Loading...
HomeMy WebLinkAboutAGENDA REPORT 1996 0523 CC SPC ITEM 03Ad ~ MEMORANDUM TO: The Honorable City Council FROM: Paul Porter, Senior Planne�J DATE: May 17, 1996 (CC meeting on May 23, r a C� 19 9 6 ) ,�� C- GCc- P1"z -- SUBJECT: CONSIDER APPROVAL OF TENTATIVE TRACT MAP NO.1 AND COMMERCIAL PLANNED DEVELOPMENT PERMIT NO. 95 -1 Background On May 1, 1996, the City Council held a public hearing on the proposed project and continued the public hearing to May 23, 1996 to allow the applicant and staff time to research several City Council Questions. The issues and responses are as follows: 1. How many cars are registered in the City? Information is not available as to the total vehicles registered within the City; however, the Department of Motor Vehicles keeps records for the total number of vehicles within Ventura County which has a total of 584,624 vehicles (412,578 automobiles, 115,787 trucks /commercial vehicles, 41,520 trailers, and 14,739 motorcycles. By estimating the City's percentage of the total population of the County (approximately 3.82 percent of the total County's population), staff has estimated the number of vehicles registered in the City to be 15,760 automobiles, 4,423 trucks /commercial vehicles, 1,586 trailers and 563 motorcycles. That is a total number of motor vehicles excluding trailers of 20,746. 2. The Council requested the Police Department to provide input as to the history of loitering and other criminal activity at other Shopping Centers in the City. Lt. Rouse indicated as of the writing of this report that this information was still being compiled. He will be prepared to discuss his findings at the City Council meeting. 3. What are the estimated cost of moving of the power poles located on the property and does the Edison Company have funding to move them? Staff has discussed this matter with Jim Austin from the Edison Company who has stated that the cost estimate of moving the existing power poles on the site would cost between $60,000 to $70,000 using three wood poles. It would cost approximately $30,000 more to use a combination of two wood ON poles and one tubular steel pole where the lines turn the corner. Construction of a tubular steel pole would not require the use of a guy wire for stabilization. Mr. Austin stated that the Edison Company does not have funds to pay for or share in the cost of relocating the power lines. 4. Could the roof mounted equipment be placed on the ground? Normally roof mounted equipment must be screened from view by the use of a parapet wall or other roof screening equipment. As at this time it is not known if all equipment can be located on the ground, staff has modified the condition of approval requiring that all equipment be placed on the ground with the exception of equipment authorized by the Director of Community Development to be roof mounted. This would be reviewed by staff at the time construction drawings are submitted. Therefore staff recommends the following language change to the City's standard condition: Roof Mounted Equipment 67. ;: ...;:;; ;; o moun a equipment s stac , bYowers' air conditioning equipment, etc.) that may extend above any parapet wall shall be enclosed on all four sides by view obscuring material. Prior to the issuance of a Zoning Clearance, the final design and materials for the roof screen and location of any roof mounted equipment must be approved by the Director of Community Development. All screening shall be tall enough to block all ground level views of equipment and shall be maintained during the life of the permit. Construction material shall match the color and material used in the construction of the buildings. Colors, materials and building appendages (such as mechanical equipment on the roof, etc.) of the proposed building shall be compatible with the existing building and adjacent development and non - reflective in nature. 5. Further clarify from Austin Faust whether the left hand turn on Tierra Rejada Road will work and how long it would take an automobile traveling at 55 mph to get to the curb cut on Tierra Rejada Road from Spring Road traveling along Tierra Rejada Road? Staff has received a telephone call from Joe Faust and Kendall Elmer of Austin Faust, Inc. Mr. Kendall indicated that having a median break on Tierra Rejada allowing left hand turns into the proposed shopping center would not create a traffic hazard, but that having one left hand turn rather than two 2 left turns (the first from Tierra Rejada to Spring Road and the second left into the shopping center) would be a safer situation, because there would be one less turning movement. Mr. Elmer further stated that an alternative of having no median break on Tierra Rejada, but allowing a U -turn at the intersection followed by a right turn into the shopping center would be the safest alternative. The City Engineer concurs with the later configuration. A west bound vehicle would take 3.7 seconds to travel the 300 feet along Tierra Rejada Road between Spring road and the proposed median break at Tierra Rejada Road. This does not appear to be a safety factor considering the unlimited site distance. Allowing the median break would eliminate a minimum of 150 feet of median landscaping. It is staff's opinion that safety concerns and intersection efficiency alone do not warrant the median break and, as such, reduce the amount of landscaping in light of the, alternatives. 