@E9PK?@ECP @EK<I9<;;<;J@CK:C8P8E;:C8P<PJ8E;=IFD KF=<<KD8O@DLD;<GK?<OGCFI<;  • -*. ( M8CL<J =IFD K?< LGG<I =<<K F= K?< ;I@CC ?FC<J I8E>< =IFD  KF  9G= @E;@:8K@E>K?<>I8ELC8IJF@CJ8I<M<IPCFFJ<KFD<;@LD;<EJ<@EK?8KQFE< .?<-*. ( M8CL<J=IFDKF=<<KI8E><=IFD KF9G=@E;@:8K@E>K?<>I8ELC8IJF@CJ8I< D<;@LD;<EJ<8E;K?<=@E< >I8@E<;J@CK8E;:C8PJF@CJ8I<D<;@LDJK@==N@K?@EK?8K QFE<  • !IFLE;N8K<I N8J <E:FLEK<I<; 8K 8 ;<GK? F= 89FLK  =<<K ;LI@E> <OGCFI8K@FE  "@JKFI@:?@>?>IFLE;N8K<IC<M<CJ@EK?<'FFIG8IB8I<88I<89FLK =<<K9<CFNK?< >IFLE;JLI=8:<  • .?<J@K<@JEFKCF:8K<;N@K?@E8=8LCKILGKLI<?8Q8I;QFE<8J;<=@E<;9PK?<-K8K<F= 8C@=FIE@88C@=FIE@8!<FCF>@:8C-LIM<P  • .?< J@K< @J CF:8K<; @E 8 J<@JD@:8CCP 8:K@M< 8I<8 F= 0<EKLI8 FLEKP 8E; ?8J 8E <JK@D8K<;G<8B>IFLE;8::<C<I8K@FE*!'F= >  • .?<GC8JK@:@KP@E;<OF==@E<>I8@E<;JF@CJI8E><J=IFDKF ,<J<8I:?9PI8P8E; -8E:@F   @E;@:8K<J K?< =@E< >I8@E<; JF@CJ :FLC; GFK<EK@8CCP C@HL<=P ;LI@E> 8 J<@JD@:<M<EK  • *.8E;-*.;8K8N<I<<M8CL8K<;GG<E;@OKF<JK@D8K<C@HL<=8:K@FE8E;;IP J<@JD@:J<KKC<D<EKLJ@E>K?<GIF>I8D!<F&F>@J'@B@8E;K?<GIF:<;LI<J;<M<CFG<; 9P,F9<IKJFE 8E;FLC8E><I8E;#;I@JJ  .?<:FD9@E<;<JK@D8K<; C@HL<=8:K@FE8E;;IPJ<@JD@:J<KKC<D<EKI8E><J=IFD89FLK KF@E:?<JN@K?8E 8M<I8><F=89FLK @E:?<J@EK?<LGG<I=<<K8KK?<J@K<  •D8AFI@KPF=K?< <JK@D8K<; J<@JD@:8CCP@E;L:<;J<KKC<D<EKF::LIJ@EK?< >I8ELC8IJF@C C8P<IJ@EK?<LGG<I =<<KF=K?<J@K<C<JJK?8EKNFKF=FLI@E:?<JF=J<KKC<D<EK@J <JK@D8K<; KF F::LI 9<CFN   =<<K   8J<; FE K?< C@HL<=8:K@FE 8E8CPJ<J K?< =@E< >I8@E<;J@CK8E;:C8PJF@CC8P<IJ;FEFK:FEKI@9LK<KFC@HL<=8:K@FEJ<KKC<D<EK  • JK@D8K<;C8K<I8CJGI<8;@E>I8E><J=IFDJ@O=<<KKF>I<8K<IK?8E =<<KLJ@E>K?< GIF:<;LI<;<M<CFG<;9P,F9<IKJFE =FI*.;8K88E;FLC8E><I8E;#;I@JJ  =FI-*.;8K8  • JK@D8K<;?P;IF:FEJFC@;8K@FE:FCC8GJ<GFK<EK@8CI8E><J=IFD KF G<I:<EK 98J<;FEK?<C89FI8KFIPK<JK@E>FEK?I<<J8DGC<JF=FEJ@K<JF@C  • (<8I9P J@K<J ?8M< <JK@D8K<; C@HL<=8:K@FE ;IP J<@JD@: J<KKC<D<EK   @E:?<J " -@K< !<FK<:?EFCF>@<J   8E;  KF  @E:?<J 'FFIG8IB G8IKD<EKJ !FI@8E   &@HL<=8:K@FEGFK<EK@8CN8J@;<EK@=@<;KF;<GK?JF=89FLK =<<KN@K?@E;@M@;L8C QFE<JI8E>@E>=IFDJ<M<I8C=<<KKF =<<KK?@:B  97 @KPF='FFIG8IB *IFA<:K(F       A !#!$   •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• JK89C@J?<;GIF:<;LI< <O:<GK<;9P8><E:@<J • <EJ@=@<J>I8ELC8IJF@C 9<KN<<E@E;@M@;L8C :FCLDEJ • *IFM@;<J:FE;L@KKF ;@JJ@G8K<9L@C;LGF=N8K<I GI<JJLI<;LI@E>8J<@JD@: <M<EK • DLCK@GC<:FEKI8:KFIJ G<I=FIDGIF:<;LI<R DLCK@GC<9@;J • (FJGF@C><E<I8K<;;LI@E> @EJK8CC8K@FE • .I<8KD<EK;<GK?C@D@K<;KF  =<<K • 0@9I8K@FE:FLC;@DG8:K8;A8:<EK JKIL:KLI<J 0@9I8K@FEDFE@KFI@E> I<:FDD<E;<;  • &@D@K<;;<EJ@KP@DGIFM<D<EKKF =@E< >I8@E<;J@CK8E;:C8PJF@CJ =IFD KF =<<K9<CFNK?< >IFLE;JLI=8:<  • .I<8KD<EK8I<8LJL8CCP<OK<E;J FLK9<PFE;9L@C;@E>=FLE;8K@FEJ •!IFLE;;@JKLI98E:<8KJLI=8:< I<HL@I<JLGG<IJ<M<I8C=<<KF= J@K<KF9<I<:FDG8:K<; • 'F9 <DF9     •  =KF=:FCLDE •FCLDE:<EK<IKF :<EK<IJG8:@E> KPG@:8CCPKF=<<K <<G-F@C'@O@E> -' • JK89C@J?<;GIF:<;LI< <O:<GK<;9P8><E:@<J • -':FCLDEJ:8E9< <OK<E;<;KF;<GK?JF= =<<K@=I<HL@I<;  • .I<8KD<EK8I<8:8E9< C@D@K<;KF9L@C;@E> =FLE;8K@FE=FFKGI@EK ;<G<E;@E>FEJ@K< :FE;@K@FEJ • 'FI<<OG<EJ@M<DF9@C@Q8K@FE 8E;G<I=FFKF=:FCLDE:FJKK?8E M@9IFI<GC8:<D<EK • F<JEFK;<EJ@=PJF@C9<KN<<E :FCLDEJ • -F@C9<KN<<E:FCLDEJ:8EJ<KKC< I<HL@I@E>8>I8;< 9<8DKPG< =FLE;8K@FEKFJG8E8:IFJJ :FCLDEJ • 9FLK G<I:<EKJGF@C ><E<I8K<;;LI@E>@EJK8CC8K@FE K?8KE<<;JKF9<;@JGFJ<;F=  • 'F9 <DF9    KF     •  =KF=:FCLDE •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ite Library Site Moorpark Apartments Site 110          (&'&)  +"((,"*  &&('(# $"!&(%"                    -  -      111 OAKRIDGE GEOSCIENCE, INC.City of Moorpark Project No. 030.003PLATE 3a30' H10'VExaggerationSee Legend on Plate 3bNOTE: Elevations are approximate and are based on USGS 7.5 minute topographic map of Moorpark quadrangle.A'AGEOLOGIC CROSS SECTION A-A'Proposed New Library SiteMoorpark, California112 OAKRIDGE GEOSCIENCE, INC.City of Moorpark Project No. 030.003PLATE 3b15' H15'VExaggerationNOTE: Elevations are approximate and are based on USGS 7.5 minute topographic map of Moorpark quadrangle.LegendGEOLOGIC CROSS SECTION B-B'Proposed New Library SiteMoorpark, CaliforniaB'B113     114                   (69@E6;2@<#216A:($(#B2>E9<<?2:<12>.@2E299<C6?5 /><C;1.:=C6@5?0.@@2>210<A>?24>.6;?.;1C6@532C36;2  ", ($(&B2>E9<<?2:<12>.@2E299<C6?5/><C;1.:= (*'" 3@>23 #("1.@A: &><720@$<   )+<>&&@?3&)322@9.E2E( ")C6@5(.;1#":216A:?@633:<12>.@2@<1.>8/><C;     "' (69@E6;2($(#=.92/><C;1>EC6@54>.B29 6@E<3#<<>=.>8 //10"1+",*'/1.*"   "   ?0.@@2>210<.>?2?.;1 ($C6@5(69@(&(#9<<?2:<12>.@2E299<C6?5/><C;1.:= %$)')%' 6;2($C6@59.E(&(B2>E9<<?21.>8/><C;1.:=   9<<?2.@ ><A;1214>.B29@< 16. ) #)% )%)"&)3@ &>2;@602 "%- !- ( >6996;4 ;0 A@@6;4?C6@5&<>@9.;1 $%))529<4.;11.@.=>2?2;@2152>26;.>2.?6:=96360.@6<;<3.0@A.9 ?A/?A>3.020<;16@6<;?2;0<A;@2>21.@@52@6:2<32D=9<>.@6<;.@@52?=206360 9<0.@6<;2D=9<>21 (A/?A>3.020<;16@6<;?:.E16332>.@<@52>9<0.@6<;?.;1 .@@56?9<0.@6<;C6@5@52=.??.42<3@6:2 16. <99<C?@2:.A42> #.E    ,)'&)3@         !  ! ""   "&>2;@602&"()  )-"" & &(( $$<  $*#'"%) %$(22"<0.@6<;#.=#)' "(-#%"(#&""%,%*$)'-$ =03#% ()*'%$)$)C6@5:216A:12;?21.>8/><C;?.;1C6@509.E3><: @<  1.:= ($C6@59.E(&(9<<?2:<12>.@2/><C;1.:=C6@5 C6@536;2><A;1214>.B29@< 16.   ", (69@E6;2($(#=.92/><C;1>EC6@54>.B29 (69@E 6;2 @< #216A: ($ (# B2>E 9<<?2 :<12>.@2 E299<C6?5 6;2 ($ C6@5 9.E (&( B2>E 9<<?2 1.>8 /><C; 1.:= 9.E2E ( ") C6@5 (.;1 #" :216A: ?@633 :<12>.@2 @< 1.>8 /><C; 1.:= ($C6@59.E(&(9<<?2:<12>.@2/><C;1.:=C6@5 ?0.@@2>210<.>?2?.;1 ($ C6@5 (69@ (&(# 9<<?2 :<12>.@2 E299<C6?5 /><C; 1.:= ''))%' 115       "&>2;@602 16. <99<C?@2:.A42> //10"1+",*'/1.*"   # )#.E   !- &>2;@602    ! C2@?5A@1<C;.3@2>?.:=96;43<>:6; :2.?A>21C.@2>.@  %$)')%' ( >6996;4 ;0 $%))529<4.;11.@.=>2?2;@2152>26;.>2.?6:=96360.@6<;<3.0@A.9 ?A/?A>3.020<;16@6<;?2;0<A;@2>21.@@52@6:2<32D=9<>.@6<;.@@52?=206360 9<0.@6<;2D=9<>21 (A/?A>3.020<;16@6<;?:.E16332>.@<@52>9<0.@6<;?.;1 .@@56?9<0.@6<;C6@5@52=.??.42<3@6:2 )%)"&)3@   #)%,)'&)3@   ! ""  9.E2E($( (.;1E"-"B2>E9<<?2:<12>.@2/><C; A@@6;4?C6@5&<>@9.;1 "%-  C6@5 @5608:<12>.@2E299<C6?5/><C;09.E2E36;2?.;1.@    E299<C6?5/><C;1.:=  6;2@<#216A:($C6@5(69@(&(#:216A:12;?2=.92  (69@E6;2@<#216A:($(#9<<?2=.92E299<C6?5/><C;1.:= C6@532C?0.@@2>210<.>?2?.;1.;1 4>.B293>.4:2;@?#)' "(-#%"(#&" '-$ =03/.3*.4&%   #% ()*'%$)$)&"()  )-"" & &(( $$<  )+<>&&@?36@E<3#<<>=.>8  &><720@$<    (*'" 3@>23 #("1.@A:&)322@$*#'"%,%*$)"%) %$(22"<0.@6<;#.= (69@E 6;2 @< #216A: ($ (# 9<<?2 =.92 E299<C6?5 /><C; 1.:= 6;2 @< #216A: ($ C6@5 (69@ (&(# :216A: 12;?2 =.92 9.E2E ($( (.;1E "-"B2>E 9<<?2 :<12>.@2 /><C; ''%'%'')%%% 116     =         /     6@E<3#<<>=.>8  &><720@$<    /.3*.4&%&)322@#)' "(-#%"(#&"$*#'"%,%*$)"%) %$(22"<0.@6<;#.='-$ =03#% ()*'%$)$)&"()  )-"" & &(( $$<  )+<>&&@?3(*'" 3@>23 #("1.@A:      9<<?2.@ 39<C6;4 0.B6;4?.;1/29<C.116;4C.@2>@<.A42>?=>6<>@< ?.:=96;4/29<C  9.E2E($(:216A:12;?2:<12>.@2/><C;C2@  ?.;1?9<A456;?.:=92>/9<C0<A;@?:.E/2.3320@21  6;2@<#216A:($(&9<<?2@<:216A:12;?2=.92E299<C6?5 /><C;C2@C6@5:<12>.@2/><C;09.E2E36;2?.;16;?.:=92>?5<2 ?.;1?9<A456;?.:=92>   9.E2E($(:216A:12;?2:<12>.@2/><C;C2@ %$)')%' ( >6996;4 ;0 $%))529<4.;11.@.=>2?2;@2152>26;.>2.?6:=96360.@6<;<3.0@A.9 ?A/?A>3.020<;16@6<;?2;0<A;@2>21.@@52@6:2<32D=9<>.@6<;.@@52?=206360 9<0.@6<;2D=9<>21 (A/?A>3.020<;16@6<;?:.E16332>.@<@52>9<0.@6<;?.;1 .@@56?9<0.@6<;C6@5@52=.??.42<3@6:2 )%)"&)3@ ) #.E      #)% 16. <99<C?@2:.A42> ,)'&)3@   ! "" A@@6;4?C6@5&<>@9.;1 "%- "&>2;@602 !- &>2;@602    ! //10"1+",*'/1.*"   $ 6;2 @< #216A: ($ (& 9<<?2 @< :216A: 12;?2 =.92 E299<C6?5 9.E2E ($(:216A:12;?2 :<12>.@2 /><C;C2@ %%'' 9.E2E ($ ( :216A: 12;?2 :<12>.@2 /><C; C2@ ')%%%' 117         6@E<3#<<>=.>8  &><720@$<    /.3*.4&%&)322@#)' "(-#%"(#&"$*#'"%,%*$)"%) %$(22"<0.@6<;#.='-$ =03#% ()*'%$)$)&"()  )-"" & &(( $$<  )+<>&&@?3(*'" 3@>23 #("1.@A:       6;2(.;1E"-":216A:?@633:<12>.@2@<1.>8/><C;C2@ ?9645@9E:60.02<A??69@E 6;2@<#216A:9.E2E($(:216A:12;?2:<12>.@2  /><C;C2@C6@532C0<.>?2?.;1  (69@E6;2($(#:216A:12;?2:<12>.@2/><C;C2@   %$)')%' ( >6996;4 ;0 $%))529<4.;11.@.=>2?2;@2152>26;.>2.?6:=96360.@6<;<3.0@A.9 ?A/?A>3.020<;16@6<;?2;0<A;@2>21.@@52@6:2<32D=9<>.@6<;.@@52?=206360 9<0.@6<;2D=9<>21 (A/?A>3.020<;16@6<;?:.E16332>.@<@52>9<0.@6<;?.;1 .@@56?9<0.@6<;C6@5@52=.??.42<3@6:2 )%)"&)3@ ) #.E      #)% 16. <99<C?@2:.A42> ,)'&)3@   ! "" A@@6;4?C6@5&<>@9.;1 "%- "&>2;@602 !- &>2;@602    ! //10"1+",*'/1.*"   $ 6;2 (.;1E "- " :216A: ?@633 :<12>.@2 @< 1.>8 /><C; C2@ 6;2 @< #216A: 9.E2E ($ ( :216A: 12;?2 :<12>.@2 (69@E 6;2 ($ (# :216A: 12;?2 :<12>.@2 /><C; C2@ 118                  36;2><<@5.6>?.;1:6;<>36;20.96052.@ @<  36;2@<:216A:4>.6;21C6@532C?0.@@2>210<.>?2?.;1.@    6@E<3#<<>=.>8  &><720@$<     &)322@#)' "(-#%"(#&"$*#'"%,%*$)"%) %$(22"<0.@6<;#.='-$ =03#% ()*'%$)$)&"()  )-"" & &(( $$<  )+<>&&@?3(*'" 3@>23 #("1.@A:     "' (69@E6;2($(#C6@54>.B29:216A:12;?24>.E6?5/><C; 1>E@<1.:=  "'  ", 9.E2E($(:216A:12;?21.>8/><C;1>E@<1.:=  ", (69@E6;2($(#9<<?2:<12>.@2/><C;1>E@<1.:=  9<<?21.:=36;2@<:216A:4>.6;21.@  36;2@<:216A:4>.6;211.>82>.@ C6@51.>8/><C;36;2?69@E92;?2?.@  6;2@<#216A:($C6@5(69@(&(#9<<?2:<12>.@2/><C; C6@5:216A:?@633:<12>.@2/><C;?69@C6@5?9645@:<@@96;4.;132C  1.:= (69@E6;2($(#9<<?2:<12>.@2/><C;1.:=  :216A:12;?2=.92E299<C6?5/><C;.@  %$)')%' ( >6996;4 ;0 $%))529<4.;11.@.=>2?2;@2152>26;.>2.?6:=96360.@6<;<3.0@A.9 ?A/?A>3.020<;16@6<;?2;0<A;@2>21.@@52@6:2<32D=9<>.@6<;.@@52?=206360 9<0.@6<;2D=9<>21 (A/?A>3.020<;16@6<;?:.E16332>.@<@52>9<0.@6<;?.;1 .@@56?9<0.@6<;C6@5@52=.??.42<3@6:2 )%)"&)3@ ) #.E      #)% 16. <99<C?@2:.A42> ,)'&)3@  ! "" A@@6;4?C6@5&<>@9.;1 "%- "&>2;@602 !- &>2;@602    ! //10"1+",*'/1.*"    "     "'   ",    ", '' 6;2 @<#216A:($ C6@5 (69@ (&(# 9<<?2 :<12>.@2 /><C; (69@E 6;2 ($ (# 9<<?2 :<12>.@2 /><C; 1.:= ')%'%%'%%' 119          = ,%  6@E<3#<<>=.>8  &><720@$<     /.3*.4&%&)322@#)' "(-#%"(#&"$*#'"%,%*$)"%) %$(22"<0.@6<;#.='-$ =03#% ()*'%$)$)&"()  )-"" & &(( $$<  )+<>&&@?3(*'" 3@>23 #("1.@A:    9<<?2.@  C6@536;29E9.:6;.@21?.;1E?69@.;1?69@6;?.:=92>?5<2.@     6;2@<#216A:($(&:216A:12;?2=.92E299<C6?5/><C;  1.:=C6@532C0<.>?2?.;1.;132C.;4A9.>4>.B293>.4:2;@? @<./<A@ 16.  9.E2E6;2@<#216A:($(:216A:12;?21.>8/><C;:<6?@ @<C2@ #216A:@<<.>?2($(&:216A:12;?2:<12>.@2/><C; :<6?@@<C2@  (.;1E(69@E"-"#"B2>E?<3@1.>8/><C;C2@ %$)')%' ( >6996;4 ;0 $%))529<4.;11.@.=>2?2;@2152>26;.>2.?6:=96360.@6<;<3.0@A.9 ?A/?A>3.020<;16@6<;?2;0<A;@2>21.@@52@6:2<32D=9<>.@6<;.@@52?=206360 9<0.@6<;2D=9<>21 (A/?A>3.020<;16@6<;?:.E16332>.@<@52>9<0.@6<;?.;1 .@@56?9<0.@6<;C6@5@52=.??.42<3@6:2 )%)"&)3@ ) #.E      #)% 16. <99<C?@2:.A42> ,)'&)3@  ! "" A@@6;4?C6@5&<>@9.;1 "%- "&>2;@602 !- &>2;@602    ! //10"1+",*'/1.*"    # 6;2 @< #216A: ($ (& :216A: 12;?2 =.92 E299<C6?5 /><C; (.;1E (69@E "-"#"B2>E ?<3@ 1.>8 /><C;C2@ '' 9.E2E 6;2 @< #216A: ($ ( :216A: 12;?2 1.>8 /><C; :<6?@ @<C2@ #216A:@<<.>?2($(&:216A:12;?2:<12>.@2/><C; ')%'%%'%%' 120       =  =  $'        6@E<3#<<>=.>8  &><720@$<     /.3*.4&%&)322@#)' "(-#%"(#&"$*#'"%,%*$)"%) %$(22"<0.@6<;#.='-$ =03#% ()*'%$)$)&"()  )-"" & &(( $$<  )+<>&&@?3(*'" 3@>23 #("1.@A:    ?5A@1<C;.3@2>?.:=96;43<>:6; :2.?A>21C.@2>.@ B2>E?@633.@   #216A:@<<.>?29.E2E($(:216A:12;?21.>8/><C; C2@ ;<>20<B2>E.3@2>?.:=96;4.@   ;<>20<B2>E.3@2>?.:=96;4.@>20<B2>21?.:=92C6@5(&)      %$)')%' ( >6996;4 ;0 $%))529<4.;11.@.=>2?2;@2152>26;.>2.?6:=96360.@6<;<3.0@A.9 ?A/?A>3.020<;16@6<;?2;0<A;@2>21.@@52@6:2<32D=9<>.@6<;.@@52?=206360 9<0.@6<;2D=9<>21 (A/?A>3.020<;16@6<;?:.E16332>.@<@52>9<0.@6<;?.;1 .@@56?9<0.@6<;C6@5@52=.??.42<3@6:2 )%)"&)3@ ) #.E      #)% 16. <99<C?@2:.A42> ,)'&)3@  ! "" A@@6;4?C6@5&<>@9.;1 "%- "&>2;@602 !- &>2;@602    ! //10"1+",*'/1.*"    $ $  #216A:@<<.>?29.E2E($(:216A:12;?21.>8/><C; 121   ,/5$/4.3 42) /1(1"# A98 A98(.:=92 ,/5$/4.3 &2$1*03*/. (@.;1.>1&2;2@>.@6<;)2?@(&)  /9<C?3<> =2;2@>.@6<;.3@2>6;6@6.9?2.@6;4 (.:=92>    %1>6B2;  /9<C?3<> =2;2@>.@6<;.3@2>6;6@6.9?2.@6;4  /9<C?3<>1>6B2.3@2>6;6@6.9?2.@6;4  #<163621.963<>;6."6;2>(.:=92> '23  /9<C?3<>6;6@6.9?2.@6;4 1>6B2;    %  9<C0<A;@?3<>:<163621.963<>;6.?.:=92> &A?5 )56;C.9921?.:=92> =A?521    % "$"-" (.;1E( ")#" "-()%$ &+ $$(#)' "( )"- (69@E($(# ( ")()%$ %$') (.;1E"-" ($C6@5(69@(&(# ($()%$ ($C6@59.E(&( ( ")#" ($(& +%"$  (.;1E( ")#" "() ( ")# 9.E2E($( %"%# )  '+"&( " %*( 3)&16-#/,2 ><A;1C.@2> (@>.@./>2.8    4--"16/'"-0,*.(&3"*,2  4-#&16-#/,"-0,&160& ,/5$/4.3.'/1-3*/. "3&1*",6-#/,2".%,"22*'*$"3*/.2  ! !  ( 122 Project: Oakridge Geoscience, Inc./MoorPark Library ProjectKehoe Testing and Engineering714-901-7270rich@kehoetesting.comwww.kehoetesting.comTotal depth: 75.29 ft, Date: 4/27/2017W. High St & Moorpark Ave Moorpark, CACone Type: Vertek CPT-1Location:CPeT-IT v.2.0.1.55 - CPTU data presentation & interpretation software - Report created on: 4/28/2017, 11:49:28 AM0Project file: C:\OakridgeMoorPk4-17\Plot Data\Plots.cptPLATE A-4123 Project: Oakridge Geoscience, Inc./MoorPark Library ProjectKehoe Testing and Engineering714-901-7270rich@kehoetesting.comwww.kehoetesting.comTotal depth: 75.14 ft, Date: 4/27/2017W. High St & Moorpark Ave Moorpark, CACone Type: Vertek CPT-2Location:CPeT-IT v.2.0.1.55 - CPTU data presentation & interpretation software - Report created on: 4/28/2017, 11:49:57 AM0Project file: C:\OakridgeMoorPk4-17\Plot Data\Plots.cptPLATE A-5124 Project: Oakridge Geoscience, Inc./MoorPark Library ProjectKehoe Testing and Engineering714-901-7270rich@kehoetesting.comwww.kehoetesting.comTotal depth: 75.07 ft, Date: 4/27/2017W. High St & Moorpark Ave Moorpark, CACone Type: Vertek CPT-3Location:CPeT-IT v.2.0.1.55 - CPTU data presentation & interpretation software - Report created on: 4/28/2017, 11:50:09 AM0Project file: C:\OakridgeMoorPk4-17\Plot Data\Plots.cptPLATE A-6125 Project: Oakridge Geoscience, Inc./MoorPark Library ProjectKehoe Testing and Engineering714-901-7270rich@kehoetesting.comwww.kehoetesting.comTotal depth: 75.16 ft, Date: 4/27/2017W. High St & Moorpark Ave Moorpark, CACone Type: Vertek CPT-4Location:CPeT-IT v.2.0.1.55 - CPTU data presentation & interpretation software - Report created on: 4/28/2017, 11:50:24 AM0Project file: C:\OakridgeMoorPk4-17\Plot Data\Plots.cptPLATE A-7126 Project: Oakridge Geoscience, Inc./MoorPark Library ProjectKehoe Testing and Engineering714-901-7270rich@kehoetesting.comwww.kehoetesting.comTotal depth: 75.27 ft, Date: 4/27/2017W. High St & Moorpark Ave Moorpark, CACone Type: Vertek CPT-5Location:CPeT-IT v.2.0.1.55 - CPTU data presentation & interpretation software - Report created on: 4/28/2017, 11:50:37 AM0Project file: C:\OakridgeMoorPk4-17\Plot Data\Plots.cptPLATE A-8127      128 -+&" .