Loading...
HomeMy WebLinkAboutAGENDA REPORT 1996 0207 CC REG ITEM 10DAgenda Report City o f Moorpark TO: The Honorable City Council FROM: Kenneth C. Gilbert, Director of Public Works January 31, 1996 (Council Meeting 2 -7 -96) DATE: SUBJECT: Consider Approval of 1996 NPDES Programs OVERVIEW This presents the following information for City Council consideration and action: • a summary of efforts undertaken to date by the Ventura Countywide Stormwater Quality Management Committee (Management Committee), of which the City of Moorpark is a member, to develop and implement a Countywide Stormwater Management Program in order to seek and obtain a Stormwater Discharge Permit from the California Regional Water Quality Control Board (CRWQCB) to meet the requirements of the federally mandated National Pollutant Discharge Elimination System (NPDES); • a review of the September 1995 Annual Report submitted to the CRWQCB by the Management Committee, which summarizes the efforts undertaken by all Co- Permittees (including Moorpark) during the first year of the Permit, to comply with the requirements of the said Discharge Permit; • a summary of the efforts required to be undertaken during the next year by all Co- Permittees, including the City of Moorpark, in order to meet the requirements of said permit; and, • a summary of the resources required for the City to undertake and complete those efforts. Attached as Exhibit 'A' is a summary of background information pertaining to the establishment of the federally mandated National Pollutant Discharge Elimination System (NPDES). 1. Report Distributed: A copy of the September 1995 NPDES Annual Report has been provided to each member of the City Council. npdes3l O C 02 6 9 NPDES Program Implementation February 1996 Page 2 2. Executive Summary: A copy Annual Report is attached provides an overview of implementation efforts. of the Executive Summary of the as Exhibit 'B'. This summary the permit requirements and 3. Compliance Efforts: The Annual Report documents permit compliance efforts completed during the first year since the permit was issued. This report also describes the compliance efforts to be undertaken and completed by each Co- permittee in the months and years to come. In addition to the specific programs listed below to be implemented by each Co- permittee, the Ventura County Flood Control District (VCFCD) administers the Countywide Stormwater Monitoring Program on behalf of all Co- permittees. Past accomplishment and future objectives of that program are described in Section 3 of the Annual Report. Section 2 of the Annual Report, describes past and future efforts to implement the Countywide Stormwater Management Program. That program actually encompasses six different programs designed to "target" specific areas of concern to stromwater quality efforts. A brief description of those programs is set forth in the following exhibits: Exhibit Program for Residents C Programs D Programs for Industrial/ Commercial Businesses E Programs for Illicit Discharge F Programs for Public Infrastructure G Programs for Land Development H Programs for Construction Sites Figure ES -1 (Exhibit B, page 3) clearly summarizes the requirements of both the initial Implementation Phase (year one) and the Full Implementation Phase (next three years) of permit compliance efforts. The first year's efforts focused primarily on the development of the programs listed above. The development of these programs has been undertaken by a number of Sub - Committees to the Ventura County Stormwater Quality Management Committee (Management Committee). [Note: City staff npddes3l 01 041,A) NPDES Program Implementation February 1996 Page 3 are members of and participate in those Committees.) Most of the actual implementation efforts were undertaken by larger cities. The only major program which the City of Moorpark implemented was the Illicit Discharge Inspection Program. The Program descriptions set forth in Exhibits C through H include a brief description of the initial implementation efforts completed to date. We have entered the Full Implementation Phase of Permit compliance efforts. In the next three years, all of the objectives of the permit are to be implemented and evaluated. Unlike the first year, in the months and years to come the smaller cities in Ventura County will be required to considerably increase their permit compliance efforts. The purpose of this report is to define the scope of those efforts and to request approval of sufficient resources to undertake and complete those efforts. The Program Descriptions in Exhibits C through H also set forth brief descriptions of the various compliance efforts to be undertaken during the next year by both the Countywide Task Force and by the City of Moorpark. The Program Descriptions in Exhibits C through H also include an estimate of the staff time and consultant costs required in the next eighteen months to undertake and complete these NPDES program objectives. Those costs are summarized in Exhibit 'I'. It is recommended that the responsibility for implementing various NPDES program requirements be allocated to those City Departments most directly involved with the clientele most affected by those requirements. The chart attached as Exhibit "J' lists the required NPDES program tasks along with anticipated staff costs which have been allocated to various recommended departments. Absent approval of additional staff, the time required to accomplish these tasks will have to be diverted from other programs. npdes3l NPDES Program Implementation February 1996 Page 4 • . . U IT IM. I. Manpower Cost Accounting: It is recommended that all staff time spent on the development, implementation and administration of the many required NPDES programs be accounted for in the Department established for this purpose (Department 145). 2. Future Year Costs: Exhibit 'K' summarizes estimated costs required to implement these programs through June 1997. It is anticipated that the cost of these programs will remain the same or increase slightly over several years to come. It is the intent of staff to request sufficient funding of these efforts in the budgets to be presented to the City Council for FY 1996/97 and subsequent years. 3. NPDES Assessment: The City of Moorpark is the only City in the County of Ventura which does not utilize the VCFCD's Assessment District to partially fund its NPDES programs. Should this continue to be the policy of the City, it will be necessary to divert monies from the Gas Tax Fund, the Community Development Fund, the General Fund and possibly other sources, to fund NPDES programs. I. Summary 1. Goals and objectives: It is recommended that the FY 1995/96 City Council objectives be revised to include the required NPDES program implementation described in this report, as a single - asterisk item. This will require some adjustments to work assignments, schedules and expected completion dates for certain other objectives, especially those listed in the Community Development Department and the Public Works Department. 2. Manpower Allocation: Attached as Exhibit 'J' is a summary of staff time and costs anticipated to be required to implement the various elements of this program. It is recommended that staff be directed to proceed with those efforts. 