Loading...
HomeMy WebLinkAboutAGENDA REPORT 2018 0620 CCSA REG ITEM 09CCITY OF MOORPARK, CALIFORNIA City Council Meeting of June 20, 2018 ACTION Adopted Reso No. 2018-3715 for amended CIP BY M. Benson C. Consider Resolution Approving Seven Year Capital Improvement Program for FY 2017/18 –FY 2024/25. Staff Recommendation: Adopt Resolution No. 2018 - ____ approving the Seven Year Capital Improvement Program for FY 2017/18 – FY 2024/25. Item: 9.C. MOORPARK CITY COUNCIL AGENDA REPORT TO: Honorable City Council FROM: Sean Corrigan, City Engineer/Public Works Director Jeremy Laurentowski, Parks & Recreation Director DATE: 6/20/18 Regular Meeting SUBJECT: Consider Resolution Approving Seven Year Capital Improvement Program for FY 2017/18 – FY 2024/25 BACKGROUND The City’s Capital Improvement Program (CIP) is updated annually. This year’s CIP is the first year in which the programs and projects for both the Public Works and the Parks, Recreation and Community Services Departments have been combined into one comprehensive document. Staff has prepared the attached final draft of the updated CIP for FY 2017/18 – FY 2024/25. This staff report summarizes the recommended changes from the previous CIP. The noteworthy Public Works Department projects out of the estimated $8.3 million proposed for the FY 2018/19 CIP program include: SB 1 funded road rehabilitation projects in the vicinity of Moorpark College and in the City’s downtown area, including pavement maintenance and repairs; Spring Road widening; Princeton Avenue improvements; Arroyo Drive resurfacing and sidewalk construction; Metrolink South Driveway construction; Upgrade of City traffic signals; Upgrade of Los Angeles Avenue Traffic Signal Interconnect System from copper to fiber; and the construction of a raised median on Los Angeles Avenue. Projected costs for the Parks, Recreation and Community Services Department projects for FY 2018/19 total approximately $8.3 million dollars, with the majority of expenses allocated to facilities projects ($7.1 million) and Landscape Maintenance District (LMD) / Landscaping ($1 million). Major planned facilities projects for FY 2018/19 include the replacement of four HVAC units at the Arroyo Vista Recreation Center (AVRC), installation of back-up generators at AVRC and the Civic Center, the purchase of existing City streetlights, and installation of artwork at the Police Services Center and Metrolink north parking lot. Major LMD/Landscaping projects include completion of the Tierra Rejada Road streetscape renovation project and the renovation of the landscaping on Championship Drive. A total of $150,000 is currently allocated to Parks Item: 9.C. 369 Honorable City Council 6/20/2018, Regular Meeting Page 2 projects for FY 2018/19, which include the installation of a central irrigation system at Arroyo Vista Community Park (AVCP) and Miller Park, and the installation of a handball wall at Mountain Meadows Park. A total of $60,000 is allocated to trails projects for FY 2018/19, which includes the development of a Trails Master Plan. DISCUSSION A. General Description and Purpose The CIP is a list of planned municipal capital improvement projects for the City. Costs for general operations and maintenance programs (e.g. pavement marking, striping, regulatory signs, tree trimming, etc.) are not included in this program as this type of Operational and Maintenance expense is set forth in the annual Departmental Operating Budgets. The purpose and focus of the CIP is to provide the City Council with a tool for planning and programming major capital improvement projects, over the next several years. B. Changes from Last Report The following revisions have been made to the CIP for FY 2017/18 – FY 2024/25: The following projects were added to the Completed Projects section of the CIP: 2017-18 C0040 SR 118/Collins Dr Construct signals at Eastbound Ramps M0021 Asphalt Overlay sections of Spring Rd, Princeton Ave, Gabbert Rd and Poindexter Ave The following projects have been programmed for 2018-19: M0033 Traffic Signal Cabinet upgrades M0040 Los Angeles Ave Traffic Signals Fiber Optic Upgrade C. Committee Review and Input On April 2, 2018, the Transportation and Public Works Committee (Councilmembers Simons and Van Dam), met to review the draft CIP update and forwarded the document to the Planning Commission for review and comment. D. Planning Commission Review Section 65401 of the California Government Code requires the Planning Commission to review the City’s CIP each year, for the purpose of reporting to the City Council on the conformity of said document with the City’s General Plan. On May 22, 2018, the draft of the subject document was presented to the Moorpark 370 Honorable City Council 6/20/2018, Regular Meeting Page 3 Planning Commission for such action. The Planning Commission found the subject CIP to be in conformance with the Moorpark General Plan, with the exception of the Moorpark Avenue Widening Project. This project includes a second southbound lane from Casey Road to Third Street that is not identified in the General Plan Circulation Element. This incongruity should be resolved as part of the updating process for the General Plan Circulation Element. E. Seven Year Program / Congestion Management Program The subject CIP provides for the planning and programming of projects over a seven-year period. This timeframe is compatible with the Ventura County Transportation Commission’s (VCTC) Congestion Management Program (CMP). The CMP requires a seven-year projection of projects which might enhance the traffic capacity on any street on the CMP Roadway Network. A map of the CMP network and a chart listing the projects on that network are included in the CMP section of the CIP. F. Priorities and Planning The funding year shown for each project listed in the CIP is an indication of its relative priority. Should the Council wish to recommend project priorities different from those set forth in the draft document prepared by staff, it may do so. G. Fiscal Year (FY) 2018/19 Budget Consistency The first year of new funding for the subject CIP is FY 2018/19. The funding amounts and sources cited in the CIP are consistent with the proposed FY 2018/19 Budget. H. GASB-34 City staff monitors and maintains an Infrastructure Valuation Program consistent with the requirements of the Government Accounting Standards Board Statement No. 34 (GASB-34). The initial analysis which established the valuation of the City’s infrastructure, inventoried, quantified, categorized and valued (replacement cost estimate) all of the City’s capital assets. The valuation amount for the City’s infrastructure assets is over $225 million, with “street-related” improvements valued at over $70 million. I. Program Content In addition to known projects planned to be constructed by either the City or private developers, a number of projects have been included in the CIP in order to fully address the needs described in certain infrastructure planning documents, noted as follows: 371 Honorable City Council 6/20/2018, Regular Meeting Page 4 1. Circulation Element: All of the “future” arterial and collector streets identified in the Circulation Element of the Moorpark General Plan, have been included in the program. 2. Master Drainage Study: All of the “future” drains identified in the City’s 1995 Master Drainage Study have also been included in the program. J. Program Format The projects listed in the CIP are organized into categories listed as follows: • Streets (including underground utility projects) • Walkways • Traffic Signals • Medians and Parkways • Storm Drains • City Facilities • Landscape Maintenance Districts and General Landscaping • Open Space • Parks • Trails K. Program Cost Estimate The Introduction section of the CIP provides a general introduction to the program and includes a listing of the total program cost estimate (exceeding $72 million), summarized as follows: PW Total Program Cost Estimate $1,603,443 $6,534,287 $16,660,000 $246,576,196 Section 100 Streets 200 Walkways Estimated Program Cost $220,317,071 $1,461,395 300 Traffic Signals 400 Medians & Parkways 500 Storm Drain Total PRCS Total Program Cost Estimate Section Estimated Program Cost 600 Facilities $60,494,000 700 LMDs/Landscaping $14,991,000 800 Open Space $3,260,000 900 Parks $19,052,000 1000 Trails $1,823,000 Total $99,620,000 372 Honorable City Council 6/20/2018, Regular Meeting Page 5 L. Project Descriptions The Projects section of the CIP sets forth a “Project Description” page for each project. The information provided on each Project Description page includes estimated project costs, recommended funding year and recommended funding sources. It should be noted that no detailed preliminary engineering was proposed for the projects listed. The cost estimates are, therefore, very preliminary and will be subject to change as the full scope and requirements of each project are developed. M. Program Expenditure and Funding Summaries The Program Expenditure and Funding section of the CIP sets forth tables listing all projects in the CIP along with total estimated project costs for each fiscal year of the program and preliminary funding sources. N. Description of Funding Sources: Definitions The Description of Funding Sources of the CIP is a listing of the major funding sources for the program, along with a description for each. O. Conclusion The subject CIP is designed to serve many purposes. • It is a budget planning document. • It is a funding source reference. • It is a plan for future improvements. • It is a list of infrastructure needs. • It sets forth the scope and estimated cost of specific projects. • It is a tool for prioritizing and scheduling capital improvement projects. • It provides a list of projects already completed. • It provides a list of potential projects. • It documents compliance with requirements of the Congestion Management Program. • Additionally, it is a “hands-on” working reference document to identify, define and describe future planned capital improvement projects. FISCAL IMPACT There is no fiscal impact with the approval of the CIP Program. Generally subject to available funding sources, the appropriations for proposed CIP are included as part of the annual budget development process. 373 Honorable City Council 6/20/2018, Regular Meeting Page 6 STAFF RECOMMENDATION Adopt Resolution No. 2018 - _______ approving the Seven Year Capital Improvement Program for FY 2017/18 – FY 2024/25. Attachments: 1. Seven Year Capital Improvement Program for FY 2017/18 – FY 2024/25 2. Resolution No. 2018 - _____ 374 City of Moorpark Capital Improvement Program Fiscal Year 201 7/18 – 2024/25 Approved on June 20, 2018 Council Resolution No. 2018 -xxxx 375 CITY OF MOORPARK Capital Improvement Program Fiscal Year 2017/18 to 2024/25 Prepared for: Janice Parvin, Mayor Roseann Mikos, Councilmember David Pollock, Councilmember Ken Simons, Councilmember Mark Van Dam, Councilmember Troy Brown, City Manager Prepared by: Sean Corrigan, P.E., Director City Engineer/Public Works Department Jeremy Laurentowski, Director Parks, Recreation & Community Services Department Approved on June 20, 2018 Council Resolution No. 2018-xxxx 376 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 I Table of Contents PAGE TABLE OF CONTENTS .......................................................................................................................................... I  LIST OF FIGURES ................................................................................................................................................ III  INTRODUCTION ..................................................................................................................................................... 1  PROJECTS ................................................................................................................................................................ 3  100 STREETS ........................................................................................................................................................... 4  Slurry Seal Program (101) ................................................................................................................................ 5  Walnut Canyon Road and Sidewalk Improvements (103) ................................................................................. 7  Spring Road Widening – Los Angeles Avenue to Flinn Avenue (104) ............................................................... 8   Princeton Avenue Widening, Realignment, and Reconstruction (105) .............................................................. 9   Los Angeles Avenue Widening – Spring Road to Moorpark Avenue (106) ..................................................... 10  Spring Road/Charles Road Bus Turn-Out (107) ............................................................................................. 11  Los Angeles Avenue Widening at Shasta Avenue (108) ................................................................................... 12  Underground Utility Projects (109) ................................................................................................................. 13  Underground Utility District No. 2 (110) ........................................................................................................ 14  Underground Utilities at Los Angeles Avenue Bridge (111) ........................................................................... 15  Railroad Crossing Improvements at Spring Road (112) ................................................................................. 16  Arroyo Drive Overlay (113) ............................................................................................................................. 17  Bus Shelter and Other Bus Stop Improvements (114)...................................................................................... 18  North Hills Parkway (115) ............................................................................................................................... 19  High Street Streetscape (116) .......................................................................................................................... 20  23 Freeway North Alignment (117) ................................................................................................................. 21  Wicks Road Sidewalk and Asphalt Overlay (118) ........................................................................................... 22  Metrolink South Parking Lot South Entry (119) .............................................................................................. 23  Gabbert Road Rail Crossing Improvements (120) .......................................................................................... 24  High Street West (121) ..................................................................................................................................... 25  Railroad Crossing Improvements at Arroyo Drive (122) ................................................................................ 26  Moorpark Avenue Widening Project (123) ...................................................................................................... 27  Lengthen Curb Radius at Designated Intersections (124) ............................................................................... 28  Los Angeles Avenue Widening West of Tierra Rejada Road (125) .................................................................. 29  Casey Road Westerly Extension (126) ............................................................................................................. 30  Moorpark Avenue Left-Turn Lane (127) .......................................................................................................... 31  Asphalt Overlay on Spring Rd., Princeton Ave., Poindexter Ave., Gabbert Rd. (128) .................................... 32  Metrolink North Parking Lot Expansion (129) ................................................................................................ 33  Bus Turn-Out Improvements (130) .................................................................................................................. 34  Campus Canyon and University Drive Pavement Rehabilitation (131) .......................................................... 35  200 WALKWAYS .................................................................................................................................................... 36  Sidewalk Reconstruction (201) ........................................................................................................................ 37  Bicycle/Pedestrian Facility Improvement Project (202) .................................................................................. 37  Arroyo Drive Bike/Ped Project (203) .............................................................................................................. 39  300 TRAFFIC SIGNALS ........................................................................................................................................... 40  Los Angeles Avenue Traffic Signals Fiber Optic Upgrade (301) .................................................................... 41  Los Angeles Avenue and Shasta Avenue (302) ................................................................................................ 42  SR118/Collins Drive E/B Ramp Signal and Striping Modification (303) ........................................................ 43  Traffic Signal Cabinet Upgrades Project (304) ............................................................................................... 44  Los Angeles Avenue and Millard Street (305) ................................................................................................. 45  377 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 II Los Angeles Avenue and Millard Street (305) ................................................................................................. 45 Los Angeles Avenue West of Butter Creek Road (306) .................................................................................... 46 Los Angeles Avenue Traffic Study (307) .......................................................................................................... 47 400 MEDIANS & PARKWAYS ................................................................................................................................. 48 Los Angeles Avenue Medians (401) ................................................................................................................. 49 Spring Road Medians (402) ............................................................................................................................. 50 Peach Hill Road Parkways (403) ..................................................................................................................... 51 500 STORM DRAIN ................................................................................................................................................. 52 Drainage Master Plan Update (501) ............................................................................................................... 53 Gabbert Canyon/Walnut Canyon Improvements (502) .................................................................................... 54 Shasta Drain (503) ........................................................................................................................................... 55 Millard Drain (504) ......................................................................................................................................... 56 Villa del Arroyo Drain (505) ........................................................................................................................... 57 Miscellaneous Drainage Improvements (506) ................................................................................................. 58 Arroyo Simi Channel Improvements (507) ...................................................................................................... 59 PUBLIC WORKS PROGRAM EXPENDITURE SUMMARY .......................................................................... 61 PUBLIC WORKS TOTAL PROGRAM FUNDING SOURCE .......................................................................... 64 CONGESTION MANAGEMENT PROGRAM ................................................................................................... 66 Congestion Management Program Network .................................................................................................... 67 Congestion Management Program Funding .................................................................................................... 68 PARKS, RECREATION AND COMMUNITY SERVICES (PRCS) PROJECTS 69 600 FACILITIES 70 ARROYO VISTA RECREATION CENTER AND GYM (Summary) 71 Back-Up Generator (601) 72 HVAC Replacement (602) 72 Kitchen Remodel (603) 73 Facility Expansion (604) 73 Security Cameras (605) 74 Water Conservation Improvements (606) 74 Flag Pole Installation (607) 75 Gymnasium Expansion (608) 75 CITY HALL / CIVIC CENTER COMPLEX (Summary) 76 Pedestrian Access Improvements (609) 77 Back-Up Generator (601) 77 Fire Sprinkler System (611) 78 Security Cameras (612) 78 Patio Remodel (613) 79 Water Conservation Improvements (614) 79 Flag Pole Installation (615) 80 Energy Efficiency Improvements (616) 80 HIGH STREET ARTS CENTER (SUMMARY) 81 Roof Renovation (617) 82 Interior Improvements (618) 82 ADA/Building Code Improvements (619) 83 METROLINK PARKING LOT 378 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 III Art In Public Places (620) 84 MOORPARK LIBRARY (Summary) 85 Restroom Improvements (621) 86 Security Cameras(622) 86 Parking Lot Improvements (623) 87 HVAC Replacement (624) 87 POLICE SERVICES CENTER (Summary) 88 Art In Public Places Installation (62 5) 89 Landscape Improvements (626) 89 Parapet Wall Installation (627) 90 MOORPARK PUBLIC SERVICES FACILITY (Summary) 91 Back-Up Generator (628) 92 Lighting Improvements (629) 92 Roof Drain Improvements (630) 93 Outdoor Break Area (631) 93 Water Conservation Improvements (632) 94 Fueling Station (633) 94 RUBEN CASTRO HUMAN SERVICES CENTER Sidewalk Installation (634) 95 31 POINDEXTER AVENUE Building Modifications (635) 96 CITYWIDE Purchase City Streetlights (636) 97 New Moorpark City Library (637) 98 New City Hall and Civic Center Complex (638) 99 Arts Master Plan (639) 100 700 LANDSCAPE MAINTENANCE DISTRICTS (LMDs) & GENERAL LANDSCAPING 101 High Street Improvements (701) 102 Princeton Avenue Landscape Renovations (Campus Park Area) (702 ) 103 Campus Park Median Renovations (Campus Park Area) (703) 104 Princeton Avenue Oak Tree (704) 105 Championship Drive Landscape Renovations (Zone 15) (705) 106 LA Avenue Parkway and Wall Treatment Renovations (706) 107 LA Avenue Parkway Renovations (Zone 7) (707) 108 Poindexter Avenue Landscaping (708) 109 Spring Road Parkway Renovation (Zone 12) (709) 110 Spring Road Street Trees (710) 111 Spring Road/Ridgecrest Drive Landscape Renovation (Zone 22) (711) 112 Metrolink Station Landscape Improvements (712) 113 Tierra Rejada Road Streetscape Renovation (713) 114 Tierra Rejada/Moorpark Road Intersection Improvements (714) 115 City Welcome Signs (715) 116 Off-Ramp Landscape Improvements (716) 117 Peach Hill Wash Channel Improvements (717) 118 800 OPEN SPACE 119 379 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 IV Develop Site Plan (80 Acre Parcel) (801) 120 Trail Connection to Conejo Open Space (80 Acre Parcel) (802) 121 Passive Recreation Uses (Meridian Hills Open Space) (803) 122 Property Acquisition (Waste Management Open Space) (804) 123 Develop Site Plan (Waste Management Open Space) (805) 124 900 PARKS 125 ARROYO VISTA COMMUNITY PARK (Summary) 126 Ball Field Lighting (901) 127 Water Spray Attraction (902) 127 Pedestrian Bridge Lighting (903) 128 Ramp/Walkway/Bike Path from Mountain Trail Street (904) 128 Softball Fencing Improvements (905) 129 Slope Landscaping (906) 129 Lease SCE Property (907) 130 New Pedestrian Bridge (908) 130 Sand Volleyball Court (909) 131 CAMPUS CANYON PARK (Summary) 132 Basketball Court Improvements (910) 133 Replace Playground Equipment (911) 133 Parking Lot (912) 134 CAMPUS PARK (Summary) 135 Restroom Improvements (913) 136 Pavilion Improvements (914) 136 Replace Playground Equipment (915) 137 COLLEGE VIEW PARK (Summary) 138 Sand Volleyball Court (916) 139 Basketball Court Improvements (917) 139 Dog Park Lighting (918) 140 Park Improvements (919) 140 New Park Sign (920) 141 COMMUNITY CENTER PARK Replace Playground Equipment (921) 142 COUNTRY TRAIL PARK (SUMMARY) 143 Park Improvements & ADA Access (922) 144 Restroom Addition (923) 144 Landscape Improvements (924) 145 GLENWOOD PARK (SUMMARY) 146 Basketball Court Lighting (925) 147 Sand Volleyball Court (926) 147 Install Trail (927) 148 Replace Playground Equipment (928) 148 New Park Sign (929) 149 MAGNOLIA PARK Replace Playground Equipment (930) 150 380 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 V MAMMOTH HIGHLANDS (SUMMARY) 151 Sand Volleyball Court (931) 152 Basketball Court Lighting Improvements (932) 152 Expand Trail (933) 153 MILLER PARK (SUMMARY) 154 Lighting Addition (934) 155 Loop Trail (935) 155 Replace Playground Equipment (936) 156 MONTE VISTA NATURE PARK (SUMMARY) 157 Lighting Improvements (937) 158 Shade Structure (938) 158 Landscape Improvements (939) 159 Trail System Improvements (940) 159 MOUNTAIN MEADOWS (SUMMARY) 160 Handball Wall (941) 161 Loop Trail (942) 161 Replace Playground Equipment (943) 162 PEACH HILL PARK (SUMMARY) 163 Lighting Upgrades & Additions (944) 164 Picnic Pavilion Improvements (945) 164 Loop Trail (946) 165 Sand Play Area (947) 165 Replace Playground Equipment (948) 166 POINDEXTER PARK (SUMMARY) 167 Security Camera Improvements (949) 168 Skate Park Fencing (950) 168 Park Amenity Improvements (951) 169 Pathway Improvements (952) 169 TIERRA REJADA PARK (SUMMARY) 170 Lighting Additions (953) 171 Tennis Court Addition (954) 171 Parking Lot Expansion (955) 172 Replace Playground Equipment (956) 172 VILLA CAMPESINA PARK (SUMMARY) 173 Security Improvements (957) 174 Replace Playground Equipment (958) 174 VIRGINIA COLONY PARK (SUMMARY) 175 Basketball Court Addition (959) 176 Replace Playground Equipment (960) 176 381 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 VI WALNUT ACRES PARK Security Cameras (961) 177 CITYWIDE PARKS (SUMMARY) 178 Central Irrigation System (962) 179 Lighting Upgrades (963) 179 ADA Improvements (964) 180 Universally Accessible Playground Equipment (965) 180 BMX/Free Style Bicycle Facility (966) 181 Sensory Garden (967) 181 Disc Golf Course (968) 182 Electronic Marquees (969) 182 Permanent Game Equipment (970) 183 Baseball Field (971) 183 Bocce Ball Court (972) 184 Ball Wall (973) 184 Update Park Features (974) 185 Additional Exercise Equipment (975) 185 Parkour Training Circuit (976) 186 Community Pool (977) 186 Parks and Recreation Master Plan Update (978) 187 1000 TRAILS 188 Zone 15 Trail Improvements (1001) 189 Trails Master Plan (1002) 190 Arroyo Simi Trail Improvements (1003) 191 Drain No. 2 Trail (1004) 192 PRCS PROGRAM EXPENDITURE SUMMARY ............................................................................................. 