Loading...
HomeMy WebLinkAboutAGENDA REPORT 1996 1120 CC REG ITEM 10C /> . 6 7/ AGENDA REPORT L' CITY OF MOORPARK . ._' `f C TO : THE HONORABLE CITY COUNCIL .C<<, FROM : DIRK LOVETT, ASSISTANT CITY ENGINEER f PREPARED BY TONY COOPER, PROJECT MANAGER DATE : NOVEMBER 13, 1996 (CITY COUNCIL MEETING OF NOVEMBER 20 , 1996 ) SUBJECT : SLURRY SEAL REPAIRS BACKGROUND At the City Council Meeting of November 6 , 1996 staff was asked to reevaluate the condition of 3 streets. Buttercreek Rd. , Alderbrook Street and Monroe Avenue. DISCUSSION On November 11th these streets were again evaluated by the Engineering Department . Each of these streets underwent repair work subsequent to the initial slurry application. Buttercreek and Alderbrook sustained damage due to vehicles which ignored posted signs and bypassed barricades . Monroe was reslurried in specific areas due to extreme surface texture irregularities . On these and all other streets that were repaired, subsequent to the initial application, the contractor undertook reasonable measures to repair the tire marks and texture irregularities per the specifications . The purpose of the slurry seal is to protect the underlying surface from damage due to the atmospheric elements thus extending the life of the pavement . According to the standard specifications, the contractor is required to repair or reseal all areas of the street which have not been sealed properly or completely. It should be noted that although repair patches are immediately noticeable due to the darker color they will quickly fade to resemble the rest of the streets . Where the rough texture was reslurried, rideability has been noticeably improved, where tire marks adversely impacted the integrity of the slurry the contractor applied a second coat of slurry to protect the asphalt . Color and texture irregularities will become less apparent over time. 000069 CONCLUSION The slurry seal application and repair work complies with the intent of the specifications . RECOMMENDATION Staff recommends that the City Council take the action as outlined in the November, 6, 1996 agenda report (attached) . Chron 85 . 341 000OSo i • • ITEMP) • • Agenda Report City of Moorpark To: The Honorable City Council From: Kenneth C. Gilbert, Director of Public Works Dirk Lovett, Assistant City Engineer Prepared By: Anthony Cooper, Civil Engineer Date: October 28, 1996 (Council Meeting November 6, 1996) Subject: Notice of Completion for 1996 Slurry Seal Project BACKGROUND On November 15, 1995, the City Council awarded a contract to Valley Slurry Seal for slurry sealing various streets throughout the City. Slurry sealing protects the existing pavement from the effects of the sun and elements, thus extending the life of the pavement. DISCUSSION A. Slurry Application The City Council awarded a contract for this work in November 1995. The slurry application began on April 1, 1996. Final repairs were completed on October 9, 1996. B. Additional Work In May of 1996, the City Council approved an increase to the cost of the project. to cover an anticipated increase in the amount of materials required to apply slurry seal to all of the streets specified. The initial bid documents quoted estimated quantities for certain bid items which were too low. This error was caused by the use of aerial photos in lieu of actual field measurements to estimate those quantities. Again, the scope of work did not change, just the estimated quantities of material required to perform that work. That City Council action included the approval of an increase to the budget amount for this project from $400,000 to $500,000. C. Change Orders Two Change Orders were issued. The first change order [$3,110.001 added a number of industrial streets to the list of streets specified. The second change order [Credit amount of ($784.00)] was a credit amount for City costs for premium overtime pay for inspection. QQ'tsfir' 111111140. • Slurry Seal `• November 1996 Page 2 D. Slurry Rep: Work After application of the slurry some of the streets were observed to have some rippling and rough texture. City Engineering sent the contractor a letter on May 22, 1996 regarding this and providing a final punch list for repairs. The contractor returned in October and applied a thin course of slurry to those areas of the streets deemed unacceptable. Patching due to tire damage was also done as part of the repair. The repair work has provided a smoother driving surface to these localized areas. E. Final Inspection and Acceptance The City Engineer has completed a final inspection of the project and has found the work to be acceptable. At this time it would be appropriate for the City Council to accept the project as completed, direct the City Clerk to file a Notice of Completion and authorize release of the retention. F. Fiscal Impact 1. Total Cost: The following is a summary of the total project costs: Element Cost ($) Design 200.00 Construction Bid Amt. 238,213.85 Qty. Adj 166,078.74 Sub-Total 404,292.59 C. O. #1 3,110.00 C. O. #2 (784.00) 406,618.59 Misc. (public notice, etc.) 283.47 Admin. & Insp. 41,912.00 Total 449,014.06 2. FY 1996/97 Costs: The full amount of the FY 1995/96 Budget for this project was $500,000. As you know, all of the work was not completed prior to July 1, 1996. As stated above, the final repairs were completed in October 1996. A summary of actual FY 1995/96 costs vs. anticipated FY 1996/97 costs is as follows: Element FY 95/96 ($) FY 96/97 ($). Total ($) Design 200.00 0.00 200.00 Construction 352,819.88 53,798.71 406,618.59 Admin. / Insp. 38,132.00 3,780.00 41,912.00 Misc. 283.47 • 0.00 283.47 Contingency 0.00 2.421.29 2,421.29 Total 391,435.35 60,000.00 451,435.35 OQ0082 Slurry Seal November 1996 Page 3 3. Budget Amendment: No funds were budgeted for this project for FY 1996/97. It will be necessary, therefore, to amend the FY 1996/97 Budget to appropriate funds and add this project. A Resolution has been prepared for this purpose. A summary of that requested action is as follows: ACCOUNT CURRENT FY96/97 SUBJECT TOTAL FY 96/97 NUMBER APPROPRIATION APPROPRIATION APPROPRIATION 203.801.xxxx.000.9903 $0.00 $60,000.00 $60,000.00 TOTALS: $0.00 $60,000.00 $60,000.00 Recommendation Staff recommends that the City Council take the following actions: 1. Adopt Resolution 96 - _ approving a budget amendment to fund remaining expenditures for the subject project from the Local Transportation 8A Fund (LTF) [Fund 203] in the amount of$60,000; 2. Accept the work as completed; 3. Instruct the City Clerk to file the Notice of Completion for the project; and, 4. Authorize the release of the retention upon satisfactory clearance of the thirty five (35) day lien period. • slry95.cip