3. Budget Adjustment: Attached as Exhibit 'K' is a summary of total anticipated costs required to proceed with the implementation of these programs through the remainder of this fiscal year, as well as Fiscal Year 1996/97. It is recommended that the budget be amended, as required, to npdes3l NPDES Program Implementation February 1996 Page 5 accurately reflect actual manhours expended on these programs in Department 145: NPDES. a. The following is an estimate of the amount of interdepartmental budget transfers which may be required in FY 1995/96 to fully account for the level of staff time anticipated to be required to undertake these programs: Amount of From To Fund Transfer (S) De went Acc I Account 01: General Fund 1,200 Solid Waste 01- 161 -500 NPDES 01- 145-500 41: Community Dev. 20,700 Planning 41- 131 -500 NPDES 41- 145 -500 03: Gas Tax 16.500 P. W. 03- 142-500 NPDES 03-145 -5000 Total 38,400 b. The following is a summary of the total impact of the above described interdepartmental budget transfers: Description Chanag ($) From Solid Waste Department (1,200) From Community Development (20,700) From Public Works (16,500) To NPDES 38,400 Net Total Budget Increase 0 c. The following is a re —cap of the revised FY 1995/96 Budget for NPDES (Dept. 145), if all of the above interdepartmental budget transfers described above are actually made: npdes3l O U OZ73 Current Revised Account Number et Change ( Ndget (5) Persomel 0 38,400 38,400 0 1 N Professional Services [641] 0 0 0 All other 0&N Accounts 4100 _ 0 4.500 0 & N Sub -Total 4,500 0 4,500 Total 4,500 38,400 42,900 npdes3l O U OZ73 NPDES Program Implementation February 1996 Page 6 3. NPDES Assessment: It is recommended that the City Council reconsider the establishment of an NPDES assessment to partially fund these programs. Under this program all of the properties in the City would be assessed an additional amount by the Assessment District which is administered by the Ventura County Flood Control District (VCFCD). It is estimated that an annual NPDES assessment of $5.00 per year per BAU (Note: a single faiily residential property is assigned 1 UU) would generate approximately $50,000 for the funding of these federally mandated programs. It should be noted that the staff time required to develop and administer the process required to formally consider an NPDES assessment are quite considerable. It is not recommended that the City Council direct staff to proceed with these efforts if is already the consensus of the City Council this funding source should not be established. MMM UDWATTON (Roll Call Vote) Staff recommends that the City Council take the following actions: 1. Amend the City Council Goals and Objectives for FY 1995/96 to include, as a single- asterisk item, the following additional objective: "Develop and implement a number of programs required by the City's Stormwater Discharge Permit as mandated by the federal NPDES program." 2. Direct staff to proceed with the work programs described in Exhibits 'C' through 'H' of this report and summarized in Exhibit 'J' of this report. 3. Authorize interdepartmental budget transfers, as required, to accurately account for NPDES related personnel costs incurred during FY 1995/96 [Note: No additional appropriations or net budget increase is authorized]. 4. Direct staff to include in the FY 1996/97 budget, recommended expenditures and funding sources necessary to comply with NPDES program requirements. 5. Direct staff to initiate proceedings required to establish an NPDES assessment in FY1996/97. npdes31 0,0474 Exhibit A: NPDES Background Information Page 1 1. NPDES: The Federal Clean Water Act was amended in 1987 to require the Federal Environmental Protection Agency (EPA) to establish regulations for the issuance of permits for storm water discharge. These regulations established the National Pollutant Discharge Elimination System (NPDES) which sets forth policies, regulations and procedures for the issuance of storm water discharge permits. The administration of this Federal program has been delegated to the California Regional Water Quality Control Board (CRWQCB). The NPDES program applies to both private organizations and public agencies. 2. Joint Permit: The NPDES requires every public agency in the country to obtain a permit. The CRWQCB requires payment of a $50,000 fee for each NPDES permit issued. In order to reduce costs and streamline the administrative process, it is common for agencies to coordinate their efforts and apply for a Joint Permit. 3. Implementation Agreement: In April of 1992, the City Council approved an Agreement between the City of Moorpark, all of the other cities in the County, the County of Ventura and the Ventura County Flood Control District. This Agreement set forth policies and guidelines to be followed by all of the co- permittees in pursuing the joint efforts required to apply for a Countywide NPDES permit and to implement the requirements of that Permit. 4. Ventura Countywide Stormwater Quality Management Committee: Representatives from all of the cities in Ventura County, the County of Ventura and the Ventura County Flood Control District, have been meeting regularly over the past several years to manage the development of the Ventura Countywide Stormwater Quality Program. Those efforts have been successful. The Ventura Countywide Stormwater Quality Program has been implemented and a Stromwater Discharge Permit has been issued by the CRWQCB. 5. Ventura County Flood Control District ( VCFCD): The VCFCD has served as the Lead Agency in coordinating the permit application process. VCFCD retained the services of a consultant, Camp, Dresser & McKee, Inc. (CDM), to assist in the completion of these efforts. npdes3l O COZ7 "5 Exhibit A: NPDES Background Information Page 2 B. City Efforts 1. Consultant: Certain elements of the County -wide Permit Application had to be provided by each Co- Permittee. In order to meet these obligations, the City of Moorpark retained the services of Hawks & Associates to compile and prepare certain information. The two elements of work developed by Hawks & Associates to meet these obligations are a Master Drainage Study and the development of a Stormwater Management Program. 2. Master Drainage Study: One of the documents required to be included in the NPDES permit application was a Storm Drain Atlas of the entire City. This atlas is one of the elements of the Master Drainage Study. This study also includes information pertaining to topography, watershed basins, hydrology, existing storm drain alignments and sizes and projected future storm drain needs for the entire City. This document was completed and approved by the City Council in May of 1995. The City's Master Drainage Study will serve as a useful resource for both the management of existing storm drain facilities and for the future development of vacant properties. 4. Initial Implementation Efforts: Each local agency is also required to undertake and administer a number of programs as required by the permit. Included in the Executive Summary of the September 1995 Annual Report (see Exhibit 'B') is a chart (Figure ES -1) which clearly illustrates efforts required by the Initial Implementation Phase. The majority of those efforts have been completed. 5. Full Implementation Efforts: The above mentioned Figure ES -1 also illustrates the efforts required for Full Program Implementation. Those efforts are set to commence immediately and be implemented over the next several years. The degree of effort required by the smaller cities to meet the requirements of Full Implementation, is far greater than that experienced during the Implementation Phase. Those requirements, time frames and costs are set forth in the staff report and related Exhibits. npdes3l u: 27G Exhibit A: NPDES Background Information Page 3 N 4F�- 1. Stormwater Monitoring: The Countywide permit required the VCFCD to install and manage a number of storm water monitoring stations at key locations throughout the County. These stations automatically take water samples during storm events. The samples are later analyzed to determine the components and constituents of the storm water runoff. The locations of the monitoring stations were selected to provide statistics which will be considered to be representative of quality of storm water County -wide. 2. other General Services: The VCFCD has also provided a number of other services to all of the Co- Permittees in order to coordinate and implement a number of the permit requirements. 