194 PRCS TOTAL PROGRAM FUNDING SOURCE ............................................................................................. 201 COMPLETED PROJECTS .................................................................................................................................. 206 DESCRIPTION OF FUNDS ................................................................................................................................. 245 POTENTIAL PROJECTS .................................................................................................................................... 251 APPROVING RESOLUTION 2018-XX ............................................................................................................. 261 382 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 VII List of Figures PAGE Figure 1. Summary of Public Works Program Expenditures.................................................. 1 Figure 2. Summary of Parks Recreation and Community Services Expenditures ................ 2 Figure 3. Congestion Management Network Program ........................................................... 67 Figure 4. Congestion Management Program Funding ........................................................... 68 383 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 1 Introduction This document is the updated Seven Year Capital Improvement Program (CIP) for the City of Moorpark Public Works and Parks, Recreation and Community Services Departments for the period covering FY 2017/18 through FY 2024/25. The primary purpose of this CIP is to provide the City Council with a framework for identifying, planning and prioritizing needed municipal capital improvements. For Public Works Department projects, the year in which each project is recommended to be funded, is an indication of the priority given to each project. The figures cited in the FY 17/18 column, should be identical to the appropriations in the FY 2017/18 Budget for capital improvement projects. Public Works Projects have been categorized into the five (5) sections, noted below. The projects identified in this CIP include both City funded projects as well as developer funded and constructed. The projects listed in Section 100 include future streets, which are identified in the Circulation Element of the Moorpark General Plan. The projects listed in Section 500 include future, needed storm drainage infrastructure improvements identified in the Moorpark Master Drainage Study. Also included, in Section 500, are certain projects of importance to the City, which are planned to be constructed by the Ventura County Watershed Protection District. Section Prior Years FY 17/18 FY  18/19 FY  19/20 FY  20/21 100 Streets $21,199,408 $793,871 $12,241,037 $1,117,000 $3,005,755 200 Walkways $124,539 $40,000 $1,056,856 $40,000 $40,000 300 Traffic Signals $50 $284,950 $1,318,443 $0 $0 400 Medians  & Parkways $318,851 $20,000 $1,742,436 $1,000 $52,000 500 Storm Drain $0 $0 $0 $800,000 $350,000 Total $21,642,848 $1,138,821 $16,358,772 $1,958,000 $3,447,755 Section FY 21/22 FY  22/23 FY  23/24 FY  24/25 Total 100 Streets $100,000 $5,150,000 $6,710,000 $170,000,000 $220,317,071 200 Walkways $40,000 $40,000 $40,000 $40,000 $1,461,395 300 Traffic Signals $0 $0 $0 $0 $1,603,443 400 Medians  & Parkways $0 $0 $0 $4,400,000 $6,534,287 500 Storm Drain $0 $0 $7,500,000 $8,010,000 $16,660,000 Total $140,000 $5,190,000 $14,250,000 $182,450,000 $246,576,196 Figure 1. Summary of Public Works Program Expenditures 384 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 2 The Parks, Recreation and Community Services Department Capital Improvement Program (CIP) is a long-range plan that schedules and prioritizes the department’s capital projects over a seven year period. It also describes each individual project and potential funding source(s). The listed projects involve capital outlays or nonrecurring expenditures for specifically identified funding sources, and do not duplicate or include routine maintenance activities or costs. Included projects must meet at least one of the following criteria: It is a new construction project with a total cost of at least $10,000 over the life of the project. Project costs can include the cost of land, engineering, architectural planning, and contract services needed to complete the project. It is an expansion or addition for an existing facility or facilities with a total cost of at least $10,000. It is a major renovation, improvement, replacement, maintenance, or rehabilitation project for an existing facility or facilities with a cost of $10,000 or more and a useful life of at least 10 years. It is a purchase of major equipment that is needed in connection with a project described above. The equipment must have a total cost of $10,000 or more with a useful life of at least 7 years. The Capital Improvement Program document also includes a list of potential projects and feasibility studies, a list of maintenance and non-capital projects, a summary of completed projects, and a description of the funding sources. A summary of the total estimated active program expenditures is as follows: Section Prior Years FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 $1,333,964 $73,378 $7,098,643 $18,405,000 $0 $468,227 $1,517,052 $1,038,814 $6,500,000 $0 $0 $1,500,000 $0 $1,610,000 $0 $300,843 $51,308 $149,800 $5,913,000 $0 600 Facilities 700 LMDs/Landscaping 800 Open Space 900 Parks 1000 Trails $178,554 $85,000 $60,000 $1,500,000 $0 Total $2,281,588 $3,226,738 $8,347,257 $33,928,000 $0 Section FY 21/22 FY 22/23 FY 23/24 FY 24/25 Total $2,589,000 $0 $0 $30,994,000 $60,493,985 $275,000 $0 $0 $5,192,000 $14,991,093 $0 $0 $0 $150,000 $3,260,000 $6,925,000 $175,000 $0 $5,536,800 $19,051,751 600 Facilities 700 LMDs/Landscaping 800 Open Space 900 Parks 1000 Trails $0 $0 $0 $0 $1,823,554 Total $9,789,000 $175,000 $0 $41,872,800 $99,620,383 Figure 2. Summary of Parks Recreation and Community Services Expenditures 385 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 3 Projects Individual project descriptions are set forth in this section. Each project description includes a location map, a project cost estimate, a proposed schedule, and recommended funding sources. It should be noted that there has been no preliminary engineering performed for most of the projects programmed in future years. The cost estimates provided for those projects are a rough estimate only and should not be relied upon to predict actual costs. These estimates were included in the project descriptions in order to provide a general idea of the total estimated program costs. Individual project cost estimates will be revised as engineering for each project is developed. 386 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 4 100 STREETS 387 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 5 Slurry Seal Program (101) Project Name:Code No.:101 Account No.: M0004 Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design $35,525 R.O.W.$0 Construction $5,531,771 $250,000 Inspection $197,556 $40,000 Total $5,764,852 $0 $0 $0 $290,000 $0 $0 $0 $0 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2002: CTM $218,236 2603: LTF $3,341,852 2415: Gas Tax $373,205 $290,000 2409: Grant $130,700 2409: Grant $479,323 2434: Prop 1B $1,168,332 2400: Parks $53,203 2412: TDA $0 Total $5,764,851 $0 $0 $0 $290,000 $0 $0 $0 $0 City of Moorpark Capital Improvement Program Location Map Project Description Various locations throughout the City. Specific locations to be determined by separate Capital Improvement Project. Bi-annual Slurry Seal/ARAM project. Resurfacing of one-third of the City’s streets every other year. Past Slurry Seal Projects are listed in the "Completed Projects" section. The scope of work often includes the removal and replacement of pavement in poor condition, and the application of crack sealer where needed. The next slurry seal project is scheduled for 2020. Effective FY 2016/2017, CIP 8098 replaced 8002. Project Funding Schedule $6,054,852Total Cost: Slurry Seal Program 388 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 6 SR-118/Collins Drive Westbound Off-Ramp Improvements (102) Project Name:Code No.:102 Account No.: and Signal Modification Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design $75,000 R.O.W. Construction $475,000 Inspection Total $0 $0 $0 $75,000 $475,000 $0 $0 $0 $0 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2603: LTF 1000 General Other Source $75,000 $475,000 Total $0 $0 $0 $75,000 $475,000 $0 $0 $0 $0 $550,000 Project Funding Schedule This project involves the modification of the westbound SR-118 off-ramp and signal to provide an un-signalized right turn lane from the westbound SR-118 off-ramp to Collins Drive. This project is partially funded by Moorpark Community College. Total Cost: Capital Improvement Program City of Moorpark Location Map Project Description SR-118/Collins Drive Westbound Off-Ramp Improvements 389 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 7 Walnut Canyon Road and Sidewalk Improvements (103) Project Name:Code No.:103 Account No.: Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design R.O.W. Construction $500,000 Inspection Total $0 $0 $0 $0 $500,000 $0 $0 $0 $0 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined $500,000 Developer Total $0 $0 $0 $0 $500,000 $0 $0 $0 $0 City of Moorpark Capital Improvement Program Location Map Project Description Project Funding Schedule Construction of additional pavement and a sidewalk on the west side of Walnut Canyon Road, north of Casey Road. This project is to be constructed by the developer of Tract 5130. $500,000Total Cost: Walnut Canyon Road and Sidewalk Improvements 390 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 8 Spring Road Widening – Los Angeles Avenue to Flinn Avenue (104) Project Name:Code No.:104 Account No.: C0022 Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design $143,880 $76,119 R.O.W. $272,178 $11,725 $76,097 Construction $44,380 $625,620 Inspection Total $460,438 $11,725 $777,836 $0 $0 $0 $0 $0 $0 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2014: LA AOC $460,438 $11,725 $777,837 Total $460,438 $11,725 $777,837 $0 $0 $0 $0 $0 $0 City of Moorpark Capital Improvement Program Location Map Project Description Construction of improvements and modifications to Spring Road, from a point south of Los Angeles Avenue northerly to Flinn Avenue. This project requires the acquisition of additional street right-of-way, widening, new curb, gutter and sidewalk along the east side of the street. Ultimate improvements will include four (4) travel lanes, six foot (6’) wide bike lanes, a fourteen foot (14’) wide landscaped median and double left-turn lanes southbound on Spring Road. Project Funding Schedule $1,249,999Total Cost: Spring Road Widening - Los Angeles Avenue to Flinn Avenue 391 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 9 Princeton Avenue Widening, Realignment, and Reconstruction (105) Project Name:Code No.:105 Account No.: C0020 Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design $950,239 $97,500 $43,792 R.O.W. $2,228,027 $3,200 $5,225 Construction $6,906,781 Inspection Total $3,178,266 $100,700 $6,955,798 $0 $0 $0 $0 $0 $0 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2014: LA AOC $3,157,771 $100,700 $5,868,554 2409: Grant $18,756 $1,087,244 2415 Gas Tax $1,739 Total $3,178,266 $100,700 $6,955,798 $0 $0 $0 $0 $0 $0 City of Moorpark Capital Improvement Program Location Map Project Description Project Funding Schedule Princeton Avenue Widening, Realignment, and Reconstruction Widening, realignment and reconstruction of Princeton Avenue from a point east of Spring Road to South Condor Drive. Additional street right-of-way is being acquired to provide an eighty-eight feet (88’) wide corridor – sufficient to allow for future widening of the road to four lanes. The current project design provides for only one lane in each direction with a paved median and paved shoulders. The project plans call for the realignment and reconstruction of the street pavement, the construction of storm drains and the construction of retaining walls as required. $10,234,764Total Cost: 392 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 10 Los Angeles Avenue Widening – Spring Road to Moorpark Avenue (106) Project Name:Code No.:106 Account No.: C0021 Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design $841,103 $504,072 R.O.W. $1,600,910 $400 $98,552 Construction $29,395 $1,214,803 $782,000 Inspection Total $2,471,408 $400 $1,817,427 $782,000 $0 $0 $0 $0 $0 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2014: LA AOC $2,471,408 $400 $1,020,657 $782,000 2401: TEA $796,770 Total $2,471,408 $400 $1,817,427 $782,000 $0 $0 $0 $0 $0 Capital Improvement Program City of Moorpark Los Angeles Avenue Widening - Spring Road to Moorpark Avenue Location Map Project Description Widening of Los Angeles Ave to provide for six (6) travel lanes of traffic, and widen Spring Rd from the McDonald’s driveway south to the gas station. At Spring Rd, Los Angeles Ave’s centerline will be shifted to the south to avoid acquiring right-of-way from the residential properties along the north side of the street. The additional right-of-way in this area will be acquired from the south side of the street. At Moorpark Avenue the additional street right-of-way will be acquired from the north side of the street. The project includes westbound right-turn lanes at Spring Road and at Moorpark Avenue, and a new traffic signal at Millard Street. Project Funding Schedule $5,071,235Total Cost: 393 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 11 Spring Road/Charles Road Bus Turn-Out (107) Project Name:Code No.:107 Account No.: C0007 Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design $13,968 R.O.W.$248 $39,000 Construction $106,000 Inspection $5,000 Total $14,216 $0 $0 $150,000 $0 $0 $0 $0 $0 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2001: TSM $14,216 $150,000 Total $14,216 $0 $0 $150,000 $0 $0 $0 $0 $0 Spring Road/Charles Street Bus Turn-Out City of Moorpark Capital Improvement Program Location Map Project Funding Schedule Project Description The construction of a bus turn-out on the east side of Spring Road just south of Charles Street. Additional street right-of-way will have to be acquired in order to implement this project. $164,216Total Cost: 394 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 12 Los Angeles Avenue Widening at Shasta Avenue (108) Project Name:Code No.:108 Account No.: C0030 Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design $76,000 $442 $50,000 R.O.W. Construction $1,809,128 Inspection Total $1,885,128 $442 $50,000 $0 $0 $0 $0 $0 $0 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2014: LA AOC $1,885,128 $442 $50,000 Total $1,885,128 $442 $50,000 $0 $0 $0 $0 $0 $0 $1,935,570Total Cost: City of Moorpark Capital Improvement Program Location Map Project Description The construction of widening the south side of Los Angeles Avenue between Maureen Lane and Leta Yancy Road, along the frontage of the vacant property of Tentative Tract 5882 [Pacific Communities]. A traffic signal will be constructed at the intersection of Los Angeles Avenue and Shasta Avenue during the development of Tract 5882 [Pacific Communities]. It is the intent of the City to seek reimbursement from the developer of Tract 5882 for City costs incurred to implement this project. Construction is complete. The remaining budget is for contingency work required by Caltrans for the final turnover. Project Funding Schedule Los Angeles Avenue Widening at Shasta Avenue 395 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 13 Underground Utility Projects (109) Project Name:Code No.:109 Account No.: Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design R.O.W. Construction $5,000,000 $5,000,000 Inspection Total $0 $0 $0 $0 $0 $0 $5,000,000 $5,000,000 $0 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined $5,000,000 $5,000,000 Total $0 $0 $0 $0 $0 $0 $5,000,000 $5,000,000 $0 Capital Improvement Program City of Moorpark Location Map Locations to be determined. Project Description City costs related to the development and implementation of various underground utility projects and/or formation of Underground Utility Districts for such purpose. Project Codes 110 and 111 describe immediate future efforts in this regard. This project (#109) has been included in order to program future “undergrounding” projects, the location and scope of which are to be determined. As projects are identified, they will be added to the CIP as separate projects. $10,000,000Total Cost: Project Funding Schedule Underground Utility Projects 396 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 14 Underground Utility District No. 2 (110) Project Name:Code No.:110 Account No.: C0027 Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design R.O.W. Construction $240 $1,710,000 Inspection Total $240 $0 $0 $0 $0 $0 $0 $1,710,000 $0 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2330: AD92-1 2014: LA AOC $240 $1,710,000 Rule 20A Total $240 $0 $0 $0 $0 $0 $0 $1,710,000 $0 City of Moorpark Capital Improvement Program Location Map Underground Utility District No. 2 Project Description Establishment and implementation of an underground utility district along Los Angeles Avenue between Shasta Avenue and Millard Street to underground the high voltage transmission lines and remove all poles and overhead wires. SCE Rule 20A monies in the approximate amount of $400,000 are not included in the budget figures shown below. The forecast amount is based on an estimate of 5,200 feet at $300 per foot. Project Funding Schedule $1,710,240Total Cost: 397 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 15 Underground Utilities at Los Angeles Avenue Bridge (111) Project Name:Code No.:111 Account No.: C0033 Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design $26,694 $133,307 R.O.W. Construction $305,000 Inspection $3,000 Total $26,694 $0 $441,307 $0 $0 $0 $0 $0 $0 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2014: LA AOC $13,280 $441,021 2001 TSM $13,414 $286 Total $26,694 $0 $441,307 $0 $0 $0 $0 $0 $0 Underground Utilities at Los Angeles Avenue Bridge $468,001Total Cost: Capital Improvement Program Location Map Project Description Establishment and implementation of an underground utility district along Los Angeles Avenue between Shasta Avenue and Millard Street to underground the high voltage transmission lines and remove all poles and overhead wires. SCE Rule 20A monies in the approximate amount of $400,000 are not included in the budget figures shown below. Project Funding Schedule City of Moorpark 398 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 16 Railroad Crossing Improvements at Spring Road (112) Project Name:Code No.:112 Account No.: C0024 Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design $160,276 R.O.W. $116,848 Construction $1,632,640 Inspection Total $1,909,764 $0 $0 $0 $0 $0 $0 $0 $0 Source Prior Years FY 16/17 FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 24/25 2603: LTF $290,367 2902: MRA $122,849 2014: LA AOC $1,496,550 Total $1,909,766 $0 $0 $0 $0 $0 $0 $0 $0 Project Funding Schedule Rail Road Crossing Improvements at Spring Road $1,909,764Total Cost: City of Moorpark Capital Improvement Program Location Map Project Description This project provides for street widening and improvements to the rail crossing by adding a center median and four (4) crossing gates. The project also includes acquisition of additional street right-of-way and street widening on the east side of the street between the rail crossing and Princeton Avenue to provide an additional right-turn lane and bike lanes on both sides of the street. SCRRA (Metrolink) is managing the construction of the project which is estimated at a total cost of $3.3 million. Metrolink is contributing $1.1_million towards the project which is not included in the funding schedule below since Metrolink is paying their contractor directly and their funds will not flow through the City’s budget. 399 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 17 Arroyo Drive Overlay (113) Project Name:Code No.:113 Account No.: C0035 Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design $656 $9,344 R.O.W. Construction $517,000 Inspection $10,000 Total $656 $0 $536,344 $0 $0 $0 $0 $0 $0 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2434: Prop 1B $656 2412: TDA 8A $536,344 Total $656 $0 $536,344 $0 $0 $0 $0 $0 $0 Pavement rehabilitation on Arroyo Drive from railroad to City boundary. Related to Project C0037. Project Funding Schedule $537,000Total Cost: Arroyo Drive Overlay City of Moorpark Capital Improvement Program Location Map Project Description 400 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 18 Bus Shelter and Other Bus Stop Improvements (114) Project Name:Code No.:114 Account No.: P0011 Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design R.O.W. Construction $26,060 $2,000 $67,738 Inspection Total $26,060 $2,000 $67,738 $0 $0 $0 $0 $0 $0 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2414: TDA 8C $26,060 $2,000 $67,738 Total $26,060 $2,000 $67,738 $0 $0 $0 $0 $0 $0 Project Funding Schedule $95,798Total Cost: Various locations to be determined Project Description The construction of bus stop improvements at various locations. Current year costs are for the relocation of the bus stop at the Community Center and the installation of five (5) new bus stop shelters at various locations. Future funding is for other Bus Stop improvements which may be required in the next few years. Bus Shelter and Other Bus Stop Improvements City of Moorpark Capital Improvement Program Location Map 401 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 19 North Hills Parkway (115) Project Name:Code No.:115 Account No.: C0031 Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design $1,028,172 $8,500,000 R.O.W. $886,409 Construction $59,258 $76,500,000 Inspection Total $1,973,839 $0 $0 $0 $0 $0 $0 $0 $85,000,000 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2002: Traffic $1,573,628 $85,000,000 2415: Gas Tax $400,211 Total $1,973,839 $0 $0 $0 $0 $0 $0 $0 $85,000,000 $86,973,839Total Cost: Location Map Project Description The construction of a new east-west arterial street north of Casey Road. The westerly end of the street is proposed to connect to Los Angeles Avenue, via a future railroad undercrossing, at a point west of Butter Creek Road. Initially, the easterly terminus of this new street will be Spring Road with the potential to continue east to a connection with the 23 Freeway North Alignment (Project 8045). The project includes widening of Gabbert Road from the new street south to the railroad crossing. Segments of this project will be constructed by developers (Tract 5147, Tract 5130, Tract 5045, TTM 5906, Hitch Ranch, Centex and the studio project) and other segments funded by the Citywide Traffic Mitigation Fund. Project Funding Schedule North Hills Parkway City of Moorpark Capital Improvement Program 402 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 20 High Street Streetscape (116) Project Name:Code No.:116 Account No.: Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design R.O.W. Construction Inspection Total $0 $0 $0 $0 $0 $0 $0 $0 $0 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 Project Funding Schedule High Street Streetscape $0Total Cost: Location Map Project Description Refer to Project Code No. 701 City of Moorpark Capital Improvement Program 403 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 21 23 Freeway North Alignment (117) Project Name:Code No.:117 Account No.: C0025 Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design $192,201 $85,000,000 R.O.W. Construction Inspection Total $192,201 $0 $0 $0 $0 $0 $0 $0 $85,000,000 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2002: Traffic $192,201 $85,000,000 Total $192,201 $0 $0 $0 $0 $0 $0 $0 $85,000,000 23 Freeway North Alignment $85,192,201Total Cost: Capital Improvement Program Location Map Project Description Construction of a roadway from the SR-118 Freeway to Broadway with a connection to North Hills Parkway at Spring Road. Initial costs are for the development of design concepts. Project Funding Schedule City of Moorpark 404 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 22 Wicks Road Sidewalk and Asphalt Overlay (118) Project Name:Code No.:118 Account No.: Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design R.O.W. Construction Inspection Total $0 $0 $0 $0 $0 $0 $0 $0 $0 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0Total Cost: Project Funding Schedule Wicks Road Sidewalk and Asphalt Overlay City of Moorpark Capital Improvement Program Location Map Project Description Construction of a sidewalk on the south side of Wicks Road and asphalt overlay from Walnut Canyon Road to the end. Total cost to be funded by private developer. 