HomeMy WebLinkAboutAGENDA REPORT 2018 0606 CCSA REG ITEM 10GCITY OF MOORPARK, CALIFORNIA City Council Meeting of June 6, 2018 ACTION Approved staff recommendation BY M. Benson Consider Agreements with American Building Comfort Services, Pipe Dreams Plumbing Company, Inc., Draper Construction, and Fence Factory dba Perimeter Security Systems for General Maintenance Services. Item: 10.G. MOORPARK CITY COUNCIL AGENDA REPORT TO: Honorable City Council FROM: Jeremy Laurentowski, Parks and Recreation Director BY: Jessica Sandifer, Community Services Manager DATE: May 22, 2018 (CC Meeting of 06/06/18) SUBJECT: Consider Agreements with American Building Comfort Services, Pipe Dreams Plumbing Company, Inc., Draper Construction, and Fence Factory dba Perimeter Security Systems for General Maintenance Services BACKGROUND Historically, the City has contracted with various licensed contractors to provide general maintenance and repair services for City owned facilities, parks, and landscape maintenance districts. These services include heating, ventilation, and air conditioning (HVAC), plumbing, electrical, roofing and general services, such as painting, concrete repairs and minor construction activities. As City facilities age over time, there is a greater need for many of these services. Currently, the service contracts for plumbing, HVAC, door and gate maintenance, and concrete repairs have reached the end of their term. Staff prepared informal bidding documents and solicited bids for each of these service contracts. The bid results are discussed below. DISCUSSION Heating, Ventilation and Air Conditioning (HVAC): The HVAC bid was released on April 25, 2018. Four bids were received by the bid due date of May 17, 2018. The HVAC Maintenance bids are to be awarded to the bidder with the lowest annual maintenance costs for the submitted facilities. The four bidders are: Item: 10.G. 572 Master Cooling $ 5,995 American Building Comfort Services $ 5,196 ACCO $31,543 Johnson Controls $41,417 Although there was a large disparity between the lowest and highest bidders, staff feels that the low bid amount is reflective of the scope of work required under this Agreement, and is reflective of the general maintenance and inspection costs that the City incurs annually. The bid is for once annual maintenance and includes replacing filters, tightening, testing and inspecting all system components. The City pays for the cost of repairs on an ‘as needed’ basis and includes funding for repairs in the annual operating budget. Since there was such a large disparity, staff contacted ACCO to discuss the bid they submitted for this work and discovered that they bid this work ‘turn- key’ and on a quarterly basis. Staff believes that Johnson Controls bid the work in a similar fashion. Based on the Annual Maintenance Costs, American Building Comfort Services was the low bidder. Staff is recommending awarding a three year agreement with two optional one year extensions to American Building Comfort Services for an annual amount of $50,000, which includes the annual maintenance costs plus funding for unanticipated repairs. This equates to a contract value of $150,000 for the three year term or $250,000 over the potential five year term. General Plumbing Services The General Plumbing Services bid was released on April 10, 2018. Only one bid was received by the bid due date of April 26, 2018. The plumbing services bid was to be awarded to the bidder with the lowest regular hourly wage. However, no responsive bids were received for this informal bid request. The sole bidder was Pipe Dreams Plumbing, however, Pipe Dreams Plumbing is not registered with the California Department of Industrial Relations (DIR), as required in the bid specifications. Pipe Dreams Plumbing has worked for the City before and possesses the necessary qualifications, resources and experience to perform the work. Since no other bids were received staff recommends negotiating an Agreement with Pipe Dreams Plumbing. The Public Contract Code allows the City to perform work on public projects under $45,000 through negotiated contract, without need of an informal bid. Additionally, the Labor Code provides exemptions from the public works registration requirement for contractors whose repair projects are under $25,000. To keep within these parameters, staff is recommending awarding a negotiated two year agreement to Pipe Dreams Plumbing for General Plumbing Services for a not-to-exceed amount of $25,000 for the two year term. 573 As-needed Concrete and Masonry Services The As-Needed Concrete and Masonry Services bid was released on April 10, 2018. Two bids were received by the bid due date of April 26, 2018. The As-Needed Concrete and Masonry Services bid was to be awarded based on the value of the items 1-6 on the bid proposal form. A typographical error on the bid form caused both bidders to total all 13 items on the bid form. This did not affect the bid results, as the low bidder was the lowest bidder based on the total of items 1-6 as well as all 13 items. The two bidders and the amounts based on 1-6 of the bid proposal, as well as all items are: Items 1-6 Items 1-13 BSN Construction $18,610 $45,215 Draper Construction $17,225 $43,275 Based on the costs of items 1-6, Draper Construction was the low bidder. Staff is recommending awarding a three year agreement with two optional one year extensions to Draper Construction. Due to a back log of work in the parks, staff is requesting an annual amount of $100,000 for year one of the Agreement term, and an annual amount of $75,000 for years two and three of the term, and the extension terms. This equates to a contract value of $250,000 for the three year term or $400,000 over the potential five year term. Gate and Door Maintenance and Repairs The Gate and Door Maintenance and Repairs bid was released on April 10, 2018. Two bids were received by the bid due date of April 26, 2018. The Gate and Door Maintenance and repair bids was to be awarded to the bidder with the lowest annual maintenance costs for the two facilities noted in the bid (Police Services Center and Moorpark Public Services Facility). The two bidders are: Ventura Overhead Door $2,500 Fence Factory dba Perimeter Security Systems $1,305 Based on the annual maintenance costs, Fence Factory dba Perimeter Security Systems was the low bidder. Staff is recommending awarding a three year agreement, with two optional one year extensions to Perimeter Security Systems for an annual amount of $35,000, which includes the annual maintenance costs plus funding for unanticipated repair costs. This equates to a contract value of $105,000 for the three year term or $175,000 over the potential five year term. 574 FISCAL IMPACT Funding has been included in the Property Maintenance Service account for each facility and park in the FY 18/19 operating budget, and will be included in subsequent operating budgets for these maintenance services. Staff is not requesting any additional appropriation for these services. STAFF RECOMMENDATION 1. Approve Agreement with American Building Comfort Services, for annual Heating, Ventilation, and Air Conditioning maintenance and miscellaneous services and repair for a three year term with two optional one year extensions for a total contract value of $250,000 over the potential five year term; authorize the City Manager to sign the Agreement and subsequent Agreement extensions, subject to final language approval of the City Manager; and 2. Approve Agreement with Pipe Dreams Plumbing for General Plumbing Services for a two-year term for a total contract value of $25,000, authorize City Manager to sign the Agreement, subject to final language approval of the City Manager; and 3. Approve Agreement with Draper Construction for as-needed concrete and masonry services for a three year term with two optional one year extensions for a total contract value of $400,000 over the potential five year term; authorize the City Manager to sign the Agreement and subsequent Agreement extensions, subject to final language approval of the City Manager; and 4. Approve Agreement with Fence Factory dba Perimeter Security Systems for annual door/gate maintenance and repair services for a three year term with two optional one year extensions for a total contract value of $175,000 over the potential five year term; authorize the City Manager sign the Agreement and subsequent Agreement extensions, subject to final language approval of the City Manager. Attachments: 1 – Agreement – American Building Comfort Services 2 – Agreement – Pipe Dreams Plumbing 3 – Agreement – Draper Construction 4 – Agreement – Fence Factory dba Perimeter Security Systems 575 AGREEMENT BETWEEN THE CITY OF MOORPARK AND AMERICAN BUILDING COMFORT SERVICES, INC. FOR HEATING, VENTILATION, AND AIR CONDITIONING MAINTENANCE AND REPAIR SERVICES THIS AGREEMENT, is made and effective as of this _________ day of ________________________, 2018, between the City of Moorpark, a municipal corporation (“City”) and American Building Comfort Services, Inc. a corporation (“Contractor”). In consideration of the mutual covenants and conditions set forth herein, the parties agree as follows: WHEREAS, City has the need for heating, ventilation, and air conditioning maintenance and repair services; and WHEREAS, Contractor specializes in providing such services and has the proper work experience, certifications, and background to carry out the duties involved; and WHEREAS, Contractor has submitted to City a Proposal dated May 15, 2018 which is attached hereto as Exhibit C. NOW, THEREFORE, in consideration of the mutual covenants, benefits, and premises herein stated, the parties hereto agree as follows: 1. TERM The term of this Agreement shall be from July 1, 2018 and will expire on June 30, 2021, unless this Agreement is terminated or suspended pursuant to this Agreement. Upon the mutual consent of both parties, the term of this Agreement may be extended by a written amendment executed by both parties for two (2) additional one (1) year periods. 2. SCOPE OF SERVICES City does hereby retain Contractor, as an independent contractor, in a contractual capacity to provide heating, ventilation, and air conditioning maintenance and repair services, as set forth in Exhibit C: Contractor’s Bid Proposal, and as set forth in Exhibit D: Informal Proposal Documents. In the event there is a conflict between the provisions of Exhibit C, Exhibit D, and this Agreement, the language contained in this Agreement shall take precedence. Contractor shall perform the tasks described and set forth in Exhibit D. Contractor shall complete the tasks according to the schedule of performance, which is also set forth in Exhibit D. Compensation for the services to be performed by Contractor shall be in accordance with Exhibit C. Compensation shall not exceed the rates or value of fifty thousand dollars ($50,000) annually, without a written amendment to the agreement 576 executed by both parties. Payment by City to Contractor shall be in accordance with the provisions of this Agreement. City and Contractor acknowledge that this project is a public work to which prevailing wages apply, and that a public work project is subject to compliance monitoring and enforcement by the California Department of Industrial Relations (DIR). Contractor agrees to comply with and be bound by all the terms, rules and regulations described in (a) Division 2, Part 7, Chapter 1 (commencing with Section 1720) of the California Labor Code, including without limitation Labor Code Section 1771 and (b) the rules and regulations established by the DIR implementing such statutes, as though set forth in full herein, including any applicable amendments made thereto during the term of this Agreement. For every subcontractor who will perform work on this project, Contractor shall be responsible for subcontractor’s compliance with (a) and (b), and Contractor shall take all necessary actions to ensure subcontractor’s compliance. Labor Code Section 1725.5 requires all contractors and subcontractors to annually register with the DIR before bidding or performing on any public work contract. 3. PERFORMANCE Contractor shall at all times faithfully, competently and to the best of their ability, experience, standard of care, and talent, perform all tasks described herein. Contractor shall employ, at a minimum, generally accepted standards and practices utilized by persons engaged in providing similar services as are required of Contractor hereunder in meeting its obligations under this Agreement. 4. MANAGEMENT The individual directly responsible for Contractor’s overall performance of the Agreement provisions herein above set forth and to serve as principal liaison between City and Contractor shall be Mark Rosales and no other individual may be substituted without the prior written approval of the City Manager. The City’s contact person in charge of administration of this Agreement, and to serve as principal liaison between Contractor and City, shall be the City Manager or the City Manager’s designee. 5. PAYMENT Taxpayer ID or Social Security numbers must be provided, on an IRS W-9 form, before payments may be made to vendors. The City agrees to pay Contractor monthly, in accordance with the payment rates and terms and the schedule of payment as set forth in Exhibit C based upon actual time spent on the above tasks. This amount shall not exceed fifty thousand dollars ($50,000) annually for the total term of the Agreement unless additional payment is approved as provided in this Agreement. 577 Contractor shall not be compensated for any services rendered in connection with its performance of this Agreement, unless such additional services and compensation are authorized, in advance, in a written amendment to the agreement executed by both parties. The City Manager, if authorized by City Council, may approve additional work not to exceed ten percent (10%) of the amount of the Agreement. Contractor shall submit invoices monthly for actual services performed. Invoices shall be submitted on or about the first business day of each month, or as soon thereafter as practical, for services provided in the previous month. Payment shall be made within thirty (30) days of receipt of each invoice as to all non-disputed fees. Any expense or reimbursable cost appearing on any invoice shall be accompanied by a receipt or other documentation subject to approval of the City Manager. If the City disputes any of Contractor’s fees or expenses it shall give written notice to Contractor within thirty (30) days of receipt of any disputed fees set forth on the invoice. 6. TERMINATION OR SUSPENSION WITHOUT CAUSE The City may at any time, for any reason, with or without cause, suspend or terminate this Agreement, or any portion hereof, by serving upon the Contractor at least ten (10) days prior written notice. Upon receipt of said notice, the Contractor shall immediately cease all work under this Agreement, unless the notice provides otherwise. If the City suspends or terminates a portion of this Agreement such suspension or termination shall not make void or invalidate the remainder of this Agreement. The Contractor may terminate this Agreement only by providing City with written notice no less than thirty (30) days in advance of such termination. In the event this Agreement is terminated or suspended pursuant to this Section, the City shall pay to Contractor the actual value of the work performed up to the time of termination or suspension, provided that the work performed is of value to the City. Upon termination or suspension of the Agreement pursuant to this Section, the Contractor will submit an invoice to the City pursuant to this Agreement. 7. DEFAULT OF CONTRACTOR The Contractor’s failure to comply with the provisions of this Agreement shall constitute a default. In the event that Contractor is in default for cause under the terms of this Agreement, City shall have no obligation or duty to continue compensating Contractor for any work performed after the date of default and can terminate or suspend this Agreement immediately by written notice to the Contractor. If such failure by the Contractor to make progress in the performance of work hereunder arises out of causes beyond the Contractor’s control, and without fault or negligence of the Contractor, it shall not be considered a default. If the City Manager or the City Manager’s designee determines that the Contractor is in default in the performance of any of the terms or conditions of this Agreement, designee shall cause to be served upon the Contractor a written notice of the default. The Contractor shall have five (5) days after service upon it of said notice in 578 which to cure the default by rendering a satisfactory performance. In the event that the Contractor fails to cure its default within such period of time, the City shall have the right, notwithstanding any other provision of this Agreement, to terminate this Agreement without further notice and without prejudice to any other remedy to which it may be entitled at law, in equity or under this Agreement. 8. LIQUIDATED DAMAGES If the Contractor fails to complete the work, or any portion thereof, within the time period required by this Agreement, or as duly extended in writing by the City Manager, Contractor shall forfeit and pay to the City, as liquidated damages, the sum of one hundred fifty dollars ($150) per day for each calendar day the work, or portion thereof, remains uncompleted after the above specified completion date. Liquidated damages shall be deducted from any payments due or to become due to the Contractor under the terms of this Agreement. Progress payments made by the City after the above specified completion date shall not constitute a waiver of liquidated damages by the City. 9. OWNERSHIP OF DOCUMENTS Contractor shall maintain complete and accurate records with respect to sales, costs, expenses, receipts, and other such information required by City that relate to the performance of services under this Agreement. Contractor shall maintain adequate records of services provided in sufficient detail to permit an evaluation of services. All such records shall be maintained in accordance with generally accepted accounting principles and shall be clearly identified and readily accessible. Contractor shall provide free access to the representatives of City or the City’s designees at reasonable times to such books and records; shall give the City the right to examine and audit said books and records; shall permit City to make transcripts therefrom as necessary; and shall allow inspection of all work, data, documents, proceedings, and activities related to this Agreement. Notification of audit shall be provided at least thirty (30) days before any such audit is conducted. Such records, together with supporting documents, shall be maintained for a period of ten (10) years after receipt of final payment. Upon completion of, or in the event of termination or suspension without cause of this Agreement, all original documents, designs, drawings, maps, models, computer files, surveys, notes, and other documents prepared in the course of providing the services to be performed pursuant to this Agreement shall become the sole property of the City and may be used, reused, or otherwise disposed of by the City without the permission of the Contractor. With respect to computer files, Contractor shall make available to the City, at the Contractor’s office and upon reasonable written request by the City, the necessary computer software and hardware for purposes of accessing, compiling, transferring, and printing computer files. 10. INDEMNIFICATION AND HOLD HARMLESS Contractor shall indemnify, defend and hold harmless City, and any and all of its officers, employees, and agents (“City Indemnitees”) from and against any and all causes of action, claims, liabilities, obligations, judgments, or damages, including 579 reasonable legal counsels’ fees and costs of litigation (“claims”), arising out of the Contractor’s performance of its obligations under this Agreement or out of the operations conducted by Contractor, including the City’s active or passive negligence, except for such loss or damage arising from the sole negligence or willful misconduct of the City. In the event the City Indemnitees are made a party to any action, lawsuit, or other adversarial proceeding arising from Contractor’s performance of this Agreement, the Contractor shall provide a defense to the City Indemnitees or at the City’s option reimburse the City Indemnitees their costs of defense, including reasonable legal counsels’ fees incurred in defense of such claims. Contractor agrees to obtain executed indemnity agreements with provisions identical to those set forth in this Section from each and every subcontractor, or any other person or entity involved by, for, with, or on behalf of Contractor in the performance of this Agreement. In the event Contractor fails to obtain such indemnity obligations from others as required here, Contractor agrees to be fully responsible according to the terms of this Section. Failure of City to monitor compliance with these requirements imposes no additional obligations on City and will in no way act as a waiver of any rights hereunder. This obligation to indemnify and defend City as set forth here is binding on the successors, assigns, or heirs of Contractor and shall survive the termination of this Agreement or this Section. City does not and shall not waive any rights that it may have against Contractor by reason of this Section, because of the acceptance by City, or the deposit with City, of any insurance policy or certificate required pursuant to this Agreement. The hold harmless and indemnification provisions shall apply regardless of whether or not said insurance policies are determined to be applicable to any losses, liabilities, damages, costs, and expenses described in this Section. This Indemnity shall survive termination of the Agreement or Final Payment hereunder. This Indemnity is in addition to any other rights or remedies that the Indemnitees may have under the law or under any other Contract Documents or Agreements. In the event of any claim or demand made against any party which is entitled to be indemnified hereunder, City may, in its sole discretion, reserve, retain, or apply any monies to the Contractor under this Agreement for the purpose of resolving such claims; provided, however, City may release such funds if the Contractor provides City with reasonable assurance of protection of the Indemnitees’ interests. City shall, in its sole discretion, determine whether such assurances are reasonable. 11. INSURANCE Contractor shall maintain prior to the beginning of and for the duration of this Agreement insurance coverage as specified in Exhibit A attached hereto and incorporated herein by this reference as though set forth in full. 12. INDEPENDENT CONTRACTOR Contractor is and shall at all times remain as to the City a wholly independent Contractor. The personnel performing the services under this Agreement on behalf of 580 Contractor shall at all times be under Contractor’s exclusive direction and control. Neither City nor any of its officers, employees, or agents shall have control over the conduct of Contractor or any of Contractor’s officers, employees, or agents, except as set forth in this Agreement. Contractor shall not at any time or in any manner represent that it or any of its officers, employees, or agents are in any manner officers, employees, or agents of the City. Contractor shall not incur or have the power to incur any debt, obligation, or liability against City, or bind City in any manner. No employee benefits shall be available to Contractor in connection with the performance of this Agreement. Except for the fees paid to Contractor as provided in the Agreement, City shall not pay salaries, wages, or other compensation to Contractor for performing services hereunder for City. City shall not be liable for compensation or indemnification to Contractor for injury or sickness arising out of performing services hereunder. 13. LEGAL RESPONSIBILITIES The Contractor shall keep itself informed of local, state and federal laws and regulations which in any manner affect those employed by it or in any way affect the performance of its service pursuant to this Agreement. The Contractor shall at all times observe and comply with all such laws and regulations, including but not limited to the Americans with Disabilities Act and Occupational Safety and Health Administration laws and regulations. The City and Contractor shall comply with Exhibit B, California Public Contract Code Section 9204, when applicable. The City, and its officers and employees, shall not be liable at law or in equity occasioned by failure of the Contractor to comply with this Section. 14. ANTI DISCRIMINATION Neither the Contractor, nor any subcontractor under the Contractor, shall discriminate in employment of persons upon the work because of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, genetic information, marital status, sex, gender, gender identity, gender expression, age, sexual orientation, or military and veteran status of such person; or any other basis protected by applicable federal, state, or local law, except as provided in Section 12940 of the Government Code. The Contractor shall have responsibility for compliance with this Section, if applicable [Labor Code Sec. 1735]. 15. UNDUE INFLUENCE Contractor declares and warrants that no undue influence or pressure is used against or in concert with any officer or employee of the City in connection with the award, terms or implementation of this Agreement, including any method of coercion, confidential financial arrangement, or financial inducement. No officer or employee of the City will receive compensation, directly or indirectly from Contractor, or any officer, employee or agent of Contractor, in connection with the award of this Agreement or any work to be conducted as a result of this Agreement. Violation of this Section shall be a 581 material breach of this Agreement entitling the City to any and all remedies at law or in equity. 16. NO BENEFIT TO ARISE TO LOCAL EMPLOYEES No member, officer, or employee of the City, or their designees or agents, and no public official who exercises authority over or responsibilities with respect to the Services during his/her tenure or for one (1) year thereafter, shall have any interest, direct or indirect, in any agreement or sub-agreement, or the proceeds thereof, for work to be performed in connection with the Services performed under this Agreement. 17. CONFLICT OF INTEREST Contractor covenants that neither they nor any officer or principal of their firm have any interests, nor shall they acquire any interest, directly or indirectly, which will conflict in any manner or degree with the performance of their services hereunder. Contractor further covenants that in the performance of this Agreement, they shall employ no person having such interest as an officer, employee, agent, or subcontractor. Contractor further covenants that Contractor has not contracted with nor is performing any services directly or indirectly, with the developer(s) and/or property owner(s) and/or firm(s) and/or partnership(s) and/or public agency(ies) owning property and/or processing an entitlement application for property in the City or its Area of Interest, now or within the past one (1) year, and further covenants and agrees that Contractor and/or its subcontractors shall provide no service or enter into any contract with any developer(s) and/or property owner(s) and/or firm(s) and/or partnership(s) and/or public agency(ies) owning property and/or processing an entitlement application for property in the City or its Area of Interest, while under contract with the City and for a one (1) year time period following termination of this Agreement. 