CITY OF MOORPARK
TO: The Honorable City Council
FROM: Kamm& C. Gilbert, Director of Public Works
DATE: December 13, 1996 (Council Meeting 12- 18-96)
' /' '_ r '1 . l" L:.
dTE Jf "O
n_ A
SUBJECT: Consider Bids for the Construction of a Bicycle / Pedestrian / Equestrian /
Emergency Access Bridge Across the Arroyo Simi at Liberty Bell Road.
This presents the results of the bid opening for the subject project and recommends the award
of a contract for the construction of the project.
t : 4211 t,1
On October 16, 1996, the City Council audwrired staff to advertise for receipt of bids for
the subject project. A summary of the steps which lead to that action are set forth in
Exhibit 1.
A summary of the bridge design is as follows:
1. Locadon: The location and alignment of the proposed bridge is depicted on the maps
and diagram attached as Exhibit 2.
2. Alignment:
• macular to the channel to allow for a shorter span which will not require
center support piers;
• North end of the bridge located just east of Liberty Bell Road.
I Length: The span of the bridge will be one hundred sixty -one feet with no center
support piers (161').
paorq. aW
000590
G1
Bids: Arroyo Vista Park Pedestrian Bridge
December 1996
Page 2
4. Width: Fifteen feet (15') clear -- seventeen feet (17') edge to edge.
5. Type of Coastaction: Cast in place, reinforced concrete, box girder construction.
6. Bridge Rail & Fence: Six feet (6') high 2" x 2" tubular steel posts spaced one foot
(i') apart, with chain link fabric, installed on a one foot (1') high concrete curb.
7. Deck Surface: Concrete with a rough broom finish.
8. Parking Lot: Project to include the construction of a puling lot just east of Liberty
Bell Road, to serve those using the bridge as well as patrons of the future Campesina
Park.
9. Vegetation: Several of the existing trees on the north and south sides of the Arroyo
will be removed. As required by the Mitigated Negative Decimation for the project,
certain landscaping will be installed adjacent to this facility. This work is not a part of
the subject project. Lmg will be installed labor under a separate contract.
10. Erosion Control: As mentioned in the Mitigated Negative Declaration for the project,
the plans and specifications require the contractor to eke certain measures to
eliminate or minimize soil erosion during the construction of the project.
11. Electrical:': The contract documents include plans and specification prepared by an
electrical engineer retained by the City, for the installation of an electrical service,
conduit and lighting in the vicinity of the bridge.
12. Irrigation Water: The contract documents include plans and specifications prepared
by a landscape architect retied by the City, for the installation of an irrigation water
line to extend from the existing irrigation system for Arroyo Vista Community Park,
across the bridge to a point just north of the bridge. This now system will provide well
water from Arroyo Vista Community Park to the landscaping which will be planted in
the areas adjacent to the bridge. This water source will be available to the serve
Campesina Park. It will also be available to be extended northerly to serve other City
owned and maintained landscaping.
1. Cabrillo: The City Council has approved a Certificate of Acceptance for an Easement
Deed from Cabrillo Economic Deveb11 Copmation to the City for certain property
required for the project. In a related metier, staff forwarded a Deed from Cabrillo to
the Ventkira County Flood Control District (VCFCD) for easements required for the
levee maintenance road on the north side of the Arroyo.
..,a
Bids: Arroyo Vista Park Pedestrian Bridge
December 1996
Page 3
2. VCFCD: The City Council also approved a Certificate of Acceptance for an Easement
Deed from the Ventura County Flood Control Dftxt (VCFCD) to allow the
construction and use of the subject bridge across the Arroyo Simi.
3. SCE: Easements are required across property owned by the Soudwrn California Edison
Company (SCE). One easement is required for the construction of the bridge abutment
on the south side of the Arroyo and to allow access between the brings and the Arroyo
Vista Community Park. Other easements (to be granted to VCFCD) are required for
the levee maintenance road on the south side of the Arroyo. The City has initiated an
eminent domain action to acquire these easements.
r i it, 7771511
When the City condemns property, it normally cannot take possession until there is a final
Judgement in the case. The final judged does not occur until the value of the property
has been established at trial. It can take several months for the case to go to trial.