11 • • • ' • u - • u ■ • - u ' ■ • • u 1. Permit Application: Initial efforts of the Ventura Countywide Stormwater Quality Management Committee was to direct the efforts of the consultant (CDM) retained by VCFCD to develop the Stormwater Discharge Permit Application. The focus of that effort was to develop an application which adequately meets the requirements of the NPDES program, but to do so in a manner which kept costs under control. It is the view of staff that end was accomplished. 2. Permit: The permit application was submitted in March of 1994. The Permit was issued by the CRWQCB in August 1994. 3. Management Committee: The Management Committee is comprised of one or more individuals from each local agency and the VCFCD. This Committee is responsible for coordinating the various efforts required to manage the program. 4. Best Management Practices (BMP): The approved NPDES permit recognizes that the most cost effective way of improving storm water quality is not through extensive analysis, testing and treatment, but through the development and implementation different ways of doing things. These improved methods cover a broad spectrum of activities including planning, construction, maintenance and operations. These "improved ways of doing" things are generally referred to as Best Management Practices or BMPs. The Management Committee, through its Sub - Committees has and will continue to develop all necessary BMPs. npdes3l 0 6%3P OZ77 Exhibit A: NPDES Background Information Page 4 5. Sub - Committees: A number of Sub - Committees have been formed to develop and implement specific program requirements by the permit. A list of those Sub - Committees, along with a brief descriptions of duties, is as follows: Residential / Public Outreach: Development of Public Information resources. Business Outreach / Illicit Discharge Program: Development of a number of programs "targeted" toward specific businesses (gas stations, restaurants, etc.). Also development of the parameters of an inspection program aimed at preventing illicit discharge of pollutants into storm drains, etc. Public Infrastructure: Development of a number of Best Management Practices (BMP) pertaining to the maintenance and management of streets, storm drains and public facilities. Planning & Land Development: Review and revise General Plans, zoning requirements, municipal ordinances and development standards necessary to provide adequate municipal police powers to require land development projects to meet program objectives. Construction: Development of standards and requirements for construction sites to prevent siltation and related stormwater quality problems. npdesn (J C- .t);,>.'7S, Exhibit B NPDES Annual Report 1995 Executive Summary npdes3l (3 C 1);!'74-1 Executive Summary Overview The Ventura Countywide Stormwater Quality Management Program (the Program) was established pursuant to Section 402(p) of the federal Clean Water Act, which requires that all point source discharges of pollutants into waters of the United States, including municipal storm drain systems, be regulated by a National Pollutant Discharge Elimination System ( NPDES) permit. On August 22, 1994, the California Regional Water Quality Control Board, Los Angeles Region (Regional Board), issued the Ventura County Flood Control District (VCFCD), the County of Ventura, and the cities of Camarillo, Fillmore, Moorpark, Ojai, Oxnard, Port Hueneme, San Buenaventura, Santa Paula, Simi Valley, and Thousand Oaks, an NPDES permit for discharges from municipal storm drain systems in Ventura County. This is the annual report on permit compliance for the first permit year: September 1, 1994 through August 31, 1995. Administration The Program is managed collectively by a Management Committee (Committee), composed of one representative from each co- permittee and chaired by VCFCD. Meeting monthly, the Committee reviews all program materials and provides direction for all aspects of the program. Five subcommittees, each chaired by a member of the Committee, also meet on a monthly basis. The subcommittee members develop standard countywide procedures for each program, review the results of co- permittee activities, and sponsor countywide events such as workshops and training sessions. To fund program activities, co- permittees draw on a number of sources. VCFCD utilizes a portion of the Benefit Assessment Program (BA) for Flood Control to fund its permit activities. Co- permittees, responsible for the cost of program implementation Ventura Countywide Annual Report Stonnwater Quality September 1, 1995 Management Program oub% e , Executive Summary within their own jurisdictional boundaries, may use the BA to supplement funds from other sources. Some co-permittees fund their entire stormwater program with BA funds, while others use a combination of funding sources. The first permit year, the total amount assessed for NPDES activities through the BA was approximately $3 million. To carry out program activities, the co-permittees utilize legal authority derived from wastewater, solid waste, and hazardous materials regulations, and various public nuisance ordinances. To specifically and conjointly address stormwater quality, the co-permittees are developing a model stormwater ordinance. The activities that must be conducted under the terms of the permit are organized into two distinct plans: the Stormwater Management Plan and the Stormwater Monitoring Plan. These two plans are discussed in the following sections. Stormwater Management Plan The Stormwater Management Plan comprises six program areas: ■ Programs for Residents ■ Programs for Industrial /Commercial Businesses ■ Programs for Public Infrastructure ■ Programs for Illicit Discharge Control ■ Programs for Land Development ■ Programs for Construction Sites Figure ES-1 depicts these six areas and the programs that were proposed in the permit application. These programs are being implemented in two stages: an initial implementation phase from September 1, 1994 through February 28, 1996; and a full implementation phase from March 1, 1996 through the end of the permit term in August 1999. Ventura Countywide Annual Report Stormwater Quay September 1, 1995 1 Management prWam ,,_._..LL �. W Executive Summary Programs for Residents During the first permit year, the Public Outreach Subcommittee focused on: General Public Information/ Participation. This program provides residents with information and education on the general nature of stormwater pollution. Refuse Disposal Practices. This program builds on existing solid waste management programs such as hazardous waste collection events, used oil recycling, green waste collection, composting, and curbside recycling service. During the second permit year, the subcommittee will begin working on additional programs to address yard /landscape and vehicle maintenance practices. General Public Information/ Participation Numerous materials have been developed for these programs, both on a countywide basis and by individual co-permittees. Beginning in the summer of 1994, the subcommittee designed and purchased a display and an Enviroscape Watershed Model, and created informational materials for countywide use to provide a consistent message about stormwater pollution prevention. The materials developed throughout the year include a general information stormwater fact sheet, children's coloring sheets, bookmarks, door hangers, and a full- color brochure that captures the beauty of the county while conveying an easy -to -read message about stormwater pollution. The subcommittee also purchased disposable pooper scoopers with the program logo and slogan, "You're the solution. Stop stormwater pollution." To evaluate the effectiveness of the program materials and other outreach efforts, a written "Test Your Knowledge" questionnaire was designed to be administered at display events. The displays have been used at sixteen events around the county between September 1, 1994 and August 31, 1995. These events included the Pollution Prevention Week celebration in September 1994, the Ventura County Science Fair exhibit for Earth Day in April 1995, and the recent Ventura County Fair in Ventura Countywide Annual Report StOrrilwater Quak September 1. 