Loading...
HomeMy WebLinkAboutAGENDA REPORT 1996 0417 CC REG ITEM 07ET LE n AGENDA REPORT c C 2 TY OF MOORPARK of__. /7 TO: The Honorable City Council qGi,:• - FROM: Kenneth C. Gilbert, Director of Public Works DATE: April 5, 1996 (Council Meeting 4- 17 -96) SUBJECT: Consider Authorizing Recordation of the Notice of Completion for the 1995 Street Reconstruction Project A. Background Last June the City Council awarded a contract for the rehabilitation of the following streets: • Poindexter Avenue between Moorpark Avenue and Gabbert Road; • Everett Street between Moorpark Avenue and Magnolia Avenue; • Magnolia Avenue between Everett Street and Charles Street; • Bard Street between High Street and Charles Street; and, • Walnut Street between High Street and Everett Street. The scope of work ranged from the complete reconstruction of certain streets (storm drains, pavement & base, curbs, gutters and sidewalks) to the construction of an asphalt overlay on others. Construction is now complete and is now appropriate for the City Council to consider acceptance of the work and recordation of the Notice of Completion. The City and the contractor have been working together over the past few months to resolve certain disputed matters pertaining the work performed and /or the amounts authorized for payment. Those discussion and negotiations were eventually successful, leading to agreement on all disputed matters. C. Fiscal Impact 1. Construction Contract Costs: A summary of the final construction costs is as follows: Description Bid Amount Quantity Adjustments Sub -Total Change Orders (See Exhibit 1) Total rewn95.caap 901,569.75 (10,512.35) 891,057.40 62.883.46 953,940.86 Sidewalk Construction April 1996 Page 2 2. Total Project Cost Estimate: A summary of the final project costs for FY 1994/95 and FY 1995/96 is as follows: Element Design Printing and Related Costs Construction Contract Admin. & FY 1994/95 a 172,143 1,857 L FY 1995/96 0 0 953,941 Inspection 0 90,000 Total 174,000 1,043,941 Notes: a: Design Costs: Walnut S/0 Charles Street [ASA 94 -004]: � of Pavement Analysis [ASA 94 -20 = $61,751]: Final Design Poindexter, Etc. Total Total ($) 172,143 1,857 953,941 90,000 1,217,941 11,099 30,600 130,444 172,143 3. State —Local Transportation Partnership Program (SLTPP): The amount initially identified in the application for SLTPP funds was $171,000. That amount was based on the Engineer's estimate of probable construction costs. Subsequent to the award of contract, Caltrans was notified of the actual bid amount, which was considerably less than the Engineer's estimate. Caltrans then provided the City with a Supplemental Agreement for this project, approving a grant amount of $164,475 based on the reduced construction cost. The Supplemental Agreement was approved by the City Council in October 1995, via Resolution No. 95 -1148. 4. Funding Sources: A revised summary of the funding sources for this project is as follows: Funding Source Purpose FY 1994/95 FY 1995/96 Total SB -821 Construct sidewalks and Bike 0 41,000 411000 Lanes on Poindexter between Chaparral School and Sierra Ave State Local State share of Pavement 0 164,475 164,475 Transportation Rehabilitation Costs (excluding Partnership that portion of Poindexter Avenue Program partially funded by SB -821) MRA Local funding source 174.000 838,466 1,012,466 Total 174,000 1,043,941 1,217,941 recon95.cmp Sidewalk Construction April 1996 Page 3 5. Budget Recap: The total FY 1995/96 costs are less than the total amount of the budget: Current Projected FY 1995/96 FY 1995/96 Account No, W t co 15-142 - 903 -0356 [SB-821 Grant] 41,000 41,000 14- 142 - 903 -0356 [STTPP Grant] 171,000 164,475 01-170- 903-0356 [Local Share] 878,000 838,466 Total 1,090,000 1,043,941 Staff recommends that the City Council take the following actions: 1. Accept the work as completed, subject to satisfactory completion of the maintenance period. 2. Instruct the City Clerk to file the Notice of Completion for the project. 3. Authorize the release of the retention upon satisfactory clearance of the thirty five (35) day lien period. recon95,cap Exhibit 1: Summary List of Change orders Description Amount (S) 1. Void 0 2. Void 0 3. Extra tree removals 1,300.00 4. Extra driveway R &R (transition) 5,000.00 5. Retaining walls 3,200.00 6. Remove J. S. & add man hole on Magnolia 11,350.00 7. Add slab over S.D.; survey monument; etc. 1,520.00 8. Add 8' 24" RCP (J. S. @ Walnut & High) 2,000.00 9. R &R 32' 18" RCP; add M H @ Bard & High; etc. 70,461.80 10. Misc. Work (driveways, curb drain, grate, etc.) 4,350.25 11. Soil Excavation; Drain 2,731.00 12. Mod. NIS Poindexter @ Cornett 2,910.64 13. Add leveling course on Poindexter 13,125.00 14. Remove abandoned conduit Everett; etc. 1,802.77 15. Add drain; survey work; time delay 3,382.00 16. Curb / gutter R & R; etc. 2,,750.00 Total 62,883.46 re=95.cnp OCK)O44