6. Discuss the sales tax leakage from the City. Fuel and service stations currently account for 14% of the sales tax received by the City. In comparison to per capita sales, the City's collection is 35% below the State average and 24% below the County average. 7. The City Council request a map showing the location of the fault and requested staff to contact Tom Blake of Frugro West to request a discussion regarding earthquake faults. A copy of the map depicting the southerly portion of the Fault Zone is attached for the City Council's information. This map also shows the Shell pipeline corridor. Fault information Discussed in the Geotechnical Report Prepared by Earth Systems Consultants The Simi Fault was found to be a zonal feature where observed in the exploratory trench. Two main gouge zones were observed, one dipping steeply to the south and the other dipping steeply to the north. The fault would be considered active according to the State of California guidelines and therefore poses a surface rupture hazard. In Moorpark, at California Motion Instrumentation Program Station 24283, a peak acceleration of.30 g was recorded (C.D.M.G. 1994). A similar magnitude acceleration was likely experienced at the subject site. When determining a maximum probable earthquake acceleration, the State of California recommends using the maximum historic acceleration value if it 3 B. is larger than the value determined from a deterministic analysis. Because the UBC designs are intended to accommodate horizontal accelerations up to 0.4 g (Seismic Zone 4), the structural designs for the structures in this project should at a_ minimum conform to the UBC requirements. Discuss whether liquefaction, the stream on the groundwater level would create development problems for the proposed development. Earthquake- induced vibrations can be the cause of several significant phenomena, including liquefaction in fine sands and silty sands. Liquefaction results in a complete loss of strength and can cause structures to settle or even overturn if it occurs in the bearing zone. If liquefaction occurs beneath sloping ground, a phenomenon known as lateral spreading can occur. Liquefaction is typically limited to the upper 40 feet of the subsurface soils. Four items are typically considered to have the most significance in liquefaction: 1. Fine sands and silty sands that are poorly graded are the soil types most susceptible to liquefaction. Poor gradation can be identified by a Uniformity Coefficient between 2 and 10. Soils that contain a wide range of soil particle sizes and coarse soils that drain freely are not generally susceptible to liquefaction. 2. The water table, perched or otherwise, usually must be within the upper 40 feet of soils for liquefaction to occur. Soils above the water table cannot liquefy. 3. Liquefaction has been shown to be unlikely where the relative densities of the soils are greater than 70 percent. A soil that has relative density less than 70 percent may liquefy depending on a number of factors, the two most important of which are strength and duration of the seismic shaking, and the percentage of soil particles that are silt and clay sized. 4. If the clay content (determined by the percent finer than 0.005 mm) is greater than 20 percent, the soil is usually considered non - liquefiable, unless it is extremely sensitive. 4 An examination of the conditions existing at the site, in relation to the criteria listed above, indicates the following: 1. The Geotechnical report indicated that standard Groundwater was only encountered in the northern - portion of the site at a depth of approximately 6 feet below the surface. It is likely that this water - flows southeastward to the eastern limit of the property where it is picked up in a previously installed canyon drain. 2. Grain size distributions for soil samples obtained at depths of between 0 and 8 feet indicate these soils marginally fall within the envelope for potentially liquefiable soils. 3. Standard penetration conducted in the borings indicate that soils within the tested depth are presently quite variable in relative density with come zones more and some less than 70 percent. Subsequent to grading, soils under the building areas will be engineered fill and will rest on bedrock. Both of these materials will have relative densities greater than 70 percent. Therefore, the potential for liquefaction will be eliminated under the building area as a result of planned improvements. Grading The developer's application indicates a proposed gradi import amount of 12,000 cubic yards. Staff estimates that this import for fill will generate 800 -900 truck trips to the site. It is sta recommendation (in compliance with condition N 26 of tact Map conditions) to approve the anticipated ips�t �gite and have the City Engineer approve the h ul ,t7o e at grading permit is issued. Tv ��, � n 1 Recommended Changes to Conditio s A rov I A' Permitted Uses 1. The permit is granted for the land and pro on the entitlement application form and approved plot plans and elevationsti kr 0 t a entified shown on the �••`-' - -� CLt.1V11 QiLU aesign or aii site - improvements slal:. ,.,be as shown on the approved plot plans and elevations except or unless indicated otherwise herein in the following conditions. All proposed