405 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 23 Metrolink South Parking Lot South Entry (119) Project Name:Code No.:119 Account No.: C0029 Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design $55,727 $20,000 $7,363 R.O.W. $614,165 $531,712 Construction $1,529 $465 $341,455 Inspection Total $671,421 $20,465 $880,530 $0 $0 $0 $0 $0 $0 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2001: TSM $357,755 $20,465 $109,019 2412: TDA 8A $33,983 2401: TEA $72,476 $509,119 3004: Special $185,000 $0 2414: TDA 8C $22,207 $262,392 Total $671,421 $20,465 $880,530 $0 $0 $0 $0 $0 $0 Project Funding Schedule $1,572,416Total Cost: Relocation of the entry to the south Metrolink parking lot to a point on First Street east of Moorpark Avenue. Metrolink South Parking Lot South Entry City of Moorpark Capital Improvement Program Location Map Project Description 406 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 24 Gabbert Road Rail Crossing Improvements (120) Project Name:Code No.:120 Account No.: Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design R.O.W. Construction Inspection Total $0 $0 $0 $0 $0 $0 $0 $0 $0 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0Total Cost: Project Description The construction of the street widening and related improvements on Gabbert Road at the rail crossing will be undertaken by AB Properties (Tract 5147) per the conditions of their Tract Map and Development Agreement requirements. There will be no City funds used for the construction of these improvements. The project is shown here in order to identify projects which are implementing components of the Circulation Element of the General Plan. Total cost to be funded by private developer. Project Funding Schedule Gabbert Road Rail Crossing Improvements City of Moorpark Capital Improvement Program Location Map 407 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 25 High Street West (121) Project Name:Code No.:121 Account No.: Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design $30,000 R.O.W.$80,000 Construction $300,000 Inspection $20,000 Total $0 $0 $0 $110,000 $320,000 $0 $0 $0 $0 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined $110,000 $320,000 Total $0 $0 $0 $110,000 $320,000 $0 $0 $0 $0 $430,000Total Cost: Location Map Project Description Widening, realignment, and reconstruction of High Street west of Moorpark Avenue. The scope of work would include a study to determine the precise alignment of this roadway project, as well as the westerly extension of the project to serve the properties in this area (Hitch Ranch). Project Funding Schedule High Street West City of Moorpark Capital Improvement Program 408 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 26 Railroad Crossing Improvements at Arroyo Drive (122) Project Name:Code No.:122 Account No.: Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design R.O.W. Construction $1,000,000 Inspection Total $0 $0 $0 $0 $1,000,000 $0 $0 $0 $0 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined $1,000,000 Total $0 $0 $0 $0 $1,000,000 $0 $0 $0 $0 Project Funding Schedule Railroad Crossing Improvements at Arroyo Drive $1,000,000Total Cost: Location Map Project Description The construction of street widening and other improvements on Arroyo Drive at the railroad crossing east of Collins Drive. PUC and Caltrans have proposed funding through Section 130 for this project. City of Moorpark Capital Improvement Program 409 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 27 Moorpark Avenue Widening Project (123) Project Name:Code No.:123 Account No.: C0004 Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design $262,920 $370,755 R.O.W. $1,923,589 $101,648 Construction $156,708 Inspection Total $2,343,217 $0 $101,648 $0 $370,755 $0 $0 $0 $0 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2002: TM $1,402,597 $101,648 $370,755 2014: LA AOC $156,708 2011: MRA $783,912 Total $2,343,217 $0 $101,648 $0 $370,755 $0 $0 $0 $0 Moorpark Avenue Widening Project Location Map Project Description Widening of Moorpark Avenue to add a southbound lane along the west side from Casey Road to Third Street. Includes street realignment at First Street and Poindexter Avenue (Prior Project 8057) and rail crossing improvements (Prior Project 8038). Prior year appropriations for those projects have been returned to funding sources. Prior to commencing work on this project, the General Plan and Circulation Element must be updated to identify the second southbound lane. Therefore, funding has been moved to Future Years. Project Funding Schedule $2,815,620Total Cost: Capital Improvement Program City of Moorpark 410 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 28 Lengthen Curb Radius at Designated Intersections (124) Project Name:Code No.:124 Account No.: Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design $50,000 R.O.W.$100,000 Construction $150,000 Inspection Total $0 $0 $0 $0 $50,000 $100,000 $150,000 $0 $0 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined $50,000 $100,000 $150,000 Total $0 $0 $0 $0 $50,000 $100,000 $150,000 $0 $0 $300,000Total Cost: Project Funding Schedule Lengthen Curb Radius at Designated Intersections City of Moorpark Capital Improvement Program Location Map Locations to be determined. Project Description This project constructs modifications to existing improvements on major arterials, including the State Highways, to lengthen the curb radii at certain corners to facilitate turning movements and ease congestion. 411 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 29 Los Angeles Avenue Widening West of Tierra Rejada Road (125) Project Name:Code No.:125 Account No.: Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design R.O.W. Construction Inspection Total $0 $0 $0 $0 $0 $0 $0 $0 $0 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 Project Funding Schedule The construction of street widening on Los Angeles Avenue west of Tierra Rejada Road, as a function of the development of property in this area. This project is proposed to be funded by development. It is shown here to reflect implementation of the Circulation Element of the Moorpark General Plan. Total cost to be funded by private developer. $0Total Cost: Los Angeles Avenue Widening west of Tierra Rejada Road City of Moorpark Capital Improvement Program Location Map Project Description 412 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 30 Casey Road Westerly Extension (126) Project Name:Code No.:126 Account No.: Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design R.O.W. Construction Inspection Total $0 $0 $0 $0 $0 $0 $0 $0 $0 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 Project Description The Circulation Element of the Moorpark General Plan calls for the westerly extension of Casey Road to connect to Gabbert Road. This future project is to be constructed by developers. Project Funding Schedule $0Total Cost: Casey Road Westerly Extention Location Map City of Moorpark Capital Improvement Program 413 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 31 Moorpark Avenue Left-Turn Lane (127) Project Name:Code No.:127 Account No.: Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design $25,000 R.O.W. $150,000 Construction $25,000 Inspection Total $200,000 $0 $0 $0 $0 $0 $0 $0 $0 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2014: LA AOC $200,000 Total $200,000 $0 $0 $0 $0 $0 $0 $0 $0 Project Funding Schedule Location Map Project Description This project will be incorporated into Metrolink’s Sealed Corridor railroad crossing improvement project. The improvements include revisions to the traffic signal to provide a protected left-turn phase for the shared left and through northbound lane. Both sides of Moorpark Avenue will be widened to accommodate a raised center median and will improve the intersection turning movements. PROJECT COMPLETE. Final payment and project closeout in progress through FY 2016-17. $200,000Total Cost: Moorpark Avenue Left Turn Lane (Complete) City of Moorpark Capital Improvement Program 414 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 32 Asphalt Overlay on Spring Rd., Princeton Ave., Poindexter Ave., Gabbert Rd. (128) Project Name:Code No.:128 Account No.: M0021 Poindexter Avenue, Gabbert Road Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design $11,742 R.O.W. Construction $601,000 Inspection $26,776 Total $11,742 $627,776 $0 $0 $0 $0 $0 $0 $0 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2409: Grant $517,000 2412: TDA 8A $11,742 $110,776 Total $11,742 $627,776 $0 $0 $0 $0 $0 $0 $0 Project Funding Schedule Asphalt Overlay on Spring Road, Princeton Avenue, Location Map Project Description Pavement rehabilitation on Spring Road (Tierra Rejada Road to Monte Vista Nature Park); Princeton Avenue (Condor Drive to Campus Park Drive); Poindexter Avenue (N. Commerce Avenue to Gabbert Road); and Gabbert Road (Poindexter Avenue to a point approximately 200-ft south of Poindexter Avenue.) $639,518Total Cost: City of Moorpark Capital Improvement Program 415 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 33 Metrolink North Parking Lot Expansion (129) Project Name:Code No.:129 Account No.: C0032 Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design $69,266 $26,363 R.O.W. Construction $4,000 $287,409 Inspection Total $69,266 $30,363 $287,409 $0 $0 $0 $0 $0 $0 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2001: TSM $42,367 $17,633 2434: Prop 1B $26,899 $12,730 $287,409 Total $69,266 $30,363 $287,409 $0 $0 $0 $0 $0 $0 Metrolink North Parking Lot Expansion Capital Improvement Program Location Map Project Description Convert vacant city lot (approximately 150-ft wide x 120-ft long) west of Metrolink North Parking Lot into a formal parking lot, adding 29 parking stalls. The project also includes reconstructing the existing North Parking Lot (owned by VCTC). Project Funding Schedule $387,038Total Cost: City of Moorpark 416 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 34 Bus Turn-Out Improvements (130) Project Name:Code No.:130 Account No.: C0049 Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design R.O.W. Construction $25,000 Inspection Total $0 $0 $25,000 $0 $0 $0 $0 $0 $0 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2001: TSM $25,000 Total $0 $0 $25,000 $0 $0 $0 $0 $0 $0 Bus Turn-Out Improvements City of Moorpark Capital Improvement Program Location Map Project Description Construct bus turn-outs and/or bus pads for new, proposed transit stops. Proposed locations are along Tierra Rejada and Miller Parkway. Project Funding Schedule $25,000Total Cost: 417 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 35 Campus Canyon and University Drive Pavement Rehabilitation (131) Project Name:Code No.:131 Account No.: M0042 Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design R.O.W. Construction $250,000 Inspection $50,000 Total $0 $0 $300,000 $0 $0 $0 $0 $0 $0 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2415: Gas Tax $300,000 Total $0 $0 $300,000 $0 $0 $0 $0 $0 $0 Project Funding Schedule $300,000Total Cost: City of Moorpark Capital Improvement Program Campus Canyon and University Drive Pavement Rehabilitation Location Map Project Description Pavement rebahilitation along residential streets. 418 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 36 200 W ALKWAYS 419 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 37 Project Name: Code No.: 201 Account No.: M0029 Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design R.O.W. Construction $124,539 Inspection Total$124,539$0 $0$0$0$0$0$0$0 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2415: Gas  Tax 2411: TDA Art 3 $124,539 Total$124,539$0 $0$0$0$0$0$0$0 Sidewalk Reconstruction City of Moorpark Capital Improvement Program Project Funding Schedule Location Map Various locations to be determined. Project Description Replacement of sidewalks, curbs, and gutter at various locations. Recurring project each fiscal year with an  estimated cost of $50,000/Year.  Effective FY 2016/2017, CIP 8097 replaced 8001.  $124,539Total Cost: Sidewalk Reconstruction (201) 420 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 38 Project Name:Code No.:202 Account No.: Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design R.O.W. Construction $40,000 $40,000 $40,000 $40,000 $40,000 $40,000 $40,000 $40,000 Inspection Total $0 $40,000 $40,000 $40,000 $40,000 $40,000 $40,000 $40,000 $40,000 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2603: LTF $20,000 $20,000 $20,000 $20,000 $20,000 $20,000 $20,000 $20,000 2411: TDA Art 3 $20,000 $20,000 $20,000 $20,000 $20,000 $20,000 $20,000 $20,000 Total $0 $40,000 $40,000 $40,000 $40,000 $40,000 $40,000 $40,000 $40,000 $320,000Total Cost: City of Moorpark Capital Improvement Program Location Map Various locations to be determined. Project Description Project Funding Schedule Bicycle/Pedestrian Facility Improvement Project The construction of bicycle and/or pedestrian facility improvements, partially funded by a TDA Article 3 State grant [SB-821]. As projects are approved and added to the Budget, a new project will be added to the CIP. Bicycle/Pedestrian Facility Improvement Project (202) 421 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 39 Project Name: Code No.: 203 Account No.: C0037 Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design $600,000 R.O.W. Construction $416,856 Inspection Total $0 $0 $1,016,856 $0 $0 $0 $0 $0 $0 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2001: TSM $731,180 2411: TDA Art 3 $285,676 Total $0 $0 $1,016,856 $0 $0 $0 $0 $0 $0 Total  Cost: Capital Improvement Program City of Moorpark Arroyo Drive  Bike/Ped Project Location Map Project Description Construction of a sidewalk on the south side  of Arroyo Drive  from the western edge of Villa del Arroyo Mobile  Home  Park to the City boundary. Related to Project C0035. Project Funding Schedule $1,016,856 Arroyo Drive Bike/Ped Project (203) 422 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 40 3 00 TRAFFIC SIGNALS 423 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 41 Project Name:Code No.:301 Account No.: M0040 Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design $950,000 R.O.W. Construction Inspection Total $0 $0 $950,000 $0 $0 $0 $0 $0 $0 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2014: LA AOC $950,000 Total $0 $0 $950,000 $0 $0 $0 $0 $0 $0 $950,000Total Cost: Los Angeles Avenue Traffic Signals/Fiber Optic Upgrade City of Moorpark Capital Improvement Program Location Map Project Description Replace existing copper lines with fiber optic technology. New traffic signal timing and coordination improvements for traffic signals along Los Angeles Avenue. Project Funding Schedule Los Angeles Avenue Traffic Signals Fiber Optic Upgrade (301) 424 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 42 Project Name:Code No.:302 Account No.: Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design R.O.W. Construction Inspection Total $0 $0 $0 $0 $0 $0 $0 $0 $0 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0Total Cost: City of Moorpark Capital Improvement Program Location Map Los Angeles Avenue and Shasta Aveune Project Description Developer for Pacific Communities (TR5053) to construct the traffic signal at the intersection of Los Angeles Avenue and Shasta Avenue. Total funding for project to be paid for by private developer. Project Funding Schedule Los Angeles Avenue and Shasta Avenue (302) 425 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 43 Project Name: Code No.: 303 Account No.: C0040 Modification Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design R.O.W. Construction $50 $174,950 Inspection Total $50 $174,950 $0 $0 $0 $0 $0 $0 $0 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 3000: Capital $50 $174,950 Total $50 $174,950 $0 $0 $0 $0 $0 $0 $0 SR‐118/Collins  Drive  Eastbound On/Off‐Ramp Signalization and Striping This project involves signalizing the  eastbound SR‐118 on/off‐ramps. Caltrans completed these  improvements in Fall 2017. $175,000Total Cost: Project Funding Schedule Location Map Project Description City of Moorpark Capital Improvement Program SR118/Collins Drive E/B Ramp Signal and Striping Modification (303) 426 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 44 Project Name:Code No.:304 Account No.: Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design R.O.W. Construction $368,443 Inspection Total $0 $0 $368,443 $0 $0 $0 $0 $0 $0 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2412: TDA 8A $368,443 Total $0 $0 $368,443 $0 $0 $0 $0 $0 $0 Total Cost: Project Description Traffic Signal Cabinet Upgrades City of Moorpark Capital Improvement Program Location Map Various traffic signal locations, citywide. Replace traffic signal controller and including battery back-up units, on Tierra Rejada Road, Spring Road, and Miller Parkway; replace traffic signal cabinets and batter back-up units on Campus Park Drive, Princeton Avenue; and replace safety lights from halogen to LEDs. Project Funding Schedule $368,443 Project Name:Code No.:304 Account No.: M0033 Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design R.O.W. Construction $368,443 Inspection Total $0 $0 $368,443 $0 $0 $0 $0 $0 $0 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2412: TDA 8A $368,443 Total $0 $0 $368,443 $0 $0 $0 $0 $0 $0 Total Cost: Project Description Traffic Signal Cabinet Upgrades City of Moorpark Capital Improvement Program Location Map Various traffic signal locations, citywide. Replace traffic signal controller and including battery back-up units, on Tierra Rejada Road, Spring Road, and Miller Parkway; replace traffic signal cabinets and batter back-up units on Campus Park Drive, Princeton Avenue; and replace safety lights from halogen to LEDs. Project Funding Schedule $368,443 Traffic Signal Cabinet Upgrades Project (304) 427 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 45 Project Name:Code No.:305 Account No.: Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design R.O.W. Construction Inspection Total $0 $0 $0 $0 $0 $0 $0 $0 $0 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0Total Cost: City of Moorpark Capital Improvement Program Location Map Los Angeles Avenue and Millard Street Project Description The Los Angeles Avenue Widening Project between Moorpark Avenue and Spring Road [Project 106] includes the construction of a traffic signal at the intersection of Los Angeles Avenue and Millard Street. This project will be partially funded by the developer of property south of the intersection [Shea Homes – Tentative Tract 5133]. Project Funding Schedule Los Angeles Avenue and Millard Street (305) 428 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 46 Project Name:Code No.:306 Account No.:8061 Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design R.O.W. Construction Inspection Total $0 $0 $0 $0 $0 $0 $0 $0 $0 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0Total Cost: City of Moorpark Capital Improvement Program Location Map Project Description This project is for the construction of a traffic signal at the future intersection of Los Angeles Avenue and the westerly terminus of the North Hills Parkway [see Project 115]. Project Funding Schedule Los Angeles Avenue West of Butter Creek Road Los Angeles Avenue West of Butter Creek Road (306) 429 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 47 Project Name:Code No.:307 Account No.: Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design $110,000 R.O.W. Construction Inspection Total $0 $110,000 $0 $0 $0 $0 $0 $0 $0 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 1000: General $40,000 2014: LA AOC $70,000 Total $0 $110,000 $0 $0 $0 $0 $0 $0 $0 Los Angeles Avenue Traffic Study City of Moorpark Capital Improvement Program $110,000Total Cost: Location Map Prepare a traffic study for the Los Angeles Avenue (SR118) corridor to determine ultimate locations of traffic signals and other improvements to optimize traffic flow and minimize impacts on adjacent residential streets. Project Description Project Funding Schedule Los Angeles Avenue Traffic Study (307) 430 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 48 4 00 MEDIANS & PARKWAYS 431 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 49 Project Name:Code No.:401 Account No.: C0026 Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design $318,851 $20,000 $42,436 $300,000 R.O.W. Construction $1,700,000 $4,100,000 Inspection Total $318,851 $20,000 $1,742,436 $0 $0 $0 $0 $0 $4,400,000 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2014: LA AOC $318,851 $20,000 $1,742,436 $4,400,000 Total $318,851 $20,000 $1,742,436 $0 $0 $0 $0 $0 $4,400,000 $6,481,287Total Cost: Los Angeles Avenue Medians City of Moorpark Capital Improvement Program Location Map Project Description The construction of raised landscaped medians on Los Angeles Avenue (SR-118), from the SR-23 freeway westerly to Tierra Rejada Road. Phase 1 will include that area east of Spring Road to the SR-23. Phase 2 will be incorporated into the Los Angeles Avenue Widening project from Spring Road to Moorpark Avenue. Project Funding Schedule Los Angeles Avenue Medians (401) 432 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 50 Project Name:Code No.:402 Account No.: Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design R.O.W. Construction Inspection Total $0 $0 $0 $0 $0 $0 $0 $0 $0 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0Total Cost: City of Moorpark Capital Improvement Program Location Map Project Description The Spring Road Widening Project [Project 104] includes the construction of raised, landscaped medians between Los Angeles Avenue and Flinn Avenue. Project Funding Schedule Spring Road Medians Spring Road Medians (402) 433 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 51 Project Name:Code No.:403 Account No.: Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design $1,000 R.O.W. Construction $50,000 Inspection $2,000 Total $0 $0 $0 $1,000 $52,000 $0 $0 $0 $0 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined $1,000 $52,000 Total $0 $0 $0 $1,000 $52,000 $0 $0 $0 $0 $53,000Total Cost: City of Moorpark Capital Improvement Program Location Map Project Description Installation of Parkway Landscaping on both sides of the “east-west” segment of Peach Hill Road between Mesa Verde Drive and Rolling Knoll Road. Project Funding Schedule Peach Hill Road Parkways Peach Hill Road Parkways (403) 434 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 52 5 00 STORM DR AIN 435 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 53 Project Name: Code No.: 501 Account No.: Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design $150,000 R.O.W. Construction Inspection Total $0 $0 $0 $0 $150,000 $0 $0 $0 $0 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2800: Endowment $150,000 Total $0 $0 $0 $0 $150,000 $0 $0 $0 $0 Drainage Master  Plan Update City of Moorpark Capital Improvement Program Location Map $150,000Total Cost: Citywide Project Description This project is to prepare an update to the 1995 Citywide Master  Plan of Drainage.  This project will be  undertaken upon completion  of the Letter of Map  Revisions to the Digital  Flood Insurance Rate  Maps.  