In the meantime, the City can take possession of the property if it deposits the amount of
its appraisal with the court and receives a court order for early possession- When an order
of early possession is issued, the City can take possession of the property ninety (90) days
after the order is served on the property owner and any occupant. However, the property
owner can have the cyder stayed on the ground that possession by the City will not be
compatible with the owner's use of its surrounding property. In such a case, the City's
possession of the property is delayed until the court hues teases and condifions that are
intended to make the City's possession compatible with the property owner's use. The delay
can be several weeks or more, depending upon how soon the court hears and decides the
"compatible use" dispute.
In this case, SCE, the property owner, and Performance Nursery, the occupant, have both
indicated a willingness to allow the City to take possession as of January 1, 1997, rather
than on a regular ninety (90) day order, as long as the City agrees up from to certain terms
and conditions. An agreement with SCE is not only essential to possession on January 1,
1997, it would be essential for possession even upon a ninety (90) day order. SCE has
indicated that it would seek to stay a ninety (90) day order, absent terms and conditions that
it finds acceptable. Thus, City staff and the City Aftwney have been working with both
SCE and its tenant on the development of a set of terms and conditions required by them
prior to agreeing to the waiver of the ninety (90) day period. Filing the case prior to
reaching such an agreement would not facilitate early possession by the City, but could
hinder it.
pedbrq. we 0005,42
Bids: Arroyo Vista Park Pedestrian Bridge
December 1996
Page 4
As of the writing of this report, those agrees were being finalized and the City Attorney
was prepeft to file the con action with the court. Staff is hopeful that the City
will receive a court Order for early possession within the next few days or weeks.
The bid documents allow the City ninety (90) days from the date of the bid opening (March
11, 1997) to award a contract. Once the coaab*d is awarded, a Notice to Proceed with
construction will be issued as soon as all of the contract documents are executed and
necessary bonds and nwArance cextifkates are received. Normally a Notice to Proceed is
issued ten (10) to thirty (30) days after the award of contract.
The City will not be in a position to issue a Notice to Proceed until after the City has
acquired access to all of the required easements. As stated above, the City may only receive
early possession of the easements with a court order. It is recommended, therefore, that a
construction contract for the subject project NOT be awarded prior to the City's receipt of
that court order.
Bids for the subject project were received and opened on December 11, 1946. A tabulation
of the bid results is attached as Exhthit 1. A summary of the bid results is as follows:
Bid
Gerstenberger Conduction
Bid Amount (Sl
507,894.00
Oberg Contracting
514,674.50
KEC Engineering
532, 834.00
Cal Fran Engineering
560, 317.00
Union Engineering
550,485.10
Lash Construction
568,662.00
John S. Meek Company, Inc.
694,970.00
The apparent low bidder for all options is (i x0embearger Cueetrnction. It has been
determined that this budder is qualified to peeorm the work. Said bidder has confined that
their bid is valid and that they are prepared to proceed with the construction of the project.
peebrg. ere 000533
Bids: Arroyo Vista Park Pedestrian Bridge
December 1996
Page 5
The Engineer's Estimate of probable conow ion cost for this project was $360,000. The
amount lied for the Engineer's Estimate in the bid wry (Exhibit 3) is 5419,931. The
engineer's estimate has been revised further to $550,000. A summary of the reasons for
these changes is as follows:
Amount ($)
419,931
Remarks:
The Engineer's Estimate set forth in the bid summary
attached as Exhibit 3.
(�(�
60,000
Mimes the estimated cost of the electrical and irrigation
work which was added to the initial bridge design package
prepared by the consultant structural engineer.
360,000+
The amount of the Engineer's Estimate set forth in the bid
documents.
+ 36.000
Plus a ten percent (10 %) increase to adjust the Engineer's
Estimate to refloct current prices. The engineer's estimate
had been prepared almost two years ago and was not
adjusted prior to advertising the project for receipt of bids.
396,000
The original estimate plus ten percent.
+60.
Plus the estimated cost for the electrical and irrigation work
added to the project.
456,000
The adjusted estimate including the electrical and irrigation
work.
+94.
Plus an amount added to Bid Item No. 23: Bridge Concrete.
The average amount bid for this item by all seven bidders is
$196,534. The engineer's estimate for this amount is
$91,000. It has been determined that the assumpfions used
for the Engineer's Estimate for this Bid Item are not
applicable to the present consbuction environment.