18. NOTICE Any notice to be given pursuant to this Agreement shall be in writing, and all such notices and any other document to be delivered shall be delivered by personal service or by deposit in the United States mail, certified or registered, return receipt requested, with postage prepaid, and addressed to the party for whom intended as follows: To: City Manager City of Moorpark 799 Moorpark Ave. Moorpark, CA 93021 To: Mark Rosales American Building Comfort Services, Inc. 2686 Johnson Drive, Suite A Ventura, CA 93003 Either party may, from time to time, by written notice to the other, designate a different address or contact person, which shall be substituted for the one above 582 specified. Notices, payments and other documents shall be deemed delivered upon receipt by personal service or as of the third (3rd) day after deposit in the United States mail. 19. CHANGE IN NAME Should a change be contemplated in the name or nature of the Contractor’s legal entity, the Contractor shall first notify the City in order that proper steps may be taken to have the change reflected in the Agreement documents. 20. ASSIGNMENT Contractor shall not assign this Agreement or any of the rights, duties or obligations hereunder. It is understood and acknowledged by the parties that Contractor is uniquely qualified to perform the services provided for in this Agreement. 21. LICENSES At all times during the term of this Agreement, Contractor shall have in full force and effect, all licenses required of it by law for the performance of the services in this Agreement. 22. VENUE AND GOVERNING LAW This Agreement is made, entered into, and executed in Ventura County, California, and any action filed in any court or for arbitration for the interpretation, enforcement or other action of the terms, conditions, or covenants referred to herein shall be filed in the applicable court in Ventura County, California. The City and Contractor understand and agree that the laws of the State of California shall govern the rights, obligations, duties, and liabilities of the parties to this Agreement and also govern the interpretation of this Agreement. 23. COST RECOVERY In the event any action, suit or proceeding is brought for the enforcement of, or the declaration of any right or obligation pursuant to this Agreement or as a result of any alleged breach of any provision of this Agreement, the prevailing party shall be entitled to recover its costs and expenses from the losing party, and any judgment or decree rendered in such a proceeding shall include an award thereof. 24. ARBITRATION Cases involving a dispute between City and Contractor may be decided by an arbitrator if both sides agree in writing, with costs proportional to the judgment of the arbitrator. 583 25. ENTIRE AGREEMENT This Agreement and the Exhibits attached hereto contain the entire understanding between the parties relating to the obligations of the parties described in this Agreement. All prior or contemporaneous agreements, understandings, representations, and statements, oral or written, are merged into this Agreement and shall be of no further force or effect. Each party is entering into this Agreement based solely upon the representations set forth herein and upon each party’s own independent investigation of any and all facts such party deems material. 26. CAPTIONS OR HEADINGS The captions and headings of the various Articles, Paragraphs, and Exhibits of this Agreement are for convenience and identification only and shall not be deemed to limit or define the content of the respective Articles, Paragraphs, and Exhibits hereof. 27. AMENDMENTS Any amendment, modification, or variation from the terms of this Agreement shall be in writing and shall be effective only upon approval by both parties to this Agreement. 28. PRECEDENCE In the event of conflict, the requirements of the City’s Request for Proposal, if any, and this Agreement shall take precedence over those contained in the Contractor’s Proposal. 29. INTERPRETATION OF AGREEMENT Should interpretation of this Agreement, or any portion thereof, be necessary, it is deemed that this Agreement was prepared by the parties jointly and equally, and shall not be interpreted against either party on the ground that the party prepared the Agreement or caused it to be prepared. 30. WAIVER No waiver of any provision of this Agreement shall be deemed, or shall constitute, a waiver of any other provision, whether or not similar, nor shall any such waiver constitute a continuing or subsequent waiver of the same provision. No waiver shall be binding unless executed in writing by the party making the waiver. 31. AUTHORITY TO EXECUTE The person or persons executing this Agreement on behalf of the Contractor warrants and represents that he/she has the authority to execute this Agreement on behalf of the Contractor and has the authority to bind Contractor to the performance of obligations hereunder. 584 IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed the day and year first above written. CITY OF MOORPARK AMERICAN BUILDING COMFORT SERVICES, INC. By:_______________________________ By:_______________________________ Troy Brown, City Manager Mark Rosales, President Attest: __________________________________ Maureen Benson, City Clerk 585 Exhibit A INSURANCE REQUIREMENTS Prior to the beginning of and throughout the duration of Work, Contractor will maintain insurance in conformance with the requirements set forth below. Contractor will use existing coverage to comply with these requirements. If that existing coverage does not meet requirements set forth here, Contractor agrees to amend, supplement or endorse the existing coverage to do so. Contractor acknowledges that the insurance coverage and policy limits set forth in this section constitute the minimum amount of coverage required. Any insurance proceeds available to the City in excess of the limits and coverage required in this Agreement and which is applicable to a given loss, will be available to the City. Contractor shall provide the following types and amounts of insurance: Commercial General Liability Insurance using Insurance Services Office (ISO) “Commercial General Liability” policy form CG 00 01 or the exact equivalent. Defense costs must be paid in addition to limits. There shall be no cross liability exclusion for claims or suits by one insured against another. Limits are subject to review but in no event less than $1,000,000 per occurrence for all covered losses and no less than $2,000,000 general aggregate. Business Auto Coverage on ISO Business Auto Coverage form CA 00 01 including symbol 1 (Any Auto) or the exact equivalent. Limits are subject to review, but in no event to be less than $1,000,000 per accident. If Contractor owns no vehicles, this requirement may be satisfied by a non-owned auto endorsement to the general liability policy described above. If Contractor or Contractor’s employees will use personal autos in any way on this project, Contractor shall provide evidence of personal auto liability for each such person. Workers’ Compensation on a state-approved policy form providing statutory benefits as required by law with employer’s liability limits no less than $1,000,000 per accident or disease. Excess or Umbrella Liability Insurance (Over Primary) if used to meet limit requirements, shall provide coverage at least as broad as specified for the underlying coverages. Coverage shall be provided on a “pay on behalf” basis, with defense costs payable in addition to policy limits. Policy shall contain a provision obligating insurer at the time insured’s liability is determined, not requiring actual payment by the insured first. There shall be no cross liability exclusion precluding coverage for claims or suits by one insured against another. Coverage shall be applicable to the City for injury to employees of Contractor, subcontractors or others involved in the Work. The scope of coverage provided is subject to approval by the City following receipt of proof of insurance as required herein. Limits are subject to review. 586 Insurance procured pursuant to these requirements shall be written by insurers that are admitted carriers in the State of California and with an A.M. Bests rating of A- or better and a minimum financial size of VII. General conditions pertaining to provision of insurance coverage by Contractor. Contractor and the City agree to the following with respect to insurance provided by Contractor: 1. Contractor agrees to have its insurer endorse the third party general liability coverage required herein to include as additional insureds the City, its officials, employees, and agents, using standard ISO endorsement CG 2010 with an edition prior to 1992. Contractor also agrees to require all contractors and subcontractors to do likewise. 2. No liability insurance coverage provided to comply with this Agreement shall prohibit Contractor, or Contractor’s employees, or agents, from waiving the right to subrogation prior to a loss. Contractor agrees to waive subrogation rights against the City regardless of the applicability of any insurance proceeds, and to require all contractors and subcontractors to do likewise. 3. All insurance coverage and limits provided by Contractor and available or applicable to this Agreement are intended to apply to the full extent of the policies. Nothing contained in this Agreement or any other agreement relating to the City or its operation limits the application of such insurance coverage. 4. None of the coverages required herein will be in compliance with these requirements if they include limiting endorsement of any kind that has not been first submitted to the City and approved in writing. 5. No liability policy shall contain any provision or definition that would serve to eliminate so-called “third party action over” claims, including any exclusion for bodily injury to an employee of the insured or of any contractor or subcontractor. 6. All coverage types and limits required are subject to approval, modification, and additional requirements by the City, as the need arises. Contractor shall not make any reductions in scope of coverage (e.g. elimination of contractual liability or reduction of discovery period) that may affect the City’s protection without the City’s prior written consent. 7. Proof of compliance with these insurance requirements, consisting of certificates of insurance evidencing all of the coverages required and an additional insured endorsement to Contractor’s general liability policy, shall be delivered to city at or prior to the execution of this Agreement. In the event such proof of any insurance is not delivered as required, or in the event such insurance is canceled or reduced at any time and no replacement coverage is provided, the City has the right, but not the duty, to obtain any insurance it deems necessary to protect its interests under this or any other Agreement and to pay the premium. Any 587 premium so paid by the City shall be charged to and promptly paid by Contractor or deducted from sums due Contractor, at the City’s option. 8. Certificate(s) are to reflect that the insurer will provide 30 days notice to the City of any cancellation or reduction of coverage. Contractor agrees to require its insurer to modify such certificates to delete any exculpatory wording stating that failure of the insurer to mail written notice of cancellation or reduction of coverage imposes no obligation, or that any party will “endeavor” (as opposed to being required) to comply with the requirements of the certificate. 9. It is acknowledged by the parties of this Agreement that all insurance coverage required to be provided by Contractor or any subcontractor, is intended to apply first and on a primary, non-contributing basis in relation to any other insurance or self-insurance available to the City. 10. Contractor agrees to ensure that subcontractors, and any other party involved with the Work who is brought onto or involved in the Work by Contractor, provide the same minimum insurance required of Contractor. Contractor agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this section. Contractor agrees that upon request, all agreements with subcontractors and others engaged in the Work will be submitted to the City for review. 11. Contractor agrees not to self-insure or to use any self-insured retentions or deductibles on any portion of the insurance required herein and further agrees that it will not allow any contractor, subcontractor, Architect, Engineer, or other entity or person in any way involved in the performance of Work contemplated by this Agreement to self-insure its obligations to the City. If Contractor’s existing coverage includes a deductible or self-insured retention, the deductible or self- insured retention must be declared to the City. At that time, the City shall review options with the Contractor, which may include reduction or elimination of the deductible or self-insured retention, substitution of other coverage, or other solutions. 12. The City reserves the right at any time during the term of the Agreement to change the amounts and types of insurance required by giving the Contractor 90 days advance written notice of such change. If such change results in substantial additional cost to the Contractor, the City will negotiate additional compensation proportional to the increased benefit to the City. 13. For purposes of applying insurance coverage only, this Agreement will be deemed to have been executed immediately upon any party hereto taking any steps that can be deemed to be in furtherance of or towards performance of this Agreement. 14. Contractor acknowledges and agrees that any actual or alleged failure on the part of the City to inform Contractor of non-compliance with an insurance 588 requirement in no way imposes any additional obligations to the City nor does it waive any rights hereunder in this or any other regard. 15. Contractor will renew the required coverage annually as long as the City, or its employees or agents face an exposure from operations of any type pursuant to this Agreement. This obligation applies whether or not the Agreement is canceled or terminated for any reason. Termination of this obligation is not effective until the City executes a written statement to that effect. 16. Contractor shall provide proof that policies of insurance required herein expiring during the term of this Agreement have been renewed or replaced with other policies providing at least the same coverage. Proof that such coverage has been ordered shall be submitted prior to expiration. A coverage binder or letter from Contractor’s insurance agent to this effect is acceptable. A certificate of insurance and/or additional insured endorsement as required in these specification applicable to the renewing or new coverage must be provided to the City within five days of the expiration of coverage. 17. The provisions of any Workers’ Compensation or similar act will not limit the obligations of Contractor under this Agreement. Contractor expressly agrees not to use any statutory immunity defenses under such laws with respect to the City, its employees, officials, and agents. 18. Requirements of specific coverage features or limits contained in this section are not intended as limitations on coverage, limits, or other requirements nor as a waiver of any coverage normally provided by any given policy. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue, and is not intended by any party or insured to be limiting or all- inclusive. 19. These insurance requirements are intended to be separate and distinct from any other provision in this Agreement and are intended by the parties here to be interpreted as such. 20. The requirements in this section supersede all other sections and provisions of this Agreement to the extent that any other section or provision conflicts or impairs the provisions of this section. 21. Contractor agrees to be responsible for ensuring that no contract used by any party involved in any way with the Work reserves the right to charge the City or Contractor for the cost of additional insurance coverage required by this Agreement. Any such provisions are to be deleted with reference to the City. It is not the intent of the City to reimburse any third party for the cost of complying with these requirements. There shall be no recourse against the City for payment of premiums or other amounts with respect thereto. 22. Contractor agrees to provide immediate notice to City of any claim or loss against Contractor arising out of the work performed under this Agreement. The City 589 assumes no obligation or liability by such notice, but has the right (but not the duty) to monitor the handling of any such claim or claims if they are likely to involve the City. 23. Contractor agrees to obtain and provide to City a copy of Professional Liability coverage for Architects or Engineers on this project, when required by City. City shall determine the liability limit. 590 EXHIBIT B PUBLIC CONTRACT CODE SECTION 9204 9204. (a) The Legislature finds and declares that it is in the best interests of the state and its citizens to ensure that all construction business performed on a public works project in the state that is complete and not in dispute is paid in full and in a timely manner. (b) Notwithstanding any other law, including, but not limited to, Article 7.1 (commencing with Section 10240) of Chapter 1 of Part 2, Chapter 10 (commencing with Section 19100) of Part 2, and Article 1.5 (commencing with Section 20104) of Chapter 1 of Part 3, this section shall apply to any claim by a contractor in connection with a public works project. (c) For purposes of this section: (1) “Claim” means a separate demand by a contractor sent by registered mail or certified mail with return receipt requested, for one or more of the following: (A) A time extension, including, without limitation, for relief from damages or penalties for delay assessed by a public entity under a contract for a public works project. (B) Payment by the public entity of money or damages arising from work done by, or on behalf of, the contractor pursuant to the contract for a public works project and payment for which is not otherwise expressly provided or to which the claimant is not otherwise entitled. (C) Payment of an amount that is disputed by the public entity. (2) “Contractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who has entered into a direct contract with a public entity for a public works project. (3) (A) “Public entity” means, without limitation, except as provided in subparagraph (B), a state agency, department, office, division, bureau, board, or commission, the California State University, the University of California, a city, including a charter city, county, including a charter county, city and county, including a charter city and county, district, special district, public authority, political subdivision, public corporation, or nonprofit transit corporation wholly owned by a public agency and formed to carry out the purposes of the public agency. (B) “Public entity” shall not include the following: (i) The Department of Water Resources as to any project under the jurisdiction of that department. (ii) The Department of Transportation as to any project under the jurisdiction of that department. (iii) The Department of Parks and Recreation as to any project under the jurisdiction of that department. (iv) The Department of Corrections and Rehabilitation with respect to any project under its jurisdiction pursuant to Chapter 11 (commencing with Section 7000) of Title 7 of Part 3 of the Penal Code. (v) The Military Department as to any project under the jurisdiction of that department. (vi) The Department of General Services as to all other projects. (vii) The High-Speed Rail Authority. 591 (4) “Public works project” means the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind. (5) “Subcontractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who either is in direct contract with a contractor or is a lower tier subcontractor. (d) (1) (A) Upon receipt of a claim pursuant to this section, the public entity to which the claim applies shall conduct a reasonable review of the claim and, within a period not to exceed 45 days, shall provide the claimant a written statement identifying what portion of the claim is disputed and what portion is undisputed. Upon receipt of a claim, a public entity and a contractor may, by mutual agreement, extend the time period provided in this subdivision. (B) The claimant shall furnish reasonable documentation to support the claim. (C) If the public entity needs approval from its governing body to provide the claimant a written statement identifying the disputed portion and the undisputed portion of the claim, and the governing body does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, the public entity shall have up to three days following the next duly publicly noticed meeting of the governing body after the 45-day period, or extension, expires to provide the claimant a written statement identifying the disputed portion and the undisputed portion. (D) Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. If the public entity fails to issue a written statement, paragraph (3) shall apply. (2) (A) If the claimant disputes the public entity’s written response, or if the public entity fails to respond to a claim issued pursuant to this section within the time prescribed, the claimant may demand in writing an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the public entity shall schedule a meet and confer conference within 30 days for settlement of the dispute. (B) Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the public entity shall provide the claimant a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. Any disputed portion of the claim, as identified by the contractor in writing, shall be submitted to nonbinding mediation, with the public entity and the claimant sharing the associated costs equally. The public entity and claimant shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator. If mediation is unsuccessful, the parts of the claim remaining in dispute shall be subject to applicable procedures outside this section. (C) For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by 592 issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this section. (D) Unless otherwise agreed to by the public entity and the contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced. (E) This section does not preclude a public entity from requiring arbitration of disputes under private arbitration or the Public Works Contract Arbitration Program, if mediation under this section does not resolve the parties’ dispute. (3) Failure by the public entity to respond to a claim from a contractor within the time periods described in this subdivision or to otherwise meet the time requirements of this section shall result in the claim being deemed rejected in its entirety. A claim that is denied by reason of the public entity’s failure to have responded to a claim, or its failure to otherwise meet the time requirements of this section, shall not constitute an adverse finding with regard to the merits of the claim or the responsibility or qualifications of the claimant. (4) Amounts not paid in a timely manner as required by this section shall bear interest at 7 percent per annum. (5) If a subcontractor or a lower tier subcontractor lacks legal standing to assert a claim against a public entity because privity of contract does not exist, the contractor may present to the public entity a claim on behalf of a subcontractor or lower tier subcontractor. A subcontractor may request in writing, either on his or her own behalf or on behalf of a lower tier subcontractor, that the contractor present a claim for work which was performed by the subcontractor or by a lower tier subcontractor on behalf of the subcontractor. The subcontractor requesting that the claim be presented to the public entity shall furnish reasonable documentation to support the claim. Within 45 days of receipt of this written request, the contractor shall notify the subcontractor in writing as to whether the contractor presented the claim to the public entity and, if the original contractor did not present the claim, provide the subcontractor with a statement of the reasons for not having done so. (e) The text of this section or a summary of it shall be set forth in the plans or specifications for any public works project that may give rise to a claim under this section. (f) A waiver of the rights granted by this section is void and contrary to public policy, provided, however, that (1) upon receipt of a claim, the parties may mutually agree to waive, in writing, mediation and proceed directly to the commencement of a civil action or binding arbitration, as applicable; and (2) a public entity may prescribe reasonable change order, claim, and dispute resolution procedures and requirements in addition to the provisions of this section, so long as the contractual provisions do not conflict with or otherwise impair the timeframes and procedures set forth in this section. (g) This section applies to contracts entered into on or after January 1, 2017. (h) Nothing in this section shall impose liability upon a public entity that makes loans or grants available through a competitive application process, for the failure of an awardee to meet its contractual obligations. (i) This section shall remain in effect only until January 1, 2020, and as of that date is repealed, unless a later enacted statute, that is enacted before January 1, 2020, deletes or extends that date. (Added by Stats. 2016, Ch. 810, Sec. 1. (AB 626) Effective January 1, 2017. Repealed as of January 1, 2020, by its own provisions.) 593 594 595 596 597 598 599 600 601 602 603 604 JANICE S. PARVIN Mayor ROSEANN MIKOS, Ph.D. Councilmember DAVID POLLOCK Councilmember KEN SIMONS Councilmember MARK VAN DAM Councilmember PARKS, RECREATION & COMMUNITY SERVICES DEPT. | 799 Moorpark Avenue, Moorpark, CA 93021 Main City Phone Number (805) 517-6200 | Fax (805) 532-2550 | moorpark@moorparkca.gov CITY OF MOORPARK April 25, 2018 RE: Heating, Ventilating and Air Conditioning (HVAC) Maintenance and Repair Services Proposals due by: May 17, 2018 at 5:00 p.m. INFORMAL PROPOSAL The City is looking for qualified Heating, Ventilating and Air Conditioning (HVAC) Contractors to provide routine repairs, preventative maintenance, and emergency response work for HVAC units at City of Moorpark Facilities. The City will be offering a one-year agreement with the selected contractor, subject to two, one year extensions, so long as the Contractor is performing satisfactorily. Contractor to provide the following services:  Provide all labor and materials, tools, equipment, transportation and services necessary to perform preventative maintenance and repair services HVAC systems at 10 City facilities: Moorpark Community Center, 799 Moorpark Avenue, Moorpark, CA 93021. 11 Rooftop Package Units City Hall Administration Building, 799 Moorpark Avenue, Moorpark, CA 93021 3 Condenser Units, 3 Air Handler Units, 1 Ductless System, and 1 Carrier VVT System City Hall Annex Buildings, 799 Moorpark Avenue, Moorpark, CA 93021 15 Bard Wall Mount Heat Pump Units Arroyo Vista Recreation Center, 4550 Tierra Rejada Road, Moorpark, CA 93021 4 Trane Large Package Units Moorpark City Library, 699 Moorpark Avenue, Moorpark, CA 93021 2 Condenser Units, 2 Air Handler Units, 2 Package Units Moorpark Public Services Facility, 627 Fitch Avenue, Moorpark, CA 93021. 4 Rooftop Package Units, 1 Rooftop Evaporative Cooler, 1 Ductless System High Street Arts Center 45 High Street, Moorpark, CA 93021 5 Rooftop Package Units 605 Informal Bid –Heating, Ventilating and Air Conditioning Repair and Maintenance Services April 2018 Page 2 Moorpark Police Services Center, 610 Spring Road, Moorpark, CA 93021 11 Package units, 2 Boilers, 17 Exhaust Fans, 1 Circulating Pump Moorpark Chamber of Commerce, 18 High Street, Moorpark, CA 93021 2 Package Units Ruben Castro Human Services Center, 612 Spring Road, Moorpark, CA 93021 14 Package Units, 1 Split System  Contractor will conduct one (1) annual preventative maintenance service in May for all noted City facilities.  