SUBJECT: MINOR MODIFICATION NO. 3 TO MAJOR MODIFICATION NO. 2 OF
CPD 89 -1
Background
On September 7, 1994, the City Council approved the application
filed by Ventura Pacific Capital Group VI requesting approval of
Major Modification No. 2 to CPD 89 -1, PM 4961 and Variance 94 -1 for
the following:
Major Modification No. 2 to CPD 89 -1 was for approved to revise the
site plan to include a market, shops, free standing commercial
buildings and a theater. The approved revisions are as follows:
Net Site Area: Approximately 15.30 acres (666,800 sq. ft.)
Major "A
"(market)
50,320
sq.
ft.
Major "B
"(theater)
35,000
sq.
ft.
Shops "1
11(7,000 sq. ft. food use)
14,850
sq.
ft.
Pad "A"
26,800
5,500
sq.
ft.
Pad "B"
(food use)
3,000
sq.
ft.
Pad "C"
3,500
sq.
ft.
Pad "D"
(3,500 sq. ft. food use)
5,000
sq.
ft.*
GROSS FLOOR AREA
117,170
sq.
ft.
Tentative Parcel Map No. 4961 was approved to subdivide the
property to correspond to the various uses within CPD 89 -1 as
follows:
Parcel Area Sq . Ft Acres
1 (Pad A)
30,400
0.70
2 (Pad B)
25,400
0.58
3 (Market)
205,000
4.71
4 (Pad C)
30,600
0.70
5 (Pad D)
30,000
0.69
6 (Shops)
26,800
0.62
7 (Theater)
318,600
7.31
Total
666,800
15.31
PP01:03:9619:58aM: \17JAN95.CC
1
0001.3
Variance 94 -1 to allow 125 compact parking spaces on the proposed
theater parcel only was denied. The City Council subsequently and
as a separate action, amended the City's Zoning Ordinance to allow
up to 15% of the required parking spaces for theaters to be compact
parking spaces.
Minor Modification No. 1 to Major Modification No. 2 to CPD 89 -1
was approved on May 3, 1995 by the City Council for: 1) Deletion
of Condition 42; 2) Incorporate changes to the site plan; 3)
Submit elevations for the Pad buildings; 4) Revise the elevations
of Shop Building No. 1; and 5) Art work in lieu of Art in Public
Places fee.
On November 22, 1995, Minor Modification No. 2 to Major
Modification No. 2 of Commercial Planned Development Permit No. 89-
1 was approved by the Director of Community Development for
approval of a E1 Pollo Loco Restaurant consisting of approximately
2,532 square feet with an outdoor patio area and automobile drive -
thru.
On December 8, 1995, Mission Bell Partners applied for Minor
Modification No. 3 to Major Modification No. 2 to CPD 89 -1 for the
following:
1. Reconfiguration of the planter west of Shops No. 1.
2. Movement of Pad "C" 9 feet east to accommodate a
potential future drive -thru lane.
3. Addition of a new trash enclosure to the south of Shops
No. 1.
4. Revised elevation to the area connecting K -Mart and
Albertson's.
5. Revised column base details.
6. Neon lighting accents along the cornices and at the
column archways at the front entry elevation to the
theater.
7. Modified west exterior elevation of the Bauducco's
Restaurant and merchant display windows on the back of
the shops.
8. Phased opening of Albertson's Market.
9. Approval of bank facility within the Albertson's
building.
Analysis
1. Reconfiguration of the planter west of Shops No. 1.
This proposed change was required as a result of Southern
California Edison's requirement for an additional electric pad
mount for a transformer to service the theater. Originally, the
theater was to have electrical power supplied from a transformer
located to the north; however, due to the length of the run from
the transformer to the building's electrical room, SCE determined
the power drop to be significant. The planter has been enlarged to
PP01:03:9619:58amA:\17JAN95.CC 2
000137
fit a second 4" by 8' pad and to accommodate a landscape buffer.
The proposed changes are shown on Sheets SDI No. 1 and W.
2. Movement of Pad "C" 9 feet east to accommodate a potential
future drive -thru lane.
The site plan that was approved as part of the approval to Major
Modification No. 2 to CPD 89 -1 provided for a drive -thru facility.
However, the building area was subsequently developed as a multi -
tenant building and the provisions for a future drive -thru was
eliminated from the plan. The applicant wishes to continue to
reserve the ability to use this pad as a drive -thru use. The
applicant has therefore requested that the pad be moved
approximately nine feet to the east, creating an 18 foot landscaped
area between the building and the sidewalk, to allow for a future
12 foot drive -thru lane around the building. See Sheets SD -1 and
L -4.
3. Addition of a new trash enclosure to the south of Shops No. 1.
The applicant has indicated that a review of the approved site plan
and the users within the project indicate that an additional trash
enclosure is required in order to support the retail and food
service uses in Shop Building No. 1. See SD -1.
The combined changes to Items 1 thru 3 reduced the available
parking by a total of seven parking stalls. The original approval
for Major Modification No. 2 to CPD 89 -1 showed a parking count of
1,185 parking stalls for Phase II. After refinement of the
boundaries, building and the movement of the Theater and Shops No.