+            **,+,' (&#*,)&    **,+,'&,,.       %.1+#++-,-' %(.1%*".+"!%/)      ! " # $ % & ' (                                  " $"#"' #  ! # ! 129 -+&" .+          %.1+#++-,-'         **,+,'&,,. **,+,' (&#*,)&      %*".+"!%/)0%.$%(.   ! " # $ % & ' (                                  " $"#"' #  ! # ! 130 -+&" .+         **,+,' (&#*,)&      %(.1%*".+"!%/) %.1+#++-,-'         **,+,'&,,.   ! " # $ % & ' (                                  " $"#"' #  ! # ! 131 -+&" .+         ! **,+,' (&#*,)&      %*".+"!%/)0%.$%(. %.1+#++-,-'         **,+,'&,,.   ! " # $ % & ' (                                  " $"#"' #  ! # ! 132 -+&" .+         " **,+,' (&#*,)&      %*".+"!%/) %.1+#++-,-'         **,+,'&,,.   ! " # $ % & ' (                                  " $"#"' #  ! # ! 133 -+&" .+        " **,+,' (&#*,)&      %(.1%*".+"!%/) %.1+#++-,-'         **,+,'&,,.   ! " # $ % & ' (                                  " $"#"' #  ! # ! 134 -+&" .+         " **,+,' (&#*,)&      %*".+"!%/)0%.$%(. %.1+#++-,-'         **,+,'&,,.   ! " # $ % & ' (                                  " $"#"' #  ! # ! 135 -+&" .+         # **,+,' (&#*,)&      %(.1%*" %.1+#++-,-'         **,+,'&,,.   ! " # $ % & ' (                                  " $"#"' #  ! # ! 136 -+&" .+         $ **,+,' (&#*,)&      %(.1%*"  %.1+#++-,-'         **,+,'&,,.   ! " # $ % & ' (                                  " $"#"' #  ! # ! 137 -+&" .+         % **,+,' (&#*,)&      (1"1%*".+"!%/) %.1+#++-,-'         **,+,'&,,.   ! " # $ % & ' (                                  " $"#"' #  ! # ! 138 -+&" .+         & **,+,' (&#*,)&      *!1%(.1 %.1+#++-,-'         **,+,'&,,.   ! " # $ % & ' (                                  " $"#"' #  ! # ! 139 '%!(%                      )),*,% &$#),($ #))     ()%%%'&'"                      &-.$ $.2(!"1$+/$!$'$.),0     $(" $("  140 '%!(%                        $) #()   )),*,% &$#),($  ()%%%'&'"                      &-.$ $.2(!"1$+/$!$'$.),0     $(" $("  141 ONE DIMENSIONAL COLLAPSE TEST XYXY Max Curvature 4 3 Max Curve Tangent 2 2.314802 43 11 4 Horiz Max 4 3 11 3 Bisect 4 3 11 3.5 Virgin 6 1 16 7 Intersect 8.87361 3.393825 Vertical Stress, ksf --- 3.11 --- --- --- --- 2.65 PROPERTIESHeight, in Void Ratio Estimated GsSUMMARY Test Method: ASTM D4546, Method BSAMPLE IDWater Content, % Dry Unit Weight, pcf USCS Classification: Saturation, % Boring, Sample #, Depth Diameter, in 1.00 18.6% 104.1 84% 0.59 2.42 0.62 2.42 11%REMARKSInundation Increment, ksf After adding water the specimen collapsed 0.43% at a stress of 3.11ksf.0.98 Poorly-graded SAND (SP): yellow, dry Final Liquid Limit 030.003 - Moorpark Library 102.0 2.5% Plastic Limit Initial Passing #200 Plasticity Index DH-1 , #10 , 30.0 ft Preconsolidation Pressure, ksf 0 1 2 3 4 5 6 7 8 0.01 0.1 1 10 Strain, %Vertical Stress, ksf PLATE B-3a142 ONE DIMENSIONAL COLLAPSE TEST XYXY Max Curvature 4 3 Max Curve Tangent 2 2.314802 43 11 4 Horiz Max 4 3 11 3 Bisect 4 3 11 3.5 Virgin 6 1 16 7 Intersect 8.87361 3.393825 Vertical Stress, ksf --- 1.03 --- --- --- --- 2.65 DH-2 , #5 , 10.0 ft Preconsolidation Pressure, ksf 030.003 - Moorpark Library 96.9 3.5% Plastic Limit Initial Passing #200 Plasticity Index 0.71 2.42 13%REMARKSInundation Increment, ksf After adding water the specimen collapsed 2.32% at a stress of 1.03ksf.0.97 Poorly-graded SAND with silt (SP-SM): light brown, dry, lightly cemented Final Liquid Limit USCS Classification: Saturation, % Boring, Sample #, Depth Diameter, in 1.00 21.0% 100.1 85% 0.65 2.42PROPERTIES Height, in Void Ratio Estimated GsSUMMARY Test Method: ASTM D4546, Method BSAMPLE IDWater Content, % Dry Unit Weight, pcf 0 1 2 3 4 5 6 7 8 0.01 0.1 1 10 Strain, %Vertical Stress, ksf PLATE B-3b143 ONE DIMENSIONAL COLLAPSE TEST XYXY Max Curvature 4 3 Max Curve Tangent 2 2.314802 43 11 4 Horiz Max 4 3 11 3 Bisect 4 3 11 3.5 Virgin 6 1 16 7 Intersect 8.87361 3.393825 Vertical Stress, ksf --- 2.49 --- --- --- --- 2.65 PROPERTIESHeight, in Void Ratio Estimated GsSUMMARY Test Method: ASTM D4546, Method BSAMPLE IDWater Content, % Dry Unit Weight, pcf USCS Classification: Saturation, % Boring, Sample #, Depth Diameter, in 1.00 24.6% 92.4 82% 0.79 2.42 0.84 2.42 18%REMARKSInundation Increment, ksf After adding water the specimen collapsed 0.05% at a stress of 2.49ksf.0.97 Poorly-graded SAND (SP): yellow brown, moist, fine Final Liquid Limit DH-2 , #9 , 25.0 ft Preconsolidation Pressure, ksf 030.003 - Moorpark Library 89.9 5.6% Plastic Limit Initial Passing #200 Plasticity Index 0 1 2 3 4 5 6 7 8 0.01 0.1 1 10 Strain, %Vertical Stress, ksf PLATE B-3c144 1$1#5'    .+'05!'45'& 31,'%5'&6%'&! #/2.'*'%-'& 1+.!92'                                       24(82#04+10 3'4463' 7#.6'  '/#3-4   39'04+592%( 7#.6' 5#$+.1/'5'3  82#04+103'4463'24( 5#$+.1/'5'3  !6304+42.#%'/'05 /-4, 4 )+1 "'+)*51(1.&)3#/4 86&#5+103'4463'24+ 0+5+#.1+4563'  "*/)%(&&-0$)&,$& --/."/*)#/"/6  1+4563'105'05 2'%+/'06/$'3 3'2#+3'&"'+)*5)3#/4 +0#."#5'3&&'&)3#/4 %% "'+)*51( 1+.1.&)3#/4 '+)*5(5'31/2#%5+10+0                               82#04+10 3'4463'24(7#.6'86&#5+103'4463'24+ 3"+2& 5.",0)-,/&002/&.0' 7#.6'!'45'2135 #.53#04  ! 145 /! (%!*/ -+&!/ !)-'. $(+-% !,0("% ! +%./0-!.! %*/ )# '# )# '# 3#+)2#2)4'2!'1207"2 07"2 07"2,42!'12$7'#&+-%*# ),(!+ !,/$"/ !  #+  !   !   !   !   !  ! !',/8%'2#2'#/'0 !             0.5- 5 )+2 +--+.%1%/2!./.0))-2'&.6  !.%./%1%/2   $))-+&+ $!'! #*0)&(''.1%)'-%'+%(%.0(!.-%,/%+*  ..0/#0*)$0#07),(!+/%+*+-0("/! !./! 2 146      147 LIQ UEFACTION ANALYSIS REPORT Input parameters and analysis data Analysis method: Fines correction method: Points to test: Earthquake magnitude Mw: Peak ground acceleration: Robertson (2009) Robertson (2009) Based on Ic value 6.90 1.03 G.W.T. (in-situ): G.W.T. (earthq.): Average results interval: Ic cut-off value: Unit weight calculation: Project title : Moorpark Library Location : High Street and Moorpark Avenue, Moorpark, Caliornia GeoLogismiki Geotechnical Engineers Merarhias 56 http://www.geologismiki.gr CPT file : CPT-1 37.50 ft 15.00 ft 5 2.60 Based on SBT Use fill: Fill height: Fill weight: Trans. detect. applied: Kσ applied: No N/A N/A Yes No Clay like behavior applied: Limit depth applied: Limit depth: MSF method: All soils No N/A Method based Cone resistance qt (tsf) 200100Depth (ft)75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Cone resistance SBTn Plot Ic (Robertson 1990) 4321 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 SBTn Plot CRR plot CRR & CSR 0.60.40.20 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 CRR plot During earthq. Qtn,cs 200180160140120100806040200Cyclic Stress Ratio* (CSR*)0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0 Liquefaction No Liquefaction Normalized friction ratio (%) 0.1 1 10Normalized CPT penetration resistance1 10 100 1,000 Friction Ratio Rf (%) 1086420 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Friction Ratio Mw =71/2, sigma'=1 atm base curve Summary of liquefaction potential FS Plot Factor of safety 21.510.50 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 FS Plot During earthq. Zone A1: Cyclic liquefaction likely depending on size and duration of cyclic loading Zone A2: Cyclic liquefaction and strength loss likely depending on loading and ground geometry Zone B: Liquefaction and post-earthquake strength loss unlikely, check cyclic softening Zone C: Cyclic liquefaction and strength loss possible depending on soil plasticity, brittleness/sensitivity, strain to peak undrained strength and ground geometry CLiq v.2.1.6.11 - CPT Liquefaction Assessment Software - Report created on: 6/5/2017, 1:10:47 PM Project file: C:\Users\Craig Prentice\Desktop\Moorpark Library\Moorpark Library.clq 1148 This software is licensed to: Oakridge Geoscience, Inc.CPT name: CPT-1Cone resistanceqt (tsf)200100Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Cone resistanceCPT basic interpretation plotsFriction RatioRf (%)1086420Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Friction RatioPore pressureu (psi)100-10Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Pore pressureInsituSBT PlotIc(SBT)4321Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420SBT PlotSoil Behaviour TypeSBT (Robertson et al. 1986)181614121086420Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Soil Behaviour TypeSandSilty sand & sandy siltSand & silty sandSilty sand & sandy siltSand & silty sandSilty sand & sandy siltSand & silty sandSandClay & silty claySilty sand & sandy siltSilty sand & sandy siltSilty sand & sandy siltSand & silty sandSilty sand & sandy siltSand & silty sandSilty sand & sandy siltClay & silty claySilty sand & sandy siltSilty sand & sandy siltSand & silty sandSilty sand & sandy siltSilty sand & sandy siltSand & silty sandSilty sand & sandy siltSand & silty sandCLiq v.2.1.6.11 - CPT Liquefaction Assessment Software - Report created on: 6/5/2017, 1:10:47 PM2Project file: C:\Users\Craig Prentice\Desktop\Moorpark Library\Moorpark Library.clqInput parameters and analysis dataAnalysis method:Fines correction method:Points to test:Earthquake magnitude Mw:Peak ground acceleration:Depth to water table (insitu):Robertson (2009)Robertson (2009)Based on Ic value6.901.0337.50 ftDepth to water table (erthq.):Average results interval:Ic cut-off value:Unit weight calculation:Use fill:Fill height:15.00 ft52.60Based on SBTNoN/AFill weight:Transition detect. applied:Kσ applied:Clay like behavior applied:Limit depth applied:Limit depth:N/AYesNoAll soilsNoN/ASBT legend1. Sensitive fine grained2. Organic material3. Clay to silty clay4. Clayey silt to silty5. Silty sand to sandy silt6. Clean sand to silty sand7. Gravely sand to sand8. Very stiff sand to9. Very stiff fine grained149 This software is licensed to: Oakridge Geoscience, Inc.CPT name: CPT-1Norm. cone resistanceQtn200150100500Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Norm. cone resistanceCPT basic interpretation plots (normalized)Norm. friction ratioFr (%)1086420Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Norm. friction ratioNom. pore pressure ratioBq10.80.60.40.20-0.2Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Nom. pore pressure ratioSBTn PlotIc (Robertson 1990)4321Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420SBTn PlotNorm. Soil Behaviour TypeSBTn (Robertson 1990)181614121086420Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Norm. Soil Behaviour TypeSandSilty sand & sandy siltSand & silty sandSilty sand & sandy siltSand & silty sandSilty sand & sandy siltSilty sand & sandy siltClay & silty claySand & silty sandSilty sand & sandy siltClayClay & silty claySilty sand & sandy siltClay & silty claySilty sand & sandy siltSand & silty sandClay & silty clayClay & silty claySilty sand & sandy siltClayClay & silty clayClay & silty claySilty sand & sandy siltClayClay & silty claySilty sand & sandy siltSilty sand & sandy siltSilty sand & sandy siltCLiq v.2.1.6.11 - CPT Liquefaction Assessment Software - Report created on: 6/5/2017, 1:10:47 PM3Project file: C:\Users\Craig Prentice\Desktop\Moorpark Library\Moorpark Library.clqSBTn legend1. Sensitive fine grained2. Organic material3. Clay to silty clay4. Clayey silt to silty5. Silty sand to sandy silt6. Clean sand to silty sand7. Gravely sand to sand8. Very stiff sand to9. Very stiff fine grainedInput parameters and analysis dataAnalysis method:Fines correction method:Points to test:Earthquake magnitude Mw:Peak ground acceleration:Depth to water table (insitu):Robertson (2009)Robertson (2009)Based on Ic value6.901.0337.50 ftDepth to water table (erthq.):Average results interval:Ic cut-off value:Unit weight calculation:Use fill:Fill height:15.00 ft52.60Based on SBTNoN/AFill weight:Transition detect. applied:Kσ applied:Clay like behavior applied:Limit depth applied:Limit depth:N/AYesNoAll soilsNoN/A150 This software is licensed to: Oakridge Geoscience, Inc.CPT name: CPT-1CRR plotCRR & CSR0.60.40.20Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420CRR plotDuring earthq.Liquefaction analysis overall plotsFS PlotFactor of safety21.510.50Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420FS PlotDuring earthq.LPILiquefaction potential20151050Depth (ft)6462605856545250484644424038363432302826242220181614121086420LPIVertical settlementsSettlement (in)1050Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Vertical settlementsLateral displacementsDisplacement (in)200150100500Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Lateral displacementsCLiq v.2.1.6.11 - CPT Liquefaction Assessment Software - Report created on: 6/5/2017, 1:10:47 PM5Project file: C:\Users\Craig