550,000
The amount of the adjusted Engineer's Estimate.
padbrq. awd V V V s!A
Bias: Arroyo Vista Park Pedestrian Bridge
December 1996
Page 6
H. FiscalImnact
1. Project Cost Estimate: A summary of the total project costs is as follows:
Elemt Prior Years M FY 19%/97 M Total ($1
Design 65,000 20,000 85,000
Land kxjuisition 40,000 40,000
Construction 0 507,894 507,894
Construction Contingency (101) 0 521106 52,106
Contract Adxin & Inspection _ 0 40,000 40,000
Total 65,000 660,000 725,000
2. Budget Amendment: It is recommended that the FY 1996 /97 Budget be amended to
provide suffices funding for this project. Consistent with prior actions of the City
Council, it is recommended that the finding sources be as follows:
•
1/3: Spring Road / Tierra Rejada Road AOC
• 2/3: Los Angeles Avenue AOC.
A resolution (Exhibit 4) has been prepared to increased the appropriation and budget
amount for the project and to revised the current budget spud to the one -third / two-
thirds split described above A summary of that recommended action is as follows:
LC=Mt )Huber Fund
211.901.8002.000.9903 L A AOC
211.900.8002.000.9903 Spring / TR A0C
Total
Current
Revised
FY %/97
I" (S).
Proposed FY 1996/97
gm (S)
300,000
200,,000
140,000 440,000
20.000 220.000
500,000
160,000 660,000
It is estimated that the bridge construction will be completed approximately seven months
from the date of the Notice to Proceed with cons"ction.
peftrg.awd 535
Bids: Arroyo Vista Park Pedestrian Bridge
December 1996
Page 7
If on the date the City Council considers this action, the City has been granted a Court Order
for early possession of the Easemmis bemg accred f m the Southern Calif mm Edison
Company, staff recommends that the City Council take the following actions:
1. Adopt Resolution 96 - approving a budget amaWment to increase the appropriation and
budget amounts for the subject project as follows:
• Los Angeles Avenue Area of Contribution Find (Account No.
211.901.8002.000.9903) from $300,000 to $440,000 ($140,000 increase);
• Spring Road Tierra Rejuk Road Area of Coition Fund (Account No.
211.900.8002.000.9903) from $200,000 to $220,000 ($20,000 increase).
2. Award a contract to Q shwboger Co=&ucdm Corporafim in the amount of
$507,894.00 for the construction of the subject project.
3. Approve a construction contingency in the amount of $52,106 for the project and
authorize the City Manager to approve additional work, if required, for an amount not
to exceed ten per cent of the contract;
4. Authorize the City Manager to sign necessary contract documents.
Note: If on the date the City Comwil considers the above action, the City has =
been grained a Court Order for early possession of the Easements berg
acquired from the Southern California Edison Company, staff recommends that
the City Co uwil continw this n Il to dee next regularly 9dmhdW meeting
of the City Council or to a special meeting convened for this purpose.
padbrq. avd 000596
Exhibit 1: Baekground
The following is a summary of the tasks required to develop and implement a project to constrict
a Pedestrian bridge across the Arroyo Simi:
Date_ UNGdation
Sept. 1985 PD -1010 (Palmer) approved for the coast tim of the U Club
Apartments. One Condition of Approval provided for the construction of
the Ped bridge.
May 1987 City & Palmer enter into a Settleamet Agreement. One paint in said
agreement clarified the developer's responsibility regarding the bridge.
Sept. 1992 City & Palmer approve a Revision to the Aunt whereby the City
agues to take over the raespomability for the design and construction of
the bridge, to be funded by the developer.
April 1993 City Council approves the selection of the design Engineer (VCE).
July 1993 City Council approves the alignment and the conceptual design for the
bridge.
Sept. 1994 City Council approves the final design concept.
July 1995 Final design completed.
Aug. 1995 City and County meet with residents of the Camillo neighborhood to
discuss the impact of the VCFCD channel widening proect on the design
for Campesina Park. Possible revisions to the channel widening project
could have required a change to the design for the bridge and easements
to be acquired from SCE.
Sept. 1995 City Council approves the acquisition of easements from Cabrillo and
from the VCFCD.
Feb. 1996 Revised alignment of the VCFCD channel widening project (Re:
Campesina Park) was provided to the City Council.
March 1996 City initiates efforts to obtain an aPpraisai report for the easements
required from the Southern California Edison Company (SCE).
April 1996 City Council approves the Conditional Negative Declaration for the
project.
June 1996 City retains Appraisal Firm.
Sep. 24, 1996 Appraisal received by City.