uses of these buildings shall be required to receive a Zoning Clearance from the Department of Community Development. The Department may determine that 5 certain uses require of es of entitlements or environmen lassessment. / Hours of O era io acid wee Dina of Parkin Area Staff Comment -- i/ ✓QQ �t� In reviewing of r a3ro�r projects, it is not that the allowable hours of ationave begun at 7:00 a.m So as to be consistent, staff recomme hat the shopping ce r hours be from 7:00 a.m. to 10:00 p.m. and that the parking area or use of other noise producing equipment not take place between the hours of 10:00 p.m. and 7:00 a.m. Property Line Wall Along Property Line Adjacent to Residents 7. The applicant shall construct a six to eight foot high wall /fence along the property line adjacent to the residential properties. The height and design of the proposed wall /fence is subject to the review and approval of the Director of Community Development. The wall shall be built at the property line of the residential lots as determined by the Director of Community Development. Prior to submittal of plans to the Department, the applicant shall review the plans with the adjacent property owners. The Director of Community Development shall have final approval authority over design, location and size of the wall /fence. Modification to Plot Plan and Elevations 8. The plot plan and elevations shall be redesigned to eliminate the automobile service station buildings. Activities Sian 32. The existing City activities sign located on the corner of the site shall be allowed to remain at or near its present location. The applicant shall record an easement for installation and maintenance of the sign. Staff Comment At this time, the sign is located in the right -of -way. Consideration should be given to relocating the sign on the Carlsberg property. Traffic_Svstem Management Contribution Since the Planning Commission's recommended change to this condition, staff has received a letter from the Air Pollution Control District (APCD) dated April 29, 1996 indicated that the air quality calculations for the project using a more appropriate t rip 6 generation factor for the convenience market component. The trip generation factor used originally was at the high end of the range of trip generation factors for convenience markets. The new trip generation factor is in the middle of the range. APCD also used a 50 percent pass -by trip factor rather than 40 percent. Pass -by trip factors for convenience markets range from 28 percent to 78 percent. The revised emission estimates for the project are 23.7 pounds per day of Reactive Organic Compounds (ROC) and 25.1 - pounds per day of Nitrous Oxides (NOx). Therefore, staff recommends the following condition to the Commercial Planned Development be imposed on the project: 42. Prior to issuance of the first Zoning Clearance for construction, the permittee shall make a contribution to the Moorpark Traffic Systems Management Fund of $.15 per square foot of floor area to fund Traffic System Management programs for the total square footage approved for the project. CITY ENGINEERING CONDITIONS 119. (Modify the fourth paragraph and add a fifth paragraph as follows) : 120. A raised property left turn Sprina Rd median shall be constructed along the Spring Road frontage. The median shall be designed to prevent movements from the mnrt (Modify the fifth paragraph as follows): The driveway on Tierra Rejada Road shall be per Ventura County Plate E -2 and shall be 4 0 feet wide. °::::::>;.:>::::; :;:;:.:.:::;;;:; :.:.:::::::::.: .::;.;;: > :: »:: :.:. ;.._::.:::::::................. 11 de. h�::> sirsr ...r►;:.:et.n:aa::...4...... �_._s,._.._Y ._ ....... _..- FIRE DEPARTMENT CONDITIONS 128. Where two way traffic and on- street parallel parking on both sides occur, a 30 -foot width shall be provided in front of the shops. TENTATIVE PARCEL MAP NO. 5001 CONDITIONS CITY ENGINEERING CONDITIONS 7 42. 43. (Modify the fifth paragraph and add a sixth paragraph as follows) : A raised median shall be constructed along the Spring Road property frontage. The median shall be designed to prevent left turn movements from the most southerly driveway onto SpringRd. ��'....... �:.. :. �::. ��� <:::., < ...............:.::::. :.:., ...,...... .<,.... ..._..:.::..::�. (Modify the fourth paragraph as follows): The driveway on Tierra Rejada Road shall be per Ventura County Plate E -2 and shall be 40 feet wide...,e.1 bg.crt FIRE DEPARTMENT CONDITIONS 72. Where two way traffic and on- street parallel parking on both sides occur, a 30 -foot width shall be provided in front of the shops. Case Processing Time Limits The aforementioned entitlement request was determined to be complete on November 6, 1995. Pursuant to the City Attorney, the City Council will have until July 6, 1996 to render a decision to approve or deny this project. Recommendations: 1. The public hearing was continued from April 17, 1996, therefore, accept additional public testimony. 2. Review and consider the information in the Mitigated Negative Declaration and Mitigation Monitoring Program. 3. Make the appropriate findings. 4. Direct staff to prepare a resolution approving Commercial Planned Development 95 -1 and Tentative Parcel Map No. 5001 as modified by the City Council. Attachment: 1. Map showing south end of fault zone 2. Concept Striping Plan E