1995 1 M^ Management Program 4j% 4 Executive Summary August 1995. The co- permittees exhibited the display and watershed model and distributed the promotional items related to stormwater pollution prevention, including oil recycling containers and beverage mugs featuring the program logo. At the Ventura County Fair, the co- permittee representatives administered the stormwater "Test Your Knowledge" questionnaires. Almost 1,000 attendees completed the questionnaire in exchange for a container (940 +) or mug (40). Co- permittee representatives scored the questionnaires and discussed any misconceptions about stormwater with the participants. Subcommittee members are tallying the results of the questionnaires and will continue to use and refine this effective educational tool. Another task for the subcommittee was to develop an inlet stenciling program that could be used countywide. Subcommittee members designed a stencil that would maintain a consistent look throughout the county, while interchanging the words "ocean," "river," "creek," "arroyo," and "lake" to accommodate the needs of each co permittee. By July 1994, the subcommittee had created a stenciling instruction packet that included directions for stencil placement, photographs, safety considerations, evaluation forms, volunteer permission slips, and release forms. They also assembled stenciling kits consisting of spray paint, a stencil, gloves, masks, safety vests, traffic cones, trash bags, rags, and pencils. The kits were placed in easy -to -carry buckets labeled with the program logo. On July 21, 1994, the co- permittees officially kicked off the stenciling program with an event in Oak Park attended by the media. Co- permittee stenciling was then initiated by Thousand Oaks and the County of Ventura in the area that drains to Malibu Creek. Other co- permittees soon followed. Some worked with groups of volunteers, turning the training into an educational opportunity. Some used city employees, and combined stenciling with a survey of inlet maintenance needs. The County of Ventura also worked with youth in the Juvenile Restitution Program and Boy Scouts of America. The Boy Scouts prepared their own instructional video for additional training purposes. All co -pem- ittee stenciling programs are ahead of schedule. Cities with the fewest inlets have completed stenciling, while larger cities and those that had Ventura Countywide Annual Report Stormwater Quality September 1, 1995 1 Management Program Executive Summary to coordinate activities between several departments still have several months before completion. Refuse Disposal Practices After reviewing a number of San Buenaventura's solid waste educational materials, the subcommittee recommended revisions to incorporate stormwater pollution prevention issues. San Buenaventura then conducted the pilot activities for this program by modifying two publications — "Recycle Automotive Products /Safe Alternatives" and "Resource- Efficient Yard Care " — distributing them as part of their regular solid waste programs. The yard care brochure was made available at the Ventura County Fair stormwater booth and will be used by San Buenaventura Waste Management staff in all composting workshops after August 1995. Following the lead of the pilot program, several co- permittees began revising their own local solid waste /hazardous waste materials to address stormwater issues. Many combined the stormwater message with the used oil recycling message to promote an "oil and water don't n-dx" campaign. Programs for Industrial /Commercial Businesses During the first permit year, the Business and Illicit Discharge Subcommittee focused on: ■ Specific Business Outreach. This collection of programs allows business owners and municipalities to work together to define appropriate, acceptable stormwater pollution controls. The program focused initially on automobile service businesses for its outreach program, and will add restaurants during the second permit year. Because these are retail businesses, the countywide program evolved as a Clean Business Program: a program that would promote "dean businesses" to the public. This may be amended in future years as different types of businesses respond to different incentives. Ventura Countywide Annual Report Stonnwater Quality September 1, 1995 Management Program In the spring of 1995, the cities of Simi Valley and Thousand Oaks each conducted a pilot Clean Business Program in two small areas. They visited a combined total of 34 businesses — conducting an initial visit to explain the program and suggest appropriate best 4 ,0%851 Executive Summary management practices (BMPs). A follow -up visit evaluated how the facilities had implemented the BMPs. Both cities discovered that the keys to a successful program lay in educating businesses in the objectives of the Clean Business Program, offering clear solutions to waste problems, and offering valuable incentives. Based on this year's results, the subcommittee is revising the program and developing a comprehensive educational handout that can be mailed out to businesses before program inspectors arrive. All materials from the program will be updated and made available to other co- permittees as they begin similar programs in 1996. Also in 1996, the subcommittee will begin working on additional programs to integrate stormwater pollution control objectives with existing programs such as code enforcement, hazardous materials control, and pretreatment /source control. Programs for Public Infrastructure During the first permit year, the Public Infrastructure Subcommittee focused on: ■ Education for Public Agencies. This program educates municipal employees about illicit discharges and stormwater pollution, and provides them with standard reporting and evaluation procedures to track observations. The subcommittee members discovered there were great differences in operations and maintenance (O&M) procedures between the co-permittees. After discussion, they developed a series of one -page fact sheets that outlined suggested BMPs for typical municipal O&M activities. San Buenaventura used these fact sheets in a pilot San Buenaventura used program to train field crews in several small "tailgate" countywide O &M fact sessions. Results of the pilot training sessions will be used to refine the fact sheets for use by all co-permittees sheets in a pilot beginning in 1996. program to train field The subcommittee also developed a form that allows all crews in several small co-permittees to report O&M activities that may effectively control stormwater pollution. Beginning in 1996, the co- "tailgate" sessions. permittees will use this form to collect information on existing drainage system, roadway, and landscape O&M program effectiveness. They will also begin working on additional programs that review stormwater pollution control measures for co- permittee corporation yards, wastewater collection systems, and solid waste collection and disposal. In addition to this program, several co-permittees have been updating their municipal drainage maps. To accomplish this and to prepare for next year's Ventura Countywide Annual Report StOrmwwer Qua: M), September 1. 