Project Funding Schedule Drainage Master Plan Update (501) 436 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 54 Project Name:Code No.:502 Account No.: Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design R.O.W. Construction $7,500,000 $7,500,000 Inspection Total $0 $0 $0 $0 $0 $0 $0 $7,500,000 $7,500,000 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined $7,500,000 $7,500,000 Total $0 $0 $0 $0 $0 $0 $0 $7,500,000 $7,500,000 $15,000,000Total Cost: City of Moorpark Capital Improvement Program Location Map Project Description The existing Ventura County Watershed Protection District [VCWPD] facilities within the Gabbert Canyon and Walnut Creek watersheds are inadequate. This project calls for the construction of new detention, diversion and capacity enhancement improvements to those existing facilities. The 2006 cost estimate for those improvements was estimated to be $12,000,000 plus financing costs. No implementation or financing plan has yet been developed. Some of the required improvements have been, or are planned to be, constructed by land development projects within this watershed. Project Funding Schedule Gabbert Canyon/Walnut Canyon Improvements Gabbert Canyon/Walnut Canyon Improvements (502) 437 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 55 Project Name:Code No.:503 Account No.: Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design R.O.W. Construction $800,000 Inspection Total $0 $0 $0 $800,000 $0 $0 $0 $0 $0 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined $800,000 Total $0 $0 $0 $800,000 $0 $0 $0 $0 $0 Construction of a storm drain to serve the residential area north of the intersection of Los Angeles Avenue and Shasta Avenue, as identified in the City’s Master Plan of Drainage. No funding source has been identified for this project. The 1995 cost estimate for this project was $188,000. However, the full scope and cost of this project has never been determined. Project Funding Schedule Shasta Drain City of Moorpark Capital Improvement Program Location Map $800,000Total Cost: Project Description Shasta Drain (503) 438 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 56 Project Name:Code No.:504 Account No.: C0003 Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design $50,000 R.O.W. Construction Inspection $460,000 Total $0 $0 $0 $0 $0 $0 $0 $0 $510,000 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined $510,000 Total $0 $0 $0 $0 $0 $0 $0 $0 $510,000 $510,000Total Cost: City of Moorpark Capital Improvement Program Location Map Project Description Construction of a storm drain to serve the residential area north of the intersection of Los Angeles Avenue and Shasta Avenue, as identified in the City’s Master Plan of Drainage. No funding source has been identified for this project. The 1995 cost estimate for this project was $188,000. However, the full scope and cost of this project has never been determined. Millard Drain Project Funding Schedule Millard Drain (504) 439 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 57 Project Name:Code No.:505 Account No.: Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design R.O.W. Construction Inspection Total $0 $0 $0 $0 $0 $0 $0 $0 $0 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined Total $0 $0 $0 $0 $0 $0 $0 $0 $0 There is a culvert under Arroyo Drive at the entrance to the Villa Del Arroyo Mobile Home Park, which connects to a storm drain pipe owned by the Mobile Home Park. This “private” drain line extends southerly to the arroyo. It has been determined that the function of that storm drain is impaired and that remedial action must be taken in order to provide adequate drainage for both the City street and the Mobile Home Park. Consistent with the provisions of a Settlement Agreement between the City and the Mobile Home Park, the property owner is required to take corrective action to remedy this problem. Project Funding Schedule Villa del Arroyo Drain City of Moorpark Capital Improvement Program Location Map $0Total Cost: Project Description Villa del Arroyo Drain (505) 440 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 58 Project Name:Code No.:506 Account No.: Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design R.O.W. Construction $200,000 Inspection Total $0 $0 $0 $0 $200,000 $0 $0 $0 $0 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined $200,000 Total $0 $0 $0 $0 $200,000 $0 $0 $0 $0 $200,000Total Cost: City of Moorpark Capital Improvement Program Location Map Location of improvements to be determined. Project Description This project is for the construction of miscellaneous drainage improvements, throughout the City, as required. Project Funding Schedule Miscellaneous Drainage Improvements Miscellaneous Drainage Improvements (506) 441 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 59 Project Name:Code No.:507 Account No.: Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design R.O.W. Construction Inspection Total $0 $0 $0 $0 $0 $0 $0 $0 $0 Source Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined Total $0 $0 $0 $0 $0 $0 $0 $0 $0 A number of projects, to be undertaken by the Ventura County Watershed Protection Agency, to construct improvements to the Arroyo Simi to render it capable of containing flows from a 100 year storm event, in a manner satisfactory to the Federal Emergency Management Agency [FEMA]. When those projects are completed, revisions to the FEMA flood zone maps will be processed to remove as many areas as possible from flood zones. Project Funding Schedule Arroyo Simi Channel Improvements City of Moorpark Capital Improvement Program Location Map $0Total Cost: Project Description Arroyo Simi Channel Improvements (507) 442 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 60 This page intentionally left blank. 443 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 61 Program Expenditure Summary Program Summary: Fiscal Year 2017/18 to 2024/25Code Project Name Account Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 TotalStreets (100)101 Slurry Seal Program M0004 $5,764,852 $0 $0 $0 $290,000 $0 $0 $0 $0 $6,054,852102 SR‐118/Collins Drive Westbound Off‐Ramp Improvements $0 $0 $0 $75,000 $475,000 $0 $0 $0 $0 $550,000103 Walnut Canyon Road  and Sidewalk Improvements $0 $0 $0 $0 $500,000 $0 $0 $0 $0 $500,000104 Spring Road Widening ‐ Los Angeles Avenue to Flinn Avenue C0022 $460,438 $11,725 $777,836 $0 $0 $0 $0 $0 $0 $1,249,999105 Princeton Avenue Widening, Realignment, and Reconstruction C0020 $3,178,266 $100,700 $6,955,798 $0 $0 $0 $0 $0 $0 $10,234,764106 Los Angeles Avenue Widening ‐ Spring Road to Moorpark C0021 $2,471,408 $400 $1,817,427 $782,000 $0 $0 $0 $0 $0 $5,071,235107 Spring Road/Charles Street Bus Turn‐Out C0007 $14,216 $0 $0 $150,000 $0 $0 $0 $0 $0 $164,216108 Los Angeles Avenue Widening at Shasta Avenue (COMPLETE) C0030 $1,885,128 $442 $50,000 $0 $0 $0 $0 $0 $0 $1,935,570109 Underground Utility Projects$0 $0 $0 $0 $0 $0 $5,000,000 $5,000,000 $0 $10,000,000110 Underground Utility District No. 2C0027$240 $0 $0 $0 $0 $0 $0 $1,710,000 $0 $1,710,240111 Underground Utilities at Los Angeles Avenue BridgeC0033 $26,694 $0 $441,307 $0 $0 $0 $0 $0 $0 $468,001112 Rail Road Crossing Improvements at Spring RoadC0024 $1,909,764 $0 $0 $0 $0 $0 $0 $0 $0 $1,909,764113 Arroyo Drive OverlayC0035$656 $0 $536,344 $0 $0 $0 $0 $0 $0 $537,000114 Bus Shelter and Other Bus Stop ImprovementsP0011 $26,060 $2,000 $67,738 $0 $0 $0 $0 $0 $0 $95,798115 North Hills ParkwayC0031 $1,973,839 $0 $0 $0 $0 $0 $0 $0 $85,000,000 $86,973,839116 High Street Streetscape$0$0 $0$0$0$0$0$0 $0 $0117 23 Freeway North AlignmentC0025 $192,201 $0 $0 $0 $0 $0 $0 $0 $85,000,000 $85,192,201118 Wicks Road Sidewalk and Asphalt Overlay$0$0 $0$0$0$0$0$0 $0 $0119 Metrolink South Parking Lot South EntryC0029 $671,421 $20,465 $880,530 $0 $0 $0 $0 $0 $0 $1,572,416120 Gabbert Road Rail Crossing Improvements$0 $0 $0 $0 $0 $0 $0 $0 $0 $0121 High Street West$0 $0 $0 $110,000 $320,000 $0 $0 $0 $0 $430,000122 Railroad Crossing Improvements at Arroyo Drive$0 $0 $0 $0 $1,000,000 $0 $0 $0 $0 $1,000,000123 Moorpark Ave Widening ProjectC0004 $2,343,217 $0 $101,648 $0 $370,755 $0 $0 $0 $0 $2,815,620124 Lengthen Curb Radius at Designated Intersections$0 $0 $0 $0 $50,000 $100,000 $150,000 $0 $0 $300,000125 Los Angeles Avenue Widening west of Tierra Rejada Road$0 $0 $0 $0 $0 $0 $0 $0 $0 $0126 Casey Road Westerly Extention$0$0 $0$0$0$0$0$0 $0 $0127 Moorpark Avenue Left Turn Lane (COMPLETE)$200,000 $0 $0 $0 $0 $0 $0 $0 $0 $200,000128 Asphalt Overlay on Spring, Princeton, Poindexter, Gabbert M0021 $11,742 $627,776 $0 $0 $0 $0 $0 $0 $0 $639,518129 Metrolink North Parking Lot ExpansionC0032 $69,266 $30,363 $287,409 $0 $0 $0 $0 $0 $0 $387,038130 Bus Turn‐Out ImprovementsC0049$0 $0 $25,000 $0 $0 $0 $0 $0 $0 $25,000131 Campus Canyon and University Drive Pavement RehabilitationM0042 $0$0$300,000$0$0$0$0$0 $0$300,000Total $21,199,408 $793,871 $12,241,037 $1,117,000 $3,005,755 $100,000 $5,150,000 $6,710,000 $170,000,000 $220,317,071 444 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 62 Program Summary: Fiscal Year 2017/18 to 2024/25Code Project Name Account Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 TotalWalkways (200)201 Sidewalk Reconstruction $124,539 $0 $0 $0 $0 $0 $0 $0 $0 $124,539202 Bicycle/Pedestrian Facility Improvement Project $0 $40,000 $40,000 $40,000 $40,000 $40,000 $40,000 $40,000 $40,000 $320,000203 Arroyo Drive Bike/Ped Project C0037 $0 $0 $1,016,856 $0 $0 $0 $0 $0 $0 $1,016,856Total$124,539 $40,000 $1,056,856 $40,000 $40,000 $40,000 $40,000 $40,000 $40,000 $1,461,395Traffic Signals (300)301 Los Angeles Avenue Traffic Signals/Fiber Optic Upgrade M0040 $0$0$950,000$0$0$0$0$0 $0$950,000302 Los Angeles Avenue and Shasta Aveune $0 $0 $0 $0 $0 $0 $0 $0 $0 $0303 SR‐118/Collins Drive Eastbound On/Off‐Ramp Signalization C0040 $50 $174,950 $0 $0 $0 $0 $0 $0 $0 $175,000304 Traffic Signal Cabinet Upgrades M0033 $0$0$368,443$0$0$0$0$0 $0$368,443305 Los Angeles Avenue and Millard Street$0 $0 $0 $0 $0 $0 $0 $0 $0 $0306 Los Angeles Avenue West of Butter Creek Road$0 $0 $0 $0 $0 $0 $0 $0 $0 $0307 Los Angeles Avenue Traffic Study$0 $110,000 $0 $0 $0 $0 $0 $0 $0 $110,000Total$50 $284,950 $1,318,443 $0 $0 $0 $0 $0 $0 $1,603,443Medians & Parkways (400)401 Los Angeles Avenue Medians C0026 $318,851 $20,000 $1,742,436 $0 $0 $0 $0 $0 $4,400,000 $6,481,287402 Spring Road Medians $0$0 $0$0$0$0$0$0 $0 $0403 Peach Hill Road Parkways $0 $0 $0 $1,000 $52,000 $0 $0 $0 $0 $53,000Total$318,851 $20,000 $1,742,436 $1,000 $52,000 $0 $0 $0 $4,400,000 $6,534,287 445 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 63 Program Summary: Fiscal Year 2017/18 to 2024/25Code Project Name Account Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 TotalStorm Drain (500)501 Drainage Master Plan Update $0 $0 $0 $0 $150,000 $0 $0 $0 $0 $150,000502 Gabbert Canyon/Walnut Canyon Improvements $0 $0 $0 $0 $0 $0 $0 $7,500,000 $7,500,000 $15,000,000503 Shasta Drain$0 $0 $0 $800,000 $0 $0 $0 $0 $0 $800,000504 Millard Drain$0 $0 $0 $0 $0 $0 $0 $0 $510,000 $510,000505 Villa del Arroyo Drain $0$0 $0$0$0$0$0$0 $0 $0506 Miscellaneous Drainage Improvements $0 $0 $0 $0 $200,000 $0 $0 $0 $0 $200,000507 Arroyo Simi Channel Improvements $0 $0 $0 $0 $0 $0 $0 $0 $0 $0Total$0 $0 $0 $800,000 $350,000 $0 $0 $7,500,000 $8,010,000 $16,660,000Grand Total$246,576,196446 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 64 Total Program Funding Source Code Project Name Account1000: General Fund2000: Traffic Safety 2001: TSM2002: Traffic Mitig.2150: Trees2315: LMD2330: AD92‐12400: Parks2412: TDA 8A2014:  LA AOC2502: STR AOC2411: TDA Art3 2603: LTF2401: Federal TEA2415: Gas Tax2409: Fed/State Grant2434: Prop 1B2800: Endowment2902: MRA3004: Special2414: TDA 8CUndeter‐mined TotalStreets (100)101 Slurry Seal Program M0004 $218,236 $53,203 $0 $3,341,852 $663,205 $610,023 $1,168,332 $6,054,851102 SR‐118/Collins Drive Westbound Off‐Ramp Improvements$550,000 $550,000103 Walnut Canyon Road  and Sidewalk Improvements$500,000 $500,000104 Spring Road Widening ‐ Los Angeles Avenue to Flinn Avenue C0022$1,250,000$1,250,000105 Princeton Avenue Widening, Realignment, and Reconstruction C0020$9,127,025 $1,739 $1,106,000 $10,234,764106 Los Angeles Avenue Widening ‐ Spring Road to Moorpark C0021$4,274,465 $796,770$5,071,235107 Spring Road/Charles Street Bus Turn‐Out C0007 $164,216$164,216108 Los Angeles Avenue Widening at Shasta AvenueC0030$1,935,570$1,935,570109 Underground Utility Projects$10,000,000 $10,000,000110 Underground Utility District No. 2C0027$1,710,240$1,710,240111 Underground Utilities at Los Angeles Avenue BridgeC0033$13,700$454,301$468,001112 Rail Road Crossing Improvements at Spring RoadC0024$1,496,550$290,367$122,849$1,909,766113 Arroyo Drive OverlayC0035$536,344$656$537,000114 Bus Shelter and Other Bus Stop ImprovementsP0011$95,798$95,798115 North Hills ParkwayC0031$86,573,628$400,211$86,973,839116 High Street Streetscape$0117 23 Freeway North AlignmentC0025$85,192,201$85,192,201118 Wicks Road Sidewalk and Asphalt Overlay$0119 Metrolink South Parking Lot South Entry C0029 $487,239 $33,983 $581,595 $185,000 $284,599 $1,572,416120 Gabbert Road Rail Crossing Improvements$0121 High Street West$430,000 $430,000122 Railroad Crossing Improvements at Arroyo Drive$1,000,000 $1,000,000123 Moorpark Ave Widening Project C0004 $1,875,000 $156,708$783,912 $2,815,620124 Lengthen Curb Radius at Designated Intersections$300,000 $300,000125 Los Angeles Avenue Widening west of Tierra Rejada Road$0126 Casey Road Westerly Extention$0127 Moorpark Avenue Left Turn Lane$200,000$200,000128 Asphalt Overlay on Spring, Princeton, Poindexter, Gabbert M0021$122,518$517,000$639,518129 Metrolink North Parking Lot ExpansionC0032$60,000$327,038$387,038130 Bus Turn‐Out ImprovementsC0049$25,000$25,000131 Campus Canyon and University Drive Pavement Rehabilitation M0042$300,000$300,000Total$0 $0 $750,155 $173,859,065 $0 $0 $0 $53,203 $692,845 $20,604,859 $0 $0 $3,632,219 $1,378,365 $1,365,155 $2,233,023 $1,496,026 $0 $906,761 $185,000 $380,397 $12,780,000 $220,317,073Program Funding Source Summary: Fiscal Year 2017/18 to 2024/25 447 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 65 Code Project Name Account1000: General Fund2000: Traffic Safety 2001: TSM2002: Traffic Mitig.2150: Trees2315: LMD2330: AD92‐12400: Parks2412: TDA 8A2014:  LA AOC2502: STR AOC2411: TDA Art3 2603: LTF2401: Federal TEA2415: Gas Tax2409: Fed/State Grant2434: Prop 1B2800: Endowment2011: MRA3004: Special2414: TDA 8CUndeter‐mined TotalTrails & Walkways (200)201 Sidewalk Reconstruction$124,539$124,539202 Bicycle/Pedestrian Facility Improvement Project$160,000 $160,000$320,000203 Arroyo Drive Bike/Ped Project C0037 $731,180$285,676$1,016,856Total$0 $0 $731,180 $0 $0 $0 $0 $0 $0 $0 $0 $570,215 $160,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,461,395Traffic Signals (300)301 Los Angeles Avenue Traffic Signals/Fiber Optic Upgrade M0040$950,000$950,000302 Los Angeles Avenue and Shasta Aveune$0303 SR‐118/Collins Drive Eastbound On/Off‐Ramp Signalization C0040$175,000 $175,000304 Traffic Signal Cabinet Upgrades M0033$368,443$368,443305 Los Angeles Avenue and Millard Street$0306 Los Angeles Avenue West of Butter Creek Road$0307 Los Angeles Avenue Traffic Study $40,000$70,000$110,000Total$40,000 $0 $0 $0 $0 $0 $0 $0 $368,443 $1,020,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $175,000 $1,603,443Medians & Parkways (400)401 Los Angeles Avenue Medians C0026$6,481,287$6,481,287402 Spring Road Medians$0403 Peach Hill Road Parkways$53,000 $53,000Total$0 $0 $0 $0 $0 $0 $0 $0 $6,481,287 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $53,000 $6,534,287Storm Drain (500)501 Drainage Master Plan Update$150,000 $150,000502 Gabbert Canyon/Walnut Canyon Improvements$15,000,000 $15,000,000503 Shasta Drain$800,000 $800,000504 Millard Drain C0003$510,000 $510,000505 Villa del Arroyo Drain$0506 Miscellaneous Drainage Improvements$200,000 $200,000507 Arroyo Simi Channel Improvements$0Total$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $150,000 $0 $0 $0 $16,510,000 $16,660,000Grand Total$246,576,198Program Funding Source Summary: Fiscal Year 2017/18 to 2024/25448 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 66 Congestion Management Program The purpose of the Ventura County Transportation Commission’s (VCTC) Congestion Management Program (CMP) is to monitor certain street segments and/or intersections on the CMP Road Network (see Map), to confirm that the Level of Service (LOS) [a measurement of the level of congestion] on those segments, or at those intersections, does not deteriorate below certain stipulated levels. Increased traffic generated by development is one of the major causes of increased traffic congestion and, therefore, the deterioration of the LOS. The CMP requires each Agency to identify projects designed to increase capacity and/or otherwise improve the efficient and effective movement of traffic. The projects set forth in this seven year program, which are on the CMP Road Network and which could reduce congestion, are listed on the following page. 449 C I T Y O F M O O R P A R K C A P I T A L I M P R O V E M E N T P R O G R A M F I S C A L Y E A R 2 0 1 7 / 1 8 T O 2 0 2 4 / 2 5 67 Congestion Management Program Network Figure 3. Congestion Management Network Program 450 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 68 Congestion Management Program Funding Congestion Management Program: Fiscal Year 2017/18 to 2024/25Code Project Name Account Prior Years FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 TotalStreets (100)106 Los Angeles Avenue Widening ‐ Spring Road to Moorpark C0021 $2,471,408 $400 $1,817,427 $782,000 $0 $0 $0 $0 $0 $5,071,235108 Los Angeles Avenue Widening at Shasta Avenue (COMPLETE) C0030 $1,885,128 $442 $50,000 $0 $0 $0 $0 $0 $0 $1,935,570117 23 Freeway North Alignment C0025 $192,201 $0 $0 $0 $0 $0 $0 $0 $85,000,000 $85,192,201123 Moorpark Ave Widening Project C0004 $2,343,217 $0 $101,648 $0 $370,755 $0 $0 $0 $0 $2,815,620125 Los Angeles Avenue Widening west of Tierra Rejada Road $0 $0 $0 $0 $0 $0 $0 $0 $0 $0Total$6,891,954 $842 $1,969,075 $782,000 $370,755 $0 $0 $0 $85,000,000 $95,014,626Traffic Signals (300)302 Los Angeles Avenue and Shasta Aveune $0 $0 $0 $0 $0 $0 $0 $0 $0 $0305 Los Angeles Avenue and Millard Street $0 $0 $0 $0 $0 $0 $0 $0 $0 $0306 Los Angeles Avenue West of Butter Creek Road $0 $0 $0 $0 $0 $0 $0 $0 $0 $0Total$0 $0 $0 $0 $0 $0 $0 $0 $0 $0Grand Total$95,014,626Figure 4. Congestion Management Program Funding 451 69 Parks, Recreation and Community Services Projects Individual project descriptions are set forth in this section. Each project description includes a project cost estimate, a proposed schedule, and recommended funding sources. It should be noted that there has been no preliminary engineering performed for most of the projects programmed in future years. The cost estimates provided for those projects are a rough estimate only and should not be relied upon to predict actual costs. These estimates were included in the project descriptions in order to provide a general idea of the total estimated program costs. Individual project cost estimates will be revised as engineering for each project is developed. 452 70 FACILITIES 453 71 City of Moorpark Capital Improvement Program Arroyo Vista Recreation Center (AVRC) 4550 Tierra Rejada Road Location Map AVRC Project Summary: Project Total Cost Back-Up Generator………………………… $ 128,000 HVAC Replacement……………………….. $ 235,000 Kitchen Remodel…………………………... $ 150,000 Facility Expansion…………………………. $2,325,000 Security Cameras…………………………... $ 35,000 Water Conservation Improvements…………. $ 55,000 Flag Pole Installation……………………….. $ 12,000 Gymnasium Expansion $2,450,000 Total AVRC Project Costs: $5,390,000 454 72 City of Moorpark Capital Improvement Program PROJECT: Back-Up Generator Code No. 601 LOCATION: Arroyo Vista Recreation Center Account No. M0023 Project Description Install a back-up generator and alarm at the Arroyo Vista Recreation Center and install portable generators for the AVRC sewer lift station (shares project number for portable generators for Public Services Facility and Community Center.) Objective IV.B.3 Project Funding Schedule Total Cost: $128,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 95,000 33,000 Construction Mgmt. Total 0 0 95,000 0 0 33,000 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2010: Community Wide Development 95,000 33,000 Total 0 0 95,000 0 0 33,000 0 0 0 PROJECT: HVAC Replacement Code No. 602 LOCATION: Arroyo Vista Recreation Center Account No. M0024 Project Description Remove and replace four HVAC units at the Arroyo Vista Recreation Center (10 ton unit, 12.5 ton unit, 15 ton unit, and 25 ton unit). Project Funding Schedule Total Cost: $235,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 40,000 Land Acquisition Improvements 195,000 Construction Mgmt. Total 0 0 235,000 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 1000: General Fund 135,000 3003: Equipment Replacement 100,000 Total 0 0 235,000 0 0 0 0 0 0 455 73 City of Moorpark Capital Improvement Program PROJECT: Kitchen Remodel Code No. 603 LOCATION: Arroyo Vista Recreation Center Account No. M0025 Project Description Design plans and implement renovation of the AVRC kitchen, including upgrading cabinets, replacing appliances, installing a new sink to comply with Health & Safety Code, and painting. Project Funding Schedule Total Cost: $150,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 25,000 Land Acquisition Improvements 125,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 150,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 1000: General Fund 150,000 Total 0 0 0 0 0 0 0 0 150,000 PROJECT: Facility Expansion Code No. 604 LOCATION: Arroyo Vista Recreation Center Account No. C0042 Project Description Develop design plans and implement improvements to Arroyo Vista Recreation Center, including office space and activity room expansion. Objective IV.A.21 Project Funding Schedule Total Cost: $2,325,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 75,000 Land Acquisition Improvements 2,000,000 Construction Mgmt. 250,000 Total 0 0 0 75,000 0 0 0 0 2,250,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2018: Endowment 75,000 Undetermined 2,250,000 Total 0 0 0 75,000 0 0 0 0 2,250,000 456 74 City of Moorpark Capital Improvement Program PROJECT: Security Cameras Code No. 605 LOCATION: Arroyo Vista Recreation Center Account No. Project Description Install new security cameras. Objective V.A.14 Project Funding Schedule Total Cost: $35,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 10,000 Land Acquisition Improvements 25,000 Construction Mgmt. Total 0 0 0 35,000 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 35,000 Total 0 0 0 35,000 0 0 0 0 0 PROJECT: Water Conservation Improvements Code No. 606 LOCATION: Arroyo Vista Recreation Center Account No. Project Description Install hands-free fixtures and low flow or waterless urinals. Project Funding Schedule Total Cost: $55,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 55,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 55,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 55,000 Total 0 0 0 0 0 0 0 0 55,000 457 75 City of Moorpark Capital Improvement Program PROJECT: Flag Pole Installation Code No. 607 LOCATION: Arroyo Vista Recreation Center Account No. Project Description Install three flag poles (U.S. flag, California flag, and City flag) to replace the single flag pole currently at the recreation center building entrance. Project Funding Schedule Total Cost: $12,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 12,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 12,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 12,000 Total 0 0 0 0 0 0 0 0 12,000 PROJECT: Gymnasium Expansion Code No. 608 LOCATION: Arroyo Vista Recreation Center Account No. C0048 Project Description Expand AVRC gymnasium to include a second basketball court, restrooms, and locker room. Objective IV.B.9 Project Funding Schedule Total Cost: $2,450,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 150,000 Land Acquisition Improvements 2,050,000 Construction Mgmt. 250,000 Total 0 0 0 0 0 2,450,000 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2010: Community Wide Development 2.450,000 Total 0 0 0 0 0 2,450,000 0 0 0 458 76 City of Moorpark Capital Improvement Program Moorpark City Hall / Civic Center Complex 799 Moorpark Avenue Location Map City Hall / Civic Center Complex Project Summary: Project Total Cost Pedestrian Access Improvements..……………………….……. $ 652,476 Back-Up Generator…..………………………….…………….. $ 105,000 Fire Sprinkler System………………………………………..… $ 65,000 Security Cameras…………………………………...………….. $ 40,000 Patio Remodel…………………….…………………………… $ 25,000 Water Conservation Improvements…..