Prentice\Desktop\Moorpark Library\Moorpark Library.clqF.S. color schemeLPI color schemeInput parameters and analysis dataAnalysis method:Fines correction method:Points to test:Earthquake magnitude Mw:Peak ground acceleration:Depth to water table (insitu):Robertson (2009)Robertson (2009)Based on Ic value6.901.0337.50 ftDepth to water table (erthq.):Average results interval:Ic cut-off value:Unit weight calculation:Use fill:Fill height:15.00 ft52.60Based on SBTNoN/AFill weight:Transition detect. applied:Kσ applied:Clay like behavior applied:Limit depth applied:Limit depth:N/AYesNoAll soilsNoN/AAlmost certain it will liquefyVery likely to liquefyLiquefaction and no liq. are equally likelyUnlike to liquefyAlmost certain it will not liquefyVery high riskHigh riskLow risk151 TRANSITION LAYER DETECTION ALGORITHM REPORT Summary Details & Plots This software is licensed to: Oakridge Geoscience, Inc.CPT name: CPT-1 SBTn Index Ic (Robertson 1990) 4321Depth (ft)74 72 70 68 66 64 62 60 58 56 54 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 SBTn Index Norm. Soil Behaviour Type SBTn (Robertson 1990) 1817161514131211109876543210Depth (ft)74 72 70 68 66 64 62 60 58 56 54 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Norm. Soil Behaviour Type Sand Silty sand & sandy silt Sand & silty sand Silty sand & sandy silt Sand & silty sand Silty sand & sandy silt Silty sand & sandy silt Clay & silty clay Sand & silty sand Silty sand & sandy silt Clay Clay & silty clay Silty sand & sandy siltClay & silty clay Silty sand & sandy silt Sand & silty sand Clay & silty clayClay & silty clay Silty sand & sandy silt ClayClay & silty clay Clay & silty claySilty sand & sandy siltClay Clay & silty clay Silty sand & sandy siltSilty sand & sandy siltClay & silty clay Sand & silty sand Transition layer algorithm properties Ic minimum check value: Ic maximum check value: Ic change ratio value: Minimum number of points in layer: General statistics Total points in CPT file: Total points excluded: Exclusion percentage: Number of layers detected: The software will delete data when the cone is in transition from either clay to sand or vise-versa. To do this the software requires a range of Ic values over which the transition will be defined (typically somewhere between 1.80 < Ic < 3.0) and a rate of change of Ic. Transitions typically occur when the rate of change of Ic is fast (i.e. delta Ic is small). The SBTn plot below, displays in red the detected transition layers based on the parameters listed below the graphs. Short description 1.70 3.00 0.0100 4 458 156 34.06% 20 CLiq v.2.1.6.11 - CPT Liquefaction Assessment Software - Report created on: 6/5/2017, 1:10:47 PM Project file: C:\Users\Craig Prentice\Desktop\Moorpark Library\Moorpark Library.clq 8152 This software is licensed to: Oakridge Geoscience, Inc.CPT name: CPT-1Cone resistanceqt (tsf)200100Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Cone resistanceSBTn PlotIc (Robertson 1990)4321Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420SBTn PlotFS PlotFactor of safety21.510.50Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420FS PlotDuring earthq.Vertical settlementsSettlement (in)1050Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Vertical settlementsEstimation of post-earthquake settlementsStrain plotVolumentric strain (%)6543210Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Strain plotCLiq v.2.1.6.11 - CPT Liquefaction Assessment Software - Report created on: 6/5/2017, 1:10:47 PM45Project file: C:\Users\Craig Prentice\Desktop\Moorpark Library\Moorpark Library.clqAbbreviationsqt:Ic:FS:Volumentric strain:Total cone resistance (cone resistance qc corrected for pore water effects)Soil Behaviour Type IndexCalculated Factor of Safety against liquefactionPost-liquefaction volumentric strain153 This software is licensed to: Oakridge Geoscience, Inc.CPT name: CPT-1Cone resistanceqt (tsf)200100Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Cone resistanceSBTn PlotIc (Robertson 1990)4321Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420SBTn PlotCorrected norm. cone resistanceQtn,cs200150100500Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Corrected norm. cone resistanceFS PlotFactor of safety21.510.50Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420FS PlotDuring earthq.Cyclic shear strainGamma max (%)6050403020100Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Cyclic shear strainLateral displacementsDisplacement (in)200150100500Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Lateral displacementsEstimation of post-earthquake lateral DisplacementsGeometric parameters: Gently sloping ground without free face (Slope 2.50 %)CLiq v.2.1.6.11 - CPT Liquefaction Assessment Software - Report created on: 6/5/2017, 1:10:47 PM52Project file: C:\Users\Craig Prentice\Desktop\Moorpark Library\Moorpark Library.clqqt: Total cone resistance (cone resistance qc corrected for pore water effects)Ic: Soil Behaviour Type IndexQtn,cs: Equivalent clean sand normalized CPT total cone resistanceF.S.: Factor of safetyγmax: Maximum cyclic shear strainLDI: Lateral displacement indexAbbreviationsSurface condition154 LIQ UEFACTION ANALYSIS REPORT Input parameters and analysis data Analysis method: Fines correction method: Points to test: Earthquake magnitude Mw: Peak ground acceleration: Robertson (2009) Robertson (2009) Based on Ic value 6.90 1.03 G.W.T. (in-situ): G.W.T. (earthq.): Average results interval: Ic cut-off value: Unit weight calculation: Project title : Moorpark Library Location : High Street and Moorpark Avenue, Moorpark, Caliornia GeoLogismiki Geotechnical Engineers Merarhias 56 http://www.geologismiki.gr CPT file : CPT-2 37.50 ft 15.00 ft 5 2.60 Based on SBT Use fill: Fill height: Fill weight: Trans. detect. applied: Kσ applied: No N/A N/A Yes No Clay like behavior applied: Limit depth applied: Limit depth: MSF method: All soils No N/A Method based Cone resistance qt (tsf) 200100Depth (ft)75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Cone resistance SBTn Plot Ic (Robertson 1990) 4321 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 SBTn Plot CRR plot CRR & CSR 0.60.40.20 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 CRR plot During earthq. Qtn,cs 200180160140120100806040200Cyclic Stress Ratio* (CSR*)0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0 Liquefaction No Liquefaction Normalized friction ratio (%) 0.1 1 10Normalized CPT penetration resistance1 10 100 1,000 Friction Ratio Rf (%) 1086420 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Friction Ratio Mw =71/2, sigma'=1 atm base curve Summary of liquefaction potential FS Plot Factor of safety 21.510.50 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 FS Plot During earthq. Zone A1: Cyclic liquefaction likely depending on size and duration of cyclic loading Zone A2: Cyclic liquefaction and strength loss likely depending on loading and ground geometry Zone B: Liquefaction and post-earthquake strength loss unlikely, check cyclic softening Zone C: Cyclic liquefaction and strength loss possible depending on soil plasticity, brittleness/sensitivity, strain to peak undrained strength and ground geometry CLiq v.2.1.6.11 - CPT Liquefaction Assessment Software - Report created on: 6/5/2017, 1:10:49 PM Project file: C:\Users\Craig Prentice\Desktop\Moorpark Library\Moorpark Library.clq 71155 This software is licensed to: Oakridge Geoscience, Inc.CPT name: CPT-2Cone resistanceqt (tsf)200100Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Cone resistanceCPT basic interpretation plotsFriction RatioRf (%)1086420Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Friction RatioPore pressureu (psi)100-10Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Pore pressureInsituSBT PlotIc(SBT)4321Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420SBT PlotSoil Behaviour TypeSBT (Robertson et al. 1986)181614121086420Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Soil Behaviour TypeSand & silty sandSilty sand & sandy siltSand & silty sandSilty sand & sandy siltSand & silty sandClay & silty claySilty sand & sandy siltSand & silty sandSilty sand & sandy siltSand & silty sandSilty sand & sandy siltSilty sand & sandy siltSand & silty sandSilty sand & sandy siltSand & silty sandSilty sand & sandy siltClay & silty claySilty sand & sandy siltSilty sand & sandy siltClay & silty claySand & silty sandSilty sand & sandy siltSilty sand & sandy siltSilty sand & sandy siltClay & silty claySilty sand & sandy siltSilty sand & sandy siltSilty sand & sandy siltClay & silty claySilty sand & sandy siltSand & silty sandCLiq v.2.1.6.11 - CPT Liquefaction Assessment Software - Report created on: 6/5/2017, 1:10:49 PM72Project file: C:\Users\Craig Prentice\Desktop\Moorpark Library\Moorpark Library.clqInput parameters and analysis dataAnalysis method:Fines correction method:Points to test:Earthquake magnitude Mw:Peak ground acceleration:Depth to water table (insitu):Robertson (2009)Robertson (2009)Based on Ic value6.901.0337.50 ftDepth to water table (erthq.):Average results interval:Ic cut-off value:Unit weight calculation:Use fill:Fill height:15.00 ft52.60Based on SBTNoN/AFill weight:Transition detect. applied:Kσ applied:Clay like behavior applied:Limit depth applied:Limit depth:N/AYesNoAll soilsNoN/ASBT legend1. Sensitive fine grained2. Organic material3. Clay to silty clay4. Clayey silt to silty5. Silty sand to sandy silt6. Clean sand to silty sand7. Gravely sand to sand8. Very stiff sand to9. Very stiff fine grained156 This software is licensed to: Oakridge Geoscience, Inc.CPT name: CPT-2Norm. cone resistanceQtn200150100500Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Norm. cone resistanceCPT basic interpretation plots (normalized)Norm. friction ratioFr (%)1086420Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Norm. friction ratioNom. pore pressure ratioBq10.80.60.40.20-0.2Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Nom. pore pressure ratioSBTn PlotIc (Robertson 1990)4321Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420SBTn PlotNorm. Soil Behaviour TypeSBTn (Robertson 1990)181614121086420Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Norm. Soil Behaviour TypeSand & silty sandSilty sand & sandy siltSand & silty sandSilty sand & sandy siltSand & silty sandSilty sand & sandy siltSand & silty sandSilty sand & sandy siltSand & silty sandSilty sand & sandy siltSand & silty sandClay & silty clayClay & silty claySilty sand & sandy siltClay & silty claySand & silty sandSilty sand & sandy siltClayClay & silty clayClay & silty claySilty sand & sandy siltClay & silty clayClay & silty clayClay & silty claySilty sand & sandy siltClayClay & silty claySilty sand & sandy siltSilty sand & sandy siltClayClay & silty claySilty sand & sandy siltCLiq v.2.1.6.11 - CPT Liquefaction Assessment Software - Report created on: 6/5/2017, 1:10:49 PM73Project file: C:\Users\Craig Prentice\Desktop\Moorpark Library\Moorpark Library.clqSBTn legend1. Sensitive fine grained2. Organic material3. Clay to silty clay4. Clayey silt to silty5. Silty sand to sandy silt6. Clean sand to silty sand7. Gravely sand to sand8. Very stiff sand to9. Very stiff fine grainedInput parameters and analysis dataAnalysis method:Fines correction method:Points to test:Earthquake magnitude Mw:Peak ground acceleration:Depth to water table (insitu):Robertson (2009)Robertson (2009)Based on Ic value6.901.0337.50 ftDepth to water table (erthq.):Average results interval:Ic cut-off value:Unit weight calculation:Use fill:Fill height:15.00 ft52.60Based on SBTNoN/AFill weight:Transition detect. applied:Kσ applied:Clay like behavior applied:Limit depth applied:Limit depth:N/AYesNoAll soilsNoN/A157 This software is licensed to: Oakridge Geoscience, Inc.CPT name: CPT-2CRR plotCRR & CSR0.60.40.20Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420CRR plotDuring earthq.Liquefaction analysis overall plotsFS PlotFactor of safety21.510.50Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420FS PlotDuring earthq.LPILiquefaction potential20151050Depth (ft)6462605856545250484644424038363432302826242220181614121086420LPIVertical settlementsSettlement (in)151050Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Vertical settlementsLateral displacementsDisplacement (in)200150100500Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Lateral displacementsCLiq v.2.1.6.11 - CPT Liquefaction Assessment Software - Report created on: 6/5/2017, 1:10:49 PM75Project file: C:\Users\Craig Prentice\Desktop\Moorpark Library\Moorpark Library.clqF.S. color schemeLPI color schemeInput parameters and analysis dataAnalysis method:Fines correction method:Points to test:Earthquake magnitude Mw:Peak ground acceleration:Depth to water table (insitu):Robertson (2009)Robertson (2009)Based on Ic value6.901.0337.50 ftDepth to water table (erthq.):Average results interval:Ic cut-off value:Unit weight calculation:Use fill:Fill height:15.00 ft52.60Based on SBTNoN/AFill weight:Transition detect. applied:Kσ applied:Clay like behavior applied:Limit depth applied:Limit depth:N/AYesNoAll soilsNoN/AAlmost certain it will liquefyVery likely to liquefyLiquefaction and no liq. are equally likelyUnlike to liquefyAlmost certain it will not liquefyVery high riskHigh riskLow risk158 TRANSITION LAYER DETECTION ALGORITHM REPORT Summary Details & Plots This software is licensed to: Oakridge Geoscience, Inc.CPT name: CPT-2 SBTn Index Ic (Robertson 1990) 4321Depth (ft)74 72 70 68 66 64 62 60 58 56 54 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 SBTn Index Norm. Soil Behaviour Type SBTn (Robertson 1990) 1817161514131211109876543210Depth (ft)74 72 70 68 66 64 62 60 58 56 54 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Norm. Soil Behaviour Type Sand & silty sand Silty sand & sandy silt Sand & silty sand Silty sand & sandy silt Sand & silty sand Silty sand & sandy silt Sand & silty sand Silty sand & sandy silt Sand & silty sand Silty sand & sandy silt Sand & silty sandClay & silty clay Clay & silty clay Silty sand & sandy silt Clay & silty clay Sand & silty sand Silty sand & sandy silt Clay Clay & silty clay Clay & silty clay Silty sand & sandy siltClay & silty clay Clay & silty clayClay Sand & silty sandClay & silty clay ClayClay & silty clay Silty sand & sandy silt Silty sand & sandy siltClay & silty clayClay Clay & silty clay Silty sand & sandy silt Transition layer algorithm properties Ic minimum check value: Ic maximum check value: Ic change ratio value: Minimum number of points in layer: General statistics Total points in CPT file: Total points excluded: Exclusion percentage: Number of layers detected: The software will delete data when the cone is in transition from either clay to sand or vise-versa. To do this the software requires a range of Ic values over which the transition will be defined (typically somewhere between 1.80 < Ic < 3.0) and a rate of change of Ic. Transitions typically occur when the rate of change of Ic is fast (i.e. delta Ic is small). The SBTn plot below, displays in red the detected transition layers based on the parameters listed below the graphs. Short description 1.70 3.00 0.0100 4 458 160 34.93% 20 CLiq v.2.1.6.11 - CPT Liquefaction Assessment Software - Report created on: 6/5/2017, 1:10:49 PM Project file: C:\Users\Craig Prentice\Desktop\Moorpark Library\Moorpark Library.clq 78159 This software is licensed to: Oakridge Geoscience, Inc.CPT name: CPT-2Cone resistanceqt (tsf)25020015010050Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Cone resistanceSBTn PlotIc (Robertson 1990)4321Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420SBTn PlotFS PlotFactor of safety21.510.50Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420FS PlotDuring earthq.Vertical settlementsSettlement (in)151050Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Vertical settlementsEstimation of post-earthquake settlementsStrain plotVolumentric strain (%)6543210Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Strain plotCLiq v.2.1.6.11 - CPT Liquefaction Assessment Software - Report created on: 6/5/2017, 1:10:49 PM115Project file: C:\Users\Craig Prentice\Desktop\Moorpark Library\Moorpark Library.clqAbbreviationsqt:Ic:FS:Volumentric strain:Total cone resistance (cone resistance qc corrected for pore water effects)Soil Behaviour Type IndexCalculated Factor of Safety against liquefactionPost-liquefaction volumentric strain160 This software is licensed to: Oakridge Geoscience, Inc.CPT name: CPT-2Cone resistanceqt (tsf)200100Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Cone resistanceSBTn PlotIc (Robertson 1990)4321Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420SBTn PlotCorrected norm. cone resistanceQtn,cs200150100500Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Corrected norm. cone resistanceFS PlotFactor of safety21.510.50Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420FS PlotDuring earthq.Cyclic shear strainGamma max (%)6050403020100Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Cyclic shear strainLateral displacementsDisplacement (in)200150100500Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Lateral displacementsEstimation of post-earthquake lateral DisplacementsGeometric parameters: Gently sloping ground without free face (Slope 2.50 %)CLiq v.2.1.6.11 - CPT Liquefaction Assessment Software - Report created on: 6/5/2017, 1:10:49 PM122Project file: C:\Users\Craig Prentice\Desktop\Moorpark Library\Moorpark Library.clqqt: Total cone resistance (cone resistance qc corrected for pore water effects)Ic: Soil Behaviour Type IndexQtn,cs: Equivalent clean sand normalized CPT total cone resistanceF.S.: Factor of safetyγmax: Maximum cyclic shear strainLDI: Lateral displacement indexAbbreviationsSurface condition161 LIQ UEFACTION ANALYSIS REPORT Input parameters and analysis data Analysis method: Fines correction method: Points to test: Earthquake magnitude Mw: Peak ground acceleration: Robertson (2009) Robertson (2009) Based on Ic value 6.90 1.03 G.W.T. (in-situ): G.W.T. (earthq.): Average results interval: Ic cut-off value: Unit weight calculation: Project title : Moorpark Library Location : High Street and Moorpark Avenue, Moorpark, Caliornia GeoLogismiki Geotechnical Engineers Merarhias 56 http://www.geologismiki.gr CPT file : CPT-3 37.50 ft 15.00 ft 5 2.60 Based on SBT Use fill: Fill height: Fill weight: Trans. detect. applied: Kσ applied: No N/A N/A Yes No Clay like behavior applied: Limit depth applied: Limit depth: MSF method: All soils No N/A Method based Cone resistance qt (tsf) 200100Depth (ft)75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Cone resistance SBTn Plot Ic (Robertson 1990) 4321 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 SBTn Plot CRR plot CRR & CSR 0.60.40.20 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 CRR plot During earthq. Qtn,cs 200180160140120100806040200Cyclic Stress Ratio* (CSR*)0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0 Liquefaction No Liquefaction Normalized friction ratio (%) 0.1 1 10Normalized CPT penetration resistance1 10 100 1,000 Friction Ratio Rf (%) 1086420 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Friction Ratio Mw =71/2, sigma'=1 atm base curve Summary of liquefaction potential FS Plot Factor of safety 21.510.50 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 FS Plot During earthq. Zone A1: Cyclic liquefaction likely depending on size and duration of cyclic loading Zone A2: Cyclic liquefaction and strength loss likely depending on loading and ground geometry Zone B: Liquefaction and post-earthquake strength loss unlikely, check cyclic softening Zone C: Cyclic liquefaction and strength loss possible depending on soil plasticity, brittleness/sensitivity, strain to peak undrained strength and ground geometry CLiq v.2.1.6.11 - CPT Liquefaction Assessment Software - Report created on: 6/5/2017, 1:10:51 PM Project file: C:\Users\Craig Prentice\Desktop\Moorpark Library\Moorpark Library.clq 141162 This software is licensed to: Oakridge Geoscience, Inc.CPT name: CPT-3Cone resistanceqt (tsf)200100Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Cone resistanceCPT basic interpretation plotsFriction RatioRf (%)1086420Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Friction RatioPore pressureu (psi)100-10Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Pore pressureInsituSBT PlotIc(SBT)4321Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420SBT PlotSoil Behaviour TypeSBT (Robertson et al. 1986)181614121086420Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Soil Behaviour TypeSand & silty sandSilty sand & sandy siltSand & silty sandSilty sand & sandy siltSand & silty sandSand & silty sandSilty sand & sandy siltSand & silty sandSilty sand & sandy siltSand & silty sandClay & silty claySilty sand & sandy siltClay & silty claySand & silty sandSand & silty sandSand & silty sandSand & silty sandClay & silty clayClay & silty claySand & silty sandClay & silty clayClay & silty claySand & silty sandSilty sand & sandy siltSand & silty sandCLiq v.2.1.6.11 - CPT Liquefaction Assessment Software - Report created on: 6/5/2017, 1:10:51 PM142Project file: C:\Users\Craig Prentice\Desktop\Moorpark Library\Moorpark Library.clqInput parameters and analysis dataAnalysis method:Fines correction method:Points to test:Earthquake magnitude Mw:Peak ground acceleration:Depth to water table (insitu):Robertson (2009)Robertson (2009)Based on Ic value6.901.0337.50 ftDepth to water table (erthq.):Average results interval:Ic cut-off value:Unit weight calculation:Use fill:Fill height:15.00 ft52.60Based on SBTNoN/AFill weight:Transition detect. applied:Kσ applied:Clay like behavior applied:Limit depth applied:Limit depth:N/AYesNoAll soilsNoN/ASBT legend1. Sensitive fine grained2. Organic material3. Clay to silty clay4. Clayey silt to silty5. Silty sand to sandy silt6. Clean sand to silty sand7. Gravely sand to sand8. Very stiff sand to9. Very stiff fine grained163 This software is licensed to: Oakridge Geoscience, Inc.CPT name: CPT-3Norm. cone resistanceQtn200150100500Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Norm. cone resistanceCPT basic interpretation plots (normalized)Norm. friction ratioFr (%)1086420Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Norm. friction ratioNom. pore pressure ratioBq10.80.60.40.20-0.2Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Nom. pore pressure ratioSBTn PlotIc (Robertson 1990)4321Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420SBTn PlotNorm. Soil Behaviour TypeSBTn (Robertson 1990)181614121086420Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Norm. Soil Behaviour TypeSand & silty sandSilty sand & sandy siltSand & silty sandSilty sand & sandy siltSand & silty sandSand & silty sandSilty sand & sandy siltSand & silty sandSilty sand & sandy siltSilty sand & sandy siltSilty sand & sandy siltClay & silty clayClayClay & silty clayClaySand & silty sandSilty sand & sandy siltClay & silty clayClay & silty claySand & silty sandClay & silty clayClay & silty clayClay & silty claySilty sand & sandy siltClayClaySilty sand & sandy siltClay & silty claySand & silty sandCLiq v.2.1.6.11 - CPT Liquefaction Assessment Software - Report created on: 6/5/2017, 1:10:51 PM143Project file: C:\Users\Craig Prentice\Desktop\Moorpark Library\Moorpark Library.clqSBTn legend1. Sensitive fine grained2. Organic material3. Clay to silty clay4. Clayey silt to silty5. Silty sand to sandy silt6. Clean sand to silty sand7. Gravely sand to sand8. Very stiff sand to9. Very stiff fine grainedInput parameters and analysis dataAnalysis method:Fines correction method:Points to test:Earthquake magnitude Mw:Peak ground acceleration:Depth to water table (insitu):Robertson (2009)Robertson (2009)Based on Ic value6.901.0337.50 ftDepth to water table (erthq.):Average results interval:Ic cut-off value:Unit weight calculation:Use fill:Fill height:15.00 ft52.60Based on SBTNoN/AFill weight:Transition detect. applied:Kσ applied:Clay like behavior applied:Limit depth applied:Limit depth:N/AYesNoAll soilsNoN/A164 This software is licensed to: Oakridge Geoscience, Inc.CPT name: CPT-3CRR plotCRR & CSR0.60.40.20Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420CRR plotDuring earthq.Liquefaction analysis overall plotsFS PlotFactor of safety21.510.50Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420FS PlotDuring earthq.LPILiquefaction potential20151050Depth (ft)6462605856545250484644424038363432302826242220181614121086420LPIVertical settlementsSettlement (in)151050Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Vertical settlementsLateral displacementsDisplacement (in)250200150100500Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Lateral displacementsCLiq v.2.1.6.11 - CPT Liquefaction Assessment Software - Report created on: 6/5/2017, 1:10:51 PM145Project file: C:\Users\Craig Prentice\Desktop\Moorpark Library\Moorpark Library.clqF.S. color schemeLPI color schemeInput parameters and analysis dataAnalysis method:Fines correction method:Points to test:Earthquake magnitude Mw:Peak ground acceleration:Depth to water table (insitu):Robertson (2009)Robertson (2009)Based on Ic value6.901.0337.50 ftDepth to water table (erthq.):Average results interval:Ic cut-off value:Unit weight calculation:Use fill:Fill height:15.00 ft52.60Based on SBTNoN/AFill weight:Transition detect. applied:Kσ applied:Clay like behavior applied:Limit depth applied:Limit depth:N/AYesNoAll soilsNoN/AAlmost certain it will liquefyVery likely to liquefyLiquefaction and no liq. are equally likelyUnlike to liquefyAlmost certain it will not liquefyVery high riskHigh riskLow risk165 TRANSITION LAYER DETECTION ALGORITHM REPORT Summary Details & Plots This software is licensed to: Oakridge Geoscience, Inc.CPT name: CPT-3 SBTn Index Ic (Robertson 1990) 4321Depth (ft)74 72 70 68 66 64 62 60 58 56 54 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 SBTn Index Norm. Soil Behaviour Type SBTn (Robertson 1990) 1817161514131211109876543210Depth (ft)74 72 70 68 66 64 62 60 58 56 54 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Norm. Soil Behaviour Type Sand & silty sand Silty sand & sandy silt Sand & silty sand Silty sand & sandy silt Sand & silty sand Sand & silty sand Silty sand & sandy silt Sand & silty sand Silty sand & sandy siltSilty sand & sandy siltSilty sand & sandy silt Clay & silty clay Clay Clay & silty clay ClaySand & silty sandSilty sand & sandy silt Clay & silty clay Clay & silty clay Sand & silty sandClay & silty clayClay & silty clay Clay & silty claySilty sand & sandy silt Clay Clay Silty sand & sandy siltClay & silty clay Sand & silty sand Transition layer algorithm properties Ic minimum check value: Ic maximum check value: Ic change ratio value: Minimum