1995 Management Program 7 t�'� 028 Executive Summary permit activities, Santa Paula developed a stormwater inlet reporting form, which was later adapted for use by San Buenaventura. The form is being used by these crews to survey all inlets and report maintenance needs. Programs for Illicit Discharge Control During the first permit year, the Business and Illicit Discharge Subcommittee focused on: with a business Illicit Discharge Investigations. This program involves locating illicit connections and evidence of illegal dumping, identifying the source of the discharges, and controlling them through education and /or enforcement of current municipal code. On April 5, 1995, Simi Valley Source Control staff organized and conducted a one -day workshop for all co- permittees. It consisted of a presentation with slides and overheads, and hands -on demonstrations for measuring flow, using a pH meter, taking samples, filling out forms, and following up After the training, the other co- permittees began their investigations in pre - selected priority drainage basins. Table ES -1 Illicit Discharge Program Investigation Results Accomplishment Sites inspected (outfalls, storm drains) Illicit discharctes observed (evidence or flow) Illicit discharges (flow only) Field samples collected Sources identified Number of Occurrences 343 54 42 21 50 Corrections made 10 Ventura Countywide Annual Report Stor)nwater Qualify September 1, 1945 a Management Program Table ES -1 displays the results of the illicit discharge investigations. Over 300 sites were inspected. Evidence of an illicit discharge was observed at approximately 15% of the sites. Evidence refers to stains, debris, or standing or flowing liquid at the site. In most cases, sources of illicit discharges were identified directly during the field inspections. If evidence of an illicit discharge was observed in a channel or subsurface storm drain, then an investigation of the upstream storm drain system was conducted to determine the likely source. Because this year's investigations were primarily conducted in M oz 8 Executive Summary watersheds with a high concentration of automotive service facilities, sources of illicit discharges included activities such as car washing and improper handling of vehicle fluids. Several other sources included residential activities such as landscape overwatering. When a business was identified as a source of an illicit discharge, co-permittee response included distributing BMP brochures, verbally explaining the problem and potential solutions, and conducting follow -up inspections. In many cases, the business owner was cooperative and the problem was corrected that day or before the follow -up inspection was conducted. In the second permit year, the co-permittees will continue their illicit discharge investigations. They will also begin to examine public reporting options, and review stormwater pollution control measures that can be utilized in other programs. Programs for Land Development During the first permit year, the Planning and Land Development Subcommittee focused on incorporating stormwater pollution control objectives into municipal land development planning and regulation: ■ Education/ Outreach to Land Developers. As programs for land development are implemented, education is provided through seminars, presentations, brochures, and other appropriate means. ■ Land Use Planning and Zoning. This program integrates appropriate stormwater pollution controls into existing land use planning and zoning instruments. ■ Development Standards and Reviews. This program defines appropriate development standards and review procedures for stormwater pollution control. ■ Permits and Inspections. This program incorporates appropriate stormwater pollution control considerations into existing development permitting programs. The subcommittee began the year by conducting an orientation workshop for municipal planners and engineers and other interested audience members on January 12, 1995. The subcommittee then broke down the four programs into eight manageable topics covering stormwater pollution aspects of planning and land development issues: Ventura Countywide Annual Report Stormwater /),,, d ftY September 1. 1995 ��M Management Program s 9 • Overview of the Countywide Approach • General Plans • Stormwater Quality Master Planning • Zoning • Development Proposal Reviews ■ Environmental Reviews ■ Development Standards ■ Inspection Procedures The subcommittee is developing standards for seven types of Executive Summary Subcommittee members are now in the process of developing approach documents and materials on these issues to help co-permittees incorporate stormwater pollution considerations into existing municipal land development regulatory programs. They have phased the program implementation, and are focusing first on six priority outdoor activities. stormwater pollution The subcommittee is developing standards for seven es controls. of stormwater pollution controls and incorporating them into an approach document. The City of Oxnard is conducting a pilot stormwater quality master plan for a developing watershed within the city and is also incorporating the findings into an approach document. As the documents reach a workable draft state, they will be implemented by Camarillo and Oxnard in a pilot program. Results of the pilot implementation will be used to refine the approach documents and materials for countywide use. Programs for Construction Sites During the first permit year, the Construction Subcommittee focused on: VCFCD developed a real -life example, or "model SWPPP, " and presented this at a workshop held on December 15, 1994. ■ Education/ Outreach to Construction Site Personnel. This program uses outreach materials to guide and educate developer /contractor staff and municipal construction inspectors on stormwater pollution prevention and control techniques. In the fall of 1994, the subcommittee developed a draft stormwater pollution prevention (SWPPP) form for contractors and public agencies to use as part of their compliance with the General Permit for Construction Activities. Using this form, VCFCD developed a real -life example, or "model SWPPP," and presented this at a workshop held on December 15, 1994. Over 70 contractors, public agency engineers and inspectors, and consultants attended. Yendtra Countywide Mnual Report Stormwater Quafify September 1. 1995 v Management Program ()ZS 10 Executive Summary Based on feedback from the workshop, VCFCD staff revised the SWPPP form to increase its flexibility and reduce the duplication of effort required, and the subcommittee developed several educational handouts. The first of these handouts, Pollution Control Objectives for Construction Sites, will be published during the second permit year. The co-permittees intend to hold a second construction workshop in the fall/winter of 1995, incorporating the new materials. They will also begin to address stormwater pollution prevention aspects of public works projects and public agency /private sector projects during the second permit year. Stormwater Monitoring Plan The Stormwater Monitoring Plan is composed of three elements: discharge characterization, pollutant source identification, and receiving water quality characterization. These were successfully implemented during the first permit year's wet season (1994/95). Six monitoring stations collected samples for discharge characterization from various types of watersheds: two residential, two industrial, one commercial, and one agricultural. Two additional monitoring stations, one upstream and one downstream of the urban area along Dry Canyon in Simi Valley, collected samples for receiving water characterization. Monitoring was conducted during five storms including a first flush event, two early season events, and two late season events. At least three events were monitored at each urban runoff location except for the agricultural station and the receiving water stations, where storm event sampling criteria was met during only two storms. A review of Ventura County median quality