Contractor to perform the following preventative maintenance services: o Replace all air filters with High Efficiency Pleated Air Filters for all buildings. o Inspect compressor oil level, refrigerant charge, and capacity controls as applicable. o Inspect all belts and alignment as required. Replace as needed. o Tighten electrical connections including high and low voltage. o Check and record voltage and amperage readings. o Visually inspect for oiler refrigerant leaks. o Check and record air temperatures. o Inspect condensate elimination. o Inspect, clean, and adjust operating and temperature controls. o Check condenser coils and clean as required. o Check heating controls, gas valves, igniters, and safety switches and/or reversing valves. o Check and/or verify flame quality. o Inspect venting and check for any material defect. o Tighten any loose screws and panels on equipment. o Prepare annual HVAC inspection reports.  Contractor is responsible for ALL equipment, tools, and materials needed to complete all services or repairs.  Contractor will provide as needed repair and emergency response services. Routine and emergency response services shall be performed as follows: 606 Informal Bid –Heating, Ventilating and Air Conditioning Repair and Maintenance Services April 2018 Page 3 o During the term of the Agreement, Contractor agrees to the following response times:  Routine Work Response: One (1) to three (3) working days from request by City.  Emergency Work Response: One (1) to three (3) hours from request by City. o Contractor shall troubleshoot and provide an initial assessment of the service or repair needed and provide an estimated cost to the City representative. o Contractor estimates will be reviewed by the City representative and upon acceptance authorize the Contractor to proceed with work. All proposed work over $1,000.00 requires a signed work order. o Contractor shall only start work upon written authorization or receipt of a signed work order from the City representative. o Contractor’s personnel are required to notify the City representative of the work start date and upon arrival before starting any work, and before leaving the site. All contractor activities at the Police Services Center will be accompanied by a City representative.  Contractor is encouraged to consider sustainability and provide energy and environmentally-friendly products.  Contractor shall provide all Manufacturer warranties and Safety Data Sheets (SDS) to City representative, as applicable.  Contractor shall itemize material and labor costs and charge them separately.  Prices noted in the proposal shall be honored for the entire contract term. Contractor responsibilities: **CONTRACTOR MUST BE REGISTERED WITH THE CALIFORNIA DEPARTMENT OF INDUSTRIAL RELATIONS (DIR) PURSUANT TO SB 854. PROOF OF REGISTRATION MUST BE PROVIDED OR THE CONTRACTORS BID WILL NOT BE ACCEPTED **THIS IS A PREVAILING WAGE PROJECT AND ALL PROPOSALS SHOULD BE BID AS SUCH. CONTRACTOR IS REQUIRED TO SUBMIT CERTIFIED PAYROLL AND COMPLY WITH ALL APPRENTICESHIP REQUIREMENTS AS OUTLINED IN LABOR CODE 607 Informal Bid –Heating, Ventilating and Air Conditioning Repair and Maintenance Services April 2018 Page 4 SECTIONS 1720 et seq. and 1770 et seq. and 1777 et seq. ANY VIOLATIONS OF LC SECTION 1776 WILL FORFEIT A $100/DAY/WORKER FINE FOR ALL WORKER’S PAID LESS THAN THE PREVAILING WAGE RATE.** 1. Each bid must be submitted on the Bid Forms provided. All blanks in the Bid Form must be filled in and all prices must be stated in both words and figures. It is the sole responsibility of the bidder to see that the bid is delivered to the proper place and received at the proper time. Any bid received after the scheduled closing time for receipt of bids will be returned to the bidder unopened. 2. The lowest bidder will be determined based on the total cost of the annual maintenance visits. 3. The bidder to whom award is made shall execute a written contract with the City within fourteen (14) calendar days after notice of the award has been sent by mail to the address given in the proposal. The contract shall be made in the form adopted by the City and incorporated in these specifications. The bidder warrants that he/she possesses, or has arranged through subcontracts, all capital and other equipment, labor and materials to carry out and complete the work hereunder in compliance with all applicable Federal, State, City, and Special District laws, ordinances, and regulations. 4. Required Licenses: Bidders must hold a valid State of California Contractor's License, C-20, Warm-Air Heating, Ventilating and Air Conditioning Contractor, and have carried a valid license for the last 5 years. 5. Work site and surrounding areas to be left clean and free of any debris or other unsuitable materials at the end of each working day or project. 6. Contractor is to properly dispose of any components containing hazardous materials and recycle any unused equipment or waste resulting from their work. 7. Contractor shall be responsible for all damages to persons or property that occur as a result of its fault or negligence in the performance of this contract and shall be responsible for the protection of the work site until job is finished. 8. Contractor shall take all necessary precautions for the safety of workers on the project and shall comply with all applicable federal, state, local and other safety laws, standards, orders, rules, regulations, and building codes to prevent accidents or injury to persons on, about, or adjacent to the premises where work is being performed and to provide a safe and healthful place of employment. 9. All equipment, materials and labor utilized and all work performed shall comply with all current codes, standards, regulations and statutes pertaining to the type of work. 608 Informal Bid –Heating, Ventilating and Air Conditioning Repair and Maintenance Services April 2018 Page 5 10. If a prospective bidder is in doubt or has any questions as to the true meaning or intent of any part of the Bid package, or discovers discrepancies, errors, or conflicts, or omissions, he/she may submit, to the City, a written request for an interpretation or a correction thereof. Interpretations or corrections shall be made only by addendum duly issued by the City. A copy of such addendum will be mailed, faxed, or delivered to each person receiving a set of the Contract Documents and such addendum shall be considered a part of, and incorporated in, the Contract Documents. Questions must be received in writing no later than 96 hours prior to the bid deadline in order to provide the City sufficient time to evaluate the question and respond no later than 72 hours prior to the bid deadline. Questions received after the 96 hour deadline will be deemed not received. 11. Contractors are encouraged to review the facilities and systems. To arrange an appointment to view the facilities, please contact Allen Water, Landscape/Parks Maintenance Superintendent at 805-517-6360. Phone # is provided to make an appointment only. All request for clarifications on the bid should be submitted via e-mail at the address below. By submitting this proposal, Contractor agrees to sign the City’s standard Agreement and to provide the insurance required by the contract. A copy of the Standard Agreement and Insurance Requirements is attached to this proposal. Contractors are encouraged to review the insurance requirements with their insurance companies to ensure that all terms can be met. Proposals are to be submitted to: Allen Water, Landscape/Parks Maintenance Superintendent City of Moorpark 799 Moorpark Avenue, Moorpark, CA 93021 Please mark outside of the envelope: DO NOT OPEN, INFORMAL BID FOR HEATING VENTILATION AND AIR CONDITIONING MAINTENANCE AND REPAIR SERVICES Questions regarding this Request for Proposals can be directed to the City’s representative in writing via e-mail to: Allen Walter, Parks/Landscape Maintenance Superintendent City of Moorpark awalter@moorparkca.gov Attachments: 1 – Proposal/Bid Forms (All to be filled out and submitted with Bid) 2 - City Standard Agreement and Insurance Requirements 609 [Informal Proposal Attachment 1 (Proposal/Bid Forms) and Attachment 2 (City Standard Agreement and Insurance Requirements) are omitted so as not to be duplicative. Their content is included in the Agreement and Exhibit C: Contractor’s Bid Proposal.] 610 AGREEMENT BETWEEN THE CITY OF MOORPARK AND PIPE DREAMS PLUMBING COMPANY, INC. FOR PLUMBING MAINTENANCE AND REPAIR SERVICES THIS AGREEMENT, is made and effective as of this _________ day of ________________________, 2018, between the City of Moorpark, a municipal corporation (“City”) and Pipe Dreams Plumbing Company, Inc. a corporation (“Contractor”). In consideration of the mutual covenants and conditions set forth herein, the parties agree as follows: WHEREAS, City has the need for plumbing maintenance and repair services at various City facilities, City parks, and City properties; and WHEREAS, Contractor specializes in providing such services and has the proper work experience, certifications, and background to carry out the duties involved; and WHEREAS, Contractor has submitted to the City a Proposal which is attached hereto as Exhibit C. NOW, THEREFORE, in consideration of the mutual covenants, benefits, and premises herein stated, the parties hereto agree as follows: 1. TERM The term of this Agreement shall be from July 1, 2018 and will expire on June 30, 2020, unless this Agreement is terminated or suspended pursuant to this Agreement. 2. SCOPE OF SERVICES City does hereby retain Contractor, as an independent contractor, in a contractual capacity to provide plumbing maintenance and repair services at various City parks, facilities and miscellaneous properties, as set forth in Exhibit C: Proposed Schedule of Work and Prices, and as set forth in Exhibit D: Scope of Services. In the event there is a conflict between the provisions of Exhibit C, Exhibit D, and this Agreement, the language contained in this Agreement shall take precedence. Contractor shall perform the tasks described and set forth in Exhibit D. Compensation for the services to be performed by Contractor shall be in accordance with Exhibit C. Compensation shall not exceed the rates or total contract value of twenty-five thousand dollars ($25,000) for the total term of the Agreement, without a written amendment to the Agreement executed by both parties. Payment by City to Contractor shall be in accordance with the provisions of this Agreement. City and Contractor acknowledge that this project is a public work to which prevailing wages apply, and that a public work project is subject to compliance monitoring and enforcement by the California Department of Industrial Relations (DIR). Contractor agrees to comply with and be bound by all the terms, rules and regulations 611 described in (a) Division 2, Part 7, Chapter 1 (commencing with Section 1720) of the California Labor Code, including without limitation Labor Code Section 1771 and (b) the rules and regulations established by the DIR implementing such statutes, as though set forth in full herein, including any applicable amendments made thereto during the term of this Agreement. For every subcontractor who will perform work on this project, Contractor shall be responsible for subcontractor’s compliance with (a) and (b), and Contractor shall take all necessary actions to ensure subcontractor’s compliance. Labor Code Section 1725.5 requires all contractors and subcontractors to annually register with the DIR before bidding or performing on any public work contract. 3. PERFORMANCE Contractor shall at all times faithfully, competently and to the best of their ability, experience, standard of care, and talent, perform all tasks described herein. Contractor shall employ, at a minimum, generally accepted standards and practices utilized by persons engaged in providing similar services as are required of Contractor hereunder in meeting its obligations under this Agreement. 4. MANAGEMENT The individual directly responsible for Contractor’s overall performance of the Agreement provisions herein above set forth and to serve as principal liaison between City and Contractor shall be John Van Diepen and no other individual may be substituted without the prior written approval of the City Manager. The City’s contact person in charge of administration of this Agreement, and to serve as principal liaison between Contractor and City, shall be the City Manager or the City Manager’s designee. 5. PAYMENT Taxpayer ID or Social Security numbers must be provided, on an IRS W-9 form, before payments may be made to vendors. The City agrees to pay Contractor monthly, in accordance with the payment rates and terms and the schedule of payment as set forth in Exhibit C, based upon actual time spent on the above tasks. This amount shall not exceed twenty-five thousand dollars ($25,000) for the total term of the Agreement unless additional payment is approved as provided in this Agreement. Contractor shall not be compensated for any additional services rendered in connection with its performance of this Agreement, unless such additional services and compensation are authorized, in advance, in a written amendment to the Agreement executed by both parties. Contractor shall submit invoices monthly for actual services performed. Invoices shall be submitted on or about the first business day of each month, or as soon thereafter as practical, for services provided in the previous month. Payment shall be 612 made within thirty (30) days of receipt of each invoice as to all non-disputed fees. Any expense or reimbursable cost appearing on any invoice shall be accompanied by a receipt or other documentation subject to approval of the City Manager. If the City disputes any of Contractor’s fees or expenses it shall give written notice to Contractor within thirty (30) days of receipt of any disputed fees set forth on the invoice. 6. TERMINATION OR SUSPENSION WITHOUT CAUSE The City may at any time, for any reason, with or without cause, suspend or terminate this Agreement, or any portion hereof, by serving upon the Contractor at least ten (10) days prior written notice. Upon receipt of said notice, the Contractor shall immediately cease all work under this Agreement, unless the notice provides otherwise. If the City suspends or terminates a portion of this Agreement such suspension or termination shall not make void or invalidate the remainder of this Agreement. The Contractor may terminate this Agreement only by providing City with written notice no less than thirty (30) days in advance of such termination. In the event this Agreement is terminated or suspended pursuant to this Section, the City shall pay to Contractor the actual value of the work performed up to the time of termination or suspension, provided that the work performed is of value to the City. Upon termination or suspension of the Agreement pursuant to this Section, the Contractor will submit an invoice to the City pursuant to this Agreement. 7. DEFAULT OF CONTRACTOR The Contractor’s failure to comply with the provisions of this Agreement shall constitute a default. In the event that Contractor is in default for cause under the terms of this Agreement, City shall have no obligation or duty to continue compensating Contractor for any work performed after the date of default and can terminate or suspend this Agreement immediately by written notice to the Contractor. If such failure by the Contractor to make progress in the performance of work hereunder arises out of causes beyond the Contractor’s control, and without fault or negligence of the Contractor, it shall not be considered a default. If the City Manager or the City Manager’s designee determines that the Contractor is in default in the performance of any of the terms or conditions of this Agreement, designee shall cause to be served upon the Contractor a written notice of the default. The Contractor shall have five (5) days after service upon it of said notice in which to cure the default by rendering a satisfactory performance. In the event that the Contractor fails to cure its default within such period of time, the City shall have the right, notwithstanding any other provision of this Agreement, to terminate this Agreement without further notice and without prejudice to any other remedy to which it may be entitled at law, in equity or under this Agreement. 613 8. LIQUIDATED DAMAGES If the Contractor fails to complete the work, or any portion thereof, within the time period required by this Agreement, or as duly extended in writing by the City Manager, Contractor shall forfeit and pay to the City, as liquidated damages, the sum of one hundred fifty dollars ($150) per day for each calendar day the work, or portion thereof, remains uncompleted after the above specified completion date. Liquidated damages shall be deducted from any payments due or to become due to the Contractor under the terms of this Agreement. Progress payments made by the City after the above specified completion date shall not constitute a waiver of liquidated damages by the City. 9. OWNERSHIP OF DOCUMENTS Contractor shall maintain complete and accurate records with respect to sales, costs, expenses, receipts, and other such information required by City that relate to the performance of services under this Agreement. Contractor shall maintain adequate records of services provided in sufficient detail to permit an evaluation of services. All such records shall be maintained in accordance with generally accepted accounting principles and shall be clearly identified and readily accessible. Contractor shall provide free access to the representatives of City or the City’s designees at reasonable times to such books and records; shall give the City the right to examine and audit said books and records; shall permit City to make transcripts therefrom as necessary; and shall allow inspection of all work, data, documents, proceedings, and activities related to this Agreement. Notification of audit shall be provided at least thirty (30) days before any such audit is conducted. Such records, together with supporting documents, shall be maintained for a period of ten (10) years after receipt of final payment. Upon completion of, or in the event of termination or suspension without cause of this Agreement, all original documents, designs, drawings, maps, models, computer files, surveys, notes, and other documents prepared in the course of providing the services to be performed pursuant to this Agreement shall become the sole property of the City and may be used, reused, or otherwise disposed of by the City without the permission of the Contractor. With respect to computer files, Contractor shall make available to the City, at the Contractor’s office and upon reasonable written request by the City, the necessary computer software and hardware for purposes of accessing, compiling, transferring, and printing computer files. 10. INDEMNIFICATION AND HOLD HARMLESS Contractor shall indemnify, defend and hold harmless City, and any and all of its officers, employees, and agents (“City Indemnitees”) from and against any and all causes of action, claims, liabilities, obligations, judgments, or damages, including reasonable legal counsels’ fees and costs of litigation (“claims”), arising out of the Contractor’s performance of its obligations under this Agreement or out of the operations conducted by Contractor, including the City’s active or passive negligence, except for such loss or damage arising from the sole negligence or willful misconduct of the City. In the event the City Indemnitees are made a party to any action, lawsuit, or other adversarial proceeding arising from Contractor’s performance of this Agreement, 614 the Contractor shall provide a defense to the City Indemnitees or at the City’s option reimburse the City Indemnitees their costs of defense, including reasonable legal counsels’ fees incurred in defense of such claims. Contractor agrees to obtain executed indemnity agreements with provisions identical to those set forth in this Section from each and every subcontractor, or any other person or entity involved by, for, with, or on behalf of Contractor in the performance of this Agreement. In the event Contractor fails to obtain such indemnity obligations from others as required here, Contractor agrees to be fully responsible according to the terms of this Section. Failure of City to monitor compliance with these requirements imposes no additional obligations on City and will in no way act as a waiver of any rights hereunder. This obligation to indemnify and defend City as set forth here is binding on the successors, assigns, or heirs of Contractor and shall survive the termination of this Agreement or this Section. City does not and shall not waive any rights that it may have against Contractor by reason of this Section, because of the acceptance by City, or the deposit with City, of any insurance policy or certificate required pursuant to this Agreement. The hold harmless and indemnification provisions shall apply regardless of whether or not said insurance policies are determined to be applicable to any losses, liabilities, damages, costs, and expenses described in this Section. This Indemnity shall survive termination of the Agreement or Final Payment hereunder. This Indemnity is in addition to any other rights or remedies that the Indemnitees may have under the law or under any other Contract Documents or Agreements. In the event of any claim or demand made against any party which is entitled to be indemnified hereunder, City may, in its sole discretion, reserve, retain, or apply any monies to the Contractor under this Agreement for the purpose of resolving such claims; provided, however, City may release such funds if the Contractor provides City with reasonable assurance of protection of the Indemnitees’ interests. City shall, in its sole discretion, determine whether such assurances are reasonable. 11. INSURANCE Contractor shall maintain prior to the beginning of and for the duration of this Agreement insurance coverage as specified in Exhibit A attached hereto and incorporated herein by this reference as though set forth in full. 12. INDEPENDENT CONTRACTOR Contractor is and shall at all times remain as to the City a wholly independent Contractor. The personnel performing the services under this Agreement on behalf of Contractor shall at all times be under Contractor’s exclusive direction and control. Neither City nor any of its officers, employees, or agents shall have control over the conduct of Contractor or any of Contractor’s officers, employees, or agents, except as set forth in this Agreement. Contractor shall not at any time or in any manner represent that it or any of its officers, employees, or agents are in any manner officers, 615 employees, or agents of the City. Contractor shall not incur or have the power to incur any debt, obligation, or liability against City, or bind City in any manner. No employee benefits shall be available to Contractor in connection with the performance of this Agreement. Except for the fees paid to Contractor as provided in the Agreement, City shall not pay salaries, wages, or other compensation to Contractor for performing services hereunder for City. City shall not be liable for compensation or indemnification to Contractor for injury or sickness arising out of performing services hereunder. 13. LEGAL RESPONSIBILITIES The Contractor shall keep itself informed of local, state and federal laws and regulations which in any manner affect those employed by it or in any way affect the performance of its service pursuant to this Agreement. The Contractor shall at all times observe and comply with all such laws and regulations, including but not limited to the Americans with Disabilities Act and Occupational Safety and Health Administration laws and regulations. The City and Contractor shall comply with Exhibit B, California Public Contract Code Section 9204, when applicable. The City, and its officers and employees, shall not be liable at law or in equity occasioned by failure of the Contractor to comply with this Section. 14. ANTI DISCRIMINATION Neither the Contractor, nor any subcontractor under the Contractor, shall discriminate in employment of persons upon the work because of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, genetic information, marital status, sex, gender, gender identity, gender expression, age, sexual orientation, or military and veteran status of such person; or any other basis protected by applicable federal, state, or local law, except as provided in Section 12940 of the Government Code. The Contractor shall have responsibility for compliance with this Section, if applicable [Labor Code Sec. 1735]. 15. UNDUE INFLUENCE Contractor declares and warrants that no undue influence or pressure is used against or in concert with any officer or employee of the City in connection with the award, terms or implementation of this Agreement, including any method of coercion, confidential financial arrangement, or financial inducement. No officer or employee of the City will receive compensation, directly or indirectly from Contractor, or any officer, employee or agent of Contractor, in connection with the award of this Agreement or any work to be conducted as a result of this Agreement. Violation of this Section shall be a material breach of this Agreement entitling the City to any and all remedies at law or in equity. 616 16. NO BENEFIT TO ARISE TO LOCAL EMPLOYEES No member, officer, or employee of the City, or their designees or agents, and no public official who exercises authority over or responsibilities with respect to the Services during his/her tenure or for one (1) year thereafter, shall have any interest, direct or indirect, in any agreement or sub-agreement, or the proceeds thereof, for work to be performed in connection with the Services performed under this Agreement. 17. CONFLICT OF INTEREST Contractor covenants that neither they nor any officer or principal of their firm have any interests, nor shall they acquire any interest, directly or indirectly, which will conflict in any manner or degree with the performance of their services hereunder. Contractor further covenants that in the performance of this Agreement, they shall employ no person having such interest as an officer, employee, agent, or subcontractor. Contractor further covenants that Contractor has not contracted with nor is performing any services directly or indirectly, with the developer(s) and/or property owner(s) and/or firm(s) and/or partnership(s) and/or public agency(ies) owning property and/or processing an entitlement application for property in the City or its Area of Interest, now or within the past one (1) year, and further covenants and agrees that Contractor and/or its subcontractors shall provide no service or enter into any contract with any developer(s) and/or property owner(s) and/or firm(s) and/or partnership(s) and/or public agency(ies) owning property and/or processing an entitlement application for property in the City or its Area of Interest, while under contract with the City and for a one (1) year time period following termination of this Agreement. 18. NOTICE Any notice to be given pursuant to this Agreement shall be in writing, and all such notices and any other document to be delivered shall be delivered by personal service or by deposit in the United States mail, certified or registered, return receipt requested, with postage prepaid, and addressed to the party for whom intended as follows: To: City Manager City of Moorpark 799 Moorpark Ave. Moorpark, CA 93021 To: John Van Diepen Pipe Dreams Plumbing Company, Inc. 2066 Ardenwood Avenue Simi Valley, CA 93063 Either party may, from time to time, by written notice to the other, designate a different address or contact person, which shall be substituted for the one above specified. Notices, payments and other documents shall be deemed delivered upon receipt by personal service or as of the third (3rd) day after deposit in the United States mail. 617 19. CHANGE IN NAME Should a change be contemplated in the name or nature of the Contractor’s legal entity, the Contractor shall first notify the City in order that proper steps may be taken to have the change reflected in the Agreement documents. 20. ASSIGNMENT Contractor shall not assign this Agreement or any of the rights, duties or obligations hereunder. It is understood and acknowledged by the parties that Contractor is uniquely qualified to perform the services provided for in this Agreement. 