Loading...
HomeMy WebLinkAboutAGENDA REPORT 1996 0619 CC REG ITEM 10C799 D.G. AGENDA REPt�I _ -_.. TO: The Honorable City Council FROM: Kenneth C. Gilbert, Director of Public Works /. DATE: May 21, 1996 (Council Meeting 6 -5 -96) SUBJECT: Consider Authorization to Proceed with the Preliminary Design and Preliminary Right -of -Way Acquisition Efforts Required for the Widening of Los Angeles Avenue West of South Condor Drive [Los Angeles Avenue - East] OVERVIEW This requests that the City Council take the following actions: 1. approve the future alignment of Los Angeles Avenue west of South Condor Drive; 2. approve the scope of work for the construction of street improvements along this street segment; 3. approve the scope of the right -of -way acquisition necessary to proceed with this project; and, 4. direct staff to proceed with engineering and other professional services required to define the actual right -of -way required and determine the anticipated cost of said acquisition. Discussion A. Alignment Study The City Engineer has prepared an Alignment Study for the subject street segment. Copies of that study were distributed to the City Council in November 1995. A summary of the findings and recommendations set forth in that study are as follows: 1. Limits: The limits of the study area extend from the easterly end of the full width street improvements just east of Chuy's restaurant, easterly to the full width street improvements at the south end of Condor Drive. le_est3 000435 Los Angeles Avenue East Widening May 1996 Page 2 2. Alternates: The study includes two alternate alignments for this street segment, summarized as follows: • Alternate #1: existing centerline unchanged • Alternate #2: centerline to be moved to the north to lessen the requirement for the taking of residential properties on the south side of the street 3. Alignment: Plans set forth in the study show the proposed street alignment for Alternate #1 and for Alternate #2. 4. Ultimate Improvements: Each alignment plan shows the recommended location for full width improvements within an eighty -eight feet (881) wide right -of -way. The recommended full -width street improvements are described as follows: • four 121 wide travel lanes; • one 14' wide raised / landscaped center median; • two 8' wide Bike Lanes; • curb and gutter; and, • two 5' wide sidewalks. There are no provisions for parkways. 5. Interim Improvements: Each alignment plan also shows the recommended location for the construction of interim improvements within the proposed full width, eighty -eight feet (881) wide, right -of -way corridor. The recommended interim improvements are described as follows: • two 12' wide travel lanes; • one 14' wide center paved median; and, • two 8' wide unpaved shoulders. 6. Right -of -Way: The study also includes plan sheets which show the right -of -way required for Alternate #1 and the right -of- way required for Alternate #2. 7. Preliminary cost Summary: The study includes estimated costs for both Alignments, generally summarized as follows: Alternate R -O -W ($) Construction ($) Total ($) 1 (Interim) 300,000 2,000,000 2,300,000 1 (Ultimate) 2,700,000 3,200,000 5,900,000 2 (Interim) 270,000 2,200,000 2,470,000 2 (Ultimate) 1,800,000 3,500,000 5,300,000 la_est3 00 rr y^. ■ 436 Los Angeles Avenue East Widening May 1996 Page 3 B. Right -of -Way Acquisition Cost Estimates It should be noted that the cost estimates for right -of -way acquisition set forth in this report are only gross estimates. More accurate cost estimates for these costs can only be provided after the affected properties have been appraised. It is the view of staff that the right -of -way acquisition cost estimates set forth herein are on the high side of a range which could have a "low end" one -half of the costs identified. And since the cost of right -of -way is a very large part of the total costs shown, the total cost of the various option set forth herein could vary considerably. C. Recommended Alternate The alignment for Alternate #2 shifts the centerline of the street northerly allowing for the construction of the project in a manner which will not require the acquisition of property from the residential properties fronting Avenida Colonia, located on the south side of Los Angeles Avenue. Not only are the right - of -way acquisition costs less, significant disruption and /or possible relocation is avoided. For these reasons, staff recommends that the alignment described in Alternate #2 be selected. D. Two Lanes vs. Four Lanes The City Traffic Engineer performed a cursory analysis of future traffic needs in this area. Based on the City's traffic model, which includes the existing General Plan area plus other possible traffic generators (i. e. Hidden Creek Ranch, etc.), he concluded that the projected traffic volume on the subject street segment would result in some relatively minor traffic congestion during peak hours. When and if a second east -west arterial street is constructed (e. g. Spring Road north), that traffic congestion would no longer occur. For this reason, it is his opinion that the additional cost of four lane improvements is not warranted at this time. E. Transportation and Streets Committee Review The Alignment Study for this project was discussed by the City Council Transportation and Streets Committee on April 3, 1996. The Committee