1 to create the 40 foot sideyard, the parking count came down to
1,102 parking spaces. With the modifications listed in the above
captioned items, a further reduction of seven stalls will take
place. The proposed parking analysis is as follows:
Parking Provided
Parking Required:
Albertson's and Retail Uses
El Pollo and other food uses
Theater with ultimate 2,499
Total
4. Revised elevation to the
Albertson's.
1,095
67,815 SF @ 1/300 226
13,466 SF @ 1 /100 135
seats @ 1/3.3 seats 714
Parking Required 1,075
Surplus Parking 20
area connecting K -Mart and
After review of the proposed open area and various uses of the area
between the R -Mart and the Albertson's, it was decided to create a
sense of continuity between the two buildings by filling in the
elevation with a reveal and plaster wall. The revised elevation
PP01:03:96 19:58amA:\17JAN95.CC
3
OOOILZ
will not preclude the future use of the area for pedestrian
friendly activities and /or possible kiosk type operations in the
future. See Sheets SD -1, SD -8 - Details 21 and 24.
5. Revised column base details.
According to the applicant, with the operation of Phase I of the
project, the lower cornice detail which is located approximately 3
feet from the base of the building columns has been a continuing
source of malicious vandalism and costly maintenance. Staff has
confirmed the vandalism cited by the applicant. The proposed
revisions is an aesthetically pleasing solution that requires a
modification of the approved elevations. The typical column as
shown on Sheet SD -7 Detail 9 has been revised to eliminate the
cornice and replace it with a 2 inch metal reveal from a medium
dash to a heavy dash finish with glazed ceramic tile centered on
the column face. The metal reveal will be painted to match the
cornice accent color.
The proposed change will be incorporated on the Theater, Shops No.
1 and Pads A, C and D. Albertson's and R -Mart will have the
originally approved detail, and the Shop Building in Phase I will
be converted to match Phase II Shops. Staff has conditioned the
project to make the conversion within one year of approval of this
Minor Modification.
6. Neon lighting accents along the cornices and at the column
archways at the front entry elevation to the theater and the
addition of eight halolite display cases.
The proposed theater has requested that a neon lighting accent be
approved as part of their entry and overall design decor. The
decor will be similar to that of the Edwards theater in Camarillo.
In addition, the applicant has requested the addition of eight
Halolite Display Cases to be located as shown on A -3.1 detail 4.
These will be shown to indicate the upcoming attractions or now
showing displays that are seen at all theaters.
7. Modified west exterior elevation of the Bauducco's Restaurant
and merchant display windows on the back of the shops.
As shown on Sheet A -4 Detail 2, the decorative door and window
locations for the Bauducco's restaurant have been added. The
architectural detailing and quoin treatments around the openings
are consistent with the architectural storefront previously
approved as part of Minor Modification No. 1. The applicant is
also requesting two merchant display windows that will be flush
with the exterior wall and accessible from the inside of the stores
to allow merchants to exhibit specials or feature products to both
the patrons of both the Theater and Restaurant who will be
utilizing the area.
PP01:03:9619:58aM: \17JAN95.CC
4
00 1 /. 1 1:
8. Phased opening of Albertson's Market.
The applicant has requested
only. The entire parking ar
of the Albertson's and it is
be fenced and the necessary
the heavy dash line on SD -1
the fence would be removed
opening of the Shops and Pad
open by July, 1996.
a phased opening of the Albertson's
as will not be complete at the opening
proposed that the non - completed areas
safety barriers be erected a shown by
The applicant has anticipated that
by the end of May, 1996, with the
Buildings. The Theater is expected to
Staff is in agreement with the phased opening and will require as
a matter of standard practice that the applicant provide sufficient
security to ensure the completion of unfinished sitework prior to
the issuance of a Certificate of Occupancy for the Albertsons.
9. Approval of bank facility within the Albertson's building.
The applicant has requested approval of a bank to be located within
the Albertson's market. The area occupied by the Wells Fargo mini -
branch will be approximately 31 feet long by 13 feet wide. A copy
of the proposed floor plan is attached showing the proposed layout.
Pursuant to Resolution No. 88 -523, the Director has the authority
to approve or deny Minor Modifications. The Director of Community
Development approved the Minor Modification with conditions on
January 3, 1996. This matter is being presented to the City
Council as a courtesy. In the event the City Council wishes to
appeal the Director's decision, it may do so. The last day to file
an appeal is January 19, 1996.
Should the City Council
hearing date. The next
meeting of February 21,
and the application i s
decision will stand and
Recommendation
desire to appeal, it should set a public
available meeting date would be the regular
1996. If the City Council takes no action,
not otherwise appealed, the Director's
become effective January 20, 1996.
Receive and file the report
Exhibits: 1. Approval Letter
2. Revised Plans
PP01 :03 :9619 :58amA: \17JAN95.CC
5
MVIA!