21. LICENSES At all times during the term of this Agreement, Contractor shall have in full force and effect, all licenses required of it by law for the performance of the services in this Agreement. 22. VENUE AND GOVERNING LAW This Agreement is made, entered into, and executed in Ventura County, California, and any action filed in any court or for arbitration for the interpretation, enforcement or other action of the terms, conditions, or covenants referred to herein shall be filed in the applicable court in Ventura County, California. The City and Contractor understand and agree that the laws of the State of California shall govern the rights, obligations, duties, and liabilities of the parties to this Agreement and also govern the interpretation of this Agreement. 23. COST RECOVERY In the event any action, suit or proceeding is brought for the enforcement of, or the declaration of any right or obligation pursuant to this Agreement or as a result of any alleged breach of any provision of this Agreement, the prevailing party shall be entitled to recover its costs and expenses from the losing party, and any judgment or decree rendered in such a proceeding shall include an award thereof. 24. ARBITRATION Cases involving a dispute between City and Contractor may be decided by an arbitrator if both sides agree in writing, with costs proportional to the judgment of the arbitrator. 25. ENTIRE AGREEMENT This Agreement and the Exhibits attached hereto contain the entire understanding between the parties relating to the obligations of the parties described in this Agreement. All prior or contemporaneous agreements, understandings, 618 representations, and statements, oral or written, are merged into this Agreement and shall be of no further force or effect. Each party is entering into this Agreement based solely upon the representations set forth herein and upon each party’s own independent investigation of any and all facts such party deems material. 26. CAPTIONS OR HEADINGS The captions and headings of the various Articles, Paragraphs, and Exhibits of this Agreement are for convenience and identification only and shall not be deemed to limit or define the content of the respective Articles, Paragraphs, and Exhibits hereof. 27. AMENDMENTS Any amendment, modification, or variation from the terms of this Agreement shall be in writing and shall be effective only upon approval by both parties to this Agreement. 28. PRECEDENCE In the event of conflict, the requirements of the City’s Request for Proposal, if any, and this Agreement shall take precedence over those contained in the Contractor’s Proposal. 29. INTERPRETATION OF AGREEMENT Should interpretation of this Agreement, or any portion thereof, be necessary, it is deemed that this Agreement was prepared by the parties jointly and equally, and shall not be interpreted against either party on the ground that the party prepared the Agreement or caused it to be prepared. 30. WAIVER No waiver of any provision of this Agreement shall be deemed, or shall constitute, a waiver of any other provision, whether or not similar, nor shall any such waiver constitute a continuing or subsequent waiver of the same provision. No waiver shall be binding unless executed in writing by the party making the waiver. 31. AUTHORITY TO EXECUTE The person or persons executing this Agreement on behalf of the Contractor warrants and represents that he/she has the authority to execute this Agreement on behalf of the Contractor and has the authority to bind Contractor to the performance of obligations hereunder. 619 IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed the day and year first above written. CITY OF MOORPARK PIPE DREAMS PLUMBING COMPANY, INC. By:_______________________________ By:_______________________________ Troy Brown, City Manager John Van Diepen, President Attest: __________________________________ Maureen Benson, City Clerk 620 Exhibit A INSURANCE REQUIREMENTS Prior to the beginning of and throughout the duration of Work, Contractor will maintain insurance in conformance with the requirements set forth below. Contractor will use existing coverage to comply with these requirements. If that existing coverage does not meet requirements set forth here, Contractor agrees to amend, supplement or endorse the existing coverage to do so. Contractor acknowledges that the insurance coverage and policy limits set forth in this section constitute the minimum amount of coverage required. Any insurance proceeds available to the City in excess of the limits and coverage required in this Agreement and which is applicable to a given loss, will be available to the City. Contractor shall provide the following types and amounts of insurance: Commercial General Liability Insurance using Insurance Services Office (ISO) “Commercial General Liability” policy form CG 00 01 or the exact equivalent. Defense costs must be paid in addition to limits. There shall be no cross liability exclusion for claims or suits by one insured against another. Limits are subject to review but in no event less than $1,000,000 per occurrence for all covered losses and no less than $2,000,000 general aggregate. Business Auto Coverage on ISO Business Auto Coverage form CA 00 01 including symbol 1 (Any Auto) or the exact equivalent. Limits are subject to review, but in no event to be less than $1,000,000 per accident. If Contractor owns no vehicles, this requirement may be satisfied by a non-owned auto endorsement to the general liability policy described above. If Contractor or Contractor’s employees will use personal autos in any way on this project, Contractor shall provide evidence of personal auto liability for each such person. Workers’ Compensation on a state-approved policy form providing statutory benefits as required by law with employer’s liability limits no less than $1,000,000 per accident or disease. Excess or Umbrella Liability Insurance (Over Primary) if used to meet limit requirements, shall provide coverage at least as broad as specified for the underlying coverages. Coverage shall be provided on a “pay on behalf” basis, with defense costs payable in addition to policy limits. Policy shall contain a provision obligating insurer at the time insured’s liability is determined, not requiring actual payment by the insured first. There shall be no cross liability exclusion precluding coverage for claims or suits by one insured against another. Coverage shall be applicable to the City for injury to employees of Contractor, subcontractors or others involved in the Work. The scope of coverage provided is subject to approval by the City following receipt of proof of insurance as required herein. Limits are subject to review. 621 Insurance procured pursuant to these requirements shall be written by insurers that are admitted carriers in the State of California and with an A.M. Bests rating of A- or better and a minimum financial size of VII. General conditions pertaining to provision of insurance coverage by Contractor. Contractor and the City agree to the following with respect to insurance provided by Contractor: 1. Contractor agrees to have its insurer endorse the third party general liability coverage required herein to include as additional insureds the City, its officials, employees, and agents, using standard ISO endorsement CG 2010 with an edition prior to 1992. Contractor also agrees to require all contractors and subcontractors to do likewise. 2. No liability insurance coverage provided to comply with this Agreement shall prohibit Contractor, or Contractor’s employees, or agents, from waiving the right to subrogation prior to a loss. Contractor agrees to waive subrogation rights against the City regardless of the applicability of any insurance proceeds, and to require all contractors and subcontractors to do likewise. 3. All insurance coverage and limits provided by Contractor and available or applicable to this Agreement are intended to apply to the full extent of the policies. Nothing contained in this Agreement or any other agreement relating to the City or its operation limits the application of such insurance coverage. 4. None of the coverages required herein will be in compliance with these requirements if they include limiting endorsement of any kind that has not been first submitted to the City and approved in writing. 5. No liability policy shall contain any provision or definition that would serve to eliminate so-called “third party action over” claims, including any exclusion for bodily injury to an employee of the insured or of any contractor or subcontractor. 6. All coverage types and limits required are subject to approval, modification, and additional requirements by the City, as the need arises. Contractor shall not make any reductions in scope of coverage (e.g. elimination of contractual liability or reduction of discovery period) that may affect the City’s protection without the City’s prior written consent. 7. Proof of compliance with these insurance requirements, consisting of certificates of insurance evidencing all of the coverages required and an additional insured endorsement to Contractor’s general liability policy, shall be delivered to city at or prior to the execution of this Agreement. In the event such proof of any insurance is not delivered as required, or in the event such insurance is canceled or reduced at any time and no replacement coverage is provided, the City has the right, but not the duty, to obtain any insurance it deems necessary to protect its interests under this or any other Agreement and to pay the premium. Any 622 premium so paid by the City shall be charged to and promptly paid by Contractor or deducted from sums due Contractor, at the City’s option. 8. Certificate(s) are to reflect that the insurer will provide 30 days notice to the City of any cancellation or reduction of coverage. Contractor agrees to require its insurer to modify such certificates to delete any exculpatory wording stating that failure of the insurer to mail written notice of cancellation or reduction of coverage imposes no obligation, or that any party will “endeavor” (as opposed to being required) to comply with the requirements of the certificate. 9. It is acknowledged by the parties of this Agreement that all insurance coverage required to be provided by Contractor or any subcontractor, is intended to apply first and on a primary, non-contributing basis in relation to any other insurance or self-insurance available to the City. 10. Contractor agrees to ensure that subcontractors, and any other party involved with the Work who is brought onto or involved in the Work by Contractor, provide the same minimum insurance required of Contractor. Contractor agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this section. Contractor agrees that upon request, all agreements with subcontractors and others engaged in the Work will be submitted to the City for review. 11. Contractor agrees not to self-insure or to use any self-insured retentions or deductibles on any portion of the insurance required herein and further agrees that it will not allow any contractor, subcontractor, Architect, Engineer, or other entity or person in any way involved in the performance of Work contemplated by this Agreement to self-insure its obligations to the City. If Contractor’s existing coverage includes a deductible or self-insured retention, the deductible or self- insured retention must be declared to the City. At that time, the City shall review options with the Contractor, which may include reduction or elimination of the deductible or self-insured retention, substitution of other coverage, or other solutions. 12. The City reserves the right at any time during the term of the Agreement to change the amounts and types of insurance required by giving the Contractor 90 days advance written notice of such change. If such change results in substantial additional cost to the Contractor, the City will negotiate additional compensation proportional to the increased benefit to the City. 13. For purposes of applying insurance coverage only, this Agreement will be deemed to have been executed immediately upon any party hereto taking any steps that can be deemed to be in furtherance of or towards performance of this Agreement. 14. Contractor acknowledges and agrees that any actual or alleged failure on the part of the City to inform Contractor of non-compliance with an insurance 623 requirement in no way imposes any additional obligations to the City nor does it waive any rights hereunder in this or any other regard. 15. Contractor will renew the required coverage annually as long as the City, or its employees or agents face an exposure from operations of any type pursuant to this Agreement. This obligation applies whether or not the Agreement is canceled or terminated for any reason. Termination of this obligation is not effective until the City executes a written statement to that effect. 16. Contractor shall provide proof that policies of insurance required herein expiring during the term of this Agreement have been renewed or replaced with other policies providing at least the same coverage. Proof that such coverage has been ordered shall be submitted prior to expiration. A coverage binder or letter from Contractor’s insurance agent to this effect is acceptable. A certificate of insurance and/or additional insured endorsement as required in these specification applicable to the renewing or new coverage must be provided to the City within five days of the expiration of coverage. 17. The provisions of any Workers’ Compensation or similar act will not limit the obligations of Contractor under this Agreement. Contractor expressly agrees not to use any statutory immunity defenses under such laws with respect to the City, its employees, officials, and agents. 18. Requirements of specific coverage features or limits contained in this section are not intended as limitations on coverage, limits, or other requirements nor as a waiver of any coverage normally provided by any given policy. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue, and is not intended by any party or insured to be limiting or all- inclusive. 19. These insurance requirements are intended to be separate and distinct from any other provision in this Agreement and are intended by the parties here to be interpreted as such. 20. The requirements in this section supersede all other sections and provisions of this Agreement to the extent that any other section or provision conflicts or impairs the provisions of this section. 21. Contractor agrees to be responsible for ensuring that no contract used by any party involved in any way with the Work reserves the right to charge the City or Contractor for the cost of additional insurance coverage required by this Agreement. Any such provisions are to be deleted with reference to the City. It is not the intent of the City to reimburse any third party for the cost of complying with these requirements. There shall be no recourse against the City for payment of premiums or other amounts with respect thereto. 22. Contractor agrees to provide immediate notice to City of any claim or loss against Contractor arising out of the work performed under this Agreement. The City 624 assumes no obligation or liability by such notice, but has the right (but not the duty) to monitor the handling of any such claim or claims if they are likely to involve the City. 23. Contractor agrees to obtain and provide to City a copy of Professional Liability coverage for Architects or Engineers on this project, when required by City. City shall determine the liability limit. 625 EXHIBIT B PUBLIC CONTRACT CODE SECTION 9204 9204. (a) The Legislature finds and declares that it is in the best interests of the state and its citizens to ensure that all construction business performed on a public works project in the state that is complete and not in dispute is paid in full and in a timely manner. (b) Notwithstanding any other law, including, but not limited to, Article 7.1 (commencing with Section 10240) of Chapter 1 of Part 2, Chapter 10 (commencing with Section 19100) of Part 2, and Article 1.5 (commencing with Section 20104) of Chapter 1 of Part 3, this section shall apply to any claim by a contractor in connection with a public works project. (c) For purposes of this section: (1) “Claim” means a separate demand by a contractor sent by registered mail or certified mail with return receipt requested, for one or more of the following: (A) A time extension, including, without limitation, for relief from damages or penalties for delay assessed by a public entity under a contract for a public works project. (B) Payment by the public entity of money or damages arising from work done by, or on behalf of, the contractor pursuant to the contract for a public works project and payment for which is not otherwise expressly provided or to which the claimant is not otherwise entitled. (C) Payment of an amount that is disputed by the public entity. (2) “Contractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who has entered into a direct contract with a public entity for a public works project. (3) (A) “Public entity” means, without limitation, except as provided in subparagraph (B), a state agency, department, office, division, bureau, board, or commission, the California State University, the University of California, a city, including a charter city, county, including a charter county, city and county, including a charter city and county, district, special district, public authority, political subdivision, public corporation, or nonprofit transit corporation wholly owned by a public agency and formed to carry out the purposes of the public agency. (B) “Public entity” shall not include the following: (i) The Department of Water Resources as to any project under the jurisdiction of that department. (ii) The Department of Transportation as to any project under the jurisdiction of that department. (iii) The Department of Parks and Recreation as to any project under the jurisdiction of that department. (iv) The Department of Corrections and Rehabilitation with respect to any project under its jurisdiction pursuant to Chapter 11 (commencing with Section 7000) of Title 7 of Part 3 of the Penal Code. (v) The Military Department as to any project under the jurisdiction of that department. (vi) The Department of General Services as to all other projects. (vii) The High-Speed Rail Authority. 626 (4) “Public works project” means the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind. (5) “Subcontractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who either is in direct contract with a contractor or is a lower tier subcontractor. (d) (1) (A) Upon receipt of a claim pursuant to this section, the public entity to which the claim applies shall conduct a reasonable review of the claim and, within a period not to exceed 45 days, shall provide the claimant a written statement identifying what portion of the claim is disputed and what portion is undisputed. Upon receipt of a claim, a public entity and a contractor may, by mutual agreement, extend the time period provided in this subdivision. (B) The claimant shall furnish reasonable documentation to support the claim. (C) If the public entity needs approval from its governing body to provide the claimant a written statement identifying the disputed portion and the undisputed portion of the claim, and the governing body does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, the public entity shall have up to three days following the next duly publicly noticed meeting of the governing body after the 45-day period, or extension, expires to provide the claimant a written statement identifying the disputed portion and the undisputed portion. (D) Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. If the public entity fails to issue a written statement, paragraph (3) shall apply. (2) (A) If the claimant disputes the public entity’s written response, or if the public entity fails to respond to a claim issued pursuant to this section within the time prescribed, the claimant may demand in writing an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the public entity shall schedule a meet and confer conference within 30 days for settlement of the dispute. (B) Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the public entity shall provide the claimant a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. Any disputed portion of the claim, as identified by the contractor in writing, shall be submitted to nonbinding mediation, with the public entity and the claimant sharing the associated costs equally. The public entity and claimant shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator. If mediation is unsuccessful, the parts of the claim remaining in dispute shall be subject to applicable procedures outside this section. (C) For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by 627 issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this section. (D) Unless otherwise agreed to by the public entity and the contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced. (E) This section does not preclude a public entity from requiring arbitration of disputes under private arbitration or the Public Works Contract Arbitration Program, if mediation under this section does not resolve the parties’ dispute. (3) Failure by the public entity to respond to a claim from a contractor within the time periods described in this subdivision or to otherwise meet the time requirements of this section shall result in the claim being deemed rejected in its entirety. A claim that is denied by reason of the public entity’s failure to have responded to a claim, or its failure to otherwise meet the time requirements of this section, shall not constitute an adverse finding with regard to the merits of the claim or the responsibility or qualifications of the claimant. (4) Amounts not paid in a timely manner as required by this section shall bear interest at 7 percent per annum. (5) If a subcontractor or a lower tier subcontractor lacks legal standing to assert a claim against a public entity because privity of contract does not exist, the contractor may present to the public entity a claim on behalf of a subcontractor or lower tier subcontractor. A subcontractor may request in writing, either on his or her own behalf or on behalf of a lower tier subcontractor, that the contractor present a claim for work which was performed by the subcontractor or by a lower tier subcontractor on behalf of the subcontractor. The subcontractor requesting that the claim be presented to the public entity shall furnish reasonable documentation to support the claim. Within 45 days of receipt of this written request, the contractor shall notify the subcontractor in writing as to whether the contractor presented the claim to the public entity and, if the original contractor did not present the claim, provide the subcontractor with a statement of the reasons for not having done so. (e) The text of this section or a summary of it shall be set forth in the plans or specifications for any public works project that may give rise to a claim under this section. (f) A waiver of the rights granted by this section is void and contrary to public policy, provided, however, that (1) upon receipt of a claim, the parties may mutually agree to waive, in writing, mediation and proceed directly to the commencement of a civil action or binding arbitration, as applicable; and (2) a public entity may prescribe reasonable change order, claim, and dispute resolution procedures and requirements in addition to the provisions of this section, so long as the contractual provisions do not conflict with or otherwise impair the timeframes and procedures set forth in this section. (g) This section applies to contracts entered into on or after January 1, 2017. (h) Nothing in this section shall impose liability upon a public entity that makes loans or grants available through a competitive application process, for the failure of an awardee to meet its contractual obligations. (i) This section shall remain in effect only until January 1, 2020, and as of that date is repealed, unless a later enacted statute, that is enacted before January 1, 2020, deletes or extends that date. (Added by Stats. 2016, Ch. 810, Sec. 1. (AB 626) Effective January 1, 2017. Repealed as of January 1, 2020, by its own provisions.) 628 629 EXHIBIT D SCOPE OF SERVICES Contractor to provide routine repairs, preventative maintenance, and emergency response work for plumbing systems at all City of Moorpark parks, facilities, and miscellaneous properties. Contractor to provide the following services:  Provide all labor and materials, tools, equipment, transportation and services necessary to perform plumbing services or repairs, including installation of new and updated plumbing components.  Provide as needed repair and emergency response services. Routine and emergency response services shall be performed as follows: o During the term of the Agreement, Contractor agrees to the following response times:  Routine Work Response: One (1) to three (3) working days from request by City.  Emergency Work Response: One (1) to three (3) hours from request by City.  Contractor shall troubleshoot and provide an initial assessment of the service or repair needed and provide an estimated cost to the City representative.  Contractor estimates will be reviewed by the City representative and upon acceptance authorize the Contractor to proceed with work. All proposed work over $1,000.00 requires a signed work order.  Contractor shall only start work upon written authorization or receipt of a signed work order from the City representative.  Contractor’s personnel are required to notify the City representative of the work start date, and upon arrival before starting any work, and before leaving the site.  Contractor is encouraged to consider sustainability and provide energy and environmentally-friendly products.  Contractor shall provide all manufacturer warranties and Safety Data Sheets (SDS) to City representative, as applicable.  Contractor shall itemize material and labor costs and charge them separately.  Prices noted in the proposal shall be honored for the entire contract term. 630 Contractor responsibilities:  Required Licenses: Bidders must hold a valid State of California Contractor's License, C-36 Plumbing, and have carried a valid license for the last 5 years.  Work site and surrounding areas to be left clean and free of any debris or other unsuitable materials at the end of each working day or project.  Contractor is to properly dispose of any components containing hazardous materials and recycle any unused equipment or waste resulting from their work.  Contractor shall be responsible for all damages to persons or property that occur as a result of its fault or negligence in the performance of this contract and shall be responsible for the protection of the work site until job is finished.  Contractor shall take all necessary precautions for the safety of workers on the project and shall comply with all applicable federal, state, local and other safety laws, standards, orders, rules, regulations, and building codes to prevent accidents or injury to persons on, about, or adjacent to the premises where work is being performed and to provide a safe and healthful place of employment.  All equipment, materials and labor utilized and all work performed shall comply with all current codes, standards, regulations and statutes pertaining to the type of work. 631 AGREEMENT BETWEEN THE CITY OF MOORPARK AND DRAPER CONSTRUCTION FOR CONCRETE AND MASONRY SERVICES THIS AGREEMENT, is made and effective as of this _________ day of ________________________, 2018, between the City of Moorpark, a municipal corporation (“City”) and Draper Construction, a sole proprietor (“Contractor”). In consideration of the mutual covenants and conditions set forth herein, the parties agree as follows: WHEREAS, City has the need for concrete and masonry services on an as- needed basis at various City parks, facilities, and Landscape Maintenance Districts; and WHEREAS, Contractor specializes in providing such services and has the proper work experience, certifications, and background to carry out the duties involved; and WHEREAS, Contractor has submitted to City a Proposal dated April 26, 2018 which is attached hereto as Exhibit C. NOW, THEREFORE, in consideration of the mutual covenants, benefits, and premises herein stated, the parties hereto agree as follows: 1. TERM The term of this Agreement shall be from the date of execution and will expire on June 30, 2021, unless this Agreement is terminated or suspended pursuant to this Agreement. Upon the mutual consent of both parties, the term of this Agreement may be extended by a written amendment executed by both parties for two (2) additional one (1) year periods. 