number of points in layer: General statistics Total points in CPT file: Total points excluded: Exclusion percentage: Number of layers detected: The software will delete data when the cone is in transition from either clay to sand or vise-versa. To do this the software requires a range of Ic values over which the transition will be defined (typically somewhere between 1.80 < Ic < 3.0) and a rate of change of Ic. Transitions typically occur when the rate of change of Ic is fast (i.e. delta Ic is small). The SBTn plot below, displays in red the detected transition layers based on the parameters listed below the graphs. Short description 1.70 3.00 0.0100 4 458 139 30.35% 20 CLiq v.2.1.6.11 - CPT Liquefaction Assessment Software - Report created on: 6/5/2017, 1:10:51 PM Project file: C:\Users\Craig Prentice\Desktop\Moorpark Library\Moorpark Library.clq 148166 This software is licensed to: Oakridge Geoscience, Inc.CPT name: CPT-3Cone resistanceqt (tsf)25020015010050Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Cone resistanceSBTn PlotIc (Robertson 1990)4321Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420SBTn PlotFS PlotFactor of safety21.510.50Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420FS PlotDuring earthq.Vertical settlementsSettlement (in)151050Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Vertical settlementsEstimation of post-earthquake settlementsStrain plotVolumentric strain (%)6543210Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Strain plotCLiq v.2.1.6.11 - CPT Liquefaction Assessment Software - Report created on: 6/5/2017, 1:10:51 PM185Project file: C:\Users\Craig Prentice\Desktop\Moorpark Library\Moorpark Library.clqAbbreviationsqt:Ic:FS:Volumentric strain:Total cone resistance (cone resistance qc corrected for pore water effects)Soil Behaviour Type IndexCalculated Factor of Safety against liquefactionPost-liquefaction volumentric strain167 This software is licensed to: Oakridge Geoscience, Inc.CPT name: CPT-3Cone resistanceqt (tsf)200100Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Cone resistanceSBTn PlotIc (Robertson 1990)4321Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420SBTn PlotCorrected norm. cone resistanceQtn,cs200150100500Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Corrected norm. cone resistanceFS PlotFactor of safety21.510.50Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420FS PlotDuring earthq.Cyclic shear strainGamma max (%)6050403020100Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Cyclic shear strainLateral displacementsDisplacement (in)2001000Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Lateral displacementsEstimation of post-earthquake lateral DisplacementsGeometric parameters: Gently sloping ground without free face (Slope 2.50 %)CLiq v.2.1.6.11 - CPT Liquefaction Assessment Software - Report created on: 6/5/2017, 1:10:51 PM192Project file: C:\Users\Craig Prentice\Desktop\Moorpark Library\Moorpark Library.clqqt: Total cone resistance (cone resistance qc corrected for pore water effects)Ic: Soil Behaviour Type IndexQtn,cs: Equivalent clean sand normalized CPT total cone resistanceF.S.: Factor of safetyγmax: Maximum cyclic shear strainLDI: Lateral displacement indexAbbreviationsSurface condition168 LIQ UEFACTION ANALYSIS REPORT Input parameters and analysis data Analysis method: Fines correction method: Points to test: Earthquake magnitude Mw: Peak ground acceleration: Robertson (2009) Robertson (2009) Based on Ic value 6.90 1.03 G.W.T. (in-situ): G.W.T. (earthq.): Average results interval: Ic cut-off value: Unit weight calculation: Project title : Moorpark Library Location : High Street and Moorpark Avenue, Moorpark, Caliornia GeoLogismiki Geotechnical Engineers Merarhias 56 http://www.geologismiki.gr CPT file : CPT-4 37.50 ft 15.00 ft 5 2.60 Based on SBT Use fill: Fill height: Fill weight: Trans. detect. applied: Kσ applied: No N/A N/A Yes No Clay like behavior applied: Limit depth applied: Limit depth: MSF method: All soils No N/A Method based Cone resistance qt (tsf) 4002000Depth (ft)75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Cone resistance SBTn Plot Ic (Robertson 1990) 4321 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 SBTn Plot CRR plot CRR & CSR 0.60.40.20 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 CRR plot During earthq. Qtn,cs 200180160140120100806040200Cyclic Stress Ratio* (CSR*)0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0 Liquefaction No Liquefaction Normalized friction ratio (%) 0.1 1 10Normalized CPT penetration resistance1 10 100 1,000 Friction Ratio Rf (%) 1086420 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Friction Ratio Mw =71/2, sigma'=1 atm base curve Summary of liquefaction potential FS Plot Factor of safety 21.510.50 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 FS Plot During earthq. Zone A1: Cyclic liquefaction likely depending on size and duration of cyclic loading Zone A2: Cyclic liquefaction and strength loss likely depending on loading and ground geometry Zone B: Liquefaction and post-earthquake strength loss unlikely, check cyclic softening Zone C: Cyclic liquefaction and strength loss possible depending on soil plasticity, brittleness/sensitivity, strain to peak undrained strength and ground geometry CLiq v.2.1.6.11 - CPT Liquefaction Assessment Software - Report created on: 6/5/2017, 1:10:53 PM Project file: C:\Users\Craig Prentice\Desktop\Moorpark Library\Moorpark Library.clq 211169 This software is licensed to: Oakridge Geoscience, Inc.CPT name: CPT-4Cone resistanceqt (tsf)400200Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Cone resistanceCPT basic interpretation plotsFriction RatioRf (%)1086420Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Friction RatioPore pressureu (psi)100-10Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Pore pressureInsituSBT PlotIc(SBT)4321Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420SBT PlotSoil Behaviour TypeSBT (Robertson et al. 1986)181614121086420Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Soil Behaviour TypeSand & silty sandSand & silty sandSilty sand & sandy siltSand & silty sandSilty sand & sandy siltSand & silty sandSilty sand & sandy siltSand & silty sandSilty sand & sandy siltSand & silty sandSilty sand & sandy siltClay & silty clayClayClay & silty claySilty sand & sandy siltSand & silty sandClay & silty clayClay & silty claySilty sand & sandy siltSandSandSilty sand & sandy siltSand & silty sandClay & silty claySandCLiq v.2.1.6.11 - CPT Liquefaction Assessment Software - Report created on: 6/5/2017, 1:10:53 PM212Project file: C:\Users\Craig Prentice\Desktop\Moorpark Library\Moorpark Library.clqInput parameters and analysis dataAnalysis method:Fines correction method:Points to test:Earthquake magnitude Mw:Peak ground acceleration:Depth to water table (insitu):Robertson (2009)Robertson (2009)Based on Ic value6.901.0337.50 ftDepth to water table (erthq.):Average results interval:Ic cut-off value:Unit weight calculation:Use fill:Fill height:15.00 ft52.60Based on SBTNoN/AFill weight:Transition detect. applied:Kσ applied:Clay like behavior applied:Limit depth applied:Limit depth:N/AYesNoAll soilsNoN/ASBT legend1. Sensitive fine grained2. Organic material3. Clay to silty clay4. Clayey silt to silty5. Silty sand to sandy silt6. Clean sand to silty sand7. Gravely sand to sand8. Very stiff sand to9. Very stiff fine grained170 This software is licensed to: Oakridge Geoscience, Inc.CPT name: CPT-4Norm. cone resistanceQtn200150100500Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Norm. cone resistanceCPT basic interpretation plots (normalized)Norm. friction ratioFr (%)1086420Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Norm. friction ratioNom. pore pressure ratioBq10.80.60.40.20-0.2Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Nom. pore pressure ratioSBTn PlotIc (Robertson 1990)4321Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420SBTn PlotNorm. Soil Behaviour TypeSBTn (Robertson 1990)181614121086420Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Norm. Soil Behaviour TypeSand & silty sandSand & silty sandSand & silty sandSilty sand & sandy siltSand & silty sandSilty sand & sandy siltSand & silty sandSilty sand & sandy siltSand & silty sandSilty sand & sandy siltSand & silty sandClay & silty clayClayClay & silty claySand & silty sandClayClayClay & silty claySand & silty sandSandClay & silty claySilty sand & sandy siltSilty sand & sandy siltSilty sand & sandy siltCLiq v.2.1.6.11 - CPT Liquefaction Assessment Software - Report created on: 6/5/2017, 1:10:53 PM213Project file: C:\Users\Craig Prentice\Desktop\Moorpark Library\Moorpark Library.clqSBTn legend1. Sensitive fine grained2. Organic material3. Clay to silty clay4. Clayey silt to silty5. Silty sand to sandy silt6. Clean sand to silty sand7. Gravely sand to sand8. Very stiff sand to9. Very stiff fine grainedInput parameters and analysis dataAnalysis method:Fines correction method:Points to test:Earthquake magnitude Mw:Peak ground acceleration:Depth to water table (insitu):Robertson (2009)Robertson (2009)Based on Ic value6.901.0337.50 ftDepth to water table (erthq.):Average results interval:Ic cut-off value:Unit weight calculation:Use fill:Fill height:15.00 ft52.60Based on SBTNoN/AFill weight:Transition detect. applied:Kσ applied:Clay like behavior applied:Limit depth applied:Limit depth:N/AYesNoAll soilsNoN/A171 This software is licensed to: Oakridge Geoscience, Inc.CPT name: CPT-4CRR plotCRR & CSR0.60.40.20Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420CRR plotDuring earthq.Liquefaction analysis overall plotsFS PlotFactor of safety21.510.50Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420FS PlotDuring earthq.LPILiquefaction potential20151050Depth (ft)6462605856545250484644424038363432302826242220181614121086420LPIVertical settlementsSettlement (in)151050Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Vertical settlementsLateral displacementsDisplacement (in)3002001000Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Lateral displacementsCLiq v.2.1.6.11 - CPT Liquefaction Assessment Software - Report created on: 6/5/2017, 1:10:53 PM215Project file: C:\Users\Craig Prentice\Desktop\Moorpark Library\Moorpark Library.clqF.S. color schemeLPI color schemeInput parameters and analysis dataAnalysis method:Fines correction method:Points to test:Earthquake magnitude Mw:Peak ground acceleration:Depth to water table (insitu):Robertson (2009)Robertson (2009)Based on Ic value6.901.0337.50 ftDepth to water table (erthq.):Average results interval:Ic cut-off value:Unit weight calculation:Use fill:Fill height:15.00 ft52.60Based on SBTNoN/AFill weight:Transition detect. applied:Kσ applied:Clay like behavior applied:Limit depth applied:Limit depth:N/AYesNoAll soilsNoN/AAlmost certain it will liquefyVery likely to liquefyLiquefaction and no liq. are equally likelyUnlike to liquefyAlmost certain it will not liquefyVery high riskHigh riskLow risk172 TRANSITION LAYER DETECTION ALGORITHM REPORT Summary Details & Plots This software is licensed to: Oakridge Geoscience, Inc.CPT name: CPT-4 SBTn Index Ic (Robertson 1990) 4321Depth (ft)74 72 70 68 66 64 62 60 58 56 54 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 SBTn Index Norm. Soil Behaviour Type SBTn (Robertson 1990) 1817161514131211109876543210Depth (ft)74 72 70 68 66 64 62 60 58 56 54 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Norm. Soil Behaviour Type Sand & silty sand Sand & silty sand Sand & silty sand Silty sand & sandy silt Sand & silty sandSilty sand & sandy silt Sand & silty sand Silty sand & sandy silt Sand & silty sand Silty sand & sandy silt Sand & silty sand Clay & silty clay Clay Clay & silty claySilty sand & sandy siltSilty sand & sandy silt Clay & silty clayClay Clay & silty clay Sand & silty sand SandClay & silty clay Silty sand & sandy silt Silty sand & sandy siltSilty sand & sandy silt Transition layer algorithm properties Ic minimum check value: Ic maximum check value: Ic change ratio value: Minimum number of points in layer: General statistics Total points in CPT file: Total points excluded: Exclusion percentage: Number of layers detected: The software will delete data when the cone is in transition from either clay to sand or vise-versa. To do this the software requires a range of Ic values over which the transition will be defined (typically somewhere between 1.80 < Ic < 3.0) and a rate of change of Ic. Transitions typically occur when the rate of change of Ic is fast (i.e. delta Ic is small). The SBTn plot below, displays in red the detected transition layers based on the parameters listed below the graphs. Short description 1.70 3.00 0.0100 4 458 64 13.97% 8 CLiq v.2.1.6.11 - CPT Liquefaction Assessment Software - Report created on: 6/5/2017, 1:10:53 PM Project file: C:\Users\Craig Prentice\Desktop\Moorpark Library\Moorpark Library.clq 218173 This software is licensed to: Oakridge Geoscience, Inc.CPT name: CPT-4Cone resistanceqt (tsf)500400300200100Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Cone resistanceSBTn PlotIc (Robertson 1990)4321Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420SBTn PlotFS PlotFactor of safety21.510.50Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420FS PlotDuring earthq.Vertical settlementsSettlement (in)151050Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Vertical settlementsEstimation of post-earthquake settlementsStrain plotVolumentric strain (%)6543210Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Strain plotCLiq v.2.1.6.11 - CPT Liquefaction Assessment Software - Report created on: 6/5/2017, 1:10:53 PM255Project file: C:\Users\Craig Prentice\Desktop\Moorpark Library\Moorpark Library.clqAbbreviationsqt:Ic:FS:Volumentric strain:Total cone resistance (cone resistance qc corrected for pore water effects)Soil Behaviour Type IndexCalculated Factor of Safety against liquefactionPost-liquefaction volumentric strain174 This software is licensed to: Oakridge Geoscience, Inc.CPT name: CPT-4Cone resistanceqt (tsf)400200Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Cone resistanceSBTn PlotIc (Robertson 1990)4321Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420SBTn PlotCorrected norm. cone resistanceQtn,cs200150100500Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Corrected norm. cone resistanceFS PlotFactor of safety21.510.50Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420FS PlotDuring earthq.Cyclic shear strainGamma max (%)6050403020100Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Cyclic shear strainLateral displacementsDisplacement (in)3002001000Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Lateral displacementsEstimation of post-earthquake lateral DisplacementsGeometric parameters: Gently sloping ground without free face (Slope 2.50 %)CLiq v.2.1.6.11 - CPT Liquefaction Assessment Software - Report created on: 6/5/2017, 1:10:53 PM262Project file: C:\Users\Craig Prentice\Desktop\Moorpark Library\Moorpark Library.clqqt: Total cone resistance (cone resistance qc corrected for pore water effects)Ic: Soil Behaviour Type IndexQtn,cs: Equivalent clean sand normalized CPT total cone resistanceF.S.: Factor of safetyγmax: Maximum cyclic shear strainLDI: Lateral displacement indexAbbreviationsSurface condition175 LIQ UEFACTION ANALYSIS REPORT Input parameters and analysis data Analysis method: Fines correction method: Points to test: Earthquake magnitude Mw: Peak ground acceleration: Robertson (2009) Robertson (2009) Based on Ic value 6.90 1.03 G.W.T. (in-situ): G.W.T. (earthq.): Average results interval: Ic cut-off value: Unit weight calculation: Project title : Moorpark Library Location : High Street and Moorpark Avenue, Moorpark, Caliornia GeoLogismiki Geotechnical Engineers Merarhias 56 http://www.geologismiki.gr CPT file : CPT-5 37.50 ft 15.00 ft 5 2.60 Based on SBT Use fill: Fill height: Fill weight: Trans. detect. applied: Kσ applied: No N/A N/A Yes No Clay like behavior applied: Limit depth applied: Limit depth: MSF method: All soils No N/A Method based Cone resistance qt (tsf) 200Depth (ft)75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Cone resistance SBTn Plot Ic (Robertson 1990) 4321 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 SBTn Plot CRR plot CRR & CSR 0.60.40.20 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 CRR plot During earthq. Qtn,cs 200180160140120100806040200Cyclic Stress Ratio* (CSR*)0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0 Liquefaction No Liquefaction Normalized friction ratio (%) 0.1 1 10Normalized CPT penetration resistance1 10 100 1,000 Friction Ratio Rf (%) 1086420 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Friction Ratio Mw =71/2, sigma'=1 atm base curve Summary of liquefaction potential FS Plot Factor of safety 21.510.50 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 FS Plot During earthq. Zone A1: Cyclic liquefaction likely depending on size and duration of cyclic loading Zone A2: Cyclic liquefaction and strength loss likely depending on loading and ground geometry Zone B: Liquefaction and post-earthquake strength loss unlikely, check cyclic softening Zone C: Cyclic liquefaction and strength loss possible depending on soil plasticity, brittleness/sensitivity, strain to peak undrained strength and ground geometry CLiq v.2.1.6.11 - CPT Liquefaction Assessment Software - Report created on: 6/5/2017, 1:10:56 PM Project file: C:\Users\Craig Prentice\Desktop\Moorpark Library\Moorpark Library.clq 281176 This software is licensed to: Oakridge Geoscience, Inc.CPT name: CPT-5Cone resistanceqt (tsf)300200100Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Cone resistanceCPT basic interpretation plotsFriction RatioRf (%)1086420Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Friction RatioPore pressureu (psi)100-10Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Pore pressureInsituSBT PlotIc(SBT)4321Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420SBT PlotSoil Behaviour TypeSBT (Robertson et al. 1986)181614121086420Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Soil Behaviour TypeSand & silty sandSilty sand & sandy siltSilty sand & sandy siltSand & silty sandSand & silty sandSilty sand & sandy siltSand & silty sandSilty sand & sandy siltSand & silty sandClayClay & silty claySand & silty sandSilty sand & sandy siltSand & silty sandSandSand & silty sandClay & silty clayClay & silty claySilty sand & sandy siltSilty sand & sandy siltSilty sand & sandy siltSilty sand & sandy siltSilty sand & sandy siltSand & silty sandSilty sand & sandy siltSilty sand & sandy siltSilty sand & sandy siltSandSilty sand & sandy siltSilty sand & sandy siltSilty sand & sandy siltSand & silty sandCLiq v.2.1.6.11 - CPT Liquefaction Assessment Software - Report created on: 6/5/2017, 1:10:56 PM282Project file: C:\Users\Craig Prentice\Desktop\Moorpark Library\Moorpark Library.clqInput parameters and analysis dataAnalysis method:Fines correction method:Points to test:Earthquake magnitude Mw:Peak ground acceleration:Depth to water table (insitu):Robertson (2009)Robertson (2009)Based on Ic value6.901.0337.50 ftDepth to water table (erthq.):Average results interval:Ic cut-off value:Unit weight calculation:Use fill:Fill height:15.00 ft52.60Based on SBTNoN/AFill weight:Transition detect. applied:Kσ applied:Clay like behavior applied:Limit depth applied:Limit depth:N/AYesNoAll soilsNoN/ASBT legend1. Sensitive fine grained2. Organic material3. Clay to silty clay4. Clayey silt to silty5. Silty sand to sandy silt6. Clean sand to silty sand7. Gravely sand to sand8. Very stiff sand to9. Very stiff fine grained177 This software is licensed to: Oakridge Geoscience, Inc.CPT name: CPT-5Norm. cone resistanceQtn200150100500Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Norm. cone resistanceCPT basic interpretation plots (normalized)Norm. friction ratioFr (%)1086420Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Norm. friction ratioNom. pore pressure ratioBq10.80.60.40.20-0.2Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Nom. pore pressure ratioSBTn PlotIc (Robertson 1990)4321Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420SBTn PlotNorm. Soil Behaviour TypeSBTn (Robertson 1990)181614121086420Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Norm. Soil Behaviour TypeSandSand & silty sandSand & silty sandSand & silty sandSilty sand & sandy siltSand & silty sandSilty sand & sandy siltSilty sand & sandy siltSilty sand & sandy siltClaySilty sand & sandy siltSand & silty sandSilty sand & sandy siltSand & silty sandSandSilty sand & sandy siltClay & silty clayClayClay & silty claySilty sand & sandy siltSilty sand & sandy siltClaySilty sand & sandy siltSilty sand & sandy siltSand & silty sandSilty sand & sandy siltClay & silty clayClaySilty sand & sandy siltSilty sand & sandy siltClay & silty claySilty sand & sandy siltClay & silty claySand & silty sandSilty sand & sandy siltCLiq v.2.1.6.11 - CPT Liquefaction Assessment Software - Report created on: 6/5/2017, 1:10:56 PM283Project file: C:\Users\Craig Prentice\Desktop\Moorpark Library\Moorpark Library.clqSBTn legend1. Sensitive fine grained2. Organic material3. Clay to silty clay4. Clayey silt to silty5. Silty sand to sandy silt6. Clean sand to silty sand7. Gravely sand to sand8. Very stiff sand to9. Very stiff fine grainedInput parameters and analysis dataAnalysis method:Fines correction method:Points to test:Earthquake magnitude Mw:Peak ground acceleration:Depth to water table (insitu):Robertson (2009)Robertson (2009)Based on Ic value6.901.0337.50 ftDepth to water table (erthq.):Average results interval:Ic cut-off value:Unit weight calculation:Use fill:Fill height:15.00 ft52.60Based on SBTNoN/AFill weight:Transition detect. applied:Kσ applied:Clay like behavior applied:Limit depth applied:Limit depth:N/AYesNoAll soilsNoN/A178 This software is licensed to: Oakridge Geoscience, Inc.CPT name: CPT-5CRR plotCRR & CSR0.60.40.20Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420CRR plotDuring earthq.Liquefaction analysis overall plotsFS PlotFactor of safety21.510.50Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420FS PlotDuring earthq.LPILiquefaction potential20151050Depth (ft)6462605856545250484644424038363432302826242220181614121086420LPIVertical settlementsSettlement (in)151050Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Vertical settlementsLateral displacementsDisplacement (in)3002001000Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Lateral displacementsCLiq v.2.1.6.11 - CPT Liquefaction Assessment Software - Report created on: 6/5/2017, 1:10:56 PM285Project file: C:\Users\Craig Prentice\Desktop\Moorpark Library\Moorpark Library.clqF.S. color schemeLPI color schemeInput parameters and analysis dataAnalysis method:Fines correction method:Points to test:Earthquake magnitude Mw:Peak ground acceleration:Depth to water table (insitu):Robertson (2009)Robertson (2009)Based on Ic value6.901.0337.50 ftDepth to water table (erthq.):Average results interval:Ic cut-off value:Unit weight calculation:Use fill:Fill height:15.00 ft52.60Based on SBTNoN/AFill weight:Transition detect. applied:Kσ applied:Clay like behavior applied:Limit depth applied:Limit depth:N/AYesNoAll soilsNoN/AAlmost certain it will liquefyVery likely to liquefyLiquefaction and no liq. are equally likelyUnlike to liquefyAlmost certain it will not liquefyVery high riskHigh riskLow risk179 TRANSITION LAYER DETECTION ALGORITHM REPORT Summary Details & Plots This software is licensed to: Oakridge Geoscience, Inc.CPT name: CPT-5 SBTn Index Ic (Robertson 1990) 4321Depth (ft)74 72 70 68 66 64 62 60 58 56 54 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 SBTn Index Norm. Soil Behaviour Type SBTn (Robertson 1990) 1817161514131211109876543210Depth (ft)74 72 70 68 66 64 62 60 58 56 54 52 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Norm. Soil Behaviour Type Sand Sand & silty sand Sand & silty sand Sand & silty sand Silty sand & sandy silt Sand & silty sand Silty sand & sandy siltSilty sand & sandy siltSilty sand & sandy siltClaySilty sand & sandy silt Sand & silty sand Silty sand & sandy silt Sand & silty sand Sand Silty sand & sandy silt Clay & silty clay Clay Clay & silty claySand & silty sand Clay & silty clay Clay & silty clay Silty sand & sandy siltClay & silty clay Sand & silty sandSilty sand & sandy silt Clay & silty clay Clay Silty sand & sandy silt Silty sand & sandy silt Clay & silty claySilty sand & sandy siltClay & silty claySand & silty sandSilty sand & sandy silt Transition layer algorithm properties Ic minimum check value: Ic maximum check value: Ic change ratio value: Minimum number of points in layer: General statistics Total points in CPT file: Total points excluded: Exclusion percentage: Number of layers detected: The software will delete data when the cone is in transition from either clay to sand or vise-versa. To do this the software requires a range of Ic values over which the transition will be defined (typically somewhere between 1.80 < Ic < 3.0) and a rate of change of Ic. Transitions typically occur when the rate of change of Ic is fast (i.e. delta Ic is small). The SBTn plot below, displays in red the detected transition layers based on the parameters listed below the graphs. Short description 1.70 3.00 0.0100 4 458 129 28.17% 17 CLiq v.2.1.6.11 - CPT Liquefaction Assessment Software - Report created on: 6/5/2017, 1:10:56 PM Project file: C:\Users\Craig Prentice\Desktop\Moorpark Library\Moorpark Library.clq 288180 This software is licensed to: Oakridge Geoscience, Inc.CPT name: CPT-5Cone resistanceqt (tsf)300200100Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Cone resistanceSBTn PlotIc (Robertson 1990)4321Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420SBTn PlotFS PlotFactor of safety21.510.50Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420FS PlotDuring earthq.Vertical settlementsSettlement (in)151050Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Vertical settlementsEstimation of post-earthquake settlementsStrain plotVolumentric strain (%)6543210Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Strain plotCLiq v.2.1.6.11 - CPT Liquefaction Assessment Software - Report created on: 6/5/2017, 1:10:56 PM325Project file: C:\Users\Craig Prentice\Desktop\Moorpark Library\Moorpark Library.clqAbbreviationsqt:Ic:FS:Volumentric strain:Total cone resistance (cone resistance qc corrected for pore water effects)Soil Behaviour Type IndexCalculated Factor of Safety against liquefactionPost-liquefaction volumentric strain181 This software is licensed to: Oakridge Geoscience, Inc.CPT name: CPT-5Cone resistanceqt (tsf)300200100Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Cone