Oct. 9, 1996 City Council approves the appraisal, determines the fmmfr market value of
the property and directs staff to make an offer to SCE for the acquisition;
of the property.
p"brq.aW
OoO59%
Exhibit 1: Background
Date
Oct. 16, 1996 City Council authorizes staff to advertise for receipt of bids.
Nov. 7, 1996 City Council adopts a Resolution of Necessity initiating eminent domain
proceedings to acquire certain easements from SCE.
Nov. 1996 Negotialm proceed with SCE and its wow regarding the terms and
conditions necessary to obtain early possession of the property.
Dec. 11, 1996 Bids are opened.
[unknown] City receives Order of Immediate Possession from the Court.
[unknown] City Council awards construction contract.
padbrq. awd +►/ ti M W)b
LOS ANGELES AVENUE
Ax R,vEA v`v ,
R
VICINITY MAP
NO SCALE
�- X. Nlf� l 2
�l aY 2)
000599
EMIDA"
\ V TO U
Z L \3AH Q
FILE. 1GD5VDRAIN DWG --1-5
s, 6s
AWN ea
I
�P
m
4\
z
O OFn
m
i-Tu
�
'
cl
kpp
��e
C
II•
N)
8
iI ,
a
c
Of1M
_- 16. 14.48'R
u W �
A
-
w
r -
� r
- N 83,512.0546
E 31,949.2829
128 +24 ARROYO SIMI
- - -
12 +17.00 BRIDGE
—
�; l� o
n
im
N68'09'34'W _ - - ~ --
g OF CNANNEL '•.
�4
m
ARROYO SIMI
— —
__ �, ,_ . _ Ss7 7.43 - •/
-' �_
`` f _tti•13.9'L', J •�1 f�.r
�
r \ \, _ — - !'"�•, `— --
/—
D —
i X1,
®�
co
•b. ^ \ �` • \n
A
O
WS
T4 Tf
D
r�
Z
FILE. 1GD5VDRAIN DWG --1-5
Exhibit 3 (1 of 6)
CITY Of 1
Bid Results
DeceWW 11, 19%
Pedestrian Bridge
--------------------------
Il�1 DESCRIPTION
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
Mobilization
Clearing 6 Grubbing
Roadway Excavation
Imported Borrow
Asphalt Concrete
PO (Type B)
24" CMP
18" CMP
18" RCP
24" Steel Flared Sec.
Permit Requirements
Steel Pipe Gates
I
PCC Curb (Type A1-6)
I►dj Exist MH
Grate Inlet
Remove Fence
Structural Excavation
Structural Backfill
Furnish Steel Piling
Bidder
--------- - - - - --
I NN:
a nESS:
CITY, STATE:
PRONE NOW:
Est Qty units
1 LS
1 LS
1 LS
1 LS
502 Tons
623 CY
112 LF
70 LF
2 LF
3 EA
1 LS
4 EA
21 LF
1 EA
1 EA
120 LF
145 CY
110 CY
1,181 LF
Engineer's Estivate
UNIT $ 1 TOTAL BID
--- - - - - -- ------- - - - - --
30,000.00
2,000.00
15,000.00
5,000.00
40.00
28.00
65.00
58.00
63.00
450.00
5,000.00
500.00
13.00
575.00
750.00
3.00
30.00
45.00
12.00
30,000.00
2,000.00
15,000.00
5,000.00
20,080.00
17,444.00
7,280.00
4,060.00
126.00
1,350.00
5,000.00
2,000.00
273.00
575.00
750.00
360.00
4,350.00
4,950.00
14,172.00
-- L_S__ »SSS_Sxx_x3 -_Sxx:
VENDOR 1
Ontewww Constr.