2. SCOPE OF SERVICES City does hereby retain Contractor, as an independent contractor, in a contractual capacity to provide concrete and masonry services on an as-needed basis at various City parks, facilities, and Landscape Maintenance Districts, as set forth in Exhibit C: Contractor’s Bid Proposal, and as set forth in Exhibit D: Informal Bid Proposal Documents. In the event there is a conflict between the provisions of Exhibit C, Exhibit D, and this Agreement, the language contained in this Agreement shall take precedence. Contractor shall perform the tasks described and set forth in Exhibit D. Compensation for the services to be performed by Contractor shall be in accordance with Exhibit C. Compensation shall not exceed the rates or value of one hundred thousand dollars ($100,000) for the period ending June 30, 2019. Thereafter, compensation shall not exceed the rates or value of seventy-five thousand dollars ($75,000) annually, without a written amendment to the Agreement executed by both 632 parties. Payment by City to Contractor shall be in accordance with the provisions of this Agreement. City and Contractor acknowledge that this project is a public work to which prevailing wages apply, and that a public work project is subject to compliance monitoring and enforcement by the California Department of Industrial Relations (DIR). Contractor agrees to comply with and be bound by all the terms, rules and regulations described in (a) Division 2, Part 7, Chapter 1 (commencing with Section 1720) of the California Labor Code, including without limitation Labor Code Section 1771 and (b) the rules and regulations established by the DIR implementing such statutes, as though set forth in full herein, including any applicable amendments made thereto during the term of this Agreement. For every subcontractor who will perform work on this project, Contractor shall be responsible for subcontractor’s compliance with (a) and (b), and Contractor shall take all necessary actions to ensure subcontractor’s compliance. Labor Code Section 1725.5 requires all contractors and subcontractors to annually register with the DIR before bidding or performing on any public work contract. 3. PERFORMANCE Contractor shall at all times faithfully, competently and to the best of their ability, experience, standard of care, and talent, perform all tasks described herein. Contractor shall employ, at a minimum, generally accepted standards and practices utilized by persons engaged in providing similar services as are required of Contractor hereunder in meeting its obligations under this Agreement. 4. MANAGEMENT The individual directly responsible for Contractor’s overall performance of the Agreement provisions herein above set forth and to serve as principal liaison between City and Contractor shall be Rob Draper and no other individual may be substituted without the prior written approval of the City Manager. The City’s contact person in charge of administration of this Agreement, and to serve as principal liaison between Contractor and City, shall be the City Manager or the City Manager’s designee. 5. PAYMENT Taxpayer ID or Social Security numbers must be provided, on an IRS W-9 form, before payments may be made to vendors. The City agrees to pay Contractor monthly, in accordance with the payment rates and terms and the schedule of payment as set forth in Exhibit C, based upon actual time spent on the above tasks. This amount shall not exceed one hundred thousand dollars ($100,000) for the period ending June 30, 2019. Thereafter compensation shall not exceed the rates or value of seventy-five thousand dollars ($75,000) annually unless additional payment is approved as provided in this Agreement. 633 Contractor shall not be compensated for any additional services rendered in connection with its performance of this Agreement, unless such additional services and compensation are authorized, in advance, in a written amendment to the Agreement executed by both parties. The City Manager, if authorized by City Council, may approve additional work not to exceed ten percent (10%) of the amount of the Agreement. Contractor shall submit invoices monthly for actual services performed. Invoices shall be submitted on or about the first business day of each month, or as soon thereafter as practical, for services provided in the previous month. Payment shall be made within thirty (30) days of receipt of each invoice as to all non-disputed fees. Any expense or reimbursable cost appearing on any invoice shall be accompanied by a receipt or other documentation subject to approval of the City Manager. If the City disputes any of Contractor’s fees or expenses it shall give written notice to Contractor within thirty (30) days of receipt of any disputed fees set forth on the invoice. 6. TERMINATION OR SUSPENSION WITHOUT CAUSE The City may at any time, for any reason, with or without cause, suspend or terminate this Agreement, or any portion hereof, by serving upon the Contractor at least ten (10) days prior written notice. Upon receipt of said notice, the Contractor shall immediately cease all work under this Agreement, unless the notice provides otherwise. If the City suspends or terminates a portion of this Agreement such suspension or termination shall not make void or invalidate the remainder of this Agreement. The Contractor may terminate this Agreement only by providing City with written notice no less than thirty (30) days in advance of such termination. In the event this Agreement is terminated or suspended pursuant to this Section, the City shall pay to Contractor the actual value of the work performed up to the time of termination or suspension, provided that the work performed is of value to the City. Upon termination or suspension of the Agreement pursuant to this Section, the Contractor will submit an invoice to the City pursuant to this Agreement. 7. DEFAULT OF CONTRACTOR The Contractor’s failure to comply with the provisions of this Agreement shall constitute a default. In the event that Contractor is in default for cause under the terms of this Agreement, City shall have no obligation or duty to continue compensating Contractor for any work performed after the date of default and can terminate or suspend this Agreement immediately by written notice to the Contractor. If such failure by the Contractor to make progress in the performance of work hereunder arises out of causes beyond the Contractor’s control, and without fault or negligence of the Contractor, it shall not be considered a default. If the City Manager or the City Manager’s designee determines that the Contractor is in default in the performance of any of the terms or conditions of this Agreement, designee shall cause to be served upon the Contractor a written notice of the default. The Contractor shall have seven (7) days after service upon it of said notice 634 in which to cure the default by rendering a satisfactory performance. In the event that the Contractor fails to cure its default within such period of time, the City shall have the right, notwithstanding any other provision of this Agreement, to terminate this Agreement without further notice and without prejudice to any other remedy to which it may be entitled at law, in equity or under this Agreement. 8. LIQUIDATED DAMAGES If the Contractor fails to complete the work, or any portion thereof, within the time period required by this Agreement, or as duly extended in writing by the City Manager, Contractor shall forfeit and pay to the City, as liquidated damages, the sum of one hundred fifty dollars ($150) per day for each calendar day the work, or portion thereof, remains uncompleted after the above specified completion date. Liquidated damages shall be deducted from any payments due or to become due to the Contractor under the terms of this Agreement. Progress payments made by the City after the above specified completion date shall not constitute a waiver of liquidated damages by the City. 9. OWNERSHIP OF DOCUMENTS Contractor shall maintain complete and accurate records with respect to sales, costs, expenses, receipts, and other such information required by City that relate to the performance of services under this Agreement. Contractor shall maintain adequate records of services provided in sufficient detail to permit an evaluation of services. All such records shall be maintained in accordance with generally accepted accounting principles and shall be clearly identified and readily accessible. Contractor shall provide free access to the representatives of City or the City’s designees at reasonable times to such books and records; shall give the City the right to examine and audit said books and records; shall permit City to make transcripts therefrom as necessary; and shall allow inspection of all work, data, documents, proceedings, and activities related to this Agreement. Notification of audit shall be provided at least thirty (30) days before any such audit is conducted. Such records, together with supporting documents, shall be maintained for a period of ten (10) years after receipt of final payment. Upon completion of, or in the event of termination or suspension without cause of this Agreement, all original documents, designs, drawings, maps, models, computer files, surveys, notes, and other documents prepared in the course of providing the services to be performed pursuant to this Agreement shall become the sole property of the City and may be used, reused, or otherwise disposed of by the City without the permission of the Contractor. With respect to computer files, Contractor shall make available to the City, at the Contractor’s office and upon reasonable written request by the City, the necessary computer software and hardware for purposes of accessing, compiling, transferring, and printing computer files. 10. INDEMNIFICATION AND HOLD HARMLESS Contractor shall indemnify, defend and hold harmless City, and any and all of its officers, employees, and agents (“City Indemnitees”) from and against any and all causes of action, claims, liabilities, obligations, judgments, or damages, including 635 reasonable legal counsels’ fees and costs of litigation (“claims”), arising out of the Contractor’s performance of its obligations under this Agreement or out of the operations conducted by Contractor, including the City’s active or passive negligence, except for such loss or damage arising from the sole negligence or willful misconduct of the City. In the event the City Indemnitees are made a party to any action, lawsuit, or other adversarial proceeding arising from Contractor’s performance of this Agreement, the Contractor shall provide a defense to the City Indemnitees or at the City’s option reimburse the City Indemnitees their costs of defense, including reasonable legal counsels’ fees incurred in defense of such claims. Contractor agrees to obtain executed indemnity agreements with provisions identical to those set forth in this Section from each and every subcontractor, or any other person or entity involved by, for, with, or on behalf of Contractor in the performance of this Agreement. In the event Contractor fails to obtain such indemnity obligations from others as required here, Contractor agrees to be fully responsible according to the terms of this Section. Failure of City to monitor compliance with these requirements imposes no additional obligations on City and will in no way act as a waiver of any rights hereunder. This obligation to indemnify and defend City as set forth here is binding on the successors, assigns, or heirs of Contractor and shall survive the termination of this Agreement or this Section. City does not and shall not waive any rights that it may have against Contractor by reason of this Section, because of the acceptance by City, or the deposit with City, of any insurance policy or certificate required pursuant to this Agreement. The hold harmless and indemnification provisions shall apply regardless of whether or not said insurance policies are determined to be applicable to any losses, liabilities, damages, costs, and expenses described in this Section. This Indemnity shall survive termination of the Agreement or Final Payment hereunder. This Indemnity is in addition to any other rights or remedies that the Indemnitees may have under the law or under any other Contract Documents or Agreements. In the event of any claim or demand made against any party which is entitled to be indemnified hereunder, City may, in its sole discretion, reserve, retain, or apply any monies to the Contractor under this Agreement for the purpose of resolving such claims; provided, however, City may release such funds if the Contractor provides City with reasonable assurance of protection of the Indemnitees’ interests. City shall, in its sole discretion, determine whether such assurances are reasonable. 11. INSURANCE Contractor shall maintain prior to the beginning of and for the duration of this Agreement insurance coverage as specified in Exhibit A attached hereto and incorporated herein by this reference as though set forth in full. 12. INDEPENDENT CONTRACTOR Contractor is and shall at all times remain as to the City a wholly independent Contractor. The personnel performing the services under this Agreement on behalf of 636 Contractor shall at all times be under Contractor’s exclusive direction and control. Neither City nor any of its officers, employees, or agents shall have control over the conduct of Contractor or any of Contractor’s officers, employees, or agents, except as set forth in this Agreement. Contractor shall not at any time or in any manner represent that it or any of its officers, employees, or agents are in any manner officers, employees, or agents of the City. Contractor shall not incur or have the power to incur any debt, obligation, or liability against City, or bind City in any manner. No employee benefits shall be available to Contractor in connection with the performance of this Agreement. Except for the fees paid to Contractor as provided in the Agreement, City shall not pay salaries, wages, or other compensation to Contractor for performing services hereunder for City. City shall not be liable for compensation or indemnification to Contractor for injury or sickness arising out of performing services hereunder. 13. LEGAL RESPONSIBILITIES The Contractor shall keep itself informed of local, state and federal laws and regulations which in any manner affect those employed by it or in any way affect the performance of its service pursuant to this Agreement. The Contractor shall at all times observe and comply with all such laws and regulations, including but not limited to the Americans with Disabilities Act and Occupational Safety and Health Administration laws and regulations. The City and Contractor shall comply with Exhibit B, California Public Contract Code Section 9204, when applicable. The City, and its officers and employees, shall not be liable at law or in equity occasioned by failure of the Contractor to comply with this Section. 14. ANTI DISCRIMINATION Neither the Contractor, nor any subcontractor under the Contractor, shall discriminate in employment of persons upon the work because of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, genetic information, marital status, sex, gender, gender identity, gender expression, age, sexual orientation, or military and veteran status of such person; or any other basis protected by applicable federal, state, or local law, except as provided in Section 12940 of the Government Code. The Contractor shall have responsibility for compliance with this Section, if applicable [Labor Code Sec. 1735]. 15. UNDUE INFLUENCE Contractor declares and warrants that no undue influence or pressure is used against or in concert with any officer or employee of the City in connection with the award, terms or implementation of this Agreement, including any method of coercion, confidential financial arrangement, or financial inducement. No officer or employee of the City will receive compensation, directly or indirectly from Contractor, or any officer, employee or agent of Contractor, in connection with the award of this Agreement or any work to be conducted as a result of this Agreement. Violation of this Section shall be a 637 material breach of this Agreement entitling the City to any and all remedies at law or in equity. 16. NO BENEFIT TO ARISE TO LOCAL EMPLOYEES No member, officer, or employee of the City, or their designees or agents, and no public official who exercises authority over or responsibilities with respect to the Services during his/her tenure or for one (1) year thereafter, shall have any interest, direct or indirect, in any agreement or sub-agreement, or the proceeds thereof, for work to be performed in connection with the Services performed under this Agreement. 17. CONFLICT OF INTEREST Contractor covenants that neither they nor any officer or principal of their firm have any interests, nor shall they acquire any interest, directly or indirectly, which will conflict in any manner or degree with the performance of their services hereunder. Contractor further covenants that in the performance of this Agreement, they shall employ no person having such interest as an officer, employee, agent, or subcontractor. Contractor further covenants that Contractor has not contracted with nor is performing any services directly or indirectly, with the developer(s) and/or property owner(s) and/or firm(s) and/or partnership(s) and/or public agency(ies) owning property and/or processing an entitlement application for property in the City or its Area of Interest, now or within the past one (1) year, and further covenants and agrees that Contractor and/or its subcontractors shall provide no service or enter into any contract with any developer(s) and/or property owner(s) and/or firm(s) and/or partnership(s) and/or public agency(ies) owning property and/or processing an entitlement application for property in the City or its Area of Interest, while under contract with the City and for a one (1) year time period following termination of this Agreement. 18. NOTICE Any notice to be given pursuant to this Agreement shall be in writing, and all such notices and any other document to be delivered shall be delivered by personal service or by deposit in the United States mail, certified or registered, return receipt requested, with postage prepaid, and addressed to the party for whom intended as follows: To: City Manager City of Moorpark 799 Moorpark Ave. Moorpark, CA 93021 To: Rob K. Draper Draper Construction 5345 Commerce Avenue, #11 Moorpark, CA 93021 Either party may, from time to time, by written notice to the other, designate a different address or contact person, which shall be substituted for the one above 638 specified. Notices, payments and other documents shall be deemed delivered upon receipt by personal service or as of the third (3rd) day after deposit in the United States mail. 19. CHANGE IN NAME Should a change be contemplated in the name or nature of the Contractor’s legal entity, the Contractor shall first notify the City in order that proper steps may be taken to have the change reflected in the Agreement documents. 20. ASSIGNMENT Contractor shall not assign this Agreement or any of the rights, duties or obligations hereunder. It is understood and acknowledged by the parties that Contractor is uniquely qualified to perform the services provided for in this Agreement. 21. LICENSES At all times during the term of this Agreement, Contractor shall have in full force and effect, all licenses required of it by law for the performance of the services in this Agreement. 22. VENUE AND GOVERNING LAW This Agreement is made, entered into, and executed in Ventura County, California, and any action filed in any court or for arbitration for the interpretation, enforcement or other action of the terms, conditions, or covenants referred to herein shall be filed in the applicable court in Ventura County, California. The City and Contractor understand and agree that the laws of the State of California shall govern the rights, obligations, duties, and liabilities of the parties to this Agreement and also govern the interpretation of this Agreement. 23. COST RECOVERY In the event any action, suit or proceeding is brought for the enforcement of, or the declaration of any right or obligation pursuant to this Agreement or as a result of any alleged breach of any provision of this Agreement, the prevailing party shall be entitled to recover its costs and expenses from the losing party, and any judgment or decree rendered in such a proceeding shall include an award thereof. 24. ARBITRATION Cases involving a dispute between City and Contractor may be decided by an arbitrator if both sides agree in writing, with costs proportional to the judgment of the arbitrator. 639 25. ENTIRE AGREEMENT This Agreement and the Exhibits attached hereto contain the entire understanding between the parties relating to the obligations of the parties described in this Agreement. All prior or contemporaneous agreements, understandings, representations, and statements, oral or written, are merged into this Agreement and shall be of no further force or effect. Each party is entering into this Agreement based solely upon the representations set forth herein and upon each party’s own independent investigation of any and all facts such party deems material. 26. CAPTIONS OR HEADINGS The captions and headings of the various Articles, Paragraphs, and Exhibits of this Agreement are for convenience and identification only and shall not be deemed to limit or define the content of the respective Articles, Paragraphs, and Exhibits hereof. 27. AMENDMENTS Any amendment, modification, or variation from the terms of this Agreement shall be in writing and shall be effective only upon approval by both parties to this Agreement. 28. PRECEDENCE In the event of conflict, the requirements of the City’s Request for Proposal, if any, and this Agreement shall take precedence over those contained in the Contractor’s Proposal. 29. INTERPRETATION OF AGREEMENT Should interpretation of this Agreement, or any portion thereof, be necessary, it is deemed that this Agreement was prepared by the parties jointly and equally, and shall not be interpreted against either party on the ground that the party prepared the Agreement or caused it to be prepared. 30. WAIVER No waiver of any provision of this Agreement shall be deemed, or shall constitute, a waiver of any other provision, whether or not similar, nor shall any such waiver constitute a continuing or subsequent waiver of the same provision. No waiver shall be binding unless executed in writing by the party making the waiver. 31. AUTHORITY TO EXECUTE The person or persons executing this Agreement on behalf of the Contractor warrants and represents that he/she has the authority to execute this Agreement on behalf of the Contractor and has the authority to bind Contractor to the performance of obligations hereunder. 640 IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed the day and year first above written. CITY OF MOORPARK DRAPER CONSTRUCTION By:_______________________________ By:_______________________________ Troy Brown, City Manager Rob K. Draper, Owner Attest: __________________________________ Maureen Benson, City Clerk 641 Exhibit A INSURANCE REQUIREMENTS Prior to the beginning of and throughout the duration of Work, Contractor will maintain insurance in conformance with the requirements set forth below. Contractor will use existing coverage to comply with these requirements. If that existing coverage does not meet requirements set forth here, Contractor agrees to amend, supplement or endorse the existing coverage to do so. Contractor acknowledges that the insurance coverage and policy limits set forth in this section constitute the minimum amount of coverage required. Any insurance proceeds available to the City in excess of the limits and coverage required in this Agreement and which is applicable to a given loss, will be available to the City. Contractor shall provide the following types and amounts of insurance: Commercial General Liability Insurance using Insurance Services Office (ISO) “Commercial General Liability” policy form CG 00 01 or the exact equivalent. Defense costs must be paid in addition to limits. There shall be no cross liability exclusion for claims or suits by one insured against another. Limits are subject to review but in no event less than $1,000,000 per occurrence for all covered losses and no less than $2,000,000 general aggregate. Business Auto Coverage on ISO Business Auto Coverage form CA 00 01 including symbol 1 (Any Auto) or the exact equivalent. Limits are subject to review, but in no event to be less than $1,000,000 per accident. If Contractor owns no vehicles, this requirement may be satisfied by a non-owned auto endorsement to the general liability policy described above. If Contractor or Contractor’s employees will use personal autos in any way on this project, Contractor shall provide evidence of personal auto liability for each such person. Workers’ Compensation on a state-approved policy form providing statutory benefits as required by law with employer’s liability limits no less than $1,000,000 per accident or disease. Excess or Umbrella Liability Insurance (Over Primary) if used to meet limit requirements, shall provide coverage at least as broad as specified for the underlying coverages. Coverage shall be provided on a “pay on behalf” basis, with defense costs payable in addition to policy limits. Policy shall contain a provision obligating insurer at the time insured’s liability is determined, not requiring actual payment by the insured first. There shall be no cross liability exclusion precluding coverage for claims or suits by one insured against another. Coverage shall be applicable to the City for injury to employees of Contractor, subcontractors or others involved in the Work. The scope of coverage provided is subject to approval by the City following receipt of proof of insurance as required herein. Limits are subject to review. 642 Insurance procured pursuant to these requirements shall be written by insurers that are admitted carriers in the State of California and with an A.M. Bests rating of A- or better and a minimum financial size of VII. General conditions pertaining to provision of insurance coverage by Contractor. Contractor and the City agree to the following with respect to insurance provided by Contractor: 1. Contractor agrees to have its insurer endorse the third party general liability coverage required herein to include as additional insureds the City, its officials, employees, and agents, using standard ISO endorsement CG 2010 with an edition prior to 1992. Contractor also agrees to require all contractors and subcontractors to do likewise. 2. No liability insurance coverage provided to comply with this Agreement shall prohibit Contractor, or Contractor’s employees, or agents, from waiving the right to subrogation prior to a loss. Contractor agrees to waive subrogation rights against the City regardless of the applicability of any insurance proceeds, and to require all contractors and subcontractors to do likewise. 3. All insurance coverage and limits provided by Contractor and available or applicable to this Agreement are intended to apply to the full extent of the policies. Nothing contained in this Agreement or any other agreement relating to the City or its operation limits the application of such insurance coverage. 4. None of the coverages required herein will be in compliance with these requirements if they include limiting endorsement of any kind that has not been first submitted to the City and approved in writing. 