resistanceSBTn PlotIc (Robertson 1990)4321Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420SBTn PlotCorrected norm. cone resistanceQtn,cs200150100500Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Corrected norm. cone resistanceFS PlotFactor of safety21.510.50Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420FS PlotDuring earthq.Cyclic shear strainGamma max (%)6050403020100Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Cyclic shear strainLateral displacementsDisplacement (in)3002001000Depth (ft)74727068666462605856545250484644424038363432302826242220181614121086420Lateral displacementsEstimation of post-earthquake lateral DisplacementsGeometric parameters: Gently sloping ground without free face (Slope 2.50 %)CLiq v.2.1.6.11 - CPT Liquefaction Assessment Software - Report created on: 6/5/2017, 1:10:56 PM332Project file: C:\Users\Craig Prentice\Desktop\Moorpark Library\Moorpark Library.clqqt: Total cone resistance (cone resistance qc corrected for pore water effects)Ic: Soil Behaviour Type IndexQtn,cs: Equivalent clean sand normalized CPT total cone resistanceF.S.: Factor of safetyγmax: Maximum cyclic shear strainLDI: Lateral displacement indexAbbreviationsSurface condition182 SPT BASED LIQ UEFACTION ANALYSIS REPORT :: Input parameters and analysis properties :: Analysis method: Fines correction method: Sampling method: Borehole diameter: Rod length: Hammer energy ratio: Boulanger & Idriss, 2014 Boulanger & Idriss, 2014 Standard Sampler 200mm 3.30 ft 1.30 G.W.T. (in-situ): G.W.T. (earthq.): Earthquake magnitude Mw: Peak ground acceleration: Eq. external load: Project title : Moorpark Library Location : High Street and Moorpark Avenue SPT Name: DH #1 37.50 ft 15.00 ft 6.90 ft 1.03 g 0.00 tsf Raw SPT Data SPT Count (blow s/ft) 50403020100Depth (ft)75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 Raw SPT Data CSR - CRR Plot CSR - CRR 10.80.60.40.20Depth (ft)70 65 60 55 50 45 40 35 30 25 20 15 10 5 CSR - CRR Plot During earthq. FS Plot Factor of Safety 21.510.50Depth (ft)70 65 60 55 50 45 40 35 30 25 20 15 10 5 FS Plot During earthq. LPI Liquefaction potential 200Depth (ft)70 65 60 55 50 45 40 35 30 25 20 15 10 5 LPI During earthq. CRR 7.50 clean sand curve Corrected Blow Count N1(60),cs 50454035302520151050Cyclic Stress Ratio*0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0.0 CRR 7.50 clean sand curve Liquefaction No Liquefaction F.S. color scheme Almost certain it will liquefy Very likely to liquefy Liquefaction and no liq. are equally likely Unlike to liquefy Almost certain it will not liquefy LPI color scheme Very high risk High risk Low risk Project File: C:\Users\Craig Prentice\Documents\Oakridge Geoscience\client-projects\GeoLogisMiki\MOORPARK LIBRARY\Moorpark LibrarySPT.lsvs Page: 1LiqSVs 1.1.1.8 - SPT & Vs Liquefaction Assessment Software 183 This software is registered to: Oakridge Geoscience, Inc.Raw SPT DataSPT Count (blow s/ft)50403020100Depth (ft)7472706866646260585654525048464442403836343230282624222018161412108642Raw SPT DataCSR - CRR PlotCSR - CRR10.80.60.40.20Depth (ft)7472706866646260585654525048464442403836343230282624222018161412108642CSR - CRR PlotDuring earthq.FS PlotFactor of Safety21.510.50Depth (ft)7472706866646260585654525048464442403836343230282624222018161412108642FS PlotDuring earthq.Vertical Liq. SettlementsCuml. Settlement (in)4020Depth (ft)7472706866646260585654525048464442403836343230282624222018161412108642Vertical Liq. SettlementsDuring earthq.Lateral Liq. DisplacementsCuml. Displacement (ft)8642Depth (ft)7472706866646260585654525048464442403836343230282624222018161412108642Lateral Liq. DisplacementsDuring earthq.:: Overall Liquefaction Assessment Analysis Plots ::Project File: C:\Users\Craig Prentice\Documents\Oakridge Geoscience\client-projects\GeoLogisMiki\MOORPARK LIBRARY\Moorpark LibrarySPT.lsvsPage: 2LiqSVs 1.1.1.8 - SPT & Vs Liquefaction Assessment Software184 This software is registered to: Oakridge Geoscience, Inc. Test Depth (ft) :: Field input data :: SPT Field Value (blows) Fines Content (%) Unit Weight (pcf) Infl. Thickness (ft) Can Liquefy 2.00 3 12.00 98.00 2.00 No 3.50 2 12.00 98.00 2.00 No 7.00 4 12.00 105.00 4.00 No 9.00 4 15.00 105.00 3.00 No 12.00 6 15.00 111.00 2.00 No 14.00 7 7.00 111.00 3.00 Yes 19.00 14 7.00 111.00 7.00 Yes 24.00 9 23.00 108.00 5.00 Yes 29.00 23 7.00 107.00 5.00 Yes 34.00 20 7.00 107.00 5.00 Yes 39.00 2 50.00 112.00 5.00 Yes 44.00 8 50.00 112.00 5.00 Yes 49.00 23 25.00 112.00 5.00 Yes 54.00 21 3.00 112.00 5.00 Yes 59.00 14 25.00 112.00 5.00 Yes 66.00 7 63.00 112.00 3.00 No 69.00 22 24.00 112.00 3.00 Yes 74.00 20 24.00 112.00 3.00 Yes Abbreviations Depth: SPT Field Value: Fines Content: Unit Weight: Infl. Thickness: Can Liquefy: Depth at which test was performed (ft) Number of blows per foot Fines content at test depth (%) Unit weight at test depth (pcf) Thickness of the soil layer to be considered in settlements analysis (ft) User defined switch for excluding/including test depth from the analysis procedure :: Cyclic Resistance Ratio (CRR) calculation data :: CRR7.5Depth (ft) SPT Field Value CN CE CB CR CS (N1)60 (N1)60csFC (%) σv (tsf) uo (tsf) σ'vo (tsf) Unit Weight (pcf) Δ(Ν1)60m 2.00 3 1.701.301.150.751.00 6 8 4.00012.0098.00 0.10 0.00 0.10 0.55 2.07 3.50 2 1.701.301.150.751.00 4 6 4.00012.0098.00 0.17 0.00 0.17 0.58 2.07 7.00 4 1.70 1.30 1.15 0.80 1.00 8 10 4.00012.00105.00 0.36 0.00 0.36 0.52 2.07 9.00 4 1.53 1.30 1.15 0.80 1.00 7 10 4.00015.00105.00 0.46 0.00 0.46 0.51 3.26 12.00 6 1.30 1.30 1.15 0.85 1.00 10 13 4.00015.00111.00 0.63 0.00 0.63 0.50 3.26 14.00 7 1.21 1.30 1.15 0.85 1.00 11 11 4.0007.00111.00 0.74 0.00 0.74 0.53 0.14 19.00 14 1.02 1.30 1.15 0.95 1.00 20 20 0.2067.00111.00 1.02 0.00 1.02 0.44 0.14 24.00 9 0.91 1.30 1.15 0.95 1.00 12 17 0.17423.00108.00 1.29 0.00 1.29 0.48 4.88 29.00 23 0.87 1.30 1.15 0.95 1.00 28 28 0.3847.00107.00 1.55 0.00 1.55 0.37 0.14 34.00 20 0.80 1.30 1.15 1.00 1.00 24 24 0.2687.00107.00 1.82 0.00 1.82 0.41 0.14 39.00 2 0.67 1.30 1.15 1.00 1.00 2 8 0.10550.00112.00 2.10 0.05 2.05 0.60 5.61 44.00 8 0.69 1.30 1.15 1.00 1.00 8 14 0.14850.00112.00 2.38 0.20 2.18 0.52 5.61 49.00 23 0.75 1.30 1.15 1.00 1.00 26 31 4.00025.00112.00 2.66 0.36 2.30 0.37 5.07 54.00 21 0.70 1.30 1.15 1.00 1.00 22 22 0.2333.00112.00 2.94 0.51 2.43 0.42 0.00 59.00 14 0.66 1.30 1.15 1.00 1.00 14 19 0.19425.00112.00 3.22 0.67 2.55 0.46 5.07 66.00 7 0.60 1.30 1.15 1.00 1.00 6 12 4.00063.00112.00 3.61 0.89 2.72 0.55 5.59 69.00 22 0.68 1.30 1.15 1.00 1.00 22 27 0.34724.00112.00 3.78 0.98 2.80 0.39 4.98 74.00 20 0.65 1.30 1.15 1.00 1.00 20 25 0.29024.00112.00 4.06 1.14 2.92 0.42 4.98 Project File: C:\Users\Craig Prentice\Documents\Oakridge Geoscience\client-projects\GeoLogisMiki\MOORPARK LIBRARY\Moorpark LibrarySPT.lsvs Page: 3LiqSVs 1.1.1.8 - SPT & Vs Liquefaction Assessment Software 185 This software is registered to: Oakridge Geoscience, Inc. :: Cyclic Resistance Ratio (CRR) calculation data :: CRR7.5Depth (ft) SPT Field Value CN CE CB CR CS (N1)60 (N1)60csFC (%) σv (tsf) uo (tsf) σ'vo (tsf) Unit Weight (pcf) Δ(Ν1)60m σv: uo: σ'vo: m: CN: CE: CB: CR: CS: N1(60): Δ(Ν1)60 N1(60)cs: CRR7.5: Total stress during SPT test (tsf) Water pore pressure during SPT test (tsf) Effective overburden pressure during SPT test (tsf) Stress exponent normalization factor Overburden corretion factor Energy correction factor Borehole diameter correction factor Rod length correction factor Liner correction factor Corrected NSPT to a 60% energy ratio Equivalent clean sand adjustment Corected N1(60) value for fines content Cyclic resistance ratio for M=7.5 Abbreviations σv,eq (tsf) rd CSR MSF CSReq,M=7.5 Ksigma CSR* :: Cyclic Stress Ratio calculation (CSR fully adjusted and normalized) :: Depth (ft) Unit Weight (pcf) uo,eq (tsf) σ'vo,eq (tsf) FSMSFmax(N1)60csα 2.00 98.00 0.10 0.00 0.10 1.00 0.670 1.03 0.649 1.10 0.590 2.0001.15 81.00 3.50 98.00 0.17 0.00 0.17 1.00 0.667 1.03 0.649 1.10 0.590 2.0001.13 61.00 7.00 105.00 0.36 0.00 0.36 0.98 0.659 1.04 0.633 1.10 0.575 2.0001.19 101.00 9.00 105.00 0.46 0.00 0.46 0.98 0.654 1.04 0.628 1.08 0.583 2.0001.19 101.00 12.00 111.00 0.63 0.00 0.63 0.96 0.645 1.06 0.611 1.05 0.580 2.0001.26 131.00 14.00 111.00 0.74 0.00 0.74 0.95 0.639 1.05 0.611 1.03 0.591 2.0001.21 111.00 19.00 111.00 1.02 0.12 0.89 0.93 0.711 1.11 0.643 1.02 0.628 0.3281.49 201.00 24.00 108.00 1.29 0.28 1.00 0.90 0.775 1.08 0.717 1.01 0.712 0.2441.38 171.00 29.00 107.00 1.55 0.44 1.12 0.88 0.818 1.19 0.688 0.99 0.695 0.5521.88 281.00 34.00 107.00 1.82 0.59 1.23 0.85 0.843 1.14 0.737 0.98 0.755 0.3551.67 241.00 39.00 112.00 2.10 0.75 1.35 0.82 0.853 1.03 0.826 0.98 0.844 0.1241.15 81.00 44.00 112.00 2.38 0.90 1.48 0.79 0.855 1.06 0.805 0.96 0.835 0.1771.29 141.00 49.00 112.00 2.66 1.06 1.60 0.76 0.849 1.23 0.692 0.91 0.759 2.0002.06 311.00 54.00 112.00 2.94 1.22 1.72 0.73 0.840 1.12 0.747 0.93 0.803 0.2901.58 221.00 59.00 112.00 3.22 1.37 1.85 0.71 0.827 1.10 0.753 0.93 0.811 0.2391.45 191.00 66.00 112.00 3.61 1.59 2.02 0.67 0.806 1.05 0.767 0.94 0.820 2.0001.24 121.00 69.00 112.00 3.78 1.68 2.10 0.66 0.796 1.18 0.677 0.88 0.770 0.4501.82 271.00 74.00 112.00 4.06 1.84 2.22 0.64 0.781 1.15 0.676 0.88 0.769 0.3771.72 251.00 σv,eq: uo,eq: σ'vo,eq: rd: α: CSR : MSF : CSReq,M=7.5: Ksigma: CSR*: FS: Total overburden pressure at test point, during earthquake (tsf) Water pressure at test point, during earthquake (tsf) Effective overburden pressure, during earthquake (tsf) Nonlinear shear mass factor Improvement factor due to stone columns Cyclic Stress Ratio Magnitude Scaling Factor CSR adjusted for M=7.5 Effective overburden stress factor CSR fully adjusted Calculated factor of safety against soil liquefaction Abbreviations :: Liquefaction potential according to Iwasaki :: Depth (ft) FS F Thickness (ft) wz IL Project File: C:\Users\Craig Prentice\Documents\Oakridge Geoscience\client-projects\GeoLogisMiki\MOORPARK LIBRARY\Moorpark LibrarySPT.lsvs Page: 4LiqSVs 1.1.1.8 - SPT & Vs Liquefaction Assessment Software 186 This software is registered to: Oakridge Geoscience, Inc. :: Liquefaction potential according to Iwasaki :: Depth (ft) FS F Thickness (ft) wz IL 2.00 2.000 0.00 9.70 0.001.50 3.50 2.000 0.00 9.47 0.001.50 7.00 2.000 0.00 8.93 0.003.50 9.00 2.000 0.00 8.63 0.002.00 12.00 2.000 0.00 8.17 0.003.00 14.00 2.000 0.00 7.87 0.002.00 19.00 0.328 0.67 7.10 7.285.00 24.00 0.244 0.76 6.34 7.315.00 29.00 0.552 0.45 5.58 3.815.00 34.00 0.355 0.64 4.82 4.735.00 39.00 0.124 0.88 4.06 5.425.00 44.00 0.177 0.82 3.29 4.135.00 49.00 2.000 0.00 2.53 0.005.00 54.00 0.290 0.71 1.77 1.925.00 59.00 0.239 0.76 1.01 1.175.00 66.00 2.000 0.00 0.00 0.000.00 69.00 0.450 0.00 0.00 0.000.00 74.00 0.377 0.00 0.00 0.000.00 35.76 IL = 0.00 - No liquefaction IL between 0.00 and 5 - Liquefaction not probable IL between 5 and 15 - Liquefaction probable IL > 15 - Liquefaction certain Overall potential IL : :: Vertical settlements estimation for dry sands :: Depth (ft) (N1)60 τav pGmax (tsf) αbγε15Nc εNc (%) ΔS (in) Δh (ft) 2.00 6 0.07 0.07 0.23 0.13 25789.58 0.05 0.16 10.08 13.35 6.4062.00 3.50 4 0.11 0.11 0.28 0.13 18434.08 0.10 0.43 10.08 36.24 17.3962.00 7.00 8 0.23 0.24 0.47 0.14 11908.57 0.02 0.05 10.08 4.45 4.2754.00 9.00 7 0.30 0.31 0.53 0.14 10194.92 0.02 0.05 10.08 4.25 3.0603.00 12.00 10 0.40 0.42 0.68 0.15 8470.78 0.01 0.02 10.08 1.72 0.8242.00 14.00 11 0.47 0.49 0.70 0.15 7681.29 0.02 0.03 10.08 2.83 2.0383.00 Abbreviations τav: p: Gmax: α, b: γ: ε15: Nc: εNc: Δh: ΔS: Average cyclic shear stress Average stress Maximum shear modulus (tsf) Shear strain formula variables Average shear strain Volumetric strain after 15 cycles Number of cycles Volumetric strain for number of cycles Nc (%) Thickness of soil layer (in) Settlement of soil layer (in) 33.999Cumulative settlemetns: Project File: C:\Users\Craig Prentice\Documents\Oakridge Geoscience\client-projects\GeoLogisMiki\MOORPARK LIBRARY\Moorpark LibrarySPT.lsvs Page: 5LiqSVs 1.1.1.8 - SPT & Vs Liquefaction Assessment Software 187 This software is registered to: Oakridge Geoscience, Inc. :: Vertical & Lateral displ.acements estimation for saturated sands :: Depth (ft) γlim (%) ev (%) dz (ft) Sv-1D (in) (N1)60cs Fα γmax (%) FSliq LDI (ft) 19.00 20 15.90 0.52 0.328 15.90 2.30 7.00 1.935 1.11 24.00 17 22.15 0.67 0.244 22.15 2.62 5.00 1.572 1.11 29.00 28 6.08 0.04 0.552 6.08 1.29 5.00 0.777 0.30 34.00 24 10.02 0.29 0.355 10.02 1.97 5.00 1.181 0.50 39.00 8 50.00 0.94 0.124 50.00 4.23 5.00 2.536 2.50 44.00 14 30.65 0.79 0.177 30.65 3.02 5.00 1.810 1.53 49.00 31 4.04 -0.16 2.000 0.00 0.00 5.00 0.000 0.00 54.00 22 12.67 0.41 0.290 12.67 2.13 5.00 1.275 0.63 59.00 19 17.78 0.57 0.239 17.78 2.40 5.00 1.441 0.89 66.00 12 0.00 0.00 2.000 0.00 0.00 3.00 0.000 0.00 69.00 27 6.92 0.11 0.450 6.92 1.53 3.00 0.549 0.21 74.00 25 8.88 0.23 0.377 8.88 1.90 3.00 0.683 0.27 Abbreviations 13.760Cumulative settlements: γlim: Fα/N: γmax: ev:: Sv-1D: LDI: Limiting shear strain (%) Maximun shear strain factor Maximum shear strain (%) Post liquefaction volumetric strain (%) Estimated vertical settlement (in) Estimated lateral displacement (ft) 9.05 Project File: C:\Users\Craig Prentice\Documents\Oakridge Geoscience\client-projects\GeoLogisMiki\MOORPARK LIBRARY\Moorpark LibrarySPT.lsvs Page: 6LiqSVs 1.1.1.8 - SPT & Vs Liquefaction Assessment Software 188 SPT BASED LIQ UEFACTION ANALYSIS REPORT :: Input