assurance /quality control (QA /QC) procedures indicated that the data resulting from analyses of the EMC values were found 1994/95 wet season samples are of adequate quality for to be similar to runoff further evaluation without significant qualification. quality for other regional Sampling and analyses of the discharge characterization and national programs. stormwater stations produced data representative of runoff quality for each watershed. Bioassays performed on the urban runoff samples resulted in 100% survival of fathead minnows. In a comparison of Ventura County discharge characterization data to other compatible databases, the median event mean concentration (EMC) values were found to be similar to runoff quality for other regional and national stormwater programs. Receiving water data were inadequate to allow a meaningful characterization of stormwater - influenced water quality. Modifications to the monitoring plan for the second permit year include focusing monitoring efforts on the sites where compilation of additional data will be of most value. All of the discharge characterization sites will be Ventura Couwliy W Annual Report Stormwaur !),, al ft , September 1, 1995 Management Program A 21� 11 Executive Summary monitored during the first flush or early season storm. An additional three storms will be monitored at the commercial and agricultural sites and a total of three storms will be monitored at the receiving water sites. Modifications will be made at the upstream receiving water site in order to attempt to collect an adequate volume of sample. Additional QA /QC samples and analysis will be included at all sites to provide independent checks on the accuracy and precision of the analytical laboratories. Due to the 100% survival results obtained in the first permit year, no bioassays will be conducted in the second permit year. Analytical methods will be changed to include analysis for diazinon and chlorinated herbicides: To identify pollutant sources, the discharge characterization data were evaluated to detect any locations with higher than normal pollutant concentrations. With a few exceptions, stormwater runoff quality was not significantly different among the urban runoff monitoring sites. Under the Stormwater Management Plan, the co- permittees are identifying businesses that have a high potential for contributing pollutants to stormwater runoff. This is achieved through implementation of illicit discharge investigations and specific business outreach activities. In subsequent years, information obtained from these programs will be shared among the co-permittees and combined with monitoring data to identify pollutants of concern and local patterns of stormwater pollution. Ventura Countywide Annual Report St rmwater Quaky September ,. 1995 1 _2-51b Management Program G ;N�:I 12 Exhibit C Programs for Residents Page 1 Title: PROGRAMS FOR RESIDENTS Summary Description: Develop and provide information to the public regarding stormwater quality issues, problems and solutions. Elements: • Public Outreach Information • Inlet Stenciling Program: Don't Dump • Refuse Disposal Practices • Yard / Landscape Maintenance Practices • Vehicle Maintenance Practices Initial I- mRlementati on Efforts QUIeted: • Public Outreach Information: - The Subcommittee has developed a number of public educational materials including displays, brochures, questionnaires, surveys, etc. These materials have been made available to the public at a number of special events. - Moorpark has distributed NPDES information materials and set up NPDES displays at City events to assist in the education of the public regarding stormwater run -off problems. • Inlet Stenciling Program: Moorpark has completed the stenciling of approximately 90% of its storm drain inlets. • Refuse Disposal Practices: The Sub - Committee is developing brochures explaining BMPs pertaining to the proper handling of residential waste materials. Countywide: • Public Outreach Information: Sub - Committee to continue to develop additional public education materials and programs. Refuse Disposal Practices: Sub- Committee to complete its update of effective public education and outreach efforts. Yard / Landscape Maintenance Practices: - Sub - Committee to develop an effective public educational and outreach strategy pertaining to improved controls over pesticides, herbicides, fertilizer, erosion, green waste, etc. [Due 12/951 - Sub - Committee to implement this program on a trial basis in selected areas. [Due 7/96] npdes3l U 0 `Ji!!);! Exhibit C Programs for Residents Page 2 • Vehicle Maintenance Practices: Sub- Committee to develop an effective public educational and outreach strategy pertaining to improved controls over home vehicle maintenance, including repairs, oil /fluid changes, washing, etc. [Due 12/95] Sub- Committee to implement this program on a trial basis in selected areas. [Due 7/96] City_of.,00rgark• • Public Outreach Information: Continue to disseminate brochures and other information as opportunities become available. • Inlet Stenciling Program: Complete inlet stenciling program. • Refuse Disposal Practices: - Distribute public education materials as they become available. [Due 9/95] - City has and will continue to administer a number of other programs impacting on stormwater quality, including Household Hazardous Waste and automotive oil recycling. • Yard /Landscape Maintenance Practices: Distribute public education materials when available. [Due 10/96] • Vehicle Maintenance Practices: - Distribute public education materials when they become available. [Due 10/96] - City has and will continue to provide used oil containers. _ , npdes3l In -House Consultant Element Man Years Manhours Cos Total Public Education 20 0 Inlet Stenciling 40 0 Refuse Disposal Practices 80 0 Yard Maintenance 40 0 Vehicle Maintenance 40 0 Sub-Committee Involvement 40 _ 0 Subtotal In -House Time 0.13 260 Manhour Costs (per hour) 30 Total Cost 7,800 0 7,800 npdes3l Exhibit D Programs for Industrial / Commercial Businesses Page 1 Title: PROGRAMS FOR INDUSTRIAL / COMMERCIAL BUSINESSES Summary Description: Develop and provide information to industrial and commercial businesses designed to educate business owners and managers about sources of stormwater pollution on their property or from their business activities. Elements: • Specific Business Outreach Programs • Enforcement Programs • Hazardous Materials Control Programs • Pretreatment / Source Control Programs Initial IRRIOMtatign Effortra Cgwleted: • Specific Business Outreach Programs: Thousand Oaks and Simi Valley implemented a "pilot" Clean Business Program. Their experience will be used to refine such programs. Countywide: • Specific Business Outreach Programs: Automotive: Sub - Committee to develop training materials for Clean Business Programs. [Due 10/95] Restaurants: - Sub - Committee to develop BMPs for restaurant owners / operators. [Due 9/95] - Thousand Oaks to conduct a pilot program. [Due 3/96] Sub - Committee to revise and refine program. [Due 8/96] • Enforcement Programs: Sub - Committee to develop model stormwater ordinance for co- permittees to use to develop and implement an enforcement program. [Due 3/96] • Hazardous Materials Control Programs: Sub - Committee to develop recommendations to resolve conflicts between existing hazardous material control measures and potential stormwater pollution control measures. [Due 8/96] • Pretreatment / Source Control Programs: Sub - Committee to develop recommendations to resolve conflicts between existing pretreatment /source control measures and potential stormwater pollution control measures. [Due 4/96] nP&S31 V 0294k Exhibit D Programs for Industrial / Commercial Businesses Page 2 City of Moorpark: specific Business Outreach Programs: Automotive: Implement Clean Business Program. [Due 3/96] Restaurants: Distribute BMPs