………………………... $ 60,000 Flag Pole Installation…………………………………………... $ 12,000 Energy Efficiency Improvements $ 35,000 Total City Hall / Civic Center Complex Project Costs: $ 994,476 459 77 City of Moorpark Capital Improvement Program PROJECT: Pedestrian Access Improvements Code No. 609 LOCATION: City Hall / Civic Center Account No. C0014 Project Description Create an ADA accessible pedestrian access from Moorpark Avenue through the Civic Center complex and create an improved bus turnout. Objective IV.A.19 Project Funding Schedule Total Cost: $652,476 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 32,874 23,000 7,098 Land Acquisition Improvements 4,184 378 584,942 Construction Mgmt. Total 37,058 23,378 592,040 0 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2001:Traffic Sys Mgt 20,621 18,378 458,251 2411:TDA Article 3 11,727 5,000 113,789 2414:TDA Article 8C 4,710 20,000 Total 37,058 23,378 592,040 0 0 0 0 0 0 PROJECT: Back-Up Generator Code No. 610 LOCATION: City Hall / Civic Center Account No. M0023 Project Description Install a portable generator to serve the Active Adult Center and Community Center (shares project number for portable generators for AVRC and Public Services Facility.) Objective IV.B.3 Project Funding Schedule Total Cost: $105,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 105,000 Construction Mgmt. Total 0 0 105,000 0 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 3003:Equipment Replacement 105,000 Total 0 0 105,000 0 0 0 0 0 0 460 78 City of Moorpark Capital Improvement Program PROJECT: Fire Sprinkler System Code No. 611 LOCATION: City Hall / Civic Center Account No. M0035 Project Description Install a fire sprinkler system at the Active Adult Center and Community Center building. Project Funding Schedule Total Cost: $65,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 65,000 Construction Mgmt. Total 0 0 0 65,000 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 1000: General Fund 65,000 Total 0 0 0 65,000 0 0 0 0 0 PROJECT: Security Cameras Code No. 612 LOCATION: City Hall / Civic Center Account No. Project Description Determine appropriate locations and install security cameras throughout the Civic Center complex. Objective V.A.14 Project Funding Schedule Total Cost: $40,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 10,000 Land Acquisition Improvements 30,000 Construction Mgmt. Total 0 0 0 40,000 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 40,000 Total 0 0 0 40,000 0 0 0 0 0 461 79 City of Moorpark Capital Improvement Program PROJECT: Patio Remodel Code No. 613 LOCATION: City Hall / Civic Center Account No. Project Description Renovate the patio at the Development Services Building and replace the plywood decking with permanent material, such as recycled plastic. Project Funding Schedule Total Cost: $25,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 25,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 25,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 25,000 Total 0 0 0 0 0 0 0 0 25,000 PROJECT: Water Conservation Improvements Code No. 614 LOCATION: City Hall / Civic Center Account No. Project Description Replace all restroom fixtures throughout the Civic Center complex with hands-free fixtures and install waterless urinals at the Active Adult Center and Community Center. Project Funding Schedule Total Cost: $60,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 60,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 60,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 60,000 Total 0 0 0 0 0 0 0 0 60,000 462 80 City of Moorpark Capital Improvement Program PROJECT: Flag Pole Installation Code No. 615 LOCATION: City Hall / Civic Center Account No. Project Description Install three flag poles (U.S. flag, California flag, and City flag) to replace the single pole located near the Active Adult Center. Project Funding Schedule Total Cost: $12,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 12,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 12,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 12,000 Total 0 0 0 0 0 0 0 0 12,000 PROJECT: Energy Efficiency Improvements Code No. 616 LOCATION: City Hall / Civic Center Account No. Project Description Install energy efficiency improvements including a drop-down ceiling with insulation at the Active Adult Center and in the Citrus Room, and replace windows at the Active Adult Center, Community Center, and the Administration building with energy efficient dual-pane windows. Project Funding Schedule Total Cost: $35,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 35,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 35,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 35,000 Total 0 0 0 0 0 0 0 0 35,000 463 81 City of Moorpark Capital Improvement Program High Street Arts Center (HSAC) 33/45/61 East High Street Location Map High Street Arts Center Project Summary: Project Total Cost Roof Renovation…………………………………………..…… $ 50,000 Interior Improvements..……………………………………..…. $ 65,000 ADA Compliance $ 40,000 Total High Street Arts Center Project Costs: $155,000 464 82 City of Moorpark Capital Improvement Program PROJECT: Roof Renovation Code No. 617 LOCATION: High Street Arts Center Account No. Project Description Replace the theater roof. Project Funding Schedule Total Cost: $50,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 50,000 Construction Mgmt. Total 0 0 50,000 0 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 1000: General Fund 50,000 Total 0 0 50,000 0 0 0 0 0 0 PROJECT: Interior Improvements Code No. 618 LOCATION: High Street Arts Center Account No. Project Description Replace carpet throughout the theater. Project Funding Schedule Total Cost: $65,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 65,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 65,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 65,000 Total 0 0 0 0 0 0 0 0 65,000 465 83 City of Moorpark Capital Improvement Program PROJECT: ADA & Building Code Compliance Code No. 619 LOCATION: High Street Arts Center Account No. Project Description Renovate stage and install guardrail at the rear balcony to meet ADA requirements. Project Funding Schedule Total Cost: $40,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 40,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 40,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 40,000 Total 0 0 0 0 0 0 0 0 40,000 466 84 City of Moorpark Capital Improvement Program LOCATION: Metrolink Parking Lot (North) Code No. 620 PROJECT: Art In Public Places Account No. C0052 Location Map Project Description Install public art at Metrolink North Parking Lot. Project Funding Schedule Total Cost: $200,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 200,000 Construction Mgmt. Total 0 0 200,000 0 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2007:Art In Public 200,000 Total 0 0 200,000 0 0 0 0 0 0 467 85 City of Moorpark Capital Improvement Program Moorpark City Library 699 Moorpark Avenue Location Map Moorpark City Library Project Summary: Project Total Cost Restroom Improvements…………………………………..…… $ 25,000 Security Cameras..…………………………………………..…. $ 35,000 Parking Lot Expansion……………………………………...….. $155,000 HVAC Replacement $ 25,000 Total Moorpark City Library Project Costs: $240,000 468 86 City of Moorpark Capital Improvement Program PROJECT: Restroom Improvements Code No. 621 LOCATION: Moorpark City Library Account No. Project Description Install floor drains and hands-free fixtures in the library restrooms. Project Funding Schedule Total Cost: $25,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 25,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 25,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 25,000 Total 0 0 0 0 0 0 0 0 25,000 PROJECT: Security Cameras Code No. 622 LOCATION: Moorpark City Library Account No. Project Description Determine appropriate locations and install security cameras at the library. Objective V.A.14 Project Funding Schedule Total Cost: $35,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 10,000 Land Acquisition Improvements 25,000 Construction Mgmt. Total 0 0 0 35,000 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 35,000 Total 0 0 0 35,000 0 0 0 0 0 469 87 City of Moorpark Capital Improvement Program PROJECT: Parking Lot Expansion Code No. 623 LOCATION: Moorpark City Library Account No. Project Description Expand the library parking lot. Project Funding Schedule Total Cost: $155,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 15,000 Land Acquisition Improvements 140,000 Construction Mgmt. Total 0 0 0 155,000 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 155,000 Total 0 0 0 155,000 0 0 0 0 0 PROJECT: HVAC Replacement Code No. 624 LOCATION: Moorpark City Library Account No. Project Description Replace the HVAC units at the library. Project Funding Schedule Total Cost: $25,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 25,000 Construction Mgmt. Total 0 0 25,000 0 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2004: Library Fac. 25,000 Total 0 0 25,000 0 0 0 0 0 0 470 88 City of Moorpark Capital Improvement Program Moorpark Police Services Center 610 Spring Road Location Map Moorpark Police Services Center Project Summary: Project Total Cost Art In Public Places Installation…………………………..…… $167,500 Landscape Improvements….………………………………..…. $ 75,000 Parapet Wall Installation $165,000 Total Moorpark Police Services Center Project Costs: $407,500 471 89 City of Moorpark Capital Improvement Program PROJECT: Art In Public Places Installation Code No. 625 LOCATION: Moorpark Police Services Center Account No. C0015 Project Description Install artwork at the Police Services Center titled “Thin Blue Line”. The art piece features an abstract figure of a police officer made from mirror polished stainless steel set on a pedestal located in the front entry plaza. The abstract figure is split down the middle and at night the artwork will be illuminated through the middle by a blue light to create a “thin blue line” through the piece. Project Funding Schedule Total Cost: $167,500 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 86 4,914 Land Acquisition Improvements 10,875 35,000 116,625 Construction Mgmt. Total 10,961 35,000 121,539 0 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2007:Art In Public 10,961 35,000 121,539 Total 10,961 35,000 121,539 0 0 0 0 0 0 PROJECT: Landscape Improvements Code No. 626 LOCATION: Moorpark Police Services Center Account No. Project Description Renovate landscaping at the Police Services Center. Renovation will include installing alternatives to the current landscape material adjacent to the vehicular parking stalls, and renovating the landscaping around the outside perimeter of the building. Project Funding Schedule Total Cost: $75,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 75,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 75,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 75,000 Total 0 0 0 0 0 0 0 0 75,000 472 90 City of Moorpark Capital Improvement Program PROJECT: Parapet Wall Installation Code No. 627 LOCATION: Moorpark Police Services Center Account No. Project Description Install parapet walls above the PSC building structure to screen roof top equipment from view. Project Funding Schedule Total Cost: $165,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 25,000 Land Acquisition Improvements 125,000 Construction Mgmt. 15,000 Total 0 0 0 0 0 0 0 0 165,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 165,000 Total 0 0 0 0 0 0 0 0 165,000 473 91 City of Moorpark Capital Improvement Program Moorpark Public Services Facility 627 Fitch Road Location Map Moorpark Public Services Facility Project Summary: Project Total Cost Back-Up Generator………………………………………..…… $106,000 Lighting Improvements….…………………………………..…. $ 75,000 Roof Drain Improvements……………………………………... $ 50,000 Outdoor Break Area………………..…………………………... $ 50,000 Water Conservation Improvements………..…………………... $ 25,000 Fueling Station $500,000 Total Moorpark Public Services Facility Project Costs: $806,000 474 92 City of Moorpark Capital Improvement Program PROJECT: Back-Up Generator Code No. 628 LOCATION: Moorpark Public Services Facility Account No. M0023 Project Description Install a portable generator at the Public Services Facility (shares project number for portable generators for AVRC and Community Center.) Objective IV.B.3 Project Funding Schedule Total Cost: $106,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 106,000 Construction Mgmt. Total 0 0 0 0 0 106,000 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 1000: General Fund 106,000 Total 0 0 0 0 0 106,000 0 0 0 PROJECT: Lighting Improvements Code No. 629 LOCATION: Moorpark Public Services Facility Account No. Project Description Replace parking lot lighting at the Public Services Facility with LED lighting or other energy efficient alternative. Project Funding Schedule Total Cost: $75,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 75,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 75,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 75,000 Total 0 0 0 0 0 0 0 0 75,000 475 93 City of Moorpark Capital Improvement Program PROJECT: Roof Drain Improvements Code No. 630 LOCATION: Moorpark Public Services Facility Account No. Project Description Improve the roof top drainage system at the Public Services Facility to minimize runoff onto the parking lot and adjacent hardscape surfaces. Project Funding Schedule Total Cost: $50,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 50,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 50,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 50,000 Total 0 0 0 0 0 0 0 0 50,000 PROJECT: Outdoor Break Area Code No. 631 LOCATION: Moorpark Public Services Facility Account No. Project Description Install an outdoor break area with shade for employees assigned to the Public Services Facility. Project Funding Schedule Total Cost: $50,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 50,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 50,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 50,000 Total 0 0 0 0 0 0 0 0 50,000 476 94 City of Moorpark Capital Improvement Program PROJECT: Water Conservation Improvements Code No. 632 LOCATION: Moorpark Public Services Facility Account No. Project Description Install hands-free fixtures and waterless urinals in the Public Services Facility restrooms. Project Funding Schedule Total Cost: $25,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 25,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 25,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 25,000 Total 0 0 0 0 0 0 0 0 25,000 PROJECT: Fueling Station Code No. 633 LOCATION: Moorpark Public Services Facility Account No. Project Description Install an alternative fuel fueling station or electric vehicle charging station at the Public Services Facility. Project Funding Schedule Total Cost: $500,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 500,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 500,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 500,000 Total 0 0 0 0 0 0 0 0 500,000 477 95 City of Moorpark Capital Improvement Program LOCATION: Ruben Castro Human Services Center (RCHSC) (612 A-B Spring Road) Code No. 634 PROJECT: Sidewalk Installation Account No. Location Map Project Description Install Sidewalk on west side of Minor Street between Flynn Avenue and Fitch Avenue. Project Funding Schedule Total Cost: $75,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 8,000 Land Acquisition Improvements 67,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 75,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 75,000 Total 0 0 0 0 0 0 0 0 75,000 478 96 City of Moorpark Capital Improvement Program LOCATION: 31 Poindexter Avenue Code No. 635 PROJECT: Building Modifications Account No. Location Map Project Description Modify building to accommodate widening of Moorpark Avenue. Project Funding Schedule Total Cost: $150,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 25,000 Land Acquisition Improvements 125,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 150,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 150,000 Total 0 0 0 0 0 0 0 0 150,000 479 97 City of Moorpark Capital Improvement Program LOCATION: Citywide Code No. 636 PROJECT: Purchase City Streetlights Account No. Location Map Citywide Locations Project Description Purchase existing City streetlights and convert them to a more energy efficient lighting source. Objective VI. A .7 Project Funding Schedule Total Cost: $2,200,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 2,200,000 Construction Mgmt. Total 0 0 2,200,000 0 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2018: Endowment 2,200,000 Total 0 0 2,200,000 0 0 0 0 0 0 480 98 City of Moorpark Capital Improvement Program LOCATION: West High Street Code No. 637 PROJECT: New Moorpark City Library Account No. C0056 Location Map Project Description Design and construction of a new City Library. (Objective IV.A.24) Project Funding Schedule Total Cost: 18,000,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 1,350,000 Land Acquisition 16,650,000 Improvements Construction Mgmt. Total 0 0 0 18,000,000 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 18,000,000 Total 0 0 0 18,000,000 0 0 0 0 0 481 99 City of Moorpark Capital Improvement Program LOCATION: TBD Code No. 638 PROJECT: New City Hall and Civic Center Complex Account No. C0012 Location Map Location TBD Project Description Acquisition of property and design and construction of a new city hall and civic center complex. (Objective IV.A.24) Project Funding Schedule Total Cost: 31,846,009 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 834,462 15,000 2,836,734 1,250,000 Land Acquisition 355,345 500,000 850,000 Improvements 96,138 108,330 25,000,000 Construction Mgmt. Total 1,285,945 15,000 3,445,064 0 0 0 0 27,100,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 3001: City Hall Improvement 1,036,288 15,000 3,351,549 27,100,000 2018: Endowment 249,657 93,515 Total 1,285,945 15,000 3,445,064 0 0 0 0 27,100,000 482 100 City of Moorpark Capital Improvement Program LOCATION: Citywide Code No. 639 PROJECT: Arts Master Plan Account No. Location Map Citywide Locations Project Description Develop an Arts Master Plan Project Funding Schedule Total Cost: $30,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 30,000 Land Acquisition Improvements Construction Mgmt. Total 0 0 30,000 0 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2007:Art In Public 30,000 Total 0 0 30,000 0 0 0 0 0 0 483 101 Landscape Maintenance Districts (LMDs) & General Landscaping 484 102 City of Moorpark Capital Improvement Program LOCATION: High Street Code No. 701 PROJECT: High Street Improvements Account No. Location Map Project Description Improve sidewalks on High Street to include traffic calming devices and street parking improvements. Install new site furnishings. Objective I.A.5 Project Funding Schedule Total Cost: $3,500,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 250,000 Land Acquisition Improvements 3,000,000 Construction Mgmt. 250,000 Total 0 0 0 3,500,000 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 3,500,000 Total 0 0 0 3,500,000 0 0 0 0 0 485 103 City of Moorpark Capital Improvement Program LOCATION: Campus Park Area Code No. 702 PROJECT: Princeton Avenue Landscape Renovations Account No. Location Map Project Description Renovate median and parkway landscaping on Princeton Avenue, removing the gazania in the medians south of Highway 118 and planting drought tolerant plants both north and south of Highway 118. Objective V.A.17 Project Funding Schedule Total Cost: $285,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 35,000 Land Acquisition Improvements 250,000 Construction Mgmt. Total 0 0 0 285,000 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2300:Citywide LLMD 285,000 Total 0 0 0 285,000 0 0 0 0 0 486 104 City of Moorpark Capital Improvement Program LOCATION: Campus Park Area Code No. 703 PROJECT: Campus Park Median Renovations Account No. Location Map Project Description Renovate the landscaped medians and parkways on Campus Park Drive utilizing drought tolerant plant material. Objective V.A.17 Project Funding Schedule Total Cost: $400,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 40,000 Land Acquisition Improvements 360,000 Construction Mgmt. Total 0 0 0 400,000 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2300:Citywide LLMD 400,000 Total 0 0 0 400,000 0 0 0 0 0 487 105 City of Moorpark Capital Improvement Program LOCATION: Campus Park Area Code No. 704 PROJECT: Princeton Avenue Oak Tree Account No. Location Map Project Description Evaluate the feasibility of relocating the large oak tree on Princeton Avenue and evaluate potential locations. Possible locations could include the 80 acre open space parcel, or the existing location of the Chamber of Commerce building on High Street (to provide a focal feature for the downtown area). Project Funding Schedule Total Cost: $65,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 65,000 Construction Mgmt. Total 0 0 0 65,000 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 65,000 Total 0 0 0 65,000 0 0 0 0 0 488 106 City of Moorpark Capital Improvement Program LOCATION: Championship Drive (Zone 15) Code No. 705 PROJECT: Championship Drive Landscape Renovations Account No. Location Map Project Description Renovate landscaping on Championship Drive. Improvements to include adding street trees adjacent to down slopes to screen lower homes, replacing the metal rail fence adjacent to Walnut Canyon Road with a three- rail fence to match other trail fencing, and installing plant material and/or bollards at the equestrian staging area to prevent vehicular access into the drainage channel (approx.. 165,000 sq. ft.). Project Funding Schedule Total Cost: $1,115,023 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 115,023 Land Acquisition Improvements 1,000,000 Construction Mgmt. Total 0 115,023 1,000,000 0 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2315:Country Club Estates 115,023 1,000,000 Total 0 115,023 1,000,000 0 0 0 0 0 0 489 107 City of Moorpark Capital Improvement Program LOCATION: Los Angeles Avenue (Citywide) Code No. 706 PROJECT: LA Avenue Parkway and Wall Treatment Renovations Account No. Location Map Project Description Renovate the landscaped parkways and enhance the wall treatments on the north side of LA Avenue, from Spring Road to Millard. Wall enhancements will include removal and replacement of the existing vine, stone pilasters, and a wall with a stucco finish. Objective V.B.6 Project Funding Schedule Total Cost: $180,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 55,000 Land Acquisition Improvements 125,000 Construction Mgmt. Total 0 0 0 0 0 180,000 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2300:Citywide LLMD 180,000 Total 0 0 0 0 0 180,000 0 0 0 490 108 City of Moorpark Capital Improvement Program LOCATION: Los Angeles Avenue (Zone 7) Code No. 707 PROJECT: LA Avenue Parkway Renovations Account No. Location Map Project Description Renovate the landscaped parkway on the north side of LA Avenue between Shasta Avenue and Gabbert Road to include drought tolerant plant material. Replace the existing pear trees with Crepe Myrtle trees. Project Funding Schedule Total Cost: $155,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 25,000 Land Acquisition Improvements 130,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 155,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2307: LA Avenue 155,000 Total 0 0 0 0 0 0 0 0 155,000 491 109 City of Moorpark Capital Improvement Program LOCATION: Poindexter Avenue Code No. 708 PROJECT: Poindexter Avenue Landscaping Account No. Location Map Project Description Landscape north side of Poindexter Avenue from Gabbert Road east to vicinity of Chaparral School. Objective V.C.2 Project Funding Schedule Total Cost: $170,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 45,000 Land Acquisition Improvements 125,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 170,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 170,000 Total 0 0 0 0 0 0 0 0 170,000 492 110 City of Moorpark Capital Improvement Program LOCATION: Spring Road (Zone 12) Code No. 709 PROJECT: Spring Road Parkway Renovation Account No. Location Map Project Description Renovate landscaped medians on Spring Road from Tierra Rejada Road to Peach Hill Road. Project Funding Schedule Total Cost: $545,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 55,000 Land Acquisition Improvements 490,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 545,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2312: Carslberg 408,750 2300: Citywide LLMD 136,250 Total 0 0 0 0 0 0 0 0 545,000 493 111 City of Moorpark Capital Improvement Program LOCATION: Spring Road Code No. 710 PROJECT: Install Street Trees Account No. Location Map Project Description Install street trees on west side of Spring Road between Arroyo Simi and Peach Hill Road . Project Funding Schedule Total Cost: $65,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 65,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 65,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 65,000 Total 0 0 0 0 0 0 0 0 65,000 494 112 City of Moorpark Capital Improvement Program LOCATION: Spring Road / Ridgecrest Drive (Zone 22) Code No. 711 PROJECT: Spring Road & Ridgecrest Drive Landscape Renovation Account No. M0037 Location Map Project Description Renovate landscaping in parkways and median islands along Spring Road and Ridgecrest Drive. Project Funding Schedule Total Cost: $876,024 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 113,248 Land Acquisition Improvements 762,776 Construction Mgmt. Total 0 876,024 0 0 