5. No liability policy shall contain any provision or definition that would serve to eliminate so-called “third party action over” claims, including any exclusion for bodily injury to an employee of the insured or of any contractor or subcontractor. 6. All coverage types and limits required are subject to approval, modification, and additional requirements by the City, as the need arises. Contractor shall not make any reductions in scope of coverage (e.g. elimination of contractual liability or reduction of discovery period) that may affect the City’s protection without the City’s prior written consent. 7. Proof of compliance with these insurance requirements, consisting of certificates of insurance evidencing all of the coverages required and an additional insured endorsement to Contractor’s general liability policy, shall be delivered to city at or prior to the execution of this Agreement. In the event such proof of any insurance is not delivered as required, or in the event such insurance is canceled or reduced at any time and no replacement coverage is provided, the City has the right, but not the duty, to obtain any insurance it deems necessary to protect its interests under this or any other Agreement and to pay the premium. Any 643 premium so paid by the City shall be charged to and promptly paid by Contractor or deducted from sums due Contractor, at the City’s option. 8. Certificate(s) are to reflect that the insurer will provide 30 days notice to the City of any cancellation or reduction of coverage. Contractor agrees to require its insurer to modify such certificates to delete any exculpatory wording stating that failure of the insurer to mail written notice of cancellation or reduction of coverage imposes no obligation, or that any party will “endeavor” (as opposed to being required) to comply with the requirements of the certificate. 9. It is acknowledged by the parties of this Agreement that all insurance coverage required to be provided by Contractor or any subcontractor, is intended to apply first and on a primary, non-contributing basis in relation to any other insurance or self-insurance available to the City. 10. Contractor agrees to ensure that subcontractors, and any other party involved with the Work who is brought onto or involved in the Work by Contractor, provide the same minimum insurance required of Contractor. Contractor agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this section. Contractor agrees that upon request, all agreements with subcontractors and others engaged in the Work will be submitted to the City for review. 11. Contractor agrees not to self-insure or to use any self-insured retentions or deductibles on any portion of the insurance required herein and further agrees that it will not allow any contractor, subcontractor, Architect, Engineer, or other entity or person in any way involved in the performance of Work contemplated by this Agreement to self-insure its obligations to the City. If Contractor’s existing coverage includes a deductible or self-insured retention, the deductible or self- insured retention must be declared to the City. At that time, the City shall review options with the Contractor, which may include reduction or elimination of the deductible or self-insured retention, substitution of other coverage, or other solutions. 12. The City reserves the right at any time during the term of the Agreement to change the amounts and types of insurance required by giving the Contractor 90 days advance written notice of such change. If such change results in substantial additional cost to the Contractor, the City will negotiate additional compensation proportional to the increased benefit to the City. 13. For purposes of applying insurance coverage only, this Agreement will be deemed to have been executed immediately upon any party hereto taking any steps that can be deemed to be in furtherance of or towards performance of this Agreement. 14. Contractor acknowledges and agrees that any actual or alleged failure on the part of the City to inform Contractor of non-compliance with an insurance 644 requirement in no way imposes any additional obligations to the City nor does it waive any rights hereunder in this or any other regard. 15. Contractor will renew the required coverage annually as long as the City, or its employees or agents face an exposure from operations of any type pursuant to this Agreement. This obligation applies whether or not the Agreement is canceled or terminated for any reason. Termination of this obligation is not effective until the City executes a written statement to that effect. 16. Contractor shall provide proof that policies of insurance required herein expiring during the term of this Agreement have been renewed or replaced with other policies providing at least the same coverage. Proof that such coverage has been ordered shall be submitted prior to expiration. A coverage binder or letter from Contractor’s insurance agent to this effect is acceptable. A certificate of insurance and/or additional insured endorsement as required in these specification applicable to the renewing or new coverage must be provided to the City within five days of the expiration of coverage. 17. The provisions of any Workers’ Compensation or similar act will not limit the obligations of Contractor under this Agreement. Contractor expressly agrees not to use any statutory immunity defenses under such laws with respect to the City, its employees, officials, and agents. 18. Requirements of specific coverage features or limits contained in this section are not intended as limitations on coverage, limits, or other requirements nor as a waiver of any coverage normally provided by any given policy. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue, and is not intended by any party or insured to be limiting or all- inclusive. 19. These insurance requirements are intended to be separate and distinct from any other provision in this Agreement and are intended by the parties here to be interpreted as such. 20. The requirements in this section supersede all other sections and provisions of this Agreement to the extent that any other section or provision conflicts or impairs the provisions of this section. 21. Contractor agrees to be responsible for ensuring that no contract used by any party involved in any way with the Work reserves the right to charge the City or Contractor for the cost of additional insurance coverage required by this Agreement. Any such provisions are to be deleted with reference to the City. It is not the intent of the City to reimburse any third party for the cost of complying with these requirements. There shall be no recourse against the City for payment of premiums or other amounts with respect thereto. 22. Contractor agrees to provide immediate notice to City of any claim or loss against Contractor arising out of the work performed under this Agreement. The City 645 assumes no obligation or liability by such notice, but has the right (but not the duty) to monitor the handling of any such claim or claims if they are likely to involve the City. 23. Contractor agrees to obtain and provide to City a copy of Professional Liability coverage for Architects or Engineers on this project, when required by City. City shall determine the liability limit. 646 EXHIBIT B PUBLIC CONTRACT CODE SECTION 9204 9204. (a) The Legislature finds and declares that it is in the best interests of the state and its citizens to ensure that all construction business performed on a public works project in the state that is complete and not in dispute is paid in full and in a timely manner. (b) Notwithstanding any other law, including, but not limited to, Article 7.1 (commencing with Section 10240) of Chapter 1 of Part 2, Chapter 10 (commencing with Section 19100) of Part 2, and Article 1.5 (commencing with Section 20104) of Chapter 1 of Part 3, this section shall apply to any claim by a contractor in connection with a public works project. (c) For purposes of this section: (1) “Claim” means a separate demand by a contractor sent by registered mail or certified mail with return receipt requested, for one or more of the following: (A) A time extension, including, without limitation, for relief from damages or penalties for delay assessed by a public entity under a contract for a public works project. (B) Payment by the public entity of money or damages arising from work done by, or on behalf of, the contractor pursuant to the contract for a public works project and payment for which is not otherwise expressly provided or to which the claimant is not otherwise entitled. (C) Payment of an amount that is disputed by the public entity. (2) “Contractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who has entered into a direct contract with a public entity for a public works project. (3) (A) “Public entity” means, without limitation, except as provided in subparagraph (B), a state agency, department, office, division, bureau, board, or commission, the California State University, the University of California, a city, including a charter city, county, including a charter county, city and county, including a charter city and county, district, special district, public authority, political subdivision, public corporation, or nonprofit transit corporation wholly owned by a public agency and formed to carry out the purposes of the public agency. (B) “Public entity” shall not include the following: (i) The Department of Water Resources as to any project under the jurisdiction of that department. (ii) The Department of Transportation as to any project under the jurisdiction of that department. (iii) The Department of Parks and Recreation as to any project under the jurisdiction of that department. (iv) The Department of Corrections and Rehabilitation with respect to any project under its jurisdiction pursuant to Chapter 11 (commencing with Section 7000) of Title 7 of Part 3 of the Penal Code. (v) The Military Department as to any project under the jurisdiction of that department. (vi) The Department of General Services as to all other projects. (vii) The High-Speed Rail Authority. 647 (4) “Public works project” means the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind. (5) “Subcontractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who either is in direct contract with a contractor or is a lower tier subcontractor. (d) (1) (A) Upon receipt of a claim pursuant to this section, the public entity to which the claim applies shall conduct a reasonable review of the claim and, within a period not to exceed 45 days, shall provide the claimant a written statement identifying what portion of the claim is disputed and what portion is undisputed. Upon receipt of a claim, a public entity and a contractor may, by mutual agreement, extend the time period provided in this subdivision. (B) The claimant shall furnish reasonable documentation to support the claim. (C) If the public entity needs approval from its governing body to provide the claimant a written statement identifying the disputed portion and the undisputed portion of the claim, and the governing body does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, the public entity shall have up to three days following the next duly publicly noticed meeting of the governing body after the 45-day period, or extension, expires to provide the claimant a written statement identifying the disputed portion and the undisputed portion. (D) Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. If the public entity fails to issue a written statement, paragraph (3) shall apply. (2) (A) If the claimant disputes the public entity’s written response, or if the public entity fails to respond to a claim issued pursuant to this section within the time prescribed, the claimant may demand in writing an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the public entity shall schedule a meet and confer conference within 30 days for settlement of the dispute. (B) Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the public entity shall provide the claimant a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. Any disputed portion of the claim, as identified by the contractor in writing, shall be submitted to nonbinding mediation, with the public entity and the claimant sharing the associated costs equally. The public entity and claimant shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator. If mediation is unsuccessful, the parts of the claim remaining in dispute shall be subject to applicable procedures outside this section. (C) For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by 648 issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this section. (D) Unless otherwise agreed to by the public entity and the contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced. (E) This section does not preclude a public entity from requiring arbitration of disputes under private arbitration or the Public Works Contract Arbitration Program, if mediation under this section does not resolve the parties’ dispute. (3) Failure by the public entity to respond to a claim from a contractor within the time periods described in this subdivision or to otherwise meet the time requirements of this section shall result in the claim being deemed rejected in its entirety. A claim that is denied by reason of the public entity’s failure to have responded to a claim, or its failure to otherwise meet the time requirements of this section, shall not constitute an adverse finding with regard to the merits of the claim or the responsibility or qualifications of the claimant. (4) Amounts not paid in a timely manner as required by this section shall bear interest at 7 percent per annum. (5) If a subcontractor or a lower tier subcontractor lacks legal standing to assert a claim against a public entity because privity of contract does not exist, the contractor may present to the public entity a claim on behalf of a subcontractor or lower tier subcontractor. A subcontractor may request in writing, either on his or her own behalf or on behalf of a lower tier subcontractor, that the contractor present a claim for work which was performed by the subcontractor or by a lower tier subcontractor on behalf of the subcontractor. The subcontractor requesting that the claim be presented to the public entity shall furnish reasonable documentation to support the claim. Within 45 days of receipt of this written request, the contractor shall notify the subcontractor in writing as to whether the contractor presented the claim to the public entity and, if the original contractor did not present the claim, provide the subcontractor with a statement of the reasons for not having done so. (e) The text of this section or a summary of it shall be set forth in the plans or specifications for any public works project that may give rise to a claim under this section. (f) A waiver of the rights granted by this section is void and contrary to public policy, provided, however, that (1) upon receipt of a claim, the parties may mutually agree to waive, in writing, mediation and proceed directly to the commencement of a civil action or binding arbitration, as applicable; and (2) a public entity may prescribe reasonable change order, claim, and dispute resolution procedures and requirements in addition to the provisions of this section, so long as the contractual provisions do not conflict with or otherwise impair the timeframes and procedures set forth in this section. (g) This section applies to contracts entered into on or after January 1, 2017. (h) Nothing in this section shall impose liability upon a public entity that makes loans or grants available through a competitive application process, for the failure of an awardee to meet its contractual obligations. (i) This section shall remain in effect only until January 1, 2020, and as of that date is repealed, unless a later enacted statute, that is enacted before January 1, 2020, deletes or extends that date. (Added by Stats. 2016, Ch. 810, Sec. 1. (AB 626) Effective January 1, 2017. Repealed as of January 1, 2020, by its own provisions.) 649 650 651 652 653 654 655 656 657 658 659 660 JANICE S. PARVIN Mayor ROSEANN MIKOS, Ph.D. Councilmember DAVID POLLOCK Councilmember KEN SIMONS Councilmember MARK VAN DAM Councilmember PARKS, RECREATION & COMMUNITY SERVICES DEPT. | 799 Moorpark Avenue, Moorpark, CA 93021 Main City Phone Number (805) 517-6200 | Fax (805) 532-2550 | moorpark@moorparkca.gov CITY OF MOORPARK April 10, 2018 RE: As-Needed Concrete and Masonry Services in various City Parks, Facilities and Landscape Maintenance Districts Proposals due by: April 26, 2018 at 5:00 p.m. INFORMAL BID PROPOSAL The City is looking for qualified Masonry Contractors to provide concrete and masonry services on an as-needed basis at City of Moorpark Parks, Facilities, and Landscape Maintenance Districts. The City will be offering a one-year agreement with the selected contractor, subject to two, one year extensions, so long as the Contractor is performing satisfactorily. The contract not-to-exceed amount will be $100,000, however, the City is not guaranteeing the value of the contract since the services will be as needed throughout the term. Contractor to: Provide all labor and materials, appliances, tools, equipment, facilities, transportation and services necessary for and incidental to performing as-needed Concrete and Masonry Services in Various City Parks, Facilities and Landscape Maintenance Districts. Representative projects can be seen on the bid proposal sheet. Contractor responsibilities: **CONTRACTOR MUST BE REGISTERED WITH THE CALIFORNIA DEPARTMENT OF INDUSTRIAL RELATIONS (DIR) PURSUANT TO SB 854. PROOF OF REGISTRATION MUST BE PROVIDED OR THE CONTRACTORS BID WILL NOT BE ACCEPTED **THIS IS A PREVAILING WAGE PROJECT AND ALL PROPOSALS SHOULD BE BID AS SUCH. CONTRACTOR IS REQUIRED TO SUBMIT CERTIFIED PAYROLL AND COMPLY WITH ALL APPRENTICESHIP REQUIREMENTS AS OUTLINED IN LABOR CODE SECTIONS 1720 et seq. and 1770 et seq. and 1777 et seq. ANY VIOLATIONS OF LC SECTION 1776 WILL FORFEIT A $100/DAY/WORKER FINE FOR ALL WORKER’S PAID LESS THAN THE PREVAILING WAGE RATE.** 1. Each bid must be submitted on the Bid Forms provided. All blanks in the Bid Form must be filled in and all prices must be stated in both words and figures. It is the sole responsibility of the bidder to see that the bid is delivered to the proper place and received at 661 Informal Bid –As-Needed Concrete and Masonry Services April 2018 Page 2 the proper time. Any bid received after the scheduled closing time for receipt of bids will be returned to the bidder unopened. 2. Lowest Bidder will be determined based on the total pricing for items 1 through 6 on the bid proposal form. 3. The bidder to whom award is made shall execute a written contract with the City within fourteen (14) calendar days after notice of the award has been sent by mail to the address given in the proposal. The contract shall be made in the form adopted by the City and incorporated in these specifications. The bidder warrants that he/she possesses, or has arranged through subcontracts, all capital and other equipment, labor and materials to carry out and complete the work hereunder in compliance with all applicable Federal, State, City, and Special District laws, ordinances, and regulations. 4. Required Licenses: Bidders must hold a valid Class A and/or C-8, State of California Contractor's License, and have carried a valid license for the last 5 years. 5. Verify that areas to remain unaltered adjacent to areas of work are completely secured and properly barricaded to ensure separation of such operations with anybody other than who is authorized to be in construction area before beginning such work. Provide barricades and maintenance thereof, in accordance with applicable Federal, State and local codes and their respective requirements. Install temporary barricades, enclosures and protections before work is started. 6. Perform work exercising proper care to prevent injury to the public, workmen and areas not included in this work scope. Repair or replace existing work scheduled to remain, which is damaged by these operations. 7. Limit noise to a reasonable level as related to specific items of equipment used and their hours of use. This does not preclude use of mechanical equipment, i.e. jack hammers, heavy equipment. 8. Site and surrounding areas to be left clean and free of any debris or other unsuitable materials. 9. Contractor will provide a competent English-speaking Superintendent to oversee the project. The Superintendent shall be present at all times work is being performed. The Superintendent shall have the authority to bind Contractor through Superintendents acts. The Superintendent shall represent the Contractor; communications given to the Superintendent shall be binding on the Contractor. 10. All equipment, materials and labor utilized and all work performed shall comply with all current codes, standards, regulations and statutes pertaining to the type of work. 662 Informal Bid –As-Needed Concrete and Masonry Services April 2018 Page 3 11. Contractor shall be responsible for all damages to persons or property that occur as a result of its fault or negligence in the performance of this contract and shall be responsible for the protection of the work site until completion of the job. 12. Contractor shall take all necessary precautions for the safety of workers on the project and shall comply with all applicable federal, state, local and other safety laws, standards, orders, rules, regulations, and building codes to prevent accidents or injury to persons on, about, or adjacent to the premises where work is being performed and to provide a safe and healthful place of employment. 13. If a prospective bidder is in doubt or has any questions as to the true meaning or intent of any part of the Bid package, or discovers discrepancies, errors, or conflicts, or omissions, he/she may submit, to the City, a written request for an interpretation or a correction thereof. Interpretations or corrections shall be made only by addendum duly issued by the City. A copy of such addendum will be mailed, faxed, or delivered to each person receiving a set of the Contract Documents and such addendum shall be considered a part of, and incorporated in, the Contract Documents. Questions must be received in writing no later than 96 hours prior to the bid deadline in order to provide the City sufficient time to evaluate the question and respond no later than 72 hours prior to the bid deadline. Questions received after the 96 hour deadline will be deemed not received. Proposals are to be submitted to: Jason La Riva, Landscape/Parks Maintenance Superintendent City of Moorpark 799 Moorpark Avenue, Moorpark, CA 93021 Please mark outside of the envelope: DO NOT OPEN, INFORMAL BID FOR AS-NEEDED CONCRETE SERVICES By submitting this proposal, Contractor agrees to sign the City’s standard Agreement and to provide the insurance required by the contract. A copy of the Standard Agreement and Insurance Requirements is attached to this proposal. Contractors are encouraged to review the insurance requirements with their insurance companies to ensure that all terms can be met. 663 Informal Bid –As-Needed Concrete and Masonry Services April 2018 Page 4 Questions regarding this Request for Proposals can be directed to the City’s representative in writing via e-mail to: Jason La Riva, Landscape/Parks Maintenance Superintendent City of Moorpark jlariva@moorparkca.gov Attachments: 1 – Proposal/Bid Forms (All to be filled out and submitted with Bid) 2 – City Standard Agreement and Insurance Requirements 3 – Ball Wall Foundation Detail 4 – DG and Concrete Mow Curb Detail 5 – Curb Ramp Detail 6 – Retaining Wall Detail 7 – Curb and Gutter Detail 664 [Informal Bid Proposal Attachment 1 (Proposal/Bid Forms) and Attachment 2 (City Standard Agreement and Insurance Requirements ) are omitted so as not to be duplicative. Their content is included in the Agreement and Exhibit C: Contractor’s Bid Proposal.] 665 ELEVATION VIEW4'-0"8'-9"24" ATTACHMENT 3 City of Moorpark Ball Wall Pole Base Foundation 666 ATTACHMENT 4667 CURB CURB FACE R I • 4' 1220 mm MIN TRANSITION 4:1 MIN X I, ' I . X , I I !~4' (1220 mm) ........ ~< A I{)::,; X ~RB 4' 1220 mm ' I :14· 'd2'20 :ml' I ~!W A ORB SEE FIGURE 1 R TYPE 1 TYPE 2 CASE A PARTS OF THIS STANDARD PLAN SHOW INSTALLATION FOR TYPICAL RETROFIT CONDITIONS, AND ARE NOT FULLY COMPLIANT WITH CALIFORNIA BUI.LDING CODE REQUIREMENTS FOR NEW DEVELOPMENT. STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION PROMULGAlEO BY TttE PUBLIO WORKS STANDARDS INC, GREENBOOK COMMITTEE 1992 REV. 1996, 2000, 2005, 2009, 2013 CURB RAMP USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION STANDARD PLAN 111-5 SHEET 1 OF 10 ATTACHMENT 5 668 ATTACHMENT 6 669 670 4' 1220 mm WHERE PLANTING AREA IS ADJACENT TO THE CURB RAMP, USE CASE A, TYPE 6 a1- <o "<'-" 4' 1220 mm >-~ " ~ PLANTING a.. AREA CURB CURB FACE WHERE PLANTING AREA IS ADJACENT TO THE CURB RAMP, USE CASE A, TYPE 6 BCR GRADE BREAK STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION CURB RAMP TYPE 3 TYPE 4 CASE A STANDARD PLAN 111--5 SHEET 2 OF 10 671 ~RB 4' 1220 mm R ,.z., ,.z .. , PLANTING AREA I· ~~·I ~!J 1ioo mm) PCC WALK 4 1220 mm MIN R NOTE 2 PLANTING AREA IF PLANTING AREA IS NOT ADJACENT TO SIDE FLARE, USE "X" PER TABLE 2 FOR THAT FLARE A ORB SEE FIGURE 1 PARKWAY R ..,.IIHn 2% MAr <( w ~ "' z F z :s 0.. R TYPE 5 · 1 TYPE 6 CASE A STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION STANDARD PLAN CURB RAMP 111-5 SHEET 3 OF 10 672 CURB CURB FACE C /• Z=X •~ ,. Z=X ., ) • X ~ .1. NOT~ 8 • , 4' / llx (1220 mm)....,i ~ C "' 2% MAJ< TYPE 1 ~ <' "'1..t TYPE 2 fjj CASE B STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION STANDARD PLAN CURB RAMP 111-5 HEET 4 OF 10 673 SKEW ANGLE a=45' OFFSET b=O UNLESS OTHERWISE NOTED ON PLANS CURB CURB FACE SKEW ANGLE, a SEE DETAIL A. B, C, OR D A PLANTING AREA CURB CURB FACE SEE DETAIL A, B, C OR D A NOTE 2 A ~ y ) NOTE 2 NOTE 8 TYPE 1 X=4' (1220 mm) IF ADJACENT TO PLANTING AREA, OTHEWISE SEE TABLE 1 TYPE 2 STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION CURB RAMP CASE C CASED STANDARD PLAN 111-5 SHEET 5 OF 10 674 s 4' (1220 mm) X <l 4' (1220 mm ~ N CURB CURB FACE X=4' 1220 mm WHEN ADJACENT TO PLANTING AREA s NOTE 2 4' (1220 mm) );-<!~ U'.l:,;: MARKED CROSSWALK _.J l;-<1~ "':,;: X s MARKED CROSSWALK X NOTE 2 NOTE 8 MARKED CROSSWALK TYPE 1 ---x+jju X GRADE BREAK MARKED CROSSWALK TYPE 2 CASE E STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION STANDARD PLAN CURB RAMP 111-5 HEET 6 OF 10 675 P RKWAY 4' 1220 mm SEE NOTE 6~ EXISTING I I ROADWAY /5% ~ A2-0 CURB AND GUTTER SECTION A-A y 4' ROUNDED EDGE ...__,e--1- SECTION B-B SEE NOTE 6~ EXISTING I I ROADWAY /5 ~ -.::;:.L._+-~-~-"2=%~M~A~X~-f-~ P RK AY y 4' (1220 mm) MIN L-~::.iA2-0 CURB AND GUTTER SECTION C-C 1220 mm USE FIGURE 1 TO DETERMINE WHICH OF SECTIONS A-A, B-B OR C-C IS APPROPRIATE. DEPRESS BACK OF WALK SEE DETAIL A, B, C OR D, SHEET 10 . DEPRESS BACK OF WALK SEE DETAIL A, B, C OR D, SHEET 10, a DEPRESS BACK OF WALK ~A I~\ ( ~ilf,i,t ~ <:..pee SIDEWALK SECTION R-R z I j(1220 mm)I !(1220 mm) ~--"""71"DEPRESS BACK OF WALK ),__~~,</~ &~~i,</k ~-~ ( -~ ~C SIDEWALK SECTION S-S STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION CURB RAMP STANDARD PLAN 111-5 SHEET 7 OF 10 676 PARKWAY WIDTH, FT (m) 4' 5' 6' 7' s· 9' 10' 11' 12' 13' 14' 15' 16' 17' 18' 19' 20' (1.2) MIN(1.5) (1.8) (2.1) (2.4) (2.7) (3.0) (3.3) (3.6) (3.9) (4.2) (4.5) (4.8) (5.1) (5.4) (5.7) (6.0) ,......_ 1" (25) "" E 2" (50) ' E ..._,,. " (/) 3" (75) " I w ~ I 4" {100) .....L "' / u u ' SECTION A-A r' z 5" (125)-~ I /1 LANDING = 4' (1220 mm) 1 -I u ~ w 6" (150)-u ,_z " <( 0 LL 7" (175)-I-f-- "" u en 8" (200)-~~ i ' Cl:'.'. J 'f'.._ :::::> 9" (225) u "--SECTION B-B V I""-:;i 10" (250) ./' CALCULATE Z DIMENSION "' 2 I PER FORMULA BELOW ...... Cl:'.'. 11" (275) l ... 