CITY OF MOORPARK
COMMUNITY DEVELOPMENT DEPARTMENT
APPROVAL OF A MINOR MODIFICATION
January 3, 1996
Minor Modification No. 3 to Major Modification No. 2 of Commercial
Planned Development Permit No. 89 -1
Filed by: Mission Bell Partner's
340 Rosewood Avenue, Suite D
Camarillo, California 93010
Address /Location: Los Angeles Ave. and Liberty Bell Center in
the City of Moorpark
For: Conditional Approval of Minor Modification No. 3 to Major
Modification No. 2 of CPD 89 -1 for the following as shown on
the attached revised plans:
1. Reconfiguration of the planter west of Shops No. 1
(Sheets SD -1, L -3).
2. Movement of Pad "C" 9 feet east to accommodate a
potential future drive -thru lane (Sheets SD -1, L -4).
3. Addition of a new trash enclosure to the south of Shops
No. 1 (Sheet SD -1).
4. Revised elevation to the area connecting K -Mart and
Albertson's (Sheets SD -1, SD -8 Details 21 and 24).
5. Revised column base details (Sheets SD -7 Details 2 and 9,
A -3.1 and A -4).
6. Neon lighting accents along the cornices and at the
column archways at the front entry elevation to the
theater (Sheet A -3.1 Detail 4).
7. Modified west exterior elevation of the Bauducco's
Restaurant and merchant display windows on the back of
the shops (Sheet A -4 Detail 2).
8. Phased opening of Albertson's Market.
9. Approval of bank facility within the Albertson's building
Sheet A -2.1).
PP01:03:9619:58amA:\17TAN95.CC
N
��I
Action: The above approval is made with the following conditions:
THESE CONDITIONS OF APPROVAL ARE IN ADDITION TO THE EXISTING
CONDITIONS OF APPROVAL FOR CPD 89 -1 MAJOR MODIFICATION NO. 2
CONDITIONS FOR CPD 89 -1 MINOR MOD NO. 3
PRIOR TO THE ISSUANCE OF A ZONING CLEARANCE THE FOLLOWINGS
CONDITIONS SHALL BE SATISFIED:
1. The permit is granted for the land and project as identified
on the entitlement application form and as shown on the
attached plan revisions. The location and design of all site
improvements shall be as shown on the approved plot plans and
elevations submitted with this application.
2. A revised landscape plan shall be submitted for review and
approval of the Director of Community Development.
3. The Director of Community Development shall approve the colors
and design of the Neon lighting accents along the cornices and
at the column archways at the front entry elevation to the
Theater.
4. The Director shall approve the design of the enclosure for the
display cases to include architectural detail to soften the
impact of the cases.
5. The applicant shall pay all outstanding case processing and
all City legal service fees prior to issuance of a Zoning
Clearance. The applicant, permittee, or successors in
interest, shall also submit to the Department of Community
Development a fee to cover costs incurred by the City for
Condition Compliance review of the Minor Modification.
6. All outstanding unfinished sitework shall be completed no
later than August 1, 1995.
7. Failure to inaugurate this Minor Modification in twelve months
or less from the date of approval will render this
modification null and void.
8. A one year extension to this Minor Modification Permit may be
granted by the Director of Community Development upon the
written request and payment of the appropriate filing fee.
9. The approval of the proposed bank does not constitute approval
of a sign for the use.
PP01:03 :9619:58amA:\17JAN95.CC 7
-140-4
California Environmental Quality Act (CEQA) Compliance: This
Department has reviewed the project to ascertain if there will be
a significant effect on the environment. It has been determined
that this project is categorically exempt from CEQA requirements as
a Class 1 exemption for minor alterations.
Ordinance Compliance: Based upon the information and findings
developed by staff, it has been determined that this application,
with the attached conditions, meets the requirements of Moorpark
Ordinance Code Section 17.44.030 - Permit Standards, in that:
a. The Minor Modification is consistent with the intent and
provisions of the City's General Plan and the City's Zoning
Ordinance;
b. The Minor Modification is compatible with the character of
surrounding development;
C. The proposed Minor Modification is not obnoxious or harmful,
and does not impair the utility of neighboring property or
uses;
d. The Modification is not be detrimental to the public interest,
health, safety, convenience, or welfare.
Appeals: As stated in Section 17.44.090 within 16 calendar days
after the permit has been approved, conditionally approved or
denied, any aggrieved person may file an appeal of the approval,
conditional approval or denial with the Community Development
Department who shall set a public hearing date before the City
Council to review the matter at the earliest convenient date.
Zoning'Clearance and Building Permit: Upon the expiration of the
16 day appeal period and upon completion of the "prior to zoning
clearance" conditions, a Zone Clearance may be obtained from the
Community Development Department.
CITY OF MOORPARK
'e Aguilera, Director
of Community Development
Date: January 3, 1996
CC. Paul Porter, Senior Planner
CPD 89 -1 Minor Modification No. 2 File
Chroni File
Attachments: Revised Plans
PP01:03:9619:5BaM: \17JAN95.CC 8
0001473