and implement other program requirements. [Due 9/96] • • a - • • Wiff In-House Consultant Element Nan Years ads Costs ($) Total 01 Automotive Business Programs 120 0 Restaurant Programs 120 5,000 Sub - Committee Involvement 40 0 Sub -total In -House Time 0.13 280 Manhour Costs (per hour) 30 Total Cost 8,400 5,000 13,400 npdes3l 'U UZ Exhibit E Programs for Illicit Discharge Page 1 Title: PROGRAMS FOR ILLICIT DISCHARGE Summary Description: Develop and implement programs designed to locate and abate illegal discharges to the storm drain system. Elements: Public Reporting • Illicit Discharge Investigations Spill Control Programs Water Conservation / Reuse Initial Implementation Efforts Completed: - Illicit Discharge Investigations - The Sub - Committee developed training materials, procedures, check lists, questionnaires and other tools used to implement this program. - Moorpark undertook and completed the following: - purchase sampling and testing equipment; - contacted the owners and managers of the properties in the study area (the industrial area northeast of Gabbbert Road and Los Angeles Avenue) to advise them of the objectives of the program; and, - performed on -site inspections upon request. .. Countywide: • Public Reporting: Sub - Committee to develop a mechanism for the reporting of illicit discharges. [Due 3/96] Spill Control Programs: Sub - Committee to review existing spill prevention, response and clean -up programs and provide summary to Management Committee. [Due 9/96] • Water Conservation / Reuse: Sub - Committee to review existing water conservation and reuse programs and provide summary to Management Committee. [Due 9/96] City of MoorRaark: • Illicit Discharge Investigations: - Establish priorities for future illicit discharge investigations. [Due 3/96] - Conduct illicit discharge investigations in other selected areas of the City. [Due: ongoing] npdes3l UUZZWI Exhibit E Programs for Illicit Discharge Page 2 Element Illicit Discharge Investigations Sub - Committee Involvement Sub -total In -House Time Kanhour Costs (per hour) Total Cost npdes3l In -House Consultant Nan Years Hanhours Costs (s) Total 320 0 0 0 0.17 360 30 10,800 0 10,800 00%97 Exhibit F Programs for Public Infrastructure Page 1 Title: PROGRAMS FOR PUBLIC INFRASTRUCTURE ,Sy Description: Develop and provide BMPs related to operation, maintenance and repair efforts performed by public agencies. Ele=ents • Education for Public Agencies • Drainage System Operation & Maintenance • Roadway Operation & Maintenance • Landscape Maintenance • Co- Permittee Corporation Yards • Wastewater Collection Systems • Solid Waste Collection and Disposal Initial al Imnl ementati n Efforts QQ=I_eted : • Education for Public Agencies - The Sub- Committee developed suggested BMPs for municipal O &M activities which impact upon stormwater run -off. countywide: • Education for Public Agencies - Sub - Committee to finalize stormwater pollution reporting forms. [Due 10/95] - Sub - Committee to finalize stormwater pollution control training materials for O &M personnel. [Due 10/95] - Sub - Committee to develop and implement outreach efforts to non -co- permittee public agencies. [Due 2/96] • Co- Permittee Corporation Yards: Sub - Committee to develop model BMPs for these purposes. [Due 5/96] • Solid Waste Collection and Disposal: Sub - Committee to identify and test alternative procedures designed to reduce stormwater pollution caused by solid waste collection practices. [Due 7/96] City of MoorR k : • Education for Public Agencies: Implement personnel training related to stormwater pollution control. [Due 11/95] • Drainage System Operation & Maintenance: Begin collecting data required to evaluate effectiveness of various O &M practices in controlling and /or reducing stormwater pollution. [Due 1/96] npd%31 ou'u%'W Exhibit F Programs for Public Infrastructure Page 2 City of Moorpslr ( on 1: • Roadway Operation & Maintenance: Begin collecting data required to evaluate effectiveness of street sweeping, pavement management and other street maintenance activities, in controlling and /or reducing stormwater pollution. [Due 1/96] • Landscape Maintenance: Begin collecting data on existing landscape maintenance practices to determine potential conflicts with objectives of stormwater pollution control efforts. [Due 7/96] • Co— Pernittee Corporation Yards: Identify stormwater pollution sources at the Corporate Yard, and those BMPs which most effectively prevent or control same. [Due 1/96] • Wastewater Collection Systems: Confirm that County Waterworks District #1 is developing procedures which control or reduce seepages, spills and overflows at or from the Sewage collection system and /or treatment plant. [Due 7/96] npdes3l M 3 ?9+c In7iouse Consultant Ele nit _ Man Yegs Kanhours costs M. _To _. Maintenance Staff Education 160 0 Data Collection: Storm Drains 100 0 Data Collection: Streets 40 0 Data Collection: Landscape Maint. 40 0 Corporate Yard Assessment 10 0 Wastewater Interface 10 0 Solid Waste Assessment 10 0 Sub - Committee Involvement 40 _ 0 Subtotal In -House Time 0.20 410 Manhour Costs (per hour) 30 Total Cost 12,300 0 12,300 npdes3l M 3 ?9+c Exhibit G Programs for Land Development Page 1 Title: PROGRAMS FOR LAND DEVELOPMENT Sumesary rip,ion: Develop information to assist public officials and developers in implementing Stormwater Quality objectives in land use and land development decisions. Elements: • Education / Outreach to Land Developers • Land Use Planning and Zoning • Development Standards and Reviews • Permits and Inspections Initial Implementation Efforts Completed: • Education / Outreach to Land Developers: Sub -- Committee is developing a number of educational materials to assist City Councils, Planning Commissions, Department Heads and developers to understand and implement required stromwater pollution controls, including Oyeriew of the Countywide Approach. • Land Use Planning and Zoning: Sub - Committee developing three documents to assist City Councils, Planning Commissions, Department Heads: - Stormwater Pollution Considerations for General Plans; - Stormwater Quality Master Planning Kethodology and Criteria; and, Development Standards and Reviews: Sub - Committee developing three documents to assist planning, engineering, public works and developers: Storer Pollution Aspects of Development Propgsal Reviews of Priority Outdoor Activities; Stormwater nua ity Consideration for Environmental Reviews for Priority Outdoor Activities; and, Suggested Development Standards for Priority outdoor Activities. Permits and Inspections: Sub - Committee developing to assist municipal inspectors contractors and engineers. - - 1 Countywide: • Education /Outreach to Land Developers: Sub- Committee to complete draft of a document for City Councils, Planning Commissions, Department Heads and developers, entitled Overview of the Countywide And. [Due 1/96] • Land Use Planning and Zoning: Sub - Committee to complete documents pertaining to stromwater quality aspects of a) General Plans, b) Master Planning and c) Zoning. [Due 5/96] npdes3l 1 0e' Exhibit G Programs for Land Development Page 2 Development Standards and Reviews: Sub - Committee to complete documents pertaining to stromwater quality aspects of a) Development Proposals, b) Environmental Reviews and c) Development Standards. [Due 12/95] Permits and Inspections: Sub- Committee to complete documents pertaining to Inspection procedures. [Due 2/96] City of Moorpark: • Education / Outreach to Land Developers: Begin to use Overview-pt.the Countywide Appzgach to educate land development community. • Land Use Planning and Zoning - Begin using Stormwater Pollut- on Considerations for General Plans in evaluating and developing General Plan Updates. [Due 9/95] - Define areas where stormwater quality master plans will be required. [Due 5/96] - Begin using Stoomwater Pollution