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2322: Moorpark Highlands 876,024 Total 0 876,024 0 0 0 0 0 0 0 495 113 City of Moorpark Capital Improvement Program LOCATION: Metrolink Station Code No. 712 PROJECT: Metrolink Station Landscape Improvements Account No. Location Map Project Description Renovate the landscaping at the Metrolink train station on the south side of the railroad tracks. Remove non- native landscaping along the pedestrian access walkway from Moorpark Avenue to the station and replace with native plant material. Project Funding Schedule Total Cost: $25,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 25,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 25,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 25,000 Total 0 0 0 0 0 0 0 0 25,000 496 114 City of Moorpark Capital Improvement Program LOCATION: Tierra Rejada Road Code No. 713 PROJECT: Tierra Rejada Road Streetscape Renovation Account No. M0031 Location Map Project Description Renovate Tierra Rejada Road parkway and median landscaping using native and/or drought tolerant trees, plants, and materials. Project Funding Schedule Total Cost: $3,236,765 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 21,356 21,800 38,814 Land Acquisition Improvements 400,590 504,205 2,250,000 Construction Mgmt. Total 421,946 526,005 38,814 2,250,000 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 1000: General Fund 396,877 412,637 30,952 2,250,000 2302: Steeple Hill 25,069 113,368 7,862 Total 421,946 526,005 38,814 2,250,000 0 0 0 0 0 497 115 City of Moorpark Capital Improvement Program LOCATION: Intersection of Tierra Rejada Road and Moorpark Road Code No. 714 PROJECT: Tierra Rejada/Moorpark Road Intersection Improvements Account No. Location Map Project Description Landscape excess right-of-way on southeast corner of Tierra Rejada Road and Moorpark Road and install standard curb and gutter. Remove pepper trees on the south side of Tierra Rejada Road and install native trees. Objective V.B.7 Project Funding Schedule Total Cost: $95,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 20,000 Land Acquisition Improvements 75,000 Construction Mgmt. Total 0 0 0 0 0 95,000 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 95,000 Total 0 0 0 0 0 95,000 0 0 0 498 116 City of Moorpark Capital Improvement Program LOCATION: Multiple Locations Code No. 715 PROJECT: City Welcome Signs Account No. Location Map Project Description Install new City welcome signs on Tierra Rejada Road and Princeton Avenue, including lighting. Project Funding Schedule Total Cost: $132,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 12,000 Land Acquisition Improvements 120,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 132,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 132,000 Total 0 0 0 0 0 0 0 0 132,000 499 117 City of Moorpark Capital Improvement Program LOCATION: Tierra Rejada Road & LA Avenue On/Off-Ramp Areas Code No. 716 PROJECT: Off-Ramp Landscape Improvements Account No. Location Map Project Description Install native landscape material and boulders within the freeway off ramp areas at Tierra Rejada Road and Highway 23/118. Install a City welcome sign with lighting at the northbound freeway off ramp at Tierra Rejada Road and install native landscaping. Install river cobble within the two triangular traffic delineators at the northbound and southbound Highway 23/118 off ramps at Tierra Rejada Road. Renovate the landscaping at the LA Avenue northbound on ramp and off ramp. Objective V.C.5 Project Funding Schedule Total Cost: $3,496,281 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 150,000 Land Acquisition Improvements 46,281 3,300,000 Construction Mgmt. Total 46,281 0 0 0 0 0 0 0 3,450,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2006: Trees 46,281 Undetermined 3,450,000 Total 46,281 0 0 0 0 0 0 0 3,450,000 500 118 City of Moorpark Capital Improvement Program LOCATION: Peach Hill Wash Channel (Zone 10) Code No. 717 PROJECT: Peach Hill Wash Slope Improvement Account No. Location Map Project Description Improve slopes adjacent to Peach Hill Wash Channel for erosion control and landscape enhancement. Project Funding Schedule Total Cost: $650,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 650,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 650,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2310: Mtn Meadows 650,000 Total 0 0 0 0 0 0 0 0 650,000 501 119 Open Space 502 120 City of Moorpark Capital Improvement Program LOCATION: 80 Acre Parcel Code No. 801 PROJECT: Develop Site Plan Account No. Location Map Project Description In conjunction with the Moorpark Watershed Parks, Recreation and Conservation Authority, develop a comprehensive site plan and identify appropriate uses for the site, potentially including: 1) Wetland area with interpretive center; 2) Seating area and access trail to the hill top view point; 3) Loop trail; 4) Bicycle/pedestrian connection to Tierra Rejada Road and adjacent communities; and/or 5) Restored riparian corridor. Objective VI.A.9 Project Funding Schedule Total Cost: $50,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 50,000 Land Acquisition Improvements Construction Mgmt. Total 0 0 0 50,000 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 50,000 Total 0 0 0 50,000 0 0 0 0 0 503 121 City of Moorpark Capital Improvement Program LOCATION: 80 Acre Parcel Code No. 802 PROJECT: Trail Connection to Conejo Open Space Account No. Location Map Project Description Evaluate the feasibility of establishing a trail connection from the 80-Acre site to Conejo Open Space. Project Funding Schedule Total Cost: $50,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 50,000 Land Acquisition Improvements Construction Mgmt. Total 0 0 0 0 0 0 0 0 50,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 50,000 Total 0 0 0 0 0 0 0 0 50,000 504 122 City of Moorpark Capital Improvement Program LOCATION: Meridian Hills Open Space Code No. 803 PROJECT: Passive Recreation Uses Account No. Location Map Project Description Evaluate potential uses for the 200+ acre Meridian Hills open space, including possible trail connection to equestrian trail on Grimes Canyon Road. Project Funding Schedule Total Cost: $50,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 50,000 Land Acquisition Improvements Construction Mgmt. Total 0 0 0 0 0 0 0 0 50,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 50,000 Total 0 0 0 0 0 0 0 0 50,000 505 123 City of Moorpark Capital Improvement Program LOCATION: Waste Management Open Space Code No. 804 PROJECT: Property Acquisition Account No. L0074 Location Map Project Description Acquire approximately 255 acres of open space from Waste Management along the City’s western boundary. Partially funded by grant funding from the County of Ventura ($1.5 million). Project Funding Schedule Total Cost: $3,060,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition 1,500,000 1,560,000 Improvements Construction Mgmt. Total 0 1,500,000 0 1,560,000 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2018:Endowment (V.C. Grant) 1,500,000 2018: Endowment 1,560,000 Total 0 1,500,000 0 1,560,000 0 0 0 0 0 506 124 City of Moorpark Capital Improvement Program LOCATION: Waste Management Open Space Code No. 805 PROJECT: Develop Site Plan Account No. Location Map Project Description Develop comprehensive site plan and evaluate potential uses for the 255 acre open space acquired from Waste Management along the City’s western border. Project Funding Schedule Total Cost: $50,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 50,000 Land Acquisition Improvements Construction Mgmt. Total 0 0 0 0 0 0 0 0 50,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 50,000 Total 0 0 0 0 0 0 0 0 50,000 507 125 Parks 508 126 City of Moorpark Capital Improvement Program Arroyo Vista Community Park 4550 Tierra Rejada Road Location Map Arroyo Vista Community Park Project Summary: Project Total Cost Ball Field Lighting…….……………………………………….. $2,500,000 Water Spray Attraction…….…………………………………... $ 665,000 Pedestrian Bridge Lighting…………………………………….. $ 170,000 Walkway/Bike Path from Mountain Trail Street…..………….. $ 573,000 Softball Fencing Improvements……………………..………… $ 20,000 Slope Landscaping……………………………………………... $ 55,000 Lease SCE Property….………………………………………... $2,500,000 New Pedestrian Bridge….……………………………………... $ 375,000 Sand Volleyball Court $ 60,000 Total Arroyo Vista Community Park Project Costs: $6,918,000 509 127 City of Moorpark Capital Improvement Program PROJECT: Ball Field Lighting Code No. 901 LOCATION: Arroyo Vista Community Park Account No. Project Description Upgrade and add additional lighting at ball fields. Objective IV.B.7 Project Funding Schedule Total Cost: $2,500,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 2,500,000 Construction Mgmt. Total 0 0 0 0 0 2,500,000 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2010: Community Wide Development 2,500,000 Total 0 0 0 0 0 2,500,000 0 0 0 PROJECT: Water Spray Attraction Code No. 902 LOCATION: Arroyo Vista Community Park Account No. Project Description Design and install a water spray attraction at AVCP. Objective V.A.12 Project Funding Schedule Total Cost: $665,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 65,000 Land Acquisition Improvements 600,000 Construction Mgmt. Total 0 0 0 665,000 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2010: Community Wide Development 665,000 Total 0 0 0 665,000 0 0 0 0 0 510 128 City of Moorpark Capital Improvement Program PROJECT: Pedestrian Bridge Lighting Code No. 903 LOCATION: Arroyo Vista Community Park Account No. Project Description Install walkway lighting on pedestrian bridge at south terminus of Leta Yancy Road. Project Funding Schedule Total Cost: $170,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 45,000 Land Acquisition Improvements 125,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 170,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2010: Community Wide Development 170,000 Total 0 0 0 0 0 0 0 0 170,000 PROJECT: Walkway/Bike Path from Mountain Trail Street Code No. 904 LOCATION: Arroyo Vista Community Park Account No. Project Description Work with Moorpark Unified School District to construct a ramp/walkway and bike path from Mountain Trail Street, through a portion of Moorpark High School, to AVCP. Objective V.A.18 Project Funding Schedule Total Cost: $573,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 40,000 Land Acquisition Improvements 525,000 Construction Mgmt. 8,000 Total 0 0 0 573,000 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2010: Community Wide Development 573,000 Total 0 0 0 573,000 0 0 0 0 0 511 129 City of Moorpark Capital Improvement Program PROJECT: Softball Fencing Improvements Code No. 905 LOCATION: Arroyo Vista Community Park Account No. Project Description Add permanent or removable outfield fencing at the AVCP softball fields as deemed appropriate. Project Funding Schedule Total Cost: $20,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 20,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 20,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2010: Community Wide Development 20,000 Total 0 0 0 0 0 0 0 0 20,000 PROJECT: Slope Landscaping Code No. 906 LOCATION: Arroyo Vista Community Park Account No. Project Description Prepare and implement a landscaping plan to improve the landscaping on the slopes adjacent to Arroyo Vista Community Park and Moorpark High School. Project Funding Schedule Total Cost: $55,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 55,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 55,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2010: Community Wide Development 55,000 Total 0 0 0 0 0 0 0 0 55,000 512 130 City of Moorpark Capital Improvement Program PROJECT: Lease SCE Property Code No. 907 LOCATION: Arroyo Vista Community Park Account No. Project Description Lease adjacent SCE property and improve area for recreational purposes and expand parking. Objective IV.A.22 Project Funding Schedule Total Cost: $2,500,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 65,000 Land Acquisition Improvements 2,435,000 Construction Mgmt. Total 0 0 0 2,500,000 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 2,500,000 Total 0 0 0 2,500,000 0 0 0 0 0 PROJECT: New Pedestrian Bridge Code No. 908 LOCATION: Arroyo Vista Community Park Account No. Project Description Evaluate feasibility of constructing a new pedestrian bridge to AVCP from southern terminus of Leta Yancy Road to allow vehicular traffic to exit AVCP from the current pedestrian bridge during special events. Objective IV.B.10 Project Funding Schedule Total Cost: $375,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 75,000 Land Acquisition Improvements 300,000 Construction Mgmt. Total 0 0 0 0 0 375,000 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2010: Community Wide Development 375,000 Total 0 0 0 0 0 375,000 0 0 0 513 131 City of Moorpark Capital Improvement Program PROJECT: Sand Volleyball Court Code No. 909 LOCATION: Arroyo Vista Community Park Account No. Project Description Install a sand volleyball court. Project Funding Schedule Total Cost: $60,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 60,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 60,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2010: Community Wide Development 60,000 Total 0 0 0 0 0 0 0 0 60,000 514 132 City of Moorpark Capital Improvement Program Campus Canyon Park 6970 Campus Canyon Drive Location Map Campus Canyon Park Project Summary: Project Total Cost Basketball Court Improvements…………….……………….… $ 12,000 Replace Playground Equipment…………….……………….… $175,000 Parking Lot $206,000 Total Campus Canyon Park Project Costs: $393,000 515 133 City of Moorpark Capital Improvement Program PROJECT: Basketball Court Improvements Code No. 910 LOCATION: Campus Canyon Park Account No. Project Description Renovate the basketball court at Campus Canyon Park. Project Funding Schedule Total Cost: $12,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 12,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 12,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2011: Park Imp. Z1 12,000 Total 0 0 0 0 0 0 0 0 12,000 PROJECT: Replace Playground Equipment Code No. 911 LOCATION: Campus Canyon Park Account No. Project Description Replace children’s play structures and equipment and replace sand with engineered wood fiber. Install sand play area. Project Funding Schedule Total Cost: 175,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 175,000 Construction Mgmt. Total 0 0 0 175,000 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 3003: Equipment Replacement 175,000 Total 0 0 0 175,000 0 0 0 0 0 516 134 City of Moorpark Capital Improvement Program PROJECT: Parking Lot Code No. 912 LOCATION: Campus Canyon Park Account No. Project Description Add parking lot at Campus Canyon Park. Project Funding Schedule Total Cost: $206,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 25,000 Land Acquisition Improvements 175,000 Construction Mgmt. 6,000 Total 0 0 0 0 0 0 0 0 206,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2011: Park Imp. Z1 206,000 Total 0 0 0 0 0 0 0 0 206,000 517 135 City of Moorpark Capital Improvement Program Campus Park 6400 Harvard Street Location Map Campus Park Project Summary: Project Total Cost Restroom Improvements………..………..……………..……... $203,000 Pavillion Improvements…………………….……………….… $ 10,000 Replace Playground Equipment $175,000 Total Campus Park Project Costs: $388,000 518 136 City of Moorpark Capital Improvement Program PROJECT: Restroom Improvements Code No. 913 LOCATION: Campus Park Account No. Project Description Remove and replace restroom building with prefabricated restroom building or renovate current restroom building at Campus Park to comply with ADA requirements and correct maintenance issues. Project Funding Schedule Total Cost: $203,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 25,000 Land Acquisition Improvements 170,000 Construction Mgmt. 8,000 Total 0 0 0 0 0 0 0 0 203,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2011: Park Imp. Z1 203,000 Total 0 0 0 0 0 0 0 0 203,000 PROJECT: Pavilion Improvements Code No. 914 LOCATION: Campus Park Account No. Project Description Replace concrete flatwork in the Campus Park picnic pavilion. Project Funding Schedule Total Cost: $10,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 10,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 10,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2011: Park Imp. Z1 10,000 Total 0 0 0 0 0 0 0 0 10,000 519 137 City of Moorpark Capital Improvement Program PROJECT: Replace Playground Equipment Code No. 915 LOCATION: Campus Park Account No. Project Description Replace children’s play structures and equipment, including swing set, and replace sand with engineered wood fiber. Install separate sand play area. Project Funding Schedule Total Cost: $175,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 15,000 160,000 Construction Mgmt. Total 0 0 15,000 160,000 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 3003: Equipment Replacement 15,000 160,000 Total 0 0 15,000 160,000 0 0 0 0 0 520 138 City of Moorpark Capital Improvement Program College View Park 15400 Campus Park Drive Location Map College View Park Project Summary: Project Total Cost Sand Volleyball Courts…………...………..…………………... $ 45,000 Basketball Court Improvements…………….……………….… $ 87,000 Dog Park Lighting…………………….…….………………..…$ 83,000 Park Improvements………………….…..….………………..… $ 27,000 New Park Sign $ 35,000 Total College View Park Project Costs: $277,000 521 139 City of Moorpark Capital Improvement Program PROJECT: Sand Volleyball Court Code No. 916 LOCATION: College View Park Account No. Project Description Install a sand volleyball court at College View Park. Project Funding Schedule Total Cost: $45,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 45,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 45,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2011: Park Imp. Z1 45,000 Total 0 0 0 0 0 0 0 0 45,000 PROJECT: Basketball Court Improvements Code No. 917 LOCATION: College View Park Account No. Project Description Install a second basketball court with lighting at College View Park. Project Funding Schedule Total Cost: $87,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 12,000 Land Acquisition Improvements 75,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 87,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2011: Park Imp. Z1 87,000 Total 0 0 0 0 0 0 0 0 87,000 522 140 City of Moorpark Capital Improvement Program PROJECT: Dog Park Lighting Code No. 918 LOCATION: College View Park Account No. Project Description Install lighting at the dog park. Project Funding Schedule Total Cost: $83,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 8,000 Land Acquisition Improvements 75,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 83,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2011: Park Imp. Z1 83,000 Total 0 0 0 0 0 0 0 0 83,000 PROJECT: Park Improvements Code No. 919 LOCATION: College View Park Account No. Project Description Install fencing along Campus Park Drive and Collins Drive, including corner. Install a park sign on Collins Drive frontage. Project Funding Schedule Total Cost: $27,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 27,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 27,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2011: Park Imp. Z1 27,000 Total 0 0 0 0 0 0 0 0 27,000 523 141 City of Moorpark Capital Improvement Program PROJECT: New Park Sign Code No. 920 LOCATION: College View Park Account No. Project Description Remove marquee base and install new park sign. Project Funding Schedule Total Cost: $35,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 35,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 35,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2011: Park Imp. Z1 35,000 Total 0 0 0 0 0 0 0 0 35,000 524 142 City of Moorpark Capital Improvement Program LOCATION: Community Center Park (799 Moorpark Avenue) Code No. 921 PROJECT: Replace Playground Equipment Account No. Location Map Project Description Replace children’s play structures and equipment, and replace sand with engineered wood fiber. Project Funding Schedule Total Cost: $125,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 125,000 Construction Mgmt. Total 0 0 0 125,000 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 3003: Equipment Replacement 125,000 Total 0 0 0 125,000 0 0 0 0 0 525 143 City of Moorpark Capital Improvement Program Country Trail Park 11701 ½ Mountain Trail Street Location Map Country Trail Park Project Summary: Project Total Cost Park Improvements and ADA Access……………………….… $ 21,508 Restroom Addition………………………….……………….… $285,000 Landscaping Improvements $ 25,000 Total Country Trail Park Project Costs: $331,508 526 144 City of Moorpark Capital Improvement Program PROJECT: Park Improvements and ADA Access Code No. 922 LOCATION: Country Trail Park Account No. C0054 Project Description Remove and replace playground equipment and sand at Country Trail Park with a reduced size playground and sand play area. Install an ADA compliant ramp and walkway from the parking lot to the playground and install decomposed granite trail. Funding allocated for design and engineering only. Improvement costs of approximately $350,000 to be budgeted following design completion. Project Funding Schedule Total Cost: $21,508 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 21,508 Land Acquisition Improvements Construction Mgmt. Total 0 21,508 0 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2013: Park Imp. Z2 21,508 Total 0 21,508 0 0 0 0 0 0 PROJECT: Restroom Addition Code No. 923 LOCATION: Country Trail Park Account No. Project Description Install a prefabricated restroom facility at Country Trail Park. Project Funding Schedule Total Cost: $285,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 45,000 Land Acquisition Improvements 210,000 Construction Mgmt. 30,000 Total 0 0 0 0 0 0 0 0 285,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2013: Park Imp. Z2 285,000 Total 0 0 0 0 0 0 0 0 285,000 527 145 City of Moorpark Capital Improvement Program PROJECT: Landscaping Improvements Code No. 924 LOCATION: Country Trail Park Account No. Project Description Improve natural area at Country Trail Park. Improve landscaping along the slope. Project Funding Schedule Total Cost: $25,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 25,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 25,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2013: Park Imp. Z2 25,000 Total 0 0 0 0 0 0 0 0 25,000 528 146 City of Moorpark Capital Improvement Program Glenwood Park 11800 Harvester Street Location Map Glenwood Park Project Summary: Project Total Cost Basketball Court Lighting….……………….……………….… $ 71,000 Sand Volleyball Court……….………..…….……………….… $ 45,000 Install Trail…………………………………………...………... $ 12,000 Replace Playground Equpment…..…………………...……….. $250,000 New Park Sign $ 35,000 Total Glenwood Park Project Costs: $413,000 529 147 City of Moorpark Capital Improvement Program PROJECT: Basketball Court Lighting Code No. 925 LOCATION: Glenwood Park Account No. Project Description Install coin operated lights at the Glenwood Park basketball court. Project Funding Schedule Total Cost: $71,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 6,000 Land Acquisition Improvements 65,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 71,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2013: Park Imp. Z2 71,000 Total 0 0 0 0 0 0 0 0 71,000 PROJECT: Sand Volleyball Court Code No. 926 LOCATION: Glenwood Park Account No. Project Description Install a sand volleyball court at Glenwood Park. Project Funding Schedule Total Cost: $45,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 45,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 45,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2013: Park Imp. Z2 45,000 Total 0 0 0 0 0 0 0 0 45,000 530 148 City of Moorpark Capital Improvement Program PROJECT: Install Trail Code No. 927 LOCATION: Glenwood Park Account No. Project Description Install a trail from Tierra Rejada Road to playground. Project Funding Schedule Total Cost: $12,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 12,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 12,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2013: Park Imp. Z2 12,000 Total 0 0 0 0 0 0 0 0 12,000 PROJECT: Replace Playground Equipment Code No. 928 LOCATION: Glenwood Park Account No. Project Description Replace children’s play structures and equipment, and replace sand with engineered wood fiber. Install sand play area. Project Funding Schedule Total Cost: $250,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 45,000 205,000 Construction Mgmt. Total 0 0 45,000 205,000 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 3003: Equipment Replacement 45,000 205,000 Total 0 0 45,000 205,000 0 0 0 0 0 531 149 City of Moorpark Capital Improvement Program PROJECT: New Park Sign Code No. 929 LOCATION: Glenwood Park Account No. Project Description Remove marquee base and install new park sign. Project Funding Schedule Total Cost: $35,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 35,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 35,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2013: Park Imp. Z2 35,000 Total 0 0 0 0 0 0 0 0 35,000 532 150 City of Moorpark Capital Improvement Program LOCATION: Magnolia Park (296 Charles Street) Code No. 930 PROJECT: Replace Playground Equipment Account No. Location Map Project Description Replace children’s play structures and equipment, and replace sand with wood fiber. Project Funding Schedule Total Cost: $175,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 175,000 Construction Mgmt. Total 0 0 0 0 0 0 175,000 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 3003: Equipment Replacement 175,000 Total 0 0 0 0 0 0 175,000 0 0 533 151 City of Moorpark Capital Improvement Program Mammoth Highlands Park 7000 Elk Run Loop Location Map Mammoth Highlands Park Project Summary: Project Total Cost Sand Volleyball Court……….