0 ' z 12" (300) OR MORE FIGURE 1 - SECTION USAGE NORMAL WHERE FIGURE 1 SHOWS USE OF SECTION 8-B, FIGURE Z CURB FACE, SECTION Y-Y DIMENSION AS FOLLOWS: INCHES (mm) X, FT (mm) Y, FT (mm) W = PARKWAY WIDTH 2" (50) 4.00' (1220) MIN 2.63' (790) L = LANDING WIDTH, 4' (1220 mm) TYP 3" (75) 4.00' (1220) MIN 3.95' (1185) Z = [(Y+L)-W] x 0.760 4" (100) 4.00' (1220) MIN 5.26' (1580) IF (Y+L) < W, THEN Z = 0 5" (125) 4.17' (1275) 6.58' (1975) 6" (150) 5.00' (1525) 7.90' (2370) 7" (175) 5.83' (1775) 9.21' (2765) 8" (200) 6.67' (2035) 10.53' (3160) 9" (225) 7.50' (2285) 11.84' (3555) 10" (250) 8.33' (2540) 13.16' (3950) 11" (275) 9.17' (2795) 14.47' (4340) 12" (300) 10.00' (3050) 15.79' (4735) SEE SHEET 9 FOR STREET SLOPE ADJUSTMENT FACTORS, ALL STREETS TABLE 1 -X ANDY VALUES TABLE 1 REFERENCE FORMULAS: X = CF / 8.333% Y = CF / (8.333% -2% WALK CROSS SLOPE) STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION STANDARD PLAN CURB RAMP 111-5 SHEET 8 OF 10 677 4' (1220 mm) j'Eo~I I .z.u!I / ,..,1r--..;::,::'-,I" ~GRADE BREAK T&// ~~ ~jT CURB/" / CURB FACE GUTTER T,'"X.DOWN, I , .1. SLOPE, S L4• X.UP :r (1220 mm) TYPICAL CURB RAMP 1 ,X.DOW~, ~ BACK OF WALK~~ I ~ ~--'-~~=--_:::::,.L-----'};Z_ 'GUTTER SECTION T-T FLOW LINE SLOPED STREET FOR SLOPED STREETS, MULTIPLY THE DIMENSIONS PARALLEL TO THE STREET, X AND Z, UPSTREAM AND DOWNSTREAM OF THE RAMP, BY THE FACTORS IN THE FOLLOWIN.G TABLE. FOR EXAMPLE, X.DOWN = X x K.DOWN s K.DOWN K.UP 0% 1.000 1.000 0.2% 0.977 1.025 0.5% 0.943 1.064 1% 0.893 1.136 2% 0.806 1.316 3% 0.735 1.563 4% 0.676 1.923 5% 0.625 2.500 TABLE 2 -SLOPE ADJUSTMENTS TABLE 2 REFERENCE FORMULAS: K.DOWN = 8.333% / (8.333% + S) K.UP = 8.333% / (8.333% - S) STREET SLOPE ADJUSTMENTS STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION STANDARD PLAN CURB RAMP 111-5 SHEET 9 OF 10 678 ' ~ @ ~ E@ (D N @ @ @ @ @ @ @ @ @ @ = ~ E 0.90" ~ E (" mm)@ O:s, @ SINGLE @ @ @ PATIERN O "TRUNCATED DOME" I 12.35" (60 mm) GROOVING DETAIL DETECTABLE WARNING DETAIL CONSTRUCT FENCE OR HANDRAIL PER CONTRACT PLANS ~ 6" (150 mm) [-"-I PAVED SURFACE RETAINING CURB -I I I ,::::PAVED SURFACE \,,____~1 C DETAIL A DETAIL 8 GRADED SLOPE 2 '1 -PAVED SURFACE MAX---...._ ~= RETAINING CURB------. -,\--==========~~~ W&,W,. \ ) ~F"" DETAIL C DETAIL D GENERAL NOTES: 1. CONCRETE SHALL BE CLASS 520-C-2500 (310-C-17) CONFORMING TO SSPWC 201-1.1.2 AND SHALL BE 4" (100 mm) THICK. 2. THE RAMP SHALL HAVE A 12" (305 mm) WIDE BORDER WITH 1/4" (6 mm) GROOVES APPROXIMATELY 3/4" (19 mm) QC. SEE GROOVING DETAIL. 3. THE RAMP SURFACE SHALL HAVE A TRANSVERSE BROOMED SURFACE TEXTURE CONFORMING TO SSPWC 303-1.9. 4. USE DETAIL "A" OR "B" IF EXISTING SURFACE BEHIND LANDING IS PAVED. 5. USE DETAIL "c" OR "D" IF EXISTING SURFACE BEHIND LANDING IS UNPAVED. 6. R = 3' (900 mm) UNLESS OTHERWISE SHOWN ON PLAN. SEE SHEET 7. 7. ANGLE = t,/2 UNLESS OTHERWISE SHOWN ON PLAN. 8. CONSTRUCT DETECTABLE WARNING SURFACE PER DETAIL THIS SHEET. MATERIALS SHALL BE PER CONTRACT DOCUMENTS. ST AND ARD PLANS FOR PUBLIC WORKS CONSTRUCTION CURB RAMP STANDARD PLAN 111-5 SHEET 10 OF 10 679 ATTACHMENT 7 680 AGREEMENT BETWEEN THE CITY OF MOORPARK AND FENCE FACTORY DBA PERIMETER SECURITY SYSTEMS FOR MOTORIZED DOOR AND GATE MAINTENANCE AND REPAIR SERVICES THIS AGREEMENT, is made and effective as of this _________ day of ________________________, 2018, between the City of Moorpark, a municipal corporation (“City”) and Fence Factory, a corporation, DBA Perimeter Security Systems (“Contractor”). In consideration of the mutual covenants and conditions set forth herein, the parties agree as follows: WHEREAS, City has the need for motorized door and gate maintenance and repair services at various City facilities, City parks, and City properties; and WHEREAS, Contractor specializes in providing such services and has the proper work experience, certifications, and background to carry out the duties involved; and WHEREAS, Contractor has submitted to City a Proposal dated April 16, 2018 which is attached hereto as Exhibit C. NOW, THEREFORE, in consideration of the mutual covenants, benefits, and premises herein stated, the parties hereto agree as follows: 1. TERM The term of this Agreement shall be from July 1, 2018 and will expire on June 30, 2021, unless this Agreement is terminated or suspended pursuant to this Agreement. Upon the mutual consent of both parties, the term of this Agreement may be extended by a written amendment executed by both parties for two (2) additional one (1) year periods. 2. SCOPE OF SERVICES City does hereby retain Contractor, as an independent contractor, in a contractual capacity to provide motorized door and gate maintenance and repair services at various City facilities, City parks, and City properties, as set forth in Exhibit C: Contractor’s Bid Proposal, and as set forth in Exhibit D: Informal Proposal Documents. In the event there is a conflict between the provisions of Exhibit C, Exhibit D and this Agreement, the language contained in this Agreement shall take precedence. Contractor shall perform the tasks described and set forth in Exhibit D. Compensation for the services to be performed by Contractor shall be in accordance with Exhibit C. Compensation shall not exceed the rates or contract value of thirty-five thousand dollars ($35,000) annually, without a written amendment to the Agreement executed by both parties. Payment by City to Contractor shall be in accordance with the provisions of this Agreement. 681 City and Contractor acknowledge that this project is a public work to which prevailing wages apply, and that a public work project is subject to compliance monitoring and enforcement by the California Department of Industrial Relations (DIR). Contractor agrees to comply with and be bound by all the terms, rules and regulations described in (a) Division 2, Part 7, Chapter 1 (commencing with Section 1720) of the California Labor Code, including without limitation Labor Code Section 1771 and (b) the rules and regulations established by the DIR implementing such statutes, as though set forth in full herein, including any applicable amendments made thereto during the term of this Agreement. For every subcontractor who will perform work on this project, Contractor shall be responsible for subcontractor’s compliance with (a) and (b), and Contractor shall take all necessary actions to ensure subcontractor’s compliance. Labor Code Section 1725.5 requires all contractors and subcontractors to annually register with the DIR before bidding or performing on any public work contract. 3. PERFORMANCE Contractor shall at all times faithfully, competently and to the best of their ability, experience, standard of care, and talent, perform all tasks described herein. Contractor shall employ, at a minimum, generally accepted standards and practices utilized by persons engaged in providing similar services as are required of Contractor hereunder in meeting its obligations under this Agreement. 4. MANAGEMENT The individual directly responsible for Contractor’s overall performance of the Agreement provisions herein above set forth and to serve as principal liaison between City and Contractor shall be Tim Whitehouse and no other individual may be substituted without the prior written approval of the City Manager. The City’s contact person in charge of administration of this Agreement, and to serve as principal liaison between Contractor and City, shall be the City Manager or the City Manager’s designee. 5. PAYMENT Taxpayer ID or Social Security numbers must be provided, on an IRS W-9 form, before payments may be made to vendors. The City agrees to pay Contractor monthly, in accordance with the payment rates and terms and the schedule of payment as set forth in Exhibit C, based upon actual time spent on the above tasks. This amount shall not exceed thirty-five thousand dollars ($35,000) annually unless additional payment is approved as provided in this Agreement. Contractor shall not be compensated for any additional services rendered in connection with its performance of this Agreement, unless such additional services and compensation are authorized, in advance, in a written amendment to the Agreement 682 executed by both parties. The City Manager, if authorized by City Council, may approve additional work not to exceed ten percent (10%) of the amount of the Agreement. Contractor shall submit invoices monthly for actual services performed. Invoices shall be submitted on or about the first business day of each month, or as soon thereafter as practical, for services provided in the previous month. Payment shall be made within thirty (30) days of receipt of each invoice as to all non-disputed fees. Any expense or reimbursable cost appearing on any invoice shall be accompanied by a receipt or other documentation subject to approval of the City Manager. If the City disputes any of Contractor’s fees or expenses it shall give written notice to Contractor within thirty (30) days of receipt of any disputed fees set forth on the invoice. 6. TERMINATION OR SUSPENSION WITHOUT CAUSE The City may at any time, for any reason, with or without cause, suspend or terminate this Agreement, or any portion hereof, by serving upon the Contractor at least ten (10) days prior written notice. Upon receipt of said notice, the Contractor shall immediately cease all work under this Agreement, unless the notice provides otherwise. If the City suspends or terminates a portion of this Agreement such suspension or termination shall not make void or invalidate the remainder of this Agreement. The Contractor may terminate this Agreement only by providing City with written notice no less than thirty (30) days in advance of such termination. In the event this Agreement is terminated or suspended pursuant to this Section, the City shall pay to Contractor the actual value of the work performed up to the time of termination or suspension, provided that the work performed is of value to the City. Upon termination or suspension of the Agreement pursuant to this Section, the Contractor will submit an invoice to the City pursuant to this Agreement. 7. DEFAULT OF CONTRACTOR The Contractor’s failure to comply with the provisions of this Agreement shall constitute a default. In the event that Contractor is in default for cause under the terms of this Agreement, City shall have no obligation or duty to continue compensating Contractor for any work performed after the date of default and can terminate or suspend this Agreement immediately by written notice to the Contractor. If such failure by the Contractor to make progress in the performance of work hereunder arises out of causes beyond the Contractor’s control, and without fault or negligence of the Contractor, it shall not be considered a default. If the City Manager or the City Manager’s designee determines that the Contractor is in default in the performance of any of the terms or conditions of this Agreement, designee shall cause to be served upon the Contractor a written notice of the default. The Contractor shall have five (5) days after service upon it of said notice in which to cure the default by rendering a satisfactory performance. In the event that the Contractor fails to cure its default within such period of time, the City shall have the right, notwithstanding any other provision of this Agreement, to terminate this 683 Agreement without further notice and without prejudice to any other remedy to which it may be entitled at law, in equity or under this Agreement. 8. LIQUIDATED DAMAGES If the Contractor fails to complete the work, or any portion thereof, within the time period required by this Agreement, or as duly extended in writing by the City Manager, Contractor shall forfeit and pay to the City, as liquidated damages, the sum of one hundred fifty dollars ($150) per day for each calendar day the work, or portion thereof, remains uncompleted after the above specified completion date. Liquidated damages shall be deducted from any payments due or to become due to the Contractor under the terms of this Agreement. Progress payments made by the City after the above specified completion date shall not constitute a waiver of liquidated damages by the City. 9. OWNERSHIP OF DOCUMENTS Contractor shall maintain complete and accurate records with respect to sales, costs, expenses, receipts, and other such information required by City that relate to the performance of services under this Agreement. Contractor shall maintain adequate records of services provided in sufficient detail to permit an evaluation of services. All such records shall be maintained in accordance with generally accepted accounting principles and shall be clearly identified and readily accessible. Contractor shall provide free access to the representatives of City or the City’s designees at reasonable times to such books and records; shall give the City the right to examine and audit said books and records; shall permit City to make transcripts therefrom as necessary; and shall allow inspection of all work, data, documents, proceedings, and activities related to this Agreement. Notification of audit shall be provided at least thirty (30) days before any such audit is conducted. Such records, together with supporting documents, shall be maintained for a period of ten (10) years after receipt of final payment. Upon completion of, or in the event of termination or suspension without cause of this Agreement, all original documents, designs, drawings, maps, models, computer files, surveys, notes, and other documents prepared in the course of providing the services to be performed pursuant to this Agreement shall become the sole property of the City and may be used, reused, or otherwise disposed of by the City without the permission of the Contractor. With respect to computer files, Contractor shall make available to the City, at the Contractor’s office and upon reasonable written request by the City, the necessary computer software and hardware for purposes of accessing, compiling, transferring, and printing computer files. 10. INDEMNIFICATION AND HOLD HARMLESS Contractor shall indemnify, defend and hold harmless City, and any and all of its officers, employees, and agents (“City Indemnitees”) from and against any and all causes of action, claims, liabilities, obligations, judgments, or damages, including reasonable legal counsels’ fees and costs of litigation (“claims”), arising out of the Contractor’s performance of its obligations under this Agreement or out of the operations conducted by Contractor, including the City’s active or passive negligence, 684 except for such loss or damage arising from the sole negligence or willful misconduct of the City. In the event the City Indemnitees are made a party to any action, lawsuit, or other adversarial proceeding arising from Contractor’s performance of this Agreement, the Contractor shall provide a defense to the City Indemnitees or at the City’s option reimburse the City Indemnitees their costs of defense, including reasonable legal counsels’ fees incurred in defense of such claims. Contractor agrees to obtain executed indemnity agreements with provisions identical to those set forth in this Section from each and every subcontractor, or any other person or entity involved by, for, with, or on behalf of Contractor in the performance of this Agreement. In the event Contractor fails to obtain such indemnity obligations from others as required here, Contractor agrees to be fully responsible according to the terms of this Section. Failure of City to monitor compliance with these requirements imposes no additional obligations on City and will in no way act as a waiver of any rights hereunder. This obligation to indemnify and defend City as set forth here is binding on the successors, assigns, or heirs of Contractor and shall survive the termination of this Agreement or this Section. City does not and shall not waive any rights that it may have against Contractor by reason of this Section, because of the acceptance by City, or the deposit with City, of any insurance policy or certificate required pursuant to this Agreement. The hold harmless and indemnification provisions shall apply regardless of whether or not said insurance policies are determined to be applicable to any losses, liabilities, damages, costs, and expenses described in this Section. This Indemnity shall survive termination of the Agreement or Final Payment hereunder. This Indemnity is in addition to any other rights or remedies that the Indemnitees may have under the law or under any other Contract Documents or Agreements. In the event of any claim or demand made against any party which is entitled to be indemnified hereunder, City may, in its sole discretion, reserve, retain, or apply any monies to the Contractor under this Agreement for the purpose of resolving such claims; provided, however, City may release such funds if the Contractor provides City with reasonable assurance of protection of the Indemnitees’ interests. City shall, in its sole discretion, determine whether such assurances are reasonable. 11. INSURANCE Contractor shall maintain prior to the beginning of and for the duration of this Agreement insurance coverage as specified in Exhibit A attached hereto and incorporated herein by this reference as though set forth in full. 12. INDEPENDENT CONTRACTOR Contractor is and shall at all times remain as to the City a wholly independent Contractor. The personnel performing the services under this Agreement on behalf of Contractor shall at all times be under Contractor’s exclusive direction and control. Neither City nor any of its officers, employees, or agents shall have control over the conduct of Contractor or any of Contractor’s officers, employees, or agents, except as 685 set forth in this Agreement. Contractor shall not at any time or in any manner represent that it or any of its officers, employees, or agents are in any manner officers, employees, or agents of the City. Contractor shall not incur or have the power to incur any debt, obligation, or liability against City, or bind City in any manner. No employee benefits shall be available to Contractor in connection with the performance of this Agreement. Except for the fees paid to Contractor as provided in the Agreement, City shall not pay salaries, wages, or other compensation to Contractor for performing services hereunder for City. City shall not be liable for compensation or indemnification to Contractor for injury or sickness arising out of performing services hereunder. 13. LEGAL RESPONSIBILITIES The Contractor shall keep itself informed of local, state and federal laws and regulations which in any manner affect those employed by it or in any way affect the performance of its service pursuant to this Agreement. The Contractor shall at all times observe and comply with all such laws and regulations, including but not limited to the Americans with Disabilities Act and Occupational Safety and Health Administration laws and regulations. The City and Contractor shall comply with Exhibit B, California Public Contract Code Section 9204, when applicable. The City, and its officers and employees, shall not be liable at law or in equity occasioned by failure of the Contractor to comply with this Section. 14. ANTI DISCRIMINATION Neither the Contractor, nor any subcontractor under the Contractor, shall discriminate in employment of persons upon the work because of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, genetic information, marital status, sex, gender, gender identity, gender expression, age, sexual orientation, or military and veteran status of such person; or any other basis protected by applicable federal, state, or local law, except as provided in Section 12940 of the Government Code. The Contractor shall have responsibility for compliance with this Section, if applicable [Labor Code Sec. 1735]. 15. UNDUE INFLUENCE Contractor declares and warrants that no undue influence or pressure is used against or in concert with any officer or employee of the City in connection with the award, terms or implementation of this Agreement, including any method of coercion, confidential financial arrangement, or financial inducement. No officer or employee of the City will receive compensation, directly or indirectly from Contractor, or any officer, employee or agent of Contractor, in connection with the award of this Agreement or any work to be conducted as a result of this Agreement. Violation of this Section shall be a material breach of this Agreement entitling the City to any and all remedies at law or in equity. 686 16. NO BENEFIT TO ARISE TO LOCAL EMPLOYEES No member, officer, or employee of the City, or their designees or agents, and no public official who exercises authority over or responsibilities with respect to the Services during his/her tenure or for one (1) year thereafter, shall have any interest, direct or indirect, in any agreement or sub-agreement, or the proceeds thereof, for work to be performed in connection with the Services performed under this Agreement. 17. CONFLICT OF INTEREST Contractor covenants that neither they nor any officer or principal of their firm have any interests, nor shall they acquire any interest, directly or indirectly, which will conflict in any manner or degree with the performance of their services hereunder. Contractor further covenants that in the performance of this Agreement, they shall employ no person having such interest as an officer, employee, agent, or subcontractor. Contractor further covenants that Contractor has not contracted with nor is performing any services directly or indirectly, with the developer(s) and/or property owner(s) and/or firm(s) and/or partnership(s) and/or public agency(ies) owning property and/or processing an entitlement application for property in the City or its Area of Interest, now or within the past one (1) year, and further covenants and agrees that Contractor and/or its subcontractors shall provide no service or enter into any contract with any developer(s) and/or property owner(s) and/or firm(s) and/or partnership(s) and/or public agency(ies) owning property and/or processing an entitlement application for property in the City or its Area of Interest, while under contract with the City and for a one (1) year time period following termination of this Agreement. 18. NOTICE Any notice to be given pursuant to this Agreement shall be in writing, and all such notices and any other document to be delivered shall be delivered by personal service or by deposit in the United States mail, certified or registered, return receipt requested, with postage prepaid, and addressed to the party for whom intended as follows: To: City Manager City of Moorpark 799 Moorpark Ave. Moorpark, CA 93021 To: Tim Whitehouse Fence Factory DBA Perimeter Security Systems 1482 Callens Road Ventura, CA 93003 Either party may, from time to time, by written notice to the other, designate a different address or contact person, which shall be substituted for the one above specified. Notices, payments and other documents shall be deemed delivered upon receipt by personal service or as of the third (3rd) day after deposit in the United States mail. 687 19. CHANGE IN NAME Should a change be contemplated in the name or nature of the Contractor’s legal entity, the Contractor shall first notify the City in order that proper steps may be taken to have the change reflected in the Agreement documents. 20. ASSIGNMENT Contractor shall not assign this Agreement or any of the rights, duties or obligations hereunder. It is understood and acknowledged by the parties that Contractor is uniquely qualified to perform the services provided for in this Agreement. 21. LICENSES At all times during the term of this Agreement, Contractor shall have in full force and effect, all licenses required of it by law for the performance of the services in this Agreement. 22. VENUE AND GOVERNING LAW This Agreement is made, entered into, and executed in Ventura County, California, and any action filed in any court or for arbitration for the interpretation, enforcement or other action of the terms, conditions, or covenants referred to herein shall be filed in the applicable court in Ventura County, California. The City and Contractor understand and agree that the laws of the State of California shall govern the rights, obligations, duties, and liabilities of the parties to this Agreement and also govern the interpretation of this Agreement. 23. COST RECOVERY In the event any action, suit or proceeding is brought for the enforcement of, or the declaration of any right or obligation pursuant to this Agreement or as a result of any alleged breach of any provision of this Agreement, the prevailing party shall be entitled to recover its costs and expenses from the losing party, and any judgment or decree rendered in such a proceeding shall include an award thereof. 24. ARBITRATION Cases involving a dispute between City and Contractor may be decided by an arbitrator if both sides agree in writing, with costs proportional to the judgment of the arbitrator. 25. ENTIRE AGREEMENT This Agreement and the Exhibits attached hereto contain the entire understanding between the parties relating to the obligations of the parties described in this Agreement. All prior or contemporaneous agreements, understandings, 688 representations, and statements, oral or written, are merged into this Agreement and shall be of no further force or effect. Each party is entering into this Agreement based solely upon the representations set forth herein and upon each party’s own independent investigation of any and all facts such party deems material. 26. CAPTIONS OR HEADINGS The captions and headings of the various Articles, Paragraphs, and Exhibits of this Agreement are for convenience and identification only and shall not be deemed to limit or define the content of the respective Articles, Paragraphs, and Exhibits hereof. 27. AMENDMENTS Any amendment, modification, or variation from the terms of this Agreement shall be in writing and shall be effective only upon approval by both parties to this Agreement. 28. PRECEDENCE In the event of conflict, the requirements of the City’s Request for Proposal, if any, and this Agreement shall take precedence over those contained in the Contractor’s Proposal. 29. INTERPRETATION OF AGREEMENT Should interpretation of this Agreement, or any portion thereof, be necessary, it is deemed that this Agreement was prepared by the parties jointly and equally, and shall not be interpreted against either party on the ground that the party prepared the Agreement or caused it to be prepared. 30. WAIVER No waiver of any provision of this Agreement shall be deemed, or shall constitute, a waiver of any other provision, whether or not similar, nor shall any such waiver constitute a continuing or subsequent waiver of the same provision. No waiver shall be binding unless executed in writing by the party making the waiver. 31. AUTHORITY TO EXECUTE The person or persons executing this Agreement on behalf of the Contractor warrants and represents that he/she has the authority to execute this Agreement on behalf of the Contractor and has the authority to bind Contractor to the performance of obligations hereunder. 