parameters and analysis properties :: Analysis method: Fines correction method: Sampling method: Borehole diameter: Rod length: Hammer energy ratio: Boulanger & Idriss, 2014 Boulanger & Idriss, 2014 Standard Sampler 200mm 3.30 ft 1.30 G.W.T. (in-situ): G.W.T. (earthq.): Earthquake magnitude Mw: Peak ground acceleration: Eq. external load: Project title : Moorpark Library Location : High Street and Moorpark Avenue SPT Name: DH #2 37.50 ft 15.00 ft 6.90 ft 1.03 g 0.00 tsf Raw SPT Data SPT Count (blow s/ft) 50403020100Depth (ft)50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 Raw SPT Data CSR - CRR Plot CSR - CRR 10.80.60.40.20Depth (ft)48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 CSR - CRR Plot During earthq. FS Plot Factor of Safety 21.510.50Depth (ft)48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 FS Plot During earthq. LPI Liquefaction potential 200Depth (ft)48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 LPI During earthq. CRR 7.50 clean sand curve Corrected Blow Count N1(60),cs 50454035302520151050Cyclic Stress Ratio*0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0.0 CRR 7.50 clean sand curve Liquefaction No Liquefaction F.S. color scheme Almost certain it will liquefy Very likely to liquefy Liquefaction and no liq. are equally likely Unlike to liquefy Almost certain it will not liquefy LPI color scheme Very high risk High risk Low risk Project File: C:\Users\Craig Prentice\Documents\Oakridge Geoscience\client-projects\GeoLogisMiki\MOORPARK LIBRARY\Moorpark LibrarySPT.lsvs Page: 7LiqSVs 1.1.1.8 - SPT & Vs Liquefaction Assessment Software 189 This software is registered to: Oakridge Geoscience, Inc.Raw SPT DataSPT Count (blow s/ft)50403020100Depth (ft)5048464442403836343230282624222018161412108642Raw SPT DataCSR - CRR PlotCSR - CRR10.80.60.40.20Depth (ft)48464442403836343230282624222018161412108642CSR - CRR PlotDuring earthq.FS PlotFactor of Safety21.510.50Depth (ft)48464442403836343230282624222018161412108642FS PlotDuring earthq.Vertical Liq. SettlementsCuml. Settlement (in)105Depth (ft)48464442403836343230282624222018161412108642Vertical Liq. SettlementsDuring earthq.Lateral Liq. DisplacementsCuml. Displacement (ft)654321Depth (ft)48464442403836343230282624222018161412108642Lateral Liq. DisplacementsDuring earthq.:: Overall Liquefaction Assessment Analysis Plots ::Project File: C:\Users\Craig Prentice\Documents\Oakridge Geoscience\client-projects\GeoLogisMiki\MOORPARK LIBRARY\Moorpark LibrarySPT.lsvsPage: 8LiqSVs 1.1.1.8 - SPT & Vs Liquefaction Assessment Software190 This software is registered to: Oakridge Geoscience, Inc. Test Depth (ft) :: Field input data :: SPT Field Value (blows) Fines Content (%) Unit Weight (pcf) Infl. Thickness (ft) Can Liquefy 2.00 15 22.00 102.00 3.00 No 4.00 9 22.00 102.00 3.00 No 7.00 6 22.00 101.00 3.00 No 9.00 9 22.00 101.00 3.00 No 12.00 7 12.00 101.00 2.00 No 14.00 9 27.00 106.00 4.00 Yes 19.00 13 27.00 106.00 5.00 Yes 24.00 9 29.00 95.00 6.00 Yes 29.00 21 6.00 95.00 5.00 Yes 34.00 15 27.00 97.00 5.00 Yes 39.00 0 52.00 118.00 1.50 Yes 41.00 17 52.00 118.00 1.50 Yes 44.00 6 47.00 118.00 4.00 Yes 49.00 12 27.00 118.00 4.00 Yes Abbreviations Depth: SPT Field Value: Fines Content: Unit Weight: Infl. Thickness: Can Liquefy: Depth at which test was performed (ft) Number of blows per foot Fines content at test depth (%) Unit weight at test depth (pcf) Thickness of the soil layer to be considered in settlements analysis (ft) User defined switch for excluding/including test depth from the analysis procedure :: Cyclic Resistance Ratio (CRR) calculation data :: CRR7.5Depth (ft) SPT Field Value CN CE CB CR CS (N1)60 (N1)60csFC (%) σv (tsf) uo (tsf) σ'vo (tsf) Unit Weight (pcf) Δ(Ν1)60m 2.00 15 1.70 1.30 1.15 0.75 1.00 29 34 4.00022.00102.00 0.10 0.00 0.10 0.32 4.77 4.00 9 1.701.301.150.751.00 17 22 4.00022.00102.00 0.20 0.00 0.20 0.40 4.77 7.00 6 1.631.301.150.801.00 12 17 4.00022.00101.00 0.36 0.00 0.36 0.45 4.77 9.00 9 1.431.301.150.801.00 15 20 4.00022.00101.00 0.46 0.00 0.46 0.42 4.77 12.00 7 1.31 1.30 1.15 0.85 1.00 12 14 4.00012.00101.00 0.61 0.00 0.61 0.49 2.07 14.00 9 1.19 1.30 1.15 0.85 1.00 14 19 4.00027.00106.00 0.71 0.00 0.71 0.44 5.21 19.00 13 1.03 1.30 1.15 0.95 1.00 19 24 0.26827.00106.00 0.98 0.00 0.98 0.40 5.21 24.00 9 0.94 1.30 1.15 0.95 1.00 12 17 0.17429.0095.00 1.22 0.00 1.22 0.47 5.32 29.00 21 0.88 1.30 1.15 0.95 1.00 26 26 0.3166.0095.00 1.45 0.00 1.45 0.39 0.03 34.00 15 0.82 1.30 1.15 1.00 1.00 18 23 0.24927.0097.00 1.70 0.00 1.70 0.42 5.21 39.00 0 0.68 1.30 1.15 1.00 1.00 0 6 0.09252.00118.00 1.99 0.05 1.94 0.63 5.61 41.00 17 0.77 1.30 1.15 1.00 1.00 20 26 0.31652.00118.00 2.11 0.11 2.00 0.41 5.61 44.00 6 0.69 1.30 1.15 1.00 1.00 6 12 0.13247.00118.00 2.29 0.20 2.08 0.54 5.61 49.00 12 0.70 1.30 1.15 1.00 1.00 13 18 0.18427.00118.00 2.58 0.36 2.22 0.47 5.21 Project File: C:\Users\Craig Prentice\Documents\Oakridge Geoscience\client-projects\GeoLogisMiki\MOORPARK LIBRARY\Moorpark LibrarySPT.lsvs Page: 9LiqSVs 1.1.1.8 - SPT & Vs Liquefaction Assessment Software 191 This software is registered to: Oakridge Geoscience, Inc. :: Cyclic Resistance Ratio (CRR) calculation data :: CRR7.5Depth (ft) SPT Field Value CN CE CB CR CS (N1)60 (N1)60csFC (%) σv (tsf) uo (tsf) σ'vo (tsf) Unit Weight (pcf) Δ(Ν1)60m σv: uo: σ'vo: m: CN: CE: CB: CR: CS: N1(60): Δ(Ν1)60 N1(60)cs: CRR7.5: Total stress during SPT test (tsf) Water pore pressure during SPT test (tsf) Effective overburden pressure during SPT test (tsf) Stress exponent normalization factor Overburden corretion factor Energy correction factor Borehole diameter correction factor Rod length correction factor Liner correction factor Corrected NSPT to a 60% energy ratio Equivalent clean sand adjustment Corected N1(60) value for fines content Cyclic resistance ratio for M=7.5 Abbreviations σv,eq (tsf) rd CSR MSF CSReq,M=7.5 Ksigma CSR* :: Cyclic Stress Ratio calculation (CSR fully adjusted and normalized) :: Depth (ft) Unit Weight (pcf) uo,eq (tsf) σ'vo,eq (tsf) FSMSFmax(N1)60csα 2.00 102.00 0.10 0.00 0.10 1.00 0.670 1.26 0.533 1.10 0.485 2.0002.20 341.00 4.00 102.00 0.20 0.00 0.20 0.99 0.666 1.12 0.593 1.10 0.539 2.0001.58 221.00 7.00 101.00 0.36 0.00 0.36 0.98 0.659 1.08 0.609 1.10 0.554 2.0001.38 171.00 9.00 101.00 0.46 0.00 0.46 0.98 0.654 1.11 0.591 1.10 0.537 2.0001.49 201.00 12.00 101.00 0.61 0.00 0.61 0.96 0.645 1.06 0.608 1.06 0.574 2.0001.29 141.00 14.00 106.00 0.71 0.00 0.71 0.95 0.639 1.10 0.583 1.05 0.555 2.0001.45 191.00 19.00 106.00 0.98 0.12 0.85 0.93 0.714 1.14 0.625 1.03 0.604 0.4441.67 241.00 24.00 95.00 1.22 0.28 0.94 0.90 0.788 1.08 0.728 1.01 0.718 0.2421.38 171.00 29.00 95.00 1.45 0.44 1.02 0.88 0.840 1.17 0.721 1.01 0.716 0.4411.77 261.00 34.00 97.00 1.70 0.59 1.10 0.85 0.874 1.13 0.771 0.99 0.776 0.3211.62 231.00 39.00 118.00 1.99 0.75 1.24 0.82 0.880 1.03 0.857 0.99 0.868 0.1061.13 61.00 41.00 118.00 2.11 0.81 1.30 0.81 0.880 1.17 0.755 0.97 0.782 0.4041.77 261.00 44.00 118.00 2.29 0.90 1.38 0.79 0.877 1.05 0.835 0.97 0.857 0.1541.24 121.00 49.00 118.00 2.58 1.06 1.52 0.76 0.867 1.09 0.796 0.96 0.833 0.2201.42 181.00 σv,eq: uo,eq: σ'vo,eq: rd: α: CSR : MSF : CSReq,M=7.5: Ksigma: CSR*: FS: Total overburden pressure at test point, during earthquake (tsf) Water pressure at test point, during earthquake (tsf) Effective overburden pressure, during earthquake (tsf) Nonlinear shear mass factor Improvement factor due to stone columns Cyclic Stress Ratio Magnitude Scaling Factor CSR adjusted for M=7.5 Effective overburden stress factor CSR fully adjusted Calculated factor of safety against soil liquefaction Abbreviations :: Liquefaction potential according to Iwasaki :: Depth (ft) FS F Thickness (ft) wz IL 2.00 2.000 0.00 9.70 0.002.00 4.00 2.000 0.00 9.39 0.002.00 7.00 2.000 0.00 8.93 0.003.00 9.00 2.000 0.00 8.63 0.002.00 Project File: C:\Users\Craig Prentice\Documents\Oakridge Geoscience\client-projects\GeoLogisMiki\MOORPARK LIBRARY\Moorpark LibrarySPT.lsvs Page: 10LiqSVs 1.1.1.8 - SPT & Vs Liquefaction Assessment Software 192 This software is registered to: Oakridge Geoscience, Inc. :: Liquefaction potential according to Iwasaki :: Depth (ft) FS F Thickness (ft) wz IL 12.00 2.000 0.00 8.17 0.003.00 14.00 2.000 0.00 7.87 0.002.00 19.00 0.444 0.56 7.10 6.025.00 24.00 0.242 0.76 6.34 7.325.00 29.00 0.441 0.56 5.58 4.755.00 34.00 0.321 0.68 4.82 4.985.00 39.00 0.106 0.89 4.06 5.535.00 41.00 0.404 0.60 3.75 1.362.00 44.00 0.154 0.85 3.29 2.553.00 49.00 0.220 0.78 2.53 3.015.00 35.53 IL = 0.00 - No liquefaction IL between 0.00 and 5 - Liquefaction not probable IL between 5 and 15 - Liquefaction probable IL > 15 - Liquefaction certain Overall potential IL : :: Vertical settlements estimation for dry sands :: Depth (ft) (N1)60 τav pGmax (tsf) αbγε15Nc εNc (%) ΔS (in) Δh (ft) 2.00 29 0.07 0.07 0.38 0.13 25177.92 0.00 0.00 10.08 0.09 0.0673.00 4.00 17 0.14 0.14 0.46 0.13 16611.23 0.00 0.00 10.08 0.35 0.2543.00 7.00 12 0.23 0.24 0.56 0.14 11903.54 0.01 0.01 10.08 0.78 0.5603.00 9.00 15 0.30 0.31 0.67 0.14 10245.08 0.01 0.01 10.08 0.47 0.3403.00 12.00 12 0.39 0.41 0.69 0.15 8626.56 0.01 0.02 10.08 1.36 0.6512.00 14.00 14 0.46 0.48 0.82 0.15 7833.59 0.01 0.01 10.08 0.54 0.5164.00 Abbreviations τav: p: Gmax: α, b: γ: ε15: Nc: εNc: Δh: ΔS: Average cyclic shear stress Average stress Maximum shear modulus (tsf) Shear strain formula variables Average shear strain Volumetric strain after 15 cycles Number of cycles Volumetric strain for number of cycles Nc (%) Thickness of soil layer (in) Settlement of soil layer (in) 2.387Cumulative settlemetns: :: Vertical & Lateral displ.acements estimation for saturated sands :: Depth (ft) γlim (%) ev (%) dz (ft) Sv-1D (in) (N1)60cs Fα γmax (%) FSliq LDI (ft) 19.00 24 10.02 0.29 0.444 10.02 1.97 5.00 1.181 0.50 24.00 17 22.15 0.67 0.242 22.15 2.62 6.00 1.887 1.33 29.00 26 7.85 0.17 0.441 7.85 1.79 5.00 1.076 0.39 34.00 23 11.27 0.35 0.321 11.27 2.04 5.00 1.227 0.56 39.00 6 50.00 0.95 0.106 50.00 4.86 1.50 0.875 0.75 41.00 26 7.85 0.17 0.404 7.85 1.79 1.50 0.323 0.12 44.00 12 38.03 0.86 0.154 38.03 3.34 4.00 1.604 1.52 Project File: C:\Users\Craig Prentice\Documents\Oakridge Geoscience\client-projects\GeoLogisMiki\MOORPARK LIBRARY\Moorpark LibrarySPT.lsvs Page: 11LiqSVs 1.1.1.8 - SPT & Vs Liquefaction Assessment Software 193 This software is registered to: Oakridge Geoscience, Inc. :: Vertical & Lateral displ.acements estimation for saturated sands :: Depth (ft) γlim (%) ev (%) dz (ft) Sv-1D (in) (N1)60cs Fα γmax (%) FSliq LDI (ft) 49.00 18 19.85 0.62 0.220 19.85 2.51 4.00 1.204 0.79 Abbreviations 9.376Cumulative settlements: γlim: Fα/N: γmax: ev:: Sv-1D: LDI: Limiting shear strain (%) Maximun shear strain factor Maximum shear strain (%) Post liquefaction volumetric strain (%) Estimated vertical settlement (in) Estimated lateral displacement (ft) 5.97 Project File: C:\Users\Craig Prentice\Documents\Oakridge Geoscience\client-projects\GeoLogisMiki\MOORPARK LIBRARY\Moorpark LibrarySPT.lsvs Page: 12LiqSVs 1.1.1.8 - SPT & Vs Liquefaction Assessment Software 194 References ⦁ Ronald D. Andrus, Hossein Hayati, Nisha P. Mohanan, 2009. Correcting Liquefaction Resistance for Aged Sands Using Measured to Estimated Velocity Ratio, Journal of Geotechnical and Geoenvironmental Engineering, Vol. 135, No. 6, June 1 ⦁ Boulanger, R.W. and Idriss, I. M., 2014. CPT AND SPT BASED LIQUEFACTION TRIGGERING PROCEDURES. DEPARTMENT OF CIVIL & ENVIRONMENTAL ENGINEERING COLLEGE OF ENGINEERING UNIVERSITY OF CALIFORNIA AT DAVIS ⦁ Dipl.-Ing. Heinz J. Priebe, Vibro Replacement to Prevent Earthquake Induced Liquefaction, Proceedings of the Geotechnique- Colloquium at Darmstadt, Germany, on March 19th, 1998 (also published in Ground Engineering, September 1998), Technical paper 12-57E ⦁ Robertson, P.K. and Cabal, K.L., 2007, Guide to Cone Penetration Testing for Geotechnical Engineering. Available at no cost at http://www.geologismiki.gr/ ⦁ Youd, T.L., Idriss, I.M., Andrus, R.D., Arango, I., Castro, G., Christian, J.T., Dobry, R., Finn, W.D.L., Harder, L.F., Hynes, M.E., Ishihara, K., Koester, J., Liao, S., Marcuson III, W.F., Martin, G.R., Mitchell, J.K., Moriwaki, Y., Power, M.S., Robertson, P.K., Seed, R., and Stokoe, K.H., Liquefaction Resistance of Soils: Summary Report from the 1996 NCEER and 1998 NCEER/NSF Workshop on Evaluation of Liquefaction Resistance of Soils, ASCE, Journal of Geotechnical & Geoenvironmental Engineering, Vol. 127, October, pp 817-833 ⦁ Zhang, G., Robertson. P.K., Brachman, R., 2002, Estimating Liquefaction Induced Ground Settlements from the CPT, Canadian Geotechnical Journal, 39: pp 1168-1180 ⦁ Zhang, G., Robertson. P.K., Brachman, R., 2004, Estimating Liquefaction Induced Lateral Displacements using the SPT and CPT, ASCE, Journal of Geotechnical & Geoenvironmental Engineering, Vol. 130, No. 8, 861-871 ⦁ Pradel, D., 1998, Procedure to Evaluate Earthquake-Induced Settlements in Dry Sandy Soils, ASCE, Journal of Geotechnical & Geoenvironmental Engineering, Vol. 124, No. 4, 364-368 ⦁ R. Kayen, R. E. S. Moss, E. M. Thompson, R. B. Seed, K. O. Cetin, A. Der Kiureghian, Y. Tanaka, K. Tokimatsu, 2013. Shear- Wave Velocity–Based Probabilistic and Deterministic Assessment of Seismic Soil Liquefaction Potential, Journal of Geotechnical and Geoenvironmental Engineering, Vol. 139, No. 3, March 1 LiqSVs 1.1.1.8 - SPT & Vs Liquefaction Assessment Software 195 APPENDIX V 196