………..…….……………….… $ 45,000 Basketball Court Light Improvements..…….……………….… $ 39,500 Expand Trail $ 25,000 Total Mammoth Highlands Park Project Costs: $109,500 534 152 City of Moorpark Capital Improvement Program PROJECT: Sand Volleyball Court Code No. 931 LOCATION: Mammoth Highlands Park Account No. Project Description Install a sand volleyball court at Mammoth Highlands Park. Project Funding Schedule Total Cost: $45,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 45,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 45,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2011: Park Imp. Z1 45,000 Total 0 0 0 0 0 0 0 0 45,000 PROJECT: Basketball Court Light Improvements Code No. 932 LOCATION: Mammoth Highlands Park Account No. Project Description Reposition or add lights as needed at the Mammoth Highlands basketball court. Project Funding Schedule Total Cost: $39,500 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 4,500 Land Acquisition Improvements 35,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 39,500 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2011: Park Imp. Z1 39,500 Total 0 0 0 0 0 0 0 0 39,500 535 153 City of Moorpark Capital Improvement Program PROJECT: Expand Trail Code No. 933 LOCATION: Mammoth Highlands Park Account No. Project Description Expand trail around perimeter of Mammoth Highlands Park. Project Funding Schedule Total Cost: $25,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 25,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 25,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2011: Park Imp. Z1 25,000 Total 0 0 0 0 0 0 0 0 25,000 536 154 City of Moorpark Capital Improvement Program Miller Park 4530 Miller Parkway Location Map Miller Park Project Summary: Project Total Cost Lighting Addition……….…………….…….……………….… $ 25,000 Loop Trail Addition……………………………………………. $ 45,000 Replace Playground Equipment $250,000 Total Miller Park Project Costs: $320,000 537 155 City of Moorpark Capital Improvement Program PROJECT: Lighting Addition Code No. 934 LOCATION: Miller Park Account No. Project Description Install security lights behind the tennis courts at Miller Park. Project Funding Schedule Total Cost: $25,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 25,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 25,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2013: Park Imp. Z2 25,000 Total 0 0 0 0 0 0 0 0 25,000 PROJECT: Loop Trail Addition Code No. 935 LOCATION: Miller Park Account No. Project Description Install loop trail at Miller Park with a connection to the adjacent nature trails. Project Funding Schedule Total Cost: $45,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 45,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 45,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2013: Park Imp. Z2 45,000 Total 0 0 0 0 0 0 0 0 45,000 538 156 City of Moorpark Capital Improvement Program PROJECT: Replace Playground Equipment Code No. 936 LOCATION: Miller Park Account No. Project Description Replace children’s play structures and equipment, and replace sand and poured-in-place surfacing with engineered wood fiber. Project Funding Schedule Total Cost: $250,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 250,000 Construction Mgmt. Total 0 0 0 250,000 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 3003: Equipment Replacement 250,000 Total 0 0 0 250,000 0 0 0 0 0 539 157 City of Moorpark Capital Improvement Program Monte Vista Nature Park 4201 Spring Road Location Map Monte Vista Nature Park Project Summary: Project Total Cost Lighting Improvements….…………….…….……………….… $ 25,000 Shade Structure………….…………….…….……………….… $ 30,000 Landscape Improvements….………….…….……………….… $300,000 Trail System Improvements $150,000 Total Monte Vista Nature Park Project Costs: $505,000 540 158 City of Moorpark Capital Improvement Program PROJECT: Lighting Improvements Code No. 937 LOCATION: Monte Vista Nature Park Account No. Project Description Install parking lot lighting at Monte Vista Nature Park. Project Funding Schedule Total Cost: $25,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 25,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 25,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2013: Park Imp. Z2 25,000 Total 0 0 0 0 0 0 0 0 25,000 PROJECT: Shade Structure Code No. 938 LOCATION: Monte Vista Nature Park Account No. Project Description Identify an appropriate location and install a shade structure at Monte Vista Nature Park. Project Funding Schedule Total Cost: $30,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 30,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 30,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2013: Park Imp. Z2 30,000 Total 0 0 0 0 0 0 0 0 30,000 541 159 City of Moorpark Capital Improvement Program PROJECT: Landscape Improvements Code No. 939 LOCATION: Monte Vista Nature Park Account No. Project Description Develop an overall site plan for Monte Vista Nature Park, to include removal of all non-native plant species. Removed plants will be replaced with native landscaping, demonstration gardens, interpretive signage, walkways, and seating areas. Project Funding Schedule Total Cost: $300,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 50,000 Land Acquisition Improvements 250,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 300,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2013: Park Imp. Z2 300,000 Total 0 0 0 0 0 0 0 0 300,000 PROJECT: Trail System Improvements Code No. 940 LOCATION: Monte Vista Nature Park Account No. Project Description Improve trail system including drainage and installation of slough walls. Project Funding Schedule Total Cost: $150,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 25,000 Land Acquisition Improvements 125,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 150,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2013: Park Imp. Z2 150,000 Total 0 0 0 0 0 0 0 0 150,000 542 160 City of Moorpark Capital Improvement Program Mountain Meadows Park 4350 Mountain Meadow Drive Location Map Mountain Meadows Park Project Summary: Project Total Cost Handball Wall.…………………..………….……………….… $ 41,924 Loop Trail………………………..………….……………….… $ 35,000 Replace Playground Equipment $225,000 Total Mountain Meadows Park Project Costs: $301,924 543 161 City of Moorpark Capital Improvement Program PROJECT: Handball Wall Code No. 941 LOCATION: Mountain Meadows Park Account No. C0045 Project Description Install a handball wall at Mountain Meadows Park. Objective IV.A.25 Project Funding Schedule Total Cost: $41,924 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 7,324 4,800 4,800 Land Acquisition Improvements 25,000 Construction Mgmt. Total 7,324 29,800 4,800 0 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2013: Park Imp. Z2 7,324 2010: Community Wide Development 29,800 4,800 Total 7,324 29,800 4,800 0 0 0 0 0 0 PROJECT: Loop Trail Code No. 942 LOCATION: Mountain Meadows Park Account No. Project Description Install a loop trail around the perimeter of Mountain Meadows Park. Project Funding Schedule Total Cost: $35,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 35,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 35,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2013: Park Imp. Z2 35,000 Total 0 0 0 0 0 0 0 0 35,000 544 162 City of Moorpark Capital Improvement Program PROJECT: Replace Playground Equipment Code No. 943 LOCATION: Mountain Meadows Park Account No. Project Description Replace children’s play structures and equipment, and replace sand and paved-in-place surfacing with engineered wood fiber. Project Funding Schedule Total Cost: $225,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 225,000 Construction Mgmt. Total 0 0 0 225,000 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 3003: Equipment Replacement 225,000 Total 0 0 0 225,000 0 0 0 0 0 545 163 City of Moorpark Capital Improvement Program Peach Hill Park 13200 Peach Hill Road Location Map Peach Hill Park Project Summary: Project Total Cost Lighting Upgrades and Additions……..…….……………….… $300,000 Picnic Pavilion Improvements.………..…….……………….… $ 75,000 Loop Trail……………………………………………………… $ 45,000 Sand Play Area………………………………………………… $ 25,300 Replace Playground Equipment $135,000 Total Peach Hill Park Project Costs: $580,300 546 164 City of Moorpark Capital Improvement Program PROJECT: Lighting Upgrades and Additions Code No. 944 LOCATION: Peach Hill Park Account No. Project Description Replace the softball field lighting and add lighting to the soccer field at Peach Hill Park. Project Funding Schedule Total Cost: $300,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 300,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 300,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2013: Park Imp. Z2 300,000 Total 0 0 0 0 0 0 0 0 300,000 PROJECT: Picnic Pavilion Improvements Code No. 945 LOCATION: Peach Hill Park Account No. Project Description Renovate the Peach Hill Park picnic pavilion, including enclosing the roof, or remove the pavilion and replace it with new pavilion with a solid roof, comparable to pavilions at other City parks. Project Funding Schedule Total Cost: $75,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 75,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 75,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2013: Park Imp. Z2 75,000 Total 0 0 0 0 0 0 0 0 75,000 547 165 City of Moorpark Capital Improvement Program PROJECT: Loop Trail Code No. 946 LOCATION: Peach Hill Park Account No. Project Description Install a loop trail around the perimeter of Peach Hill Park. Project Funding Schedule Total Cost: $45,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 45,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 45,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2013: Park Imp. Z2 45,000 Total 0 0 0 0 0 0 0 0 45,000 PROJECT: Sand Play Area Code No. 947 LOCATION: Peach Hill Park Account No. C0054 Project Description Install sand play area Project Funding Schedule Total Cost: $25,300 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 25,300 Construction Mgmt. Total 0 0 0 25,300 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2013: Park Imp. Z2 25,300 Total 0 0 0 25,300 0 0 0 0 0 548 166 City of Moorpark Capital Improvement Program PROJECT: Replace Playground Equipment Code No. 948 LOCATION: Peach Hill Park Account No. Project Description Replace children’s play structures and equipment. Project Funding Schedule Total Cost: $35,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 135,000 Construction Mgmt. Total 0 0 0 135,000 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 3003: Equipment Replacement 135,000 Total 0 0 0 135,000 0 0 0 0 0 549 167 City of Moorpark Capital Improvement Program Poindexter Park 500 Poindexter Avenue Location Map Poindexter Park Project Summary: Project Total Cost Security Camera Upgrades…..………..…….……………….… $ 35,000 Skate Park Fencing…………..………..…….……………….… $ 30,000 Park Amenity Improvements……...…..…….……………….… $ 30,000 Pathway Improvements $ 65,000 Total Poindexter Park Project Costs: $160,000 550 168 City of Moorpark Capital Improvement Program PROJECT: Security Camera Upgrades Code No. 949 LOCATION: Poindexter Park Account No. Project Description Upgrade security cameras at Poindexter Park, and install additional cameras as needed. Objective V.A.14 Project Funding Schedule Total Cost: $35,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 10,000 Land Acquisition Improvements 25,000 Construction Mgmt. Total 0 0 0 35,000 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2011: Park Imp. Z1 35,000 Total 0 0 0 35,000 0 0 0 0 0 PROJECT: Skate Park Fencing Code No. 950 LOCATION: Poindexter Park Account No. Project Description Improve security fencing around the perimeter of the skate park. Project Funding Schedule Total Cost: $30,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 30,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 30,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2010: Community Wide Development 30,000 Total 0 0 0 0 0 0 0 0 30,000 551 169 City of Moorpark Capital Improvement Program PROJECT: Park Amenity Improvements Code No. 951 LOCATION: Poindexter Park Account No. Project Description Replace metal and wood amenities throughout Poindexter Park with concrete, including the picnic tables in the picnic pavilion. Project Funding Schedule Total Cost: $30,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 30,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 30,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2011: Park Imp. Z1 30,000 Total 0 0 0 0 0 0 0 0 30,000 PROJECT: Pathway Improvements Code No. 952 LOCATION: Poindexter Park Account No. Project Description Install concrete mow curbs, improve the decomposed granite paths at Poindexter Park, and install outdoor exercise equipment along the path. Project Funding Schedule Total Cost: $65,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 65,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 65,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2011: Park Imp. Z1 65,000 Total 0 0 0 0 0 0 0 0 65,000 552 170 City of Moorpark Capital Improvement Program Tierra Rejada Park 11900 Mountain Trail Street Location Map Tierra Rejada Park Project Summary: Project Total Cost Lighting Additions………………...…..…….……………….… $ 85,000 Tennis Court Addition…………………………………………..$ 70,000 Parking Lot Expansion…………………………………………. $106,000 Replace Playground Equipment $400,000 Total Tierra Rejada Park Project Costs: $661,000 553 171 City of Moorpark Capital Improvement Program PROJECT: Lighting Additions Code No. 953 LOCATION: Tierra Rejada Park Account No. Project Description Install coin operated lights at the basketball and tennis courts at Tierra Rejada Park. Project Funding Schedule Total Cost: $85,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 10,000 Land Acquisition Improvements 75,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 85,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2013: Park Imp. Z2 85,000 Total 0 0 0 0 0 0 0 0 85,000 PROJECT: Tennis Court Addition Code No. 954 LOCATION: Tierra Rejada Park Account No. Project Description Construct additional court at Tierra Rejada Park. Project Funding Schedule Total Cost: $70,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 10,000 Land Acquisition Improvements 60,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 70,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2013: Park Imp. Z2 70,000 Total 0 0 0 0 0 0 0 0 70,000 554 172 City of Moorpark Capital Improvement Program PROJECT: Parking Lot Expansion Code No. 955 LOCATION: Tierra Rejada Park Account No. Project Description Expand parking lot on Mountain Meadow Drive by approximately 14 spaces. Project Funding Schedule Total Cost: $106,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 25,000 Land Acquisition Improvements 75,000 Construction Mgmt. 6,000 Total 0 0 0 0 0 0 0 0 106,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2013: Park Imp. Z2 106,000 Total 0 0 0 0 0 0 0 0 106,000 PROJECT: Replace Playground Equipment Code No. 956 LOCATION: Tierra Rejada Park Account No. Project Description Replace children’s play structures and equipment, and replace sand with engineered wood fiber. Create sand play area. Project Funding Schedule Total Cost: $400,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 400,000 Construction Mgmt. Total 0 0 0 400,000 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 3003: Equipment Replacement 400,000 Total 0 0 0 400,000 0 0 0 0 0 555 173 City of Moorpark Capital Improvement Program Villa Campesina Park 4704 Leta Yancy Road Location Map Villa Campesina Park Project Summary: Project Total Cost Security Improvements………………………………………. $ 55,000 Replace Playground Equipment $250,000 Total Villa Campesina Park Project Costs: $305,000 556 174 City of Moorpark Capital Improvement Program PROJECT: Security Improvements Code No. 957 LOCATION: Villa Campesina Park Account No. Project Description Install security cameras and add additional security lighting as needed at Villa Campesina Park. Objective V.A.14 Project Funding Schedule Total Cost: $55,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 10,000 Land Acquisition Improvements 45,000 Construction Mgmt. Total 0 0 0 55,000 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2013: Park Imp. Z2 55,000 Total 0 0 0 55,000 0 0 0 0 0 PROJECT: Replace Playground Equipment Code No. 958 LOCATION: Villa Campesina Park Account No. Project Description Replace children’s play structures and equipment, and replace sand with engineered wood fiber. Project Funding Schedule Total Cost: $250,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 250,000 Construction Mgmt. Total 0 0 0 250,000 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 3003: Equipment Replacement 250,000 Total 0 0 0 250,000 0 0 0 0 0 557 175 City of Moorpark Capital Improvement Program Virginia Colony Park 14507 Condor Drive Location Map Virginia Colony Park Project Summary: Project Total Cost Basketball Court Addition………………………………………$ 55,000 Replace Playground Equipment $200,000 Total Virginia Colony Park Project Costs: $255,000 558 176 City of Moorpark Capital Improvement Program PROJECT: Basketball Court Addition Code No. 959 LOCATION: Virginia Colony Park Account No. Project Description Install a full or half-court basketball court at Virginia Colony Park. Project Funding Schedule Total Cost: $55,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 55,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 55,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2011: Park Imp. Z1 55,000 Total 0 0 0 0 0 0 0 0 55,000 PROJECT: Replace Playground Equipment Code No. 960 LOCATION: Virginia Colony Park Account No. Project Description Replace children’s play structures and equipment, and replace sand with engineered wood fiber. Add sand play area. Project Funding Schedule Total Cost: $200,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 200,000 Construction Mgmt. Total 0 0 0 0 0 200,000 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 3003: Equipment Replacement 200,000 Total 0 0 0 0 0 200,000 0 0 0 559 177 City of Moorpark Capital Improvement Program LOCATION: Walnut Acres Park (161 Second Street) Code No. 961 PROJECT: Security Cameras Account No. Location Map Project Description Install security cameras as needed at Walnut Acres Park. Objective V.A.14 Project Funding Schedule Total Cost: $10,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 10,000 Construction Mgmt. Total 0 0 0 10,000 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2011: Park Imp. Z1 10,000 Total 0 0 0 10,000 0 0 0 0 0 560 178 City of Moorpark Capital Improvement Program Citywide Parks Various Locations / Locations To Be Determined Citywide Parks Project Summary: Project Total Cost Central Irrigation System….……...…..…….……………….… $ 378,519 Lighting Upgrades….……...…..…………....……………….… $ 555,000 ADA Improvements………..……...…..…….……………….… $ 60,000 Universally Accessible Playground.…..…….……………….… $ 350,000 BMX/Bicycle Facility…..….……...…..…….……………….… $ 850,000 Sensory Garden…………….……...…..…….……………….… $ 295,000 Disc Golf Course………..….……...…..…….……………….…$ 150,000 Electronic Marquees……….……...…..…….……………….… $ 275,000 Permanent Game Equipment……...…..…….……………….… $ 30,000 Baseball Field…..………….……...…..…….……………….… $ 260,000 Bocce Ball Court….……….……...…..…….……………….… $ 10,000 Ball Wall……….………………….…..…….……………….… $ 35,000 Update Park Features……...….…...…..…….……………….… $ 175,000 Additional Exercise Equipment…...…..…….……………….… $ 150,000 Parkour Training Circuit….…..…...…..…….……………….… $ 175,000 Community Pool ………………….…..…….……………….… $3,000,000 Parks and Recreation Master Plan $ 75,000 Total Citywide Parks Project Costs: $6,823,519 561 179 City of Moorpark Capital Improvement Program PROJECT: Central Irrigation System Code No. 962 LOCATION: Citywide Parks Account No. C0019 Project Description Replace existing irrigation controllers with WeatherTRAK ET Pro2 controllers at various City parks and Landscape Maintenance Districts. Project largely complete, with only work at AVCP and Miller Park remaining. The central control system at AVCP will include an inline fertilization system to manage fertilization of sports turf. Project Funding Schedule Total Cost: $378,519 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 293,519 85,000 Construction Mgmt. Total 293,519 0 85,000 0 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 1000: General Fund 71,599 85,000 2302: District 84-2 Z2 33,111 2312: District 84-2 Z12 34,466 2315: District 84-2 Z15 61,937 2322: District 84-2 Z22 92,406 Total 293,519 0 85,000 0 0 0 0 0 0 PROJECT: Lighting Upgrades Code No. 963 LOCATION: Citywide Parks Account No. Project Description Replace site lighting with LED lighting or other energy efficient alternatives at Campus Canyon, College View, Mammoth Highlands, Miller, Mountain Meadows, Peach Hill, Tierra Rejada, and Villa Campesina Parks. Project Funding Schedule Total Cost: $555,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 55,000 Land Acquisition Improvements 500,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 555,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 555,000 Total 0 0 0 0 0 0 0 0 555,000 562 180 City of Moorpark Capital Improvement Program PROJECT: ADA Improvements Code No. 964 LOCATION: Citywide Parks Account No. Project Description Install ADA compliant walkways connecting public sidewalks to park walkways and amenities at Peach Hill, Monte Vista, Mountain Meadows, and Tierra Rejada Parks. Install upgrades at Villa Campesina Park, including parking and signage. Project Funding Schedule Total Cost: $60,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 60,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 60,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 60,000 Total 0 0 0 0 0 0 0 0 60,000 PROJECT: Universally Accessible Playground Code No. 965 LOCATION: Citywide Parks Account No. Project Description Design and install universally accessible playground equipment at one City park. Objective IV.A.16 Project Funding Schedule Total Cost: $350,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 350,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 350,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 350,000 Total 0 0 0 0 0 0 0 0 350,000 563 181 City of Moorpark Capital Improvement Program PROJECT: BMX / Bicycle Facility Code No. 966 LOCATION: Citywide Parks Account No. Project Description Select a site and design and construct a facility to accommodate either bicycle free-style or BMX riding. Objective IV.B.8 Project Funding Schedule Total Cost: $850,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 100,000 Land Acquisition Improvements 750,000 Construction Mgmt. Total 0 0 0 0 0 850,000 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 850,000 Total 0 0 0 0 0 850,000 0 0 0 PROJECT: Sensory Garden Code No. 967 LOCATION: Citywide Parks Account No. Project Description Select a site and design and install a therapeutic or sensory garden. Project Funding Schedule Total Cost: $295,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 45,000 Land Acquisition Improvements 250,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 295,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 295,000 Total 0 0 0 0 0 0 0 0 295,000 564 182 City of Moorpark Capital Improvement Program PROJECT: Disc Golf Course Code No. 968 LOCATION: Citywide Parks Account No. Project Description Determine an appropriate location for and install a disc golf course, including walkways and amenities. Objective IV.A.20 Project Funding Schedule Total Cost: $150,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 25,000 Land Acquisition Improvements 125,000 Construction Mgmt. Total 0 0 0 150,000 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 150,000 Total 0 0 0 150,000 0 0 0 0 0 PROJECT: Electronic Marquees Code No. 969 LOCATION: Citywide Parks Account No. Project Description Determine appropriate locations for and install electronic messaging marquees. Replace the magnetic marquee at AVCP with an electronic marquee. Project Funding Schedule Total Cost: $275,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 275,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 