689 IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed the day and year first above written. CITY OF MOORPARK FENCE FACTORY DBA PERIMETER SECURITY SYSTEMS By:_______________________________ By:_______________________________ Troy Brown, City Manager Tim Whitehouse, Branch Manager Attest: __________________________________ Maureen Benson, City Clerk 690 Exhibit A INSURANCE REQUIREMENTS Prior to the beginning of and throughout the duration of Work, Contractor will maintain insurance in conformance with the requirements set forth below. Contractor will use existing coverage to comply with these requirements. If that existing coverage does not meet requirements set forth here, Contractor agrees to amend, supplement or endorse the existing coverage to do so. Contractor acknowledges that the insurance coverage and policy limits set forth in this section constitute the minimum amount of coverage required. Any insurance proceeds available to the City in excess of the limits and coverage required in this Agreement and which is applicable to a given loss, will be available to the City. Contractor shall provide the following types and amounts of insurance: Commercial General Liability Insurance using Insurance Services Office (ISO) “Commercial General Liability” policy form CG 00 01 or the exact equivalent. Defense costs must be paid in addition to limits. There shall be no cross liability exclusion for claims or suits by one insured against another. Limits are subject to review but in no event less than $1,000,000 per occurrence for all covered losses and no less than $2,000,000 general aggregate. Business Auto Coverage on ISO Business Auto Coverage form CA 00 01 including symbol 1 (Any Auto) or the exact equivalent. Limits are subject to review, but in no event to be less than $1,000,000 per accident. If Contractor owns no vehicles, this requirement may be satisfied by a non-owned auto endorsement to the general liability policy described above. If Contractor or Contractor’s employees will use personal autos in any way on this project, Contractor shall provide evidence of personal auto liability for each such person. Workers’ Compensation on a state-approved policy form providing statutory benefits as required by law with employer’s liability limits no less than $1,000,000 per accident or disease. Excess or Umbrella Liability Insurance (Over Primary) if used to meet limit requirements, shall provide coverage at least as broad as specified for the underlying coverages. Coverage shall be provided on a “pay on behalf” basis, with defense costs payable in addition to policy limits. Policy shall contain a provision obligating insurer at the time insured’s liability is determined, not requiring actual payment by the insured first. There shall be no cross liability exclusion precluding coverage for claims or suits by one insured against another. Coverage shall be applicable to the City for injury to employees of Contractor, subcontractors or others involved in the Work. The scope of coverage provided is subject to approval by the City following receipt of proof of insurance as required herein. Limits are subject to review. 691 Insurance procured pursuant to these requirements shall be written by insurers that are admitted carriers in the State of California and with an A.M. Bests rating of A- or better and a minimum financial size of VII. General conditions pertaining to provision of insurance coverage by Contractor. Contractor and the City agree to the following with respect to insurance provided by Contractor: 1. Contractor agrees to have its insurer endorse the third party general liability coverage required herein to include as additional insureds the City, its officials, employees, and agents, using standard ISO endorsement CG 2010 with an edition prior to 1992. Contractor also agrees to require all contractors and subcontractors to do likewise. 2. No liability insurance coverage provided to comply with this Agreement shall prohibit Contractor, or Contractor’s employees, or agents, from waiving the right to subrogation prior to a loss. Contractor agrees to waive subrogation rights against the City regardless of the applicability of any insurance proceeds, and to require all contractors and subcontractors to do likewise. 3. All insurance coverage and limits provided by Contractor and available or applicable to this Agreement are intended to apply to the full extent of the policies. Nothing contained in this Agreement or any other agreement relating to the City or its operation limits the application of such insurance coverage. 4. None of the coverages required herein will be in compliance with these requirements if they include limiting endorsement of any kind that has not been first submitted to the City and approved in writing. 5. No liability policy shall contain any provision or definition that would serve to eliminate so-called “third party action over” claims, including any exclusion for bodily injury to an employee of the insured or of any contractor or subcontractor. 6. All coverage types and limits required are subject to approval, modification, and additional requirements by the City, as the need arises. Contractor shall not make any reductions in scope of coverage (e.g. elimination of contractual liability or reduction of discovery period) that may affect the City’s protection without the City’s prior written consent. 7. Proof of compliance with these insurance requirements, consisting of certificates of insurance evidencing all of the coverages required and an additional insured endorsement to Contractor’s general liability policy, shall be delivered to city at or prior to the execution of this Agreement. In the event such proof of any insurance is not delivered as required, or in the event such insurance is canceled or reduced at any time and no replacement coverage is provided, the City has the right, but not the duty, to obtain any insurance it deems necessary to protect its interests under this or any other Agreement and to pay the premium. Any 692 premium so paid by the City shall be charged to and promptly paid by Contractor or deducted from sums due Contractor, at the City’s option. 8. Certificate(s) are to reflect that the insurer will provide 30 days notice to the City of any cancellation or reduction of coverage. Contractor agrees to require its insurer to modify such certificates to delete any exculpatory wording stating that failure of the insurer to mail written notice of cancellation or reduction of coverage imposes no obligation, or that any party will “endeavor” (as opposed to being required) to comply with the requirements of the certificate. 9. It is acknowledged by the parties of this Agreement that all insurance coverage required to be provided by Contractor or any subcontractor, is intended to apply first and on a primary, non-contributing basis in relation to any other insurance or self-insurance available to the City. 10. Contractor agrees to ensure that subcontractors, and any other party involved with the Work who is brought onto or involved in the Work by Contractor, provide the same minimum insurance required of Contractor. Contractor agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this section. Contractor agrees that upon request, all agreements with subcontractors and others engaged in the Work will be submitted to the City for review. 11. Contractor agrees not to self-insure or to use any self-insured retentions or deductibles on any portion of the insurance required herein and further agrees that it will not allow any contractor, subcontractor, Architect, Engineer, or other entity or person in any way involved in the performance of Work contemplated by this Agreement to self-insure its obligations to the City. If Contractor’s existing coverage includes a deductible or self-insured retention, the deductible or self- insured retention must be declared to the City. At that time, the City shall review options with the Contractor, which may include reduction or elimination of the deductible or self-insured retention, substitution of other coverage, or other solutions. 12. The City reserves the right at any time during the term of the Agreement to change the amounts and types of insurance required by giving the Contractor 90 days advance written notice of such change. If such change results in substantial additional cost to the Contractor, the City will negotiate additional compensation proportional to the increased benefit to the City. 13. For purposes of applying insurance coverage only, this Agreement will be deemed to have been executed immediately upon any party hereto taking any steps that can be deemed to be in furtherance of or towards performance of this Agreement. 14. Contractor acknowledges and agrees that any actual or alleged failure on the part of the City to inform Contractor of non-compliance with an insurance 693 requirement in no way imposes any additional obligations to the City nor does it waive any rights hereunder in this or any other regard. 15. Contractor will renew the required coverage annually as long as the City, or its employees or agents face an exposure from operations of any type pursuant to this Agreement. This obligation applies whether or not the Agreement is canceled or terminated for any reason. Termination of this obligation is not effective until the City executes a written statement to that effect. 16. Contractor shall provide proof that policies of insurance required herein expiring during the term of this Agreement have been renewed or replaced with other policies providing at least the same coverage. Proof that such coverage has been ordered shall be submitted prior to expiration. A coverage binder or letter from Contractor’s insurance agent to this effect is acceptable. A certificate of insurance and/or additional insured endorsement as required in these specification applicable to the renewing or new coverage must be provided to the City within five days of the expiration of coverage. 17. The provisions of any Workers’ Compensation or similar act will not limit the obligations of Contractor under this Agreement. Contractor expressly agrees not to use any statutory immunity defenses under such laws with respect to the City, its employees, officials, and agents. 18. Requirements of specific coverage features or limits contained in this section are not intended as limitations on coverage, limits, or other requirements nor as a waiver of any coverage normally provided by any given policy. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue, and is not intended by any party or insured to be limiting or all- inclusive. 19. These insurance requirements are intended to be separate and distinct from any other provision in this Agreement and are intended by the parties here to be interpreted as such. 20. The requirements in this section supersede all other sections and provisions of this Agreement to the extent that any other section or provision conflicts or impairs the provisions of this section. 21. Contractor agrees to be responsible for ensuring that no contract used by any party involved in any way with the Work reserves the right to charge the City or Contractor for the cost of additional insurance coverage required by this Agreement. Any such provisions are to be deleted with reference to the City. It is not the intent of the City to reimburse any third party for the cost of complying with these requirements. There shall be no recourse against the City for payment of premiums or other amounts with respect thereto. 22. Contractor agrees to provide immediate notice to City of any claim or loss against Contractor arising out of the work performed under this Agreement. The City 694 assumes no obligation or liability by such notice, but has the right (but not the duty) to monitor the handling of any such claim or claims if they are likely to involve the City. 23. Contractor agrees to obtain and provide to City a copy of Professional Liability coverage for Architects or Engineers on this project, when required by City. City shall determine the liability limit. 695 EXHIBIT B PUBLIC CONTRACT CODE SECTION 9204 9204. (a) The Legislature finds and declares that it is in the best interests of the state and its citizens to ensure that all construction business performed on a public works project in the state that is complete and not in dispute is paid in full and in a timely manner. (b) Notwithstanding any other law, including, but not limited to, Article 7.1 (commencing with Section 10240) of Chapter 1 of Part 2, Chapter 10 (commencing with Section 19100) of Part 2, and Article 1.5 (commencing with Section 20104) of Chapter 1 of Part 3, this section shall apply to any claim by a contractor in connection with a public works project. (c) For purposes of this section: (1) “Claim” means a separate demand by a contractor sent by registered mail or certified mail with return receipt requested, for one or more of the following: (A) A time extension, including, without limitation, for relief from damages or penalties for delay assessed by a public entity under a contract for a public works project. (B) Payment by the public entity of money or damages arising from work done by, or on behalf of, the contractor pursuant to the contract for a public works project and payment for which is not otherwise expressly provided or to which the claimant is not otherwise entitled. (C) Payment of an amount that is disputed by the public entity. (2) “Contractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who has entered into a direct contract with a public entity for a public works project. (3) (A) “Public entity” means, without limitation, except as provided in subparagraph (B), a state agency, department, office, division, bureau, board, or commission, the California State University, the University of California, a city, including a charter city, county, including a charter county, city and county, including a charter city and county, district, special district, public authority, political subdivision, public corporation, or nonprofit transit corporation wholly owned by a public agency and formed to carry out the purposes of the public agency. (B) “Public entity” shall not include the following: (i) The Department of Water Resources as to any project under the jurisdiction of that department. (ii) The Department of Transportation as to any project under the jurisdiction of that department. (iii) The Department of Parks and Recreation as to any project under the jurisdiction of that department. (iv) The Department of Corrections and Rehabilitation with respect to any project under its jurisdiction pursuant to Chapter 11 (commencing with Section 7000) of Title 7 of Part 3 of the Penal Code. (v) The Military Department as to any project under the jurisdiction of that department. (vi) The Department of General Services as to all other projects. (vii) The High-Speed Rail Authority. 696 (4) “Public works project” means the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind. (5) “Subcontractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who either is in direct contract with a contractor or is a lower tier subcontractor. (d) (1) (A) Upon receipt of a claim pursuant to this section, the public entity to which the claim applies shall conduct a reasonable review of the claim and, within a period not to exceed 45 days, shall provide the claimant a written statement identifying what portion of the claim is disputed and what portion is undisputed. Upon receipt of a claim, a public entity and a contractor may, by mutual agreement, extend the time period provided in this subdivision. (B) The claimant shall furnish reasonable documentation to support the claim. (C) If the public entity needs approval from its governing body to provide the claimant a written statement identifying the disputed portion and the undisputed portion of the claim, and the governing body does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, the public entity shall have up to three days following the next duly publicly noticed meeting of the governing body after the 45-day period, or extension, expires to provide the claimant a written statement identifying the disputed portion and the undisputed portion. (D) Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. If the public entity fails to issue a written statement, paragraph (3) shall apply. (2) (A) If the claimant disputes the public entity’s written response, or if the public entity fails to respond to a claim issued pursuant to this section within the time prescribed, the claimant may demand in writing an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the public entity shall schedule a meet and confer conference within 30 days for settlement of the dispute. (B) Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the public entity shall provide the claimant a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. Any disputed portion of the claim, as identified by the contractor in writing, shall be submitted to nonbinding mediation, with the public entity and the claimant sharing the associated costs equally. The public entity and claimant shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator. If mediation is unsuccessful, the parts of the claim remaining in dispute shall be subject to applicable procedures outside this section. (C) For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by 697 issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this section. (D) Unless otherwise agreed to by the public entity and the contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced. (E) This section does not preclude a public entity from requiring arbitration of disputes under private arbitration or the Public Works Contract Arbitration Program, if mediation under this section does not resolve the parties’ dispute. (3) Failure by the public entity to respond to a claim from a contractor within the time periods described in this subdivision or to otherwise meet the time requirements of this section shall result in the claim being deemed rejected in its entirety. A claim that is denied by reason of the public entity’s failure to have responded to a claim, or its failure to otherwise meet the time requirements of this section, shall not constitute an adverse finding with regard to the merits of the claim or the responsibility or qualifications of the claimant. (4) Amounts not paid in a timely manner as required by this section shall bear interest at 7 percent per annum. (5) If a subcontractor or a lower tier subcontractor lacks legal standing to assert a claim against a public entity because privity of contract does not exist, the contractor may present to the public entity a claim on behalf of a subcontractor or lower tier subcontractor. A subcontractor may request in writing, either on his or her own behalf or on behalf of a lower tier subcontractor, that the contractor present a claim for work which was performed by the subcontractor or by a lower tier subcontractor on behalf of the subcontractor. The subcontractor requesting that the claim be presented to the public entity shall furnish reasonable documentation to support the claim. Within 45 days of receipt of this written request, the contractor shall notify the subcontractor in writing as to whether the contractor presented the claim to the public entity and, if the original contractor did not present the claim, provide the subcontractor with a statement of the reasons for not having done so. (e) The text of this section or a summary of it shall be set forth in the plans or specifications for any public works project that may give rise to a claim under this section. (f) A waiver of the rights granted by this section is void and contrary to public policy, provided, however, that (1) upon receipt of a claim, the parties may mutually agree to waive, in writing, mediation and proceed directly to the commencement of a civil action or binding arbitration, as applicable; and (2) a public entity may prescribe reasonable change order, claim, and dispute resolution procedures and requirements in addition to the provisions of this section, so long as the contractual provisions do not conflict with or otherwise impair the timeframes and procedures set forth in this section. (g) This section applies to contracts entered into on or after January 1, 2017. (h) Nothing in this section shall impose liability upon a public entity that makes loans or grants available through a competitive application process, for the failure of an awardee to meet its contractual obligations. (i) This section shall remain in effect only until January 1, 2020, and as of that date is repealed, unless a later enacted statute, that is enacted before January 1, 2020, deletes or extends that date. (Added by Stats. 2016, Ch. 810, Sec. 1. (AB 626) Effective January 1, 2017. Repealed as of January 1, 2020, by its own provisions.) 698 699 700 701 702 703 704 705 706 707 708 JANICE S. PARVIN Mayor ROSEANN MIKOS, Ph.D. Councilmember DAVID POLLOCK Councilmember KEN SIMONS Councilmember MARK VAN DAM Councilmember PARKS, RECREATION & COMMUNITY SERVICES DEPT. | 799 Moorpark Avenue, Moorpark, CA 93021 Main City Phone Number (805) 517-6200 | Fax (805) 532-2550 | moorpark@moorparkca.gov CITY OF MOORPARK April 10, 2018 RE: Motorized Door and Gate Maintenance and Repair Services Proposals due by: April 26, 2018 at 5:00 p.m. INFORMAL PROPOSAL The City is looking for qualified Door, Gate and Activating Device Contractors to provide routine repairs, preventative maintenance, and emergency response work for motorized gates and doors at City of Moorpark Facilities. The City will be offering a one-year agreement with the selected contractor, subject to two, one year extensions, so long as the Contractor is performing satisfactorily. Contractor to provide the following services:  Provide all labor and materials, tools, equipment, transportation and services necessary to perform preventative maintenance and repair services on all components of motorized gates and activation devices. Currently, the City has five motorized gates at two facilities:  Moorpark Police Services Center, 610 Spring Road, Moorpark, CA 93021. There are three (3) motorized gates at this facility.  Moorpark Public Services Center, 627 Fitch Avenue, Moorpark, CA 93021. There are two (2) motorized gates at this facility.  Contractor will provide preventative maintenance services on the motorized gates quarterly in January, April, July, and October. Contractor to perform the following preventative maintenance services: o Inspection of the gate, all moving parts, and activation devices for any parts that need to be repaired/replaced. o Lubricate, tight and adjust all moving parts o Test safety features o Inspect controls boards and clean o Inspect gate and associated components for proper operation  Contractor will provide as needed repair and emergency response services. Routine and emergency response services shall be performed as follows: o During the term of the Agreement, Contractor agrees to the following response times: 709 Informal Bid –Motorized Door and Gate Maintenance and Repair Services April 2018 Page 2  Routine Work Response: One (1) to three (3) working days from request by City.  Emergency Work Response: One (1) to three (3) hours from request by City. o Contractor shall troubleshoot and provide an initial assessment of the service or repair needed and provide an estimated cost to the City representative. o Contractor estimates will be reviewed by the City representative and upon acceptance authorize the Contractor to proceed with work. All proposed work over $1,000.00 requires a signed work order. o Contractor shall only start work upon written authorization or receipt of a signed work order from the City representative. o Contractor’s personnel are required to notify the City representative of the work start date and upon arrival before starting any work, and before leaving the site. All contractor activities at the Police Services Center will be accompanied by a City representative. o During the agreement term, Contractor may also perform installation of new or updated door, gate or activating devices following the above process.  Contractor is encouraged to consider sustainability and provide energy and environmentally-friendly products.  Contractor shall provide all Manufacturer warranties and Safety Data Sheets (SDS) to City representative, as applicable.  Contractor shall itemize material and labor costs and charge them separately.  Prices noted in the proposal shall be honored for the entire contract term. Contractor responsibilities: **CONTRACTOR MUST BE REGISTERED WITH THE CALIFORNIA DEPARTMENT OF INDUSTRIAL RELATIONS (DIR) PURSUANT TO SB 854. PROOF OF REGISTRATION MUST BE PROVIDED OR THE CONTRACTORS BID WILL NOT BE ACCEPTED **THIS IS A PREVAILING WAGE PROJECT AND ALL PROPOSALS SHOULD BE BID AS SUCH. CONTRACTOR IS REQUIRED TO SUBMIT CERTIFIED PAYROLL AND COMPLY 710 Informal Bid –Motorized Door and Gate Maintenance and Repair Services April 2018 Page 3 WITH ALL APPRENTICESHIP REQUIREMENTS AS OUTLINED IN LABOR CODE SECTIONS 1720 et seq. and 1770 et seq. and 1777 et seq. ANY VIOLATIONS OF LC SECTION 1776 WILL FORFEIT A $100/DAY/WORKER FINE FOR ALL WORKER’S PAID LESS THAN THE PREVAILING WAGE RATE.** 1. Each bid must be submitted on the Bid Forms provided. All blanks in the Bid Form must be filled in and all prices must be stated in both words and figures. It is the sole responsibility of the bidder to see that the bid is delivered to the proper place and received at the proper time. Any bid received after the scheduled closing time for receipt of bids will be returned to the bidder unopened. 2. The lowest bidder will be determined based on the annual cost of the quarterly maintenance visits. 3. The bidder to whom award is made shall execute a written contract with the City within fourteen (14) calendar days after notice of the award has been sent by mail to the address given in the proposal. The contract shall be made in the form adopted by the City and incorporated in these specifications. The bidder warrants that he/she possesses, or has arranged through subcontracts, all capital and other equipment, labor and materials to carry out and complete the work hereunder in compliance with all applicable Federal, State, City, and Special District laws, ordinances, and regulations. 4. Required Licenses: Bidders must hold a valid State of California Contractor's License, C-61 D-28 Doors, Gates and Activating Devices, and have carried a valid license for the last 5 years. 5. Work site and surrounding areas to be left clean and free of any debris or other unsuitable materials at the end of each working day or project. 6. Contractor is to properly dispose of any components containing hazardous materials and recycle any unused equipment or waste resulting from their work. 7. Contractor shall be responsible for all damages to persons or property that occur as a result of its fault or negligence in the performance of this contract and shall be responsible for the protection of the work site until job is finished. 8. Contractor shall take all necessary precautions for the safety of workers on the project and shall comply with all applicable federal, state, local and other safety laws, standards, orders, rules, regulations, and building codes to prevent accidents or injury to persons on, about, or adjacent to the premises where work is being performed and to provide a safe and healthful place of employment. 9. All equipment, materials and labor utilized and all work performed shall comply 711 Informal Bid –Motorized Door and Gate Maintenance and Repair Services April 2018 Page 4 with all current codes, standards, regulations and statutes pertaining to the type of work. 10. If a prospective bidder is in doubt or has any questions as to the true meaning or intent of any part of the Bid package, or discovers discrepancies, errors, or conflicts, or omissions, he/she may submit, to the City, a written request for an interpretation or a correction thereof. Interpretations or corrections shall be made only by addendum duly issued by the City. A copy of such addendum will be mailed, faxed, or delivered to each person receiving a set of the Contract Documents and such addendum shall be considered a part of, and incorporated in, the Contract Documents. Questions must be received in writing no later than 96 hours prior to the bid deadline in order to provide the City sufficient time to evaluate the question and respond no later than 72 hours prior to the bid deadline. Questions received after the 96 hour deadline will be deemed not received. By submitting this proposal, Contractor agrees to sign the City’s standard Agreement and to provide the insurance required by the contract. A copy of the Standard Agreement and Insurance Requirements is attached to this proposal. Contractors are encouraged to review the insurance requirements with their insurance companies to ensure that all terms can be met. Proposals are to be submitted to: Allen Water, Landscape/Parks Maintenance Superintendent City of Moorpark 799 Moorpark Avenue, Moorpark, CA 93021 Please mark outside of the envelope: DO NOT OPEN, INFORMAL BID FOR MOTORIZED DOOR AND GATE MAINTENANCE AND REPAIR SERVICES Questions regarding this Request for Proposals can be directed to the City’s representative in writing via e-mail to: Allen Walter, Parks/Landscape Maintenance Superintendent City of Moorpark awalter@moorparkca.gov Attachments: 1 – Proposal/Bid Forms (All to be filled out and submitted with Bid) 2 - City Standard Agreement and Insurance Requirements 712 Note: Informal Proposal Attachment 1 (Proposal/Bid Forms) and Attachment 2 (City Standard Agreement and Insurance Requirements ) are omitted so as not to be duplicative. Their content is included in the Agreement and Exhibit C: Contractor’s Bid Proposal. 713