Loading...
HomeMy WebLinkAboutAGENDA REPORT 1995 1004 CC REG ITEM 08NY OF MOORPARK AGENDA REPORT TO: The Honorable City Council FROM: Christine Adams, Director of Community ITEM- CITAl Services DATE: September 22, 1995 (Meeting of October 4, 1995) SUBJECT: Consider Rejecting Bid for Construction of Arroyo Vista Community Park Restroom / Concession Building. BACKGROUND At the August 2, 1995 City Council meeting, the City Council rejected construction bids for the restroom / concession facility at Arroyo Vista Community Park and directed staff to re- advertise for new bids. Staff also advertised for bids for water and sewer line construction, as a separate project. The City Council appropriated $642,700 of funding to make park improvements to the Arroyo Vista Community Park, Phase II. These improvements are to include two softball diamonds, with lights for one, with fencing, bleachers, dugouts, and infields; a roller hockey rink; a tot lot, and a picnic shelter with tables, benches, barbecues, drinking fountain and a restroom and concession facility. The City retained the services of an architect, Andrew Alan Czubiak, to prepare plans and specifications for a restroom facility for Arroyo Vista Community Park. Mr. Czubiak was contracted with the City in the past and was the architect on the restroom facility at Peach Hill Park. The City had also contracted with Dwight French & Associates to design the sewer and water line extensions. They were previously contracted with the City and did the offsite utility work for Phase I of Arroyo Vista Community Park. DESIGN FEATURES The restroom facility will have a men's restroom with two sinks, two urinals, and two toilets, a women's restroom with two sinks and three toilets, a janitor supply closet, an equipment storage room, and a concession area with storage, a counter area and a double sink. The entire building will be 50' x 25' (1250 sq. ft.) The roof will have a blue "mission" style tile roof, and the exterior walls will be a gray precision block, to compliment the architectural colors of the Recreation Center. The plumbing fixtures are stainless steel. Oi 01 ?- 4 DISCUSSION ON FINANCIAL OVERVIEW The City's consultants have provided staff a preliminary cost estimate of $85,000 for the restroom construction. The Council may recall that the City has received a commitment from the Moorpark American Youth Soccer Organization (AYSO) to donate $5,000 towards the construction of the restroom facility. This is a one time only donation, and may be spread over several years. Park Improvement Budget (Phase II) Water Well Well Pump Repair Ballfields (2) Ball Lights (1) Installed Restroom /Concession Play Equipment Hardscape Roller hockey Picnic Shelter Tables, Benches, BBQ's, Drinking Fountains, and Trash Cans TOPO/ Survey Soils Test Architect for Restroom Sewer /Water /Hydrant Blue Prints Construction Admin.(Picon) Sod /Irrigation Removal for improvement areas, plus brickdust for infields Road Oil Treatment Fencing Inspection / Permits TOTAL Contingency * Estimate Only BID SUMMARY Approved Revised $ 80,000 $ 80,000 $ 15,000 $ 15,000 $ 73,777 $ 51,630 $ 89,808 $ 85,517 $ 85,000 $ 85,000 $ 62,941 $ 62,295 $ 0 $ 0 $ 60,736 $ 73,103 $ 21,644 $ 21,644 $ 31,082 $ 16,304 $ 700 $ 700 $ 1,500 $ 1,500 $ 3,400 $ 3,400 $ 65,000 $ 65,000 $ 1,500 $ 1,500 $ 15,100 $ 15,100 $ 1,000 $ 32,000 $ 5,600 $ 5,600 $ 3,500 $ 3,500 $ 3,500 $ 3,500 $620,788 $622,293 $ 21,912 - $ 20,407 $642,700 $642,700 There were two responsive bidders for the restroom /concession building construction, and a summary of bids is attached to this report. The apparent low bid was for $117,480, which exceeded the estimated cost for construction by $32,480. The apparent low bid is higher than the low bid received during the previous process in August ($105,000) . Staff has been U 1.` 5 told by several contractors that the specified blue tile roof, and the stainless steel restroom fixtures contributed to the bids exceeding the estimated costs, which was based on $65.00 per square foot cost for a building of this type and style. Staff, with Council's direction, will re- advertise for bids, and will consider including the Arroyo Vista Community Park restroom / concession building as an alternate in the Poindexter Park construction bid, which should be advertised by October 6, 1995. RECOMMENDATION Reject all bids and direct staff to re- advertise for bids for construction of the restroom /concession facility, as a bid option as part of the Poindexter Park project. 0001%6 Bid Summary Restroom Concession Building T & J Construction $117,480 Gonzales Construction $170,540 0 001,40