27013 La»gside A ". NO-
Caslyon Oovetry, CA 91351
(805) 250 -7341
_ UNIT $ � 'PO'PaL SiD
18144.00
5376.00
19003.04
1.00
50.40
25.7043
49.80
47.20
627.20
448.00
1344.00
1030.40
24.64
1344.00
2016.00
4.48
17.1476
22.6036
15.6667
18,144.00
5,376.00
19,003.04
1.00
25,300.80
16,013.78
5,577.60
3,304.00
1,254.40
1,344.00
1,344.00
4,121.60
517.44
1,344.00
2,016.00
537.60
2,486.40
2,486.40
18,502.37
VENDOR 2
----------------v------
Oberg Contracting
2131 Kalfred Street
Simi Valley, CA 93063
(805) 522 -1954
-- UNIT_$__1_ SAL BID-_
50,700.00
6,200.00
11,000.00
7,500.00
49.50
28.00
52.00
49.00
430.00
235.00
400.00
1,000.00
30.00
400.00
2,300.00
7.50
50.00
60.00
5.50
50,700.00
6,200.00
11,000.00
7,500.00
24,849.00
17,444.00
5,824.00
3,430.00
860.00
705.00
400.00
4,000.00
630.00
400.00
2,300.00
900.00
7,250.00
6,600.00
6,495.50,
= _- xxxxxx� »xxxxxxxxx- �zzxx_ xzxxxxxxxxxxxxxxxxz _zLxx___ »xvr_cxxc. »xx ..xx.M xxx- »xcxxxxzzzxxxxxxx_ xxxxxzxzxxzx_ -__ -x
V V V �'.�k
Exhibit 3 (2 of 6)
CITY or mmm
Bid baits
D00016K 11, M
Pedestrian Bridge
ITM DESCRIPTION
20
21
22
23
24
25
26
27
28
29
30
31
Drive Steel Piles
Prestress Concrete
Concrete Footing
Concrete Bridge
Joint steel
Re-bar
Picket Railing
Electrical
Irrigation
Install GCP Inlet
Bollards
Release
------------------------
Ingimer's btiute
ZEN,,
2,900.00
17,000.00
300.00
350.00
40.00
0.50
100.00
30,000.00
30,000.00
1,000.00
300.00
1.00
TOTAL BID
46,400.00
17,000.00
6,000.00
91,000.00
1,360.00
21,800.00
39,400.00
30,000.00
30,000.00
1,000.00
1,200.00
1.00
GK$b@*WW COMtr.
27013 ride Ave. 90'
CWfoo Watry, CA 91351
(805) 250-7341
MIT $
2206.40
19592.00
211.%
$40.00
33.60
0.4816
61.3442
24192.00
29495.20
8%.00
448.00
1.00
TOTAL BID
35,302.40
18,592.00
4,239.20
218,400.00
1,142.40
20,"7.76
24,169.61
24,192.00
29,495.20
8%.00
1,792.00
1.00
VIM 2
— - — -----------------
Merg ftuwt*
2131 NUffred Street
SW Valley, CA 93063
(M) 522-1954
OBIT $
3,200.00
18,000.00
400.00
600.00
60.00
0.58
57.00
23,000.00
45,000.00
4,400.00
450.00
1.00
TOTAL BID
51,200.00
18,000.00
8,000.00
156,000.00
2,040.00
25,288.00
22,458.00
23,000.00
45,000.00
4,400.00
1,800.00
1.00
TOTAL 419,931.00 507,994.00 514,674.50
-----------
000kioz
Bidder
CITY, STATE:
PAt I mm:
MEXT Pam:
----- — ------
Bet Qty
71
units
16
EA
I
LS
20
CY
260
CY
34
LF
43,600
LBS
394
LF
1
LS
1
is
1
1A
4
U
1
LS
------------------------
Ingimer's btiute
ZEN,,
2,900.00
17,000.00
300.00
350.00
40.00
0.50
100.00
30,000.00
30,000.00
1,000.00
300.00
1.00
TOTAL BID
46,400.00
17,000.00
6,000.00
91,000.00
1,360.00
21,800.00
39,400.00
30,000.00
30,000.00
1,000.00
1,200.00
1.00
GK$b@*WW COMtr.
27013 ride Ave. 90'
CWfoo Watry, CA 91351
(805) 250-7341
MIT $
2206.40
19592.00
211.%
$40.00
33.60
0.4816
61.3442
24192.00
29495.20
8%.00
448.00
1.00
TOTAL BID
35,302.40
18,592.00
4,239.20
218,400.00
1,142.40
20,"7.76
24,169.61
24,192.00
29,495.20
8%.00
1,792.00
1.00
VIM 2
— - — -----------------
Merg ftuwt*
2131 NUffred Street
SW Valley, CA 93063
(M) 522-1954
OBIT $
3,200.00
18,000.00
400.00
600.00
60.00
0.58
57.00
23,000.00
45,000.00
4,400.00
450.00
1.00
TOTAL BID
51,200.00
18,000.00
8,000.00
156,000.00
2,040.00
25,288.00
22,458.00
23,000.00
45,000.00
4,400.00
1,800.00
1.00
TOTAL 419,931.00 507,994.00 514,674.50
-----------
000kioz
Exhibit 3 (3 of 6)
CITY OF MONK
Bid Results
lieces# K 11, 19%
Pedestrian Bridge
IT)IMI DUCRIPTIOI
1
2
3
4
5
6
7
8
9
10
it
12
13
14
15
16
17
18
19
Aobiliaation
Clearing & Grubbing
Roadway Excavation
Imported Borrow
Asphalt Concrete
M (Type B)
24" CAP
18" CAP
18" RCP
24" Steel Flared Sec.