decided to not offer a recommendation until this analysis was developed and provided to the City Council. le_est3 000437 Los Angeles Avenue East Widening May 1996 Page 4 F. Options It is recommended that the City proceed with a project for the construction of Interim Improvements along this street segment, which would be compatible with the roadway alignment defined by Alternate #2. As stated above, the construction of four lanes along this segment of street does not appear to be warranted at this time. However, the need for four lanes may occur at some point in the future. There are, therefore, two options to consider in proceeding with the implementation of this project: a) a project which would easily accommodate the future widening of the street to four lanes, or b) a project which would not. A more detailed description of these two Options is as follows: Option A: • Acquire the full right -of -way required for the construction of ultimate full -width (four lanes) street improvements; • Construct retaining walls required to accommodate the possible future construction of full -width (four lane) street improvements; and, • Construct interim improvements within that corridor. Option B: • Acquire ONLY that amount of right -of -way required for the construction of interim (two lanes) street improvements; • Construct retaining walls within that right -of -way designed to ONLY accommodate the construction of those interim (two lane) street improvements; and, • Construct interim improvements within that corridor. Cost Estimate: A cost estimate comparing these two options is as follows: Element Option A Option B Right -of -way Acquisition 1,800,000 270,000 Retaining Walls 1,000,000 680,000 All other Interim Improvements 1,250,000 1,250,000 Total 4,050,000 2,200,000 G. Future Construction of Four Lanes As stated above, at some point in the future it may become necessary to widen the interim two -lane improvements to four lanes. The following is an estimate of the cost to undertake this additional street widening given the two Options for la_ests 000438 Los Angeles Avenue East Widening May 1996 Page 5 Interim Improvements described above. Please note that all of the cost estimates in this report presume current day costs. None of these figures include any inflation factors. A comparison of the additional lane improvements to four -lanes above, is as follows: Element Right -of -way Acquisition Retaining Walls Widen to four lanes Total cost to widen the initial two - under the two options described Option A 0 0 1,300,000 1,300,000 option B 1,600,000 1,100,000 1,300,000 4,000,000 The combined cost undertaking Interim Improvement followed by the future widening to four lane improvements is summarized as follows: Element Option A Option B Interim Improvements 4,050,000 2,200,000 Ultimate Improvements 1.300.000 4,000,000 Total 5,350,000 6,200,000 H. Funding This project would be funded by the Los Angeles Avenue AOC. There are sufficient funds available for the construction of this project utilizing either option. I. Summary / Conclusions 1. Alignment: It is recommended that Alignment Alternate #2 (shift centerline northerly) be selected. 2. Interim Improvements: It is recommended that only the two - lane interim improvements be constructed at this time. 3. Right -of -Way / Retaining Walls: Although initial costs under Option A are approximately $1,850,000 more than Option B, the selection of this option will save the City at least $850,000 (current dollars without an inflation factor) when and if it becomes necessary to later widen this street segment to four lanes. For this reasons, staff recommends selection of Option A: the acquisition of right -of -way and construction of retaining walls necessary to accommodate full -width (four lane) street improvements. ln_est3 __^^(( 000439 Los Angeles Avenue East Widening May 1996 Page 6 4. Preliminary Design: In order to accurately define the right - of -way required, it is necessary to prepare a preliminary design for the full width four -lane improvements and related earthwork and retaining walls. Legal description of the areas to be acquired will be prepared based upon that preliminary design. 5. Final Design for Street Improvements: It is recommended that the preparation of the final improvement plans and specifications for the interim two -lane street improvements be deferred until after the right -of -way acquisition effort has been completed or is near completion. Staff recommends that the City Council take the following actions: 1. Approve the future roadway alignment for Los Angeles Avenue East defined as Alternate #2 in the Alignment Study and summarized in this report (centerline to be shifted northerly) . 2. Approve the right -of -way acquisition efforts and the preliminary design for the retaining walls described in Option A set forth above in this report. 3. Direct staff to proceed with the development of a preliminary design to determine actual right -of -way requirements. 4. Direct staff to proceed with the title work, engineering work and appraisal work necessary to prepare the final Deeds for all of the right -of -way required, and to determine estimated cost of said acquisition. 5. Direct staff to report back to the City Council when these efforts are completed, to seek authorization to proceed with right -of -way acquisition. la est3