Considerations for Zoning fo_r Priority outdoor Activities in land development reviews. [Due 1/96] • Development Standards and Reviews: Begin to review and refine standards and procedures in documents pertaining to stromwater quality aspects of a) Development Proposals, b) Environmental Reviews and c) Development Standards. [Due 12/95] • Permits and Inspections: Begin to review and refine Inspection procedures in document provided. [Due 2/96] Manbour Costs (per hour) 30 Total Cost 19,800 0 19,800 npdes3l I_;'10�1101 In -House Consultant Element Min Yea Manhours Costs Total (S1 Informational J Educational Programs 30 0 General Plan Updates 30 0 Stonwater Quality Master Plans 100 0 Implement Suggested Zoning Standards 180 0 Reviewing Development Proposals 80 0 Environmental Impact Reports 80 0 Development Standards 80 0 Inspection Procedures 40 0 Sub- Coamittee Meetings (* by P.W. Staff) * 40 _ 0 Sub -total In -House Time 0.31 * 660 Manbour Costs (per hour) 30 Total Cost 19,800 0 19,800 npdes3l I_;'10�1101 Exhibit H Programs for Construction Sites Page 1 Title: PROGRAMS FOR CONSTRUCTION SITES Summary Description: Develop and provide information to the public and private sectors pertaining to stormwater quality problems associated with major construction sites. E eaents • Education / Outreach to Construction Site Personnel • Co- Permittee Public Works Projects • Public Agency and Private Sector Projects Initial In2lementation Eff Efforts Completed: Education / Outreach to Construction Site Personnel: Sub - Committee developed draft Stormwater Pollution Prevention Plan (SWPPP) forms and procedures to be used by both private contractors and public agencies. The Sub - Committee also hosted workshops to educate those required to comply with these regulations. W. • ' -" ' 9 •.� _ • Y_- t Ott.._ ti• . . CCountywide • Education / Outreach to Construction Site Personnel - Sub - Committee to continue to develop training materials and conduct workshops. [Due 12/95] - Sub - Committee to prepare draft guidelines for construction site stromwater pollution control measures as well as the inspection of same. [Due 12/95] • Co- Permittee Public Works Projects - VCFCD to prepare standard language for Public Works contracts related to SWPPP requirements. [Due 12/95] • Public Agency and Private Sector Projects - Sub - Committee to develop policies regarding public and private construction sites. [Due 7/96] City of Moorpark: • Education / Outreach to Construction Site Personnel - Begin training staff on the implementation of these requirements. [Due 12/95] - Begin to distribute outreach materials. [Due 12/95] - Begin to document observed stormwater pollution control problems and actions taken. [Due 12/951 • Public Agency and Private Sector Projects - Begin verifying that contractors /developers have submitted an NOI (Notice of Intent) to the State prior to issuance of City permits. [Due 11/95] - Consider adoption of policies regarding public and private construction sites. [Due 10/96] npdes3l U(; 0302 Exhibit H Programs for Construction Sites Page 2 Program 1nRjmentatiQn Costs f FY 1995Z96 & FY 1996f971 : In -HQM Consultant Element Kan Years Nanhours (S, Total lfi� Staff Training 100 0 Contractor Outreach 60 Documenting Offenses 100 NOI Verification 60 Adopt policies 100 Sub - Committee Involvement _40 _0 Sub -total In -House Time 0.22 460 Nanbour Costs (per hour) 30 Total Cost 13,800 0 npdes3l 13,800 00030"W? Exhibit I Program Cost Summary Page 1 The following chart summarizes all of the program costs described in Exhibits C through H, plus program administration costs. U, PrMams for.,. C Residents (Public outreach) D Industrial / Commercial Businesses E Illicit Discharge Control F Public Infrastructure G Land Development H Construction Sites - General Administration Total 1996 Program Costs Total Reg. FY 1995/96 Costs Total Est. FY 1996/97 Costs npdes3l In -House Cis (S) Consultant Costs (St Total (Sl Nan Years .13 7,800 0 7,800 .13 8,400 0 8,400 .17 10,800 0 10,800 .20 12,300 0 12,300 .31 19,800 0 19,800 .21 13,800 0 13,800 .06 3.600 0 3,600 1.21 76,500 0 76,500 0.61 38,400 0 38,400 0.60 38,100 0 38,100 Exhibit J In —House Staff Hours Page 1 It is recommended that the responsibility for implementing various NPDES program requirements be allocated to those City Departments most directly involved with clientele affected by those requirements. The following charts list the required program tasks along with anticipated staff costs allocated to recommended departments. npdes3l OU, G -30 Total Solid Engin. / Code Public Ex. Pumas for: Ilan Hours Waste ($) Bldg, r s Tina ( $) Fnf. . ($) Works M C Residents 20 600 Public Education 10 300 Inlet Stenciling 40 1,200 Refuse Disposal 40 1,200 Yard Maintenance 0 Vehicle Maintenance 0 D Businesses 20 600 Automotive 60 1,800 Restaurant 60 1,800 E Illicit Discharge Control 200 3,000 3,000 F Public Infrastructure 20 600 Staff Training 120 3,600 Storm Drain Data 80 2,400 Street Data 20 600 Landscape Data 0 Corporate Yard Data 10 300 Wastewater Coord. 10 300 Solid Waste 0 G Land Development 20 600 Educational Programs 10 300 General Plan Updates 10 300 Stormwater Master Plans 40 1200 Zoning Standards 80 2400 Development Proposals 30 900 EIRs 30 900 Development Standards 30 900 Inspections 10 300 H Construction Sites 20 600 Staff Training 60 1,800 Contractor Outreach 40 11200 Documenting Offenses 80 2,400 NOI Verification 30 900 Adopt Policies 20 600 - General Administration _ 6¢ 1,8M Total FY 95/96 Costs 1,280 1,200 6,900 7,200 6,600 16,500 npdes3l OU, G -30 Exhibit J In —House Staff Hours Page 2 D Businesses Total PrqXa Man Hours Restaurant C Residents 20 Public Education 10 Inlet Stenciling 0 Refuse Disposal 40 Yard Maintenance 40 Vehicle Maintenance 40 D Businesses 20 Automotive 60 Restaurant 60 E Illicit Discharge Control 160 F Public Infrastructure 20 Staff Training 40 Storm Drain Data 20 Street Data 20 Landscape Data 40 Corporate Yard Data 0 Wastewater Coord. 0 Solid Waste 10 G Land Development 20 Educational Programs 20 General Plan Updates 20 Stormwater Master Plans 60 Zoning Standards 100 Development Proposals 50 EIRs 50 Development Standards 50 Inspections 30 B Construction Sites 20 Staff Training 40 Contractor Outreach 20 Documenting Offenses 20 NOI Verification 30 Adopt Policies 80 General Administration _600 Total FY 96/97 Costs 1260 Solid Engin. / Code Public Waste Bldg, i$1 P a Enf. (0 works 600 300 1,200 1,200 600 600 900 2,400 600 600 1800 3000 1500 1500 1500 900 1,200 5,700 11,400 1,200 1,200 600 1,800 1,800 2,400 2,400 600 1,200 600 600 1,200 300 600 600 1,800 8,400 11,400 npdes31 01%21, 030 Exhibit K Program Funding Summary Page 1 The following charts lists all of the identified NPDES Program costs along with recommended funding sources. i .. npdes3l General Comm Staff Consultant fjL Program Time (S) Tice ( $ ) C Residents 3,300 D Businesses 4,200 E Illicit Discharge Control 6,000 F Public Infrastructure 7,800 G Land Development 7,800 H Construction Sites 7,500 - General Administration 1,800 7,800 Total FY 95/96 Costs 38,400 0 npdes3l General Comm Staff Consultant LL PrMam Time - _ 1,200 .LS1 3,300 C Residents 4,500 4,200 D Businesses 4,200 5,000 E Illicit Discharge Control 4,800 7,800 F Public Infrastructure 4,500 7,800 G Land Development 12,000 7,500 H Construction Sites 6,300 1,800 - General Administration 1,800 38,400 Est. FY 96/97 Costs 38,100 5,000 npdes3l General Comm Gas 8,600 Fund Dev (S) To-j_t Total (Sl 1,200 2,100 3,300 11,400 3,600 600 4,200 600 3,000 3,000 6,000 11800 1,200 30,500 7,800 7,800 7,200 600 7,800 6,900 600 7,500 11800 1,800 1,200 20,700 16,500 38,400 General Comm Gas Fund (S) W-1 1 Tax f51 Total 1,200 2,400 900 4,500 8,600 600 9,200 2,400 2,400 4,800 4,500 4,500 11,400 600 12,000 5,700 600 6,30/0 0 1,800 11800 1,200 30,500 11,400 43,100 Est. Two Year Total 62,700 22,000 2,400 51,200 27,900 81,500 rr �i�•� Of�.o% 0