Permit Reguiremnts
Steel Pipe Gates
PCC Curb (Type Al -6)
Adj Exist AH
Grate Inlet
Remove Fence
Structural Excavation
Structural Backfill
F urn isb Steel Piling
Bidder
VIM 3
111111E:
0C bowing
ADMMS:
200 A. Sham Ave.
CITY, STATE:
Comte, CA 92546
PUS 111 WR:
(805) 250-7341
Est Qty Units
UKIT $ I TOTAL BID
1 LS
1 LS
1 LS
1 LS
502 Tons
623 CY
112 LF
70 LF
2 LF
3 EA
1 LS
4 EA
21 LF
1 &A
1 EA
120 LF
145 CY
110 CY
1,181 LF
25,000.00
16,000.00
25,000.00
1,000.00
50.00
30.00
120.00
135.00
1,900.00
800.00
1,000.00
3,000.00
85.00
980.00
1,700.00
10.00
25.00
110.00
23.00
25,000.00
16,000.00
25,000.00
1,000.00
25,100.00
18,690.00
13,440.00
9,450.00
3,800.00
2,400.00
1,000.00
12,000.00
1,785.00
980.00
1,700.00
1,200.00
3,625.00
12,100.00
27,163.00
VIM 4
Cal From Eaginaering
%0 Enchanted Nay [ 1111]
Sini Valley, CA 93465
(805) 579 -9173
- UNIT $ 1 TOTAL BID
51000.00
10000.00
20000.00
7500.00
43.00
36.00
49.00
40.00
670.00
390.00
1.00
1000.00
38.00
1200.00
2850.00
6.00
33.00
37.00
16.00
51,000.00
10,000.00
20,000.00
7,500.00
21,586.00
22,428.00
5,488.00
2,800.00
1,340.00
1,170.00
1.00
4,000.00
798.00
1,200.00
2,850.00
720.00
4,785.00
4,070.00
18,896.00
Vom 5
Lob Construction
721 Carpentaria St
Santa Barbara, CA 93140
(805) %3 -3553
- -UNIT $ I TOTAL BID
• -- ------ - - - - --
82,500.00
7,000.00
31,000.00
2,500.00
49.00
41.00
60.00
51.00
535.00
330.00
1.00
1,100.00
16.00
1,750.00
1,125.00
4.00
6.00
24.00
16.00
82,500.00
7,000.00
31,000.00
2,500.00
24,598.00
25,543.00
6,720.00
3,570.00
1,070.00
990.00
1.00
4,400.00
336.00
1,750.00
1,125.00
480.00
870.00
2,640.00
18,8%.00
00M03
Exhibit 3 (4 of 6)
xssx= a =xxxxz= sxsxxxxssx =r;
CITY OF NOORPAIC
Bid Results
December 11, 19%
Pedestrian Bridge
ITO DESCRIPTION
20
21
22
23
24
25
26
27
28
29
30
31
Drive Steel Piles
Prestress Concrete
Concrete Footing
Concrete Bridge
Joint Steel
Re-bar
Picket Railing
Electrical
Irrigation
I�
Install GCP Inlet
Bollards
Release
cssx -= sss-_ xssss
Biddy
----------------
IN:
ADDRESS:
CITY, STATE:
PM BUM:
CMICT PIM:
