Loading...
HomeMy WebLinkAboutAGENDA REPORT 1996 0117 CC REG ITEM 07DAGENDA REPORT CITY OF MOORPARK TO: The Honorable City Council FROM: Baldemar Troche Public Works Management DATE: January 9, 1996 (CC Meeting of 1- 17 -95) b �J -17 71 1 --7 Analy %�'v� SUBJECT: Consider Authorizing Recordation of the Notice of Completion for the Miscellaneous Concrete Work Project and Amendment to the Budget for Said Project BACKGROUND In certain neighborhoods of the City, existing improvements are substandard. The purpose of the subject project was to replace curb and gutter, perform minor asphalt work, and reconstruct a driveway apron (refer to Exhibit 'A' for locations). On June 21, 1995, City Council authorized staff to solicit bids to perform said project. Staff awarded a City Manager Approved Contract to Greg Quigley Concrete (low bidder) for $7,771. FISCAL IMPACT A. Total Construction Contract Costs: A summary of the final costs to Greg Quigley Concrete for the miscellaneous concrete project is as follows: Description Costs ($l Bid Amount $ 7,771 Change Order #1 $ 3,962 Change Order #2 $ 1,344 Change Order #3 $ 1,025 Change Order #4 $ 1,635 $15,737 a. Change Order #1 ($3,962): Quantity increase for reconstruction of curb and gutter. b. Change Order #2 ($1,344): Asphalt reconstruction at the northwest corner of Bard Street and Third Street. C. Change Order #3 ($1,025): Relocation of brick pilaster on Esther Street. This work was required by, and was funded by, the Sidewalk Construction Project 95 -1 in order to allow the construction of a five feet (51) wide sidewalk between a wood pole and a brick pilaster. Greg Quigley Concrete was selected to relocate said pilaster because the bid he quoted was much less than the price quoted by the contractor for that project. d. Change Order #4 ($1,635): Reconstruction of curb and gutter at the northeast corner of Peach Hill Road and Vista Del Valle Drive. 000058 i Miscellaneous Concrete Project Page 2 B. Total Miscellaneous Concrete Work Project Construction Costs: A summary of the total cost for the subject contract is as follows: Description Costs ($) Total Construction Contract $ 15,737 Less Sidewalk Construction Project 95 -1 $ (1,025) Less Driveway Reconstruction* $ (1,450) Net Miscellaneous Concrete Work Project Construction Costs $ 13,262 *Note: The driveway reconstruction at 362 Second Street was be funded by the SB -821 grant. C. Total Project Costs: A summary of the total project costs is summarized as follows: Description Cost Est. Design $ 0 Construction $13,262 Contract Administration & Inspection $0 TOTAL COST $13,262 D. Budget: The budgeted amount for this line item is $10,000 (account no. 03.142.903.009). This line item is for all miscellaneous sidewalk repair work for the entire fiscal year. The amount spent in this account for the subject and other work, exceeds the budget by $3,262. Staff recommends that the budget be revised to fund these and possible future sidewalk repair costs. A re -cap of proposed work includes: Item Amount Misc. (printing and publication) $ 82.60 Subject Contract $13,262.00 Sub -Total $13,344.60 Future Work (FY 95 -96) $ 6,655.40 Total $20,000.00 RECOMMENDATION (Roll Call Vote Staff recommends that the City Council take the following actions: 1. Accept the work as completed, subject to satisfactory completion of the maintenance period. 2. Instruct the City Clerk to file the Notice of Completion for said project. 3. Authorize the release of the retention upon satisfactory clearance of the thirty five (35) day lien period. 4. Approve an additional appropriation from the Gas Tax Fund ($10,000) and amend account no. 03.142.903 .009 from $10,000 t, $20,000. \specs \con_95_2.rpt 00001 Exhibit A No. Description 1 Driveway reconstruction 2 Curb & Gutter reconstruction 3 Curb & Gutter reconstruction 4 Curb & Gutter reconstruction 5 Curb & Gutter reconstruction 6 Curb & Gutter reconstruction 7 Curb & Gutter reconstruction 8 Curb & Gutter reconstruction 9 Curb & Gutter reconstruction 10 Curb & Gutter reconstruction 11 Curb & Gutter reconstruction 12 Curb & Gutter reconstruction 13 Curb & Gutter reconstruction 14 Asphalt reconstruction Location 362 Second St. 4536 Vista Del Valle Dr. South -east corner of Mountain Meadows Dr. & Rivergrove St. 4253 Granadilla Dr. 11927 Rivergrove St. 233 High St. Moorpark Ave. (end of cul -de -sac) 337 Bard St. 4277 Granadilla Dr. 11512 Buttercreek Rd. 805 Hedyland Crt. North -west corner of College View Heights Dr. and Hastings North -east corner of Peach Hill Rd. and Vista Del Valle Dr. 337 Bard St. 000060