Est Qty units
16 EA
1 IS
20 CY
260 CY
34 LF
43,600 LBS
394 LF
1 LS
1 LS
1 EA
4 EA
1 LS
VIM 3
uc Engiaeering
200 N. MUM Ave.
Coroaa, C1 92506
(805) 250 -7341
UNIT $ TOTAL BID
2,300.00
21,000.00
240.00
575.00
40.00
0.60
60.00
30,000.00
33,000.00
3,800.00
335.00
1.00
36,800.00
21,000.00
4,800.00
149,500.00
1,360.00
26,160.00
23,640.00
30,000.00
33,000.00
3,800.00
1,340.00
1.00
:ssssxxssss -xx_ _sxsxxxxs
van 4
------------------------
Cal Fran ae9imeriag
%0 Eadeated stay [ 1111 ]
Siai Vary, CA 93065
(805) 579 -9173
-------,.---------------
UNIT $ TOTAL BID
-
2250.00
20000.00
350.00
800.00
50.00
0.50
61.00
27000.00
30000.00
2150.00
500.00
1.00
36,000.00
20,000.00
7,000.00
208,000.00
1,700.00
21,800.00
24,034.00
27,000.00
30,000.00
2,150.00
2,000.00
1.00
.sxxxaxsxsNxxxx - -� x - - -x -,
van 5
------------------------
Lash Construction
721 Carpentaria St
Salta Barbara, CA 93140
(805) %3 -3553
- UNIT $ I TOTAL BID
2,350.00
20,700.00
280.00
658.00
20.00
0.53
66.00
30,400.00
32,000.00
3,500.00
500.00
1.00
37,600.00
20,700.00
5,600.00
171,080.00
680.00
23,108.00
26,004.00
30,400.00
32,000.00
3,500.00
2,000.00
1.00
TOTAL 532,834.00 560,317.00 568,662.00
Exhibit 3 (5 of 6)
xuxxxxxxasaxaxsxexaasaxa=
CITY of MARK
Bid Results
Deomm 11, 19%
Pedestrian Bridge
--------------------------
IM DESCRIPTION
--------------------------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
L6
17
L8
L9
Mobilization
Clearing & Grubbing
Roadway Excavation
Imported Borrow
Asphalt Concrete
PNB (Type B)
24" CMP
18" CMP
18" RCP
24" Steel Flared Sec.
Permit Requirements
Steel Pipe Gates
PCC Curb (Type A1-6)
Adj Exist MR
Grate Inlet
Remove Fence
Structural Excavation
Structural Backfill
Furnish Steel Piling
.x := sasxsx °ass. xaxxaxsaxaaxs__sxxxa _xsa
Bidder Von 6
NAME: Union Amoseering
ADDRESS: 3658 N. Ventura Ave
CITY, STATE: Venture, CA 93001
PIM hUM: (805) 648 -3373
Est Qty Units UNIT $ 1 TOTAL BID
1 LS 21,919.00
1 LS 19,941.00
1 IS 14,843.00
1 LS 23,988.00
502 Tons 49.70
623 CY 41.90
112 LF 90.70
70 LF 76.30
2 LF 167.50
3 EA 451.30
1 LS 18,750.00
4 EA 1,150.00
21 LF 25.00
1 EA 383.00
1 EA 1,146.00
120 LF 8.80
145 CY 35.00
110 CY 56.30
1,181 LF 17.50
21,919.00
19,941.00
14,843.00
23,988.00
24,949.40
26,103.70
10,158.40
5,341.00
335.00
1,353.90
18,750.00
4,600.00
525.00
383.00
1,146.00
1,056.00
5,075.00
6,193.00
20,667.50
.xxx:xaaacssxc =xxax == xaxs =,
VB M 7
Job S. Meek
1032 V. 'C' St.
Nilaimgton, CA 90744
(310) 830 -6323
- UNIT $ 1 TOTAL BID
74645.00.
6500.00
16285.00
5400.00
50.00
32.00
43.00
48.00
250.00
260.00
3000.00
1060.00
20.00
500.00
4000.00
5.00
39.90
135.00
15.50
74,645.00
6,500.00
16,285.00
5,400.00
25,100.00
19,936.00
4,816.00
3,360.00
500.00
780.00
3,000.00
4,240.00
420.00
500.00
4,000.00
600.00
5,785.50
14,850.00
18,305.50
._- �saaxasxsxsxxxaxax_sxs,
UNIT $ 1 TOTAL BID
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
000(.) Wi
Exhibit 3 (6 of 6)
MY OF NZWAK
Bid Results
December 11, 19%
Pedestrian Bridge
--------------------------
ITEN DESCRIPTION
--------------------------
20
21
22
23
24
25
26
27
28
29
30
31
Drive Steel Piles
Prestress Concrete
Concrete Footing
Concrete Bridge
Joint Steel
Re -bar
Picket Railing
Electrical
Irrigation
Install GCP Inlet
Bollards
Release
Bidder Vmn 6
---------------- ------------------------
NAME: union Engineering
anNS: 3658 N. Ventura Ave
CITY, STATE: Ventura, CA 93001
PM ND116BR: (805) 648 -3373
COMlACT PERSON:
Est Qty Units UNIT $ I TOTAL BID
16
EA
2,462.50
1
IS
22,500.00
20
CY
283.80
260
CY
691.30
34
LF
107.50
43,600
LBS
0.69
394
LF
68.80
1
LS
31,850.00
1
LS
0.00
1
EA
1,146.00
4
EA
500.00
1
LS
1.00
39,400.00
22,500.00
5,676.00
179,738.00
3,655.00
30,084.00
27,107.20
31,850.00
0.00
1,146.00
2,000.00
1.00
VEMDOR 7
------------------------
Jft S. Neek
1032 W. 'C' St.
Nilnington, CA 90744
(310) 830 -6323
UNIT $ TOTAL BID
--
2790.00
18400.00
315.00
1100.00
35.00
0.49
63.00
31355.00
41775.00
7850.00
562.50
1.00
44,640.00
18,400.00
6,300.00
286,000.00
1,190.00
21,364.00
24,822.00
31,355.00
41,775.00
7,850.00
2,250.00
1.00
.=s° r_sssss °ssssss__ssss
------------------------
-- UNIT -$ -- 1 TOTAL BID
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL 550,485.10 694,970.00 0.00
---------------------------------------------------------__-_----------
000c,®6
4�§ �,
RESOLUTION NO. 96 -
A RE90LUTION OF THE CITY COUNCIL OF THE CITY
OF MOORPARK, CALIFORNIA, AUTHORIZING A
BUDGET A MOMENT TO THE FISCAL YEAR 19960197
ADOPTED BUDGET FOR THE LOS APIGEL 3S AVENUE
AREA OF CONTRMUTION ACCOUNT (ACCOUNT
NUMBER 211.901) AND THE TIERRA REIADA / SPRING
ROAD AREA OF CONTRIBUTION ACCOUNT (ACCOUNT
NUMBER 211.900)
WHEREAS, on June 19, 1996, the City Council adopted the Budget for Fiscal Year
1996/97; and,
WHEREAS, said budget included the funding of a project to construct a Pedestrian /
Equestrian / Bicycle Emergency Access Bridge across the Arroyo Sine in the vicinity of Liberty
Bell Road; and,
WHEREAS, a staff report has been tented to the City Council requesting an increase in
the funding for that project in the aggregate amount of $ 160,000; and,
WHEREAS, Exhibit "A," attached hereto and made a part hereof, describes said budget
amendment and its resultant impacts to the budget line item(s) and projected year end fund
balance(s).
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF MOORPARK,
CALIFORNIA, DOES HEREBY RESOLVE AS FOLLOWS:
SECTION 1. That a Budget amendment in the amount of $160,000 to Accounts 211.900
and 211. 901, as more particularly described in Exhibit "A, " is hereby approved.
PASSED AND ADOPTED this 18th day of December, 1996.
ATTESTED:
City Clerk
Mayor, City of Moorpark, California
P) 1 *4 2
Resolution No. 96 -
Exhibit "A"
SUPPLEMENTAL APPROPRIATIONS BY ACCOUNT NUMBER
ACCOUNT
NUMBER
Spring / T. R. AOC
211.900.8002.000.9903
L A Ave AOC
211.901.8002.000.9903
TOTALS:
CURRENT
APPROPRIATION
11 ftl 1
$500,000.00
n z o9 2
SUBJECT REVISED
APPROPRIATION APPROPRIATION
(REDUCTION)
$20,000.00 $220,000.00
$140,000.00
$160,000.00
$660,000.00
EFFECT OF PROPOSED SUPPLEMENTAL APPROPRIATIONS TO FUND BALANCES
FUND CURRENT
PROJECTED FY 46/97
YEAR END BALANCE
!211.900
Spring Rd / Tierra
Rejada Rd
211.901
L. A. Ave. AOC
TOTALS:
$512,010.00
$4,006,578.00
SUPILEITAL REVISED
APPROPRIATION PROTECTED FY
96/97 YEAR END
BALANCE
$20,000.00 $492,010.00
$140,000.001 $3,866,578.00
$160,000.00
000608