275,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 275,000 Total 0 0 0 0 0 0 0 0 275,000 565 183 City of Moorpark Capital Improvement Program PROJECT: Permanent Game Equipment Code No. 970 LOCATION: Citywide Parks Account No. Project Description Select sites and install various permanent game equipment including a shuffleball court, horseshoe pit, and cornhole/beanbag toss pit. Project Funding Schedule Total Cost: $30,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 30,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 30,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 30,000 Total 0 0 0 0 0 0 0 0 30,000 PROJECT: Baseball Field Code No. 971 LOCATION: Citywide Parks Account No. Project Description Identify site and install a baseball field. Project Funding Schedule Total Cost: $260,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 35,000 Land Acquisition Improvements 225,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 260,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 260,000 Total 0 0 0 0 0 0 0 0 260,000 566 184 City of Moorpark Capital Improvement Program PROJECT: Bocce Ball Court Code No. 972 LOCATION: Citywide Parks Account No. Project Description Select site and install an additional bocce ball court. Project Funding Schedule Total Cost: $10,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 10,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 10,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 10,000 Total 0 0 0 0 0 0 0 0 10,000 PROJECT: Ball Wall Code No. 973 LOCATION: Citywide Parks Account No. Project Description Identify additional park location and install a ball wall. Project Funding Schedule Total Cost: $35,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 35,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 35,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 35,000 Total 0 0 0 0 0 0 0 0 35,000 567 185 City of Moorpark Capital Improvement Program PROJECT: Update Park Features Code No. 974 LOCATION: Citywide Parks Account No. Project Description Improve drinking fountains, identify locations and install electronic play systems, tandem swings, and other upgraded features. Project Funding Schedule Total Cost: $175,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 175,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 175,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 175,000 Total 0 0 0 0 0 0 0 0 175,000 PROJECT: Additional Exercise Equipment Code No. 975 LOCATION: Citywide Parks Account No. Project Description Identify locations and install additional exercise equipment. Project Funding Schedule Total Cost: $150,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 150,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 150,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 150,000 Total 0 0 0 0 0 0 0 0 150,000 568 186 City of Moorpark Capital Improvement Program PROJECT: Parkour Training Circuit Code No. 976 LOCATION: Citywide Parks Account No. Project Description Install fitness circuit specific to Parkour training. Project Funding Schedule Total Cost: $175,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 175,000 Construction Mgmt. Total 0 0 0 0 0 0 0 0 175,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 175,000 Total 0 0 0 0 0 0 0 0 175,000 PROJECT: Community Pool Code No. 977 LOCATION: Citywide Parks Account No. Project Description Coordinate construction of community pool with the High School or identify location and construct a community pool facility at a City park. Objective IV.B.2 Project Funding Schedule Total Cost: $3,000,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 3,000,000 Construction Mgmt. Total 0 0 0 0 0 3,000,000 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 3,000,000 Total 0 0 0 0 0 3,000,000 0 0 0 569 187 City of Moorpark Capital Improvement Program PROJECT: Parks and Recreation Master Plan Update Code No. 978 LOCATION: Citywide Parks Account No. Project Description Update Parks and Recreation Master Plan to ensure goals and policies remain current and are based on recreational needs of the community. Project Funding Schedule Total Cost: $75,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 75,000 Land Acquisition Improvements Construction Mgmt. Total 0 0 0 0 0 0 0 0 75,000 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Undetermined 75,000 Total 0 0 0 0 0 0 0 0 75,000 570 188 Trails 571 189 City of Moorpark Capital Improvement Program LOCATION: Zone 15 Code No. 1001 PROJECT: Trail Improvements Account No. C0053 Location Map Project Description Renovate trails to improve drainage and minimize runoff. Remove horse crossing bars at the entrance to all multi-use trails, and replace with more effective alternative device or system where feasible. Add new sidewalk on the eastern terminus of Championship Drive. Project Funding Schedule Total Cost: $1,600,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 85,000 15,000 Land Acquisition Improvements 1,500,000 Construction Mgmt. Total 0 85,000 15,000 1,500,000 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2315: Country Club Estates 85,000 15,000 1,500,000 Total 0 85,000 15,000 1,500,000 0 0 0 0 0 572 190 City of Moorpark Capital Improvement Program LOCATION: Citywide Code No. 1002 PROJECT: Trails Master Plan Account No. Location Map Citywide Locations Project Description Develop a Trails Master Plan. Project Funding Schedule Total Cost: $45,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering Land Acquisition Improvements 45,000 Construction Mgmt. Total 0 0 45,000 0 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 1000: General Fund 45,000 Total 0 0 45,000 0 0 0 0 0 0 573 191 City of Moorpark Capital Improvement Program LOCATION: Arroyo Simi Code No. 1003 PROJECT: Arroyo Simi Trail Improvements Account No. Location Map Project Description Prior Year costs are for the Arroyo Simi Trail Feasibility Study. That study evaluated options for the possible future development of a trail system, generally along the levee road of the Arroyo Simi, from the westerly City Limit easterly to Madera Road in the City of Simi Valley. Future expenses for projects to implement segments of the trail system are yet to be determined. Ramps from the Spring Road bridge down to the proposed trail are included in the design for future channel improvements. Project Funding Schedule Total Cost: $150,000 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 150,000 Land Acquisition Improvements Construction Mgmt. Total 150,000 0 0 0 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2412:TDA Article 8A 30,000 2409: Federal Grant 120,000 Total 150,000 0 0 0 0 0 0 0 0 574 192 City of Moorpark Capital Improvement Program LOCATION: Drain No. 2 Code No. 1004 PROJECT: Drain No. 2 Trail Account No. Location Map Project Description This project is to provide for the construction of a trail extending from the east end of Campus Park Drive, across the watercourse referred to as Drain No. 2, then south under the freeway through an existing access tunnel to Arroyo Drive. Prior year costs were for the development of a feasibility study to determine access and design requirements. Review and finalization of the study has been placed on hold. Cost estimates for this project have not yet been developed and the funding for future year projects has not yet been determined. Project Funding Schedule Total Cost: $28,554 Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Design / Engineering 28,554 Land Acquisition Improvements Construction Mgmt. Total 28,554 0 0 0 0 0 0 0 0 Funding Sources Source Prior Yrs FY 17/18 (Est.) FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 2001: Traffic Sys Mgt 28,554 Total 28,554 0 0 0 0 0 0 0 0 575 193 City of Moorpark Capital Improvement Program C. Program Expenditure Summaries  Total Program Project Costs (Listed by Fiscal Year) 194  Total Program (Seven Years) – Spread to Funding Source 201 576 Program Expenditure Summary: Parks Recreation and Community Services Department Program Summary: Fiscal Years 2017/18 - 2024/25 Project Code Project Name Number Prior Yrs FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Total FACILITIES (600) Arroyo Vista Recreation Center and Gym 601 Back-Up Generator M0023 $95,000 $33,000 $128,000 602 HVAC Replacement M0024 $235,000 $235,000 603 Kitchen Remodel M0025 $150,000 $150,000 604 Facility Expansion C0042 $75,000 $2,250,000 $2,325,000 605 Security Cameras $35,000 $35,000 606 Water Conservation Improvements $55,000 $55,000 607 Flag Pole Installation $12,000 $12,000 608 Gymnasium Expansion C0048 $2,450,000 $2,450,000 Arroyo Vista Recreation Center and Gym Total:$0 $0 $330,000 $110,000 $0 $2,483,000 $0 $0 $2,467,000 $5,390,000 City Hall / Civic Center Complex 609 Pedestrian Access Improvements C0014 $37,058 $23,378 $592,040 $652,476 610 Back-Up Generator M0023 $105,000 $105,000 611 Fire Sprinkler System M0035 $65,000 $65,000 612 Security Cameras $40,000 $40,000 613 Patio Remodel $25,000 $25,000 614 Water Conservation Improvements $60,000 $60,000 615 Flag Pole Installation $12,000 $12,000 616 Energy Efficiency Improvements $35,000 $35,000 City Hall / Civic Center Complex Total:$37,058 $23,378 $697,040 $105,000 $0 $0 $0 $0 $132,000 $994,476 High Street Arts Center 617 Roof Renovation $50,000 $50,000 618 Interior Improvements $65,000 $65,000 619 ADA/Building Code Improvements $40,000 $40,000 High Street Arts Center Total:$0 $0 $50,000 $0 $0 $0 $0 $0 $105,000 $155,000 Metrolink Parking Lot 620 Art In Public Places C0052 $200,000 $200,000 Moorpark Library 621 Restroom Improvements $25,000 $25,000 622 Security Cameras $35,000 $35,000 623 Parking Lot Improvements $155,000 $155,000 624 HVAC Replacement $25,000 $25,000 Moorpark Library Total:$0 $0 $25,000 $190,000 $0 $0 $0 $0 $25,000 $240,000 194577 Program Summary: Fiscal Years 2017/18 - 2024/25 Project Code Project Name Number Prior Yrs FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Total Police Services Center 625 Art In Public Places Installation C0015 $10,961 $35,000 $121,539 $167,500 626 Landscape Improvements $75,000 $75,000 627 Parapet Wall Installation $165,000 $165,000 Police Services Center Total:$10,961 $35,000 $121,539 $0 $0 $0 $0 $0 $240,000 $407,500 Moorpark Public Services Facility 628 Back-Up Generator M0023 $106,000 $106,000 629 Lighting Improvements $75,000 $75,000 630 Roof Drain Improvements $50,000 $50,000 631 Outdoor Break Area $50,000 $50,000 632 Water Conservation Improvements $25,000 $25,000 633 Fueling Station $500,000 $500,000 Moorpark Public Services Facility Total:$0 $0 $0 $0 $0 $106,000 $0 $0 $700,000 $806,000 Ruben Castro Human Services Center 634 Sidewalk Installation $75,000 $75,000 31 Poindexter Avenue 635 Building Modifications $150,000 $150,000 Citywide 636 Purchase City Streetlights $2,200,000 $2,200,000 637 New Moorpark City Library C0056 $18,000,000 $18,000,000 638 New City Hall and Civic Center Complex C0012 $1,285,945 $15,000 $3,445,064 $27,100,000 $31,846,009 639 Arts Master Plan $30,000 $30,000 Citywide Total:$1,285,945 $15,000 $5,675,064 $18,000,000 $0 $0 $0 $0 $27,100,000 $52,076,009 FACILITIES TOTAL:$1,333,964 $73,378 $7,098,643 $18,405,000 $0 $2,589,000 $0 $0 $30,994,000 $60,493,985 195578 Program Summary: Fiscal Years 2017/18 - 2024/25 Project Code Project Name Number Prior Yrs FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Total LANDSCAPE MAINTENANCE DISTRICTS (LMDS) & GENERAL LANDSCAPING (700) 701 High Street Improvements $3,500,000 $3,500,000 702 Princeton Avenue Landscape Renovations (Campus Park Area)$285,000 $285,000 703 Campus Park Median Renovations (Campus Park Area)$400,000 $400,000 704 Princeton Avenue Oak Tree $65,000 $65,000 705 Championship Drive Landscape Renovations (Zone 15)$115,023 $1,000,000 $1,115,023 706 LA Avenue Parkway and Wall Treatment Renovations $180,000 $180,000 707 LA Avenue Parkway Renovations (Zone 7)$155,000 $155,000 708 Poindexter Avenue Landscaping $170,000 $170,000 709 Spring Road Parkway Renovation (Zone 12)$545,000 $545,000 710 Spring Road Street Trees $65,000 $65,000 711 Spring Rd. / Ridgecrest Dr. Landscape Renovation (Zone 22)M0037 $876,024 $876,024 712 Metrolink Station Landscape Improvements $25,000 $25,000 713 Tierra Rejada Road Streetscape Renovation M0031 $421,946 $526,005 $38,814 $2,250,000 $3,236,765 714 Tierra Rejada/Moorpark Road Intersection Improvements $95,000 $95,000 715 City Welcome Sign Improvements $132,000 $132,000 716 Off-Ramp Landscape Improvements $46,281 $3,450,000 $3,496,281 717 Peach Hill Wash Channel Improvements $650,000 $650,000 LANDSCAPE MAINTENANCE DISTRICTS & GENERAL LANDSCAPING TOTAL:$468,227 $1,517,052 $1,038,814 $6,500,000 $0 $275,000 $0 $0 $5,192,000 $14,991,093 OPEN SPACE (800) 801 Develop Site Plan (80 Acre Parcel)$50,000 $50,000 802 Trail Connection to Conejo Open Space (80 Acre Parcel)$50,000 $50,000 803 Passive Recreation Uses (Meridian Hills Open Space)$50,000 $50,000 804 Property Acquisition (Waste Management Open Space)$1,500,000 $1,560,000 $3,060,000 805 Develop Site Plan (Waste Management Open Space)$50,000 $50,000 OPEN SPACE TOTAL:$0 $1,500,000 $0 $1,610,000 $0 $0 $0 $0 $150,000 $3,260,000 196579 Program Summary: Fiscal Years 2017/18 - 2024/25 Project Code Project Name Number Prior Yrs FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Total PARKS (900) Arroyo Vista Community Park 901 Ball Field Lighting $2,500,000 $2,500,000 902 Water Spray Attraction $665,000 $665,000 903 Pedestrian Bridge Lighting $170,000 $170,000 904 Walkway/Bike Path from Mountain Trail St.$573,000 $573,000 905 Softball Fencing Improvements $20,000 $20,000 906 Slope Landscaping $55,000 $55,000 907 Lease SCE Property $2,500,000 $2,500,000 908 New Pedestrian Bridge $375,000 $375,000 909 Sand Volleyball Court $60,000 $60,000 Arroyo Vista Community Park Total:$0 $0 $0 $3,738,000 $0 $2,875,000 $0 $0 $305,000 $6,918,000 Campus Canyon Park 910 Basketball Court Improvements $12,000 $12,000 911 Replace Playground Equipment $175,000 $175,000 912 Parking Lot $206,000 $206,000 Campus Canyon Park Total:$0 $0 $0 $175,000 $0 $0 $0 $0 $218,000 $393,000 Campus Park 913 Restroom Improvements $203,000 $203,000 914 Pavilion Improvements $10,000 $10,000 915 Replace Playground Equipment $15,000 $160,000 $175,000 Campus Park Total:$0 $0 $15,000 $160,000 $0 $0 $0 $0 $213,000 $388,000 College View Park 916 Sand Volleyball Court $45,000 $45,000 917 Basketball Court Improvements $87,000 $87,000 918 Dog Park Lighting $83,000 $83,000 919 Park Improvements $27,000 $27,000 920 New Park Sign $35,000 $35,000 College View Park Total:$0 $0 $0 $0 $0 $0 $0 $0 $277,000 $277,000 Community Center Park 921 Replace Playground Equipment $125,000 $125,000 Country Trail Park 922 Park Improvements & ADA Access $21,508 $21,508 923 Restroom Addition $285,000 $285,000 924 Landscape Improvements $25,000 $25,000 Country Trail Park Total:$0 $21,508 $0 $0 $0 $0 $0 $0 $310,000 $331,508 197580 Program Summary: Fiscal Years 2017/18 - 2024/25 Project Code Project Name Number Prior Yrs FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Total Glenwood Park 925 Basketball Court Lighting $71,000 $71,000 926 Sand Volleyball Court $45,000 $45,000 927 Install Trail $12,000 $12,000 928 Replace Playground Equipment $45,000 $205,000 $250,000 929 New Park Sign $35,000 $35,000 Glenwood Park Total:$0 $0 $45,000 $205,000 $0 $0 $0 $0 $163,000 $413,000 Magnolia Park 930 Replace Playground Equipment $175,000 $175,000 Mammoth Highlands Park 931 Sand Volleyball Court $45,000 $45,000 932 Basketball Court Lighting Improvements $39,500 $39,500 933 Expand Trail $25,000 $25,000 Mammoth Highlands Park Total:$0 $0 $0 $0 $0 $0 $0 $0 $109,500 $109,500 Miller Park 934 Lighting Addition $25,000 $25,000 935 Loop Trail $45,000 $45,000 936 Replace Playground Equipment $250,000 $250,000 Miller Park Total:$0 $0 $0 $250,000 $0 $0 $0 $0 $70,000 $320,000 Monte Vista Nature Park 937 Lighting Improvements $25,000 $25,000 938 Shade Structure $30,000 $30,000 939 Landscape Improvements $300,000 $300,000 940 Trail System Improvements $150,000 $150,000 Monte Vista Nature Park Total:$0 $0 $0 $0 $0 $0 $0 $0 $505,000 $505,000 Mountain Meadows 941 Handball Wall C0045 $7,324 $29,800 $4,800 $41,924 942 Loop Trail $35,000 $35,000 943 Replace Playground Equipment $225,000 $225,000 Mountain Meadows Total:$7,324 $29,800 $4,800 $225,000 $0 $0 $0 $0 $35,000 $301,924 Peach Hill Park 944 Lighting Upgrades & Additions $300,000 $300,000 945 Picnic Pavilion Improvements $75,000 $75,000 946 Loop Trail $45,000 $45,000 947 Sand Play Area $25,300 $25,300 948 Replace Playground Equipment $135,000 $135,000 Peach Hill Park Total:$0 $0 $0 $135,000 $0 $0 $0 $0 $445,300 $580,300 198581 Program Summary: Fiscal Years 2017/18 - 2024/25 Project Code Project Name Number Prior Yrs FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Total Poindexter Park 949 Security Camera Improvements $35,000 $35,000 950 Skate Park Fencing $30,000 $30,000 951 Park Amenity Improvements $30,000 $30,000 952 Pathway Improvements $65,000 $65,000 Poindexter Park Total:$0 $0 $0 $35,000 $0 $0 $0 $0 $125,000 $160,000 Tierra Rejada Park 953 Lighting Additions $85,000 $85,000 954 Tennis Court Addition $70,000 $70,000 955 Parking Lot Expansion $106,000 $106,000 956 Replace Playground Equipment $400,000 $400,000 Tierra Rejada Park Total:$0 $0 $0 $400,000 $0 $0 $0 $0 $261,000 $661,000 Villa Campesina Park 957 Security Improvements $55,000 $55,000 958 Replace Playground Equipment $250,000 $250,000 Villa Campesina Park Total:$0 $0 $0 $305,000 $0 $0 $0 $0 $0 $305,000 Virginia Colony Park 959 Basketball Court Addition $55,000 $55,000 960 Replace Playground Equipment $200,000 $200,000 Virginia Colony Park Total:$0 $0 $0 $0 $0 $200,000 $0 $0 $55,000 $255,000 Walnut Acres Park 961 Security Cameras $10,000 $10,000 Citywide Parks 962 Central Irrigation System C0019 $293,519 $85,000 $378,519 963 Lighting Upgrades $555,000 $555,000 964 ADA Improvements $60,000 $60,000 965 Universally Accessible Playground Equipment $350,000 $350,000 966 BMX/Free Style Bicycle Facility $850,000 $850,000 967 Sensory Garden $295,000 $295,000 968 Disc Golf Course $150,000 $150,000 969 Electronic Marquees $275,000 $275,000 970 Permanent Game Equipment $30,000 $30,000 971 Baseball Field $260,000 $260,000 972 Bocce Ball Court $10,000 $10,000 973 Ball Wall $35,000 $35,000 974 Update Park Features $175,000 $175,000 199582 Program Summary: Fiscal Years 2017/18 - 2024/25 Project Code Project Name Number Prior Yrs FY 17/18 FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Total Citywide Parks (Continued) 975 Additional Exercise Equipment $150,000 $150,000 976 Parkour Training Circuit $175,000 $175,000 977 Community Pool $3,000,000 $3,000,000 978 Parks and Recreation Master Plan Update $75,000 $75,000 Citywide Parks Total:$293,519 $0 $85,000 $150,000 $0 $3,850,000 $0 $0 $2,445,000 $6,823,519 PARKS TOTAL:$300,843 $51,308 $149,800 $5,913,000 $0 $6,925,000 $175,000 $0 $5,536,800 $19,051,751 TRAILS (1000) 1001 Zone 15 Trail Improvements $85,000 $15,000 $1,500,000 $1,600,000 1002 Trails Master Plan $45,000 $45,000 1003 Arroyo Simi Trail Improvements $150,000 $150,000 1004 Drain No. 2 Trail $28,554 $28,554 TRAILS TOTAL:$178,554 $85,000 $60,000 $1,500,000 $0 $0 $0 $0 $0 $1,823,554 TOTAL PROGRAM EXPENDITURE:$2,281,588 $3,226,738 $8,347,257 $33,928,000 $0 $9,789,000 $175,000 $0 $41,872,800 $99,620,383 200583 Program Funding Summary: Parks, Recreation and Community Services Department Program Funding Source: Fiscal Years 2017/18 - 2024/25 1000:2004:2006:2007:2010:2011:2013:2018:2300:2302:2307:2310:2312:2315:2322:3001:3003:2001:2409:2411:2412:2414: Project General Library Tree &Art In Public Community Park Imp.Park Imp.Endowment 84-2 84-2 84-2 84-2 Mtn 84-2 Country Moorpark City Hall Equipment Traffic Sys Federal TDA TDA TDA Code Project Name Number Fund Facilities Landscape Places Wide Dev.Zone 1 Zone 2 Fund Citywide Steeple Hill LA Ave Meadows Carlsberg Club Estates Highlands Improvement Replacement Mgmt Grant Article 3 Article 8A Article 8C Undetermined Total Facilities (600) Arroyo Vista Recreation Center and Gym 601 Back-Up Generator M0023 $128,000 $128,000 602 HVAC Replacement M0024 $135,000 $100,000 $235,000 603 Kitchen Remodel M0025 $150,000 $150,000 604 Facility Expansion C0042 $75,000 $2,250,000 $2,325,000 605 Security Cameras $35,000 $35,000 606 $55,000 $55,000 607 Flag Pole Installation $12,000 $12,000 608 Gymnasium Expansion C0048 $2,450,000 $2,450,000 Arroyo Vista Recreation Center and Gym Total:$285,000 $0 $0 $0 $2,578,000 $0 $0 $75,000 $0 $0 $0 $0 $0 $0 $0 $0 $100,000 $0 $0 $0 $0 $0 $2,352,000 $5,390,000 City Hall / Civic Center Complex 609 Pedestrian Access Improvements C0014 $497,250 $130,516 $24,710 $652,476 610 Back-Up Generator M0023 $105,000 $105,000 611 Fire Sprinkler System M0035 $65,000 $65,000 612 Security Cameras $40,000 $40,000 613 Patio Remodel $25,000 $25,000 614 $60,000 $60,000 615 Flag Pole Installation $12,000 $12,000 616 Energy Efficiency Improvements $35,000 $35,000 City Hall / Civic Center Complex Total $65,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $105,000 $497,250 $0 $130,516 $0 $24,710 $172,000 $994,476 High Street Arts Center 617 Roof Renovation $50,000 $50,000 618 Interior Improvements $65,000 $65,000 619 $40,000 $40,000 High Street Arts Center Total:$50,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $105,000 $155,000 Metrolink Parking Lot 620 Art In Public Places 7708 $200,000 $200,000 Moorpark Library 621 Restroom Improvements $25,000 $25,000 622 Security Cameras $35,000 $35,000 623 Parking Lot Improvements $155,000 $155,000 624 HVAC Replacement $25,000 $25,000 Moorpark Library Total:$0 $25,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $215,000 $240,000 Police Services Center 625 Art In Public Places Installation C0015 $167,500 $167,500 626 Landscape Improvements $75,000 $75,000 627 Parapet Wall Installation $165,000 $165,000 Police Services Center Total:$0 $0 $0 $167,500 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $240,000 $407,500 Moorpark Public Services Facility 628 Back-Up Generator M0023 $106,000 $106,000 629 Lighting Improvements $75,000 $75,000 630 Roof Drain Improvements $50,000 $50,000 631 Outdoor Break Area $50,000 $50,000 632 $25,000 $25,000 633 Fueling Station $500,000 $500,000 Moorpark Public Services Facility Total:$106,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $700,000 $806,000 Water Conservation Improvements Water Conservation Improvements ADA/Building Code Improvements Water Conservation Improvements 201584 Program Funding Source: Fiscal Years 2017/18 - 2024/25 1000:2004:2006:2007:2010:2011:2013:2018:2300:2302:2307:2310:2312:2315:2322:3001:3003:2001:2409:2411:2412:2414: Project General Library Tree &Art In Public Community Park Imp.Park Imp.Endowment 84-2 84-2 84-2 84-2 Mtn 84-2 Country Moorpark City Hall Equipment Traffic Sys Federal TDA TDA TDA Code Project Name Number Fund Facilities Landscape Places Wide Dev.Zone 2017-1 Zone 3 Fund Citywide Steeple Hill LA Ave Meadows Carlsberg Club Estates Highlands Improvement Replacement Mgmt Grant Article 3 Article 8A Article 8C Undetermined Total Ruben Castro Human Services Center 634 Sidewalk Installation $75,000 $75,000 31 Poindexter Avenue 635 Building Modifications $150,000 $150,000 Citywide 636 Purchase City Streetlights $2,200,000 $2,200,000 637 New Moorpark City Library $18,000,000 $18,000,000 638 New City Hall / Civic Center $343,172 $31,502,837 $31,846,009 639 Arts Master Plan $30,000 $30,000 Citywide Total $0 $0 $0 $30,000 $0 $0 $0 $2,543,172 $0 $0 $0 $0 $0 $0 $0 $31,502,837 $0 $0 $0 $0 $0 $0 $18,000,000 $52,076,009 Facilities Total:$506,000 $25,000 $0 $397,500 $2,578,000 $0 $0 $2,618,172 $0 $0 $0 $0 $0 $0 $0 $31,502,837 $205,000 $497,250 $0 $130,516 $0 $24,710 $22,009,000 $60,493,985 LANDSCAPE MAINTENANCE DISTRICTS (LMDs) & GENERAL LANDSCAPING (700) 701 High Street Improvements $3,500,000 $3,500,000 702 Princeton Avenue Landscape Renovations (Campus Park Area)$285,000 $285,000 703 Campus Park Median Renovations (Campus Park Area)$400,000 $400,000 704 Princeton Avenue Oak Tree $65,000 $65,000 705 Championship Drive Landscape Renovations (Zone 15)$1,115,023 $1,115,023 706 LA Avenue Parkway and Wall Treatment Renovations $180,000 $180,000 707 LA Avenue Parkway Renovations (Zone 7)$155,000 $155,000 708 Poindexter Ave. Landscaping $170,000 $170,000 709 Spring Road Parkway Renovation (Zone 12)$136,250 $408,750 $545,000 710 Spring Road Street Trees $65,000 $65,000 711 Spring Rd/Ridgecrest Dr Landscape Renovation (Zone 22)M0037 $876,024 $876,024 712 Metrolink Station Landscape Improvements $25,000 $25,000 713 Tierra Rejada Road Streetscape Renovation M0031 $3,090,466 $146,299 $3,236,765 714 Tierra Rejada/Moorpark Road Intersection Improvements $95,000 $95,000 715 $132,000 $132,000 716 $46,281 $3,450,000 $3,496,281 717 $650,000 $650,000 $3,090,466 $0 $46,281 $0 $0 $0 $0 $0 $1,001,250 $146,299 $155,000 $650,000 $408,750 $1,115,023 $876,024 $0 $0 $0 $0 $0 $0 $0 $7,502,000 $14,991,093 OPEN SPACE (800) 801 $50,000 $50,000 802 $50,000 $50,000 803 $50,000 $50,000 804 $3,060,000 $3,060,000 805 $50,000 $50,000 Open Space Total:$0 $0 $0 $0 $0 $0 $0 $3,060,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $200,000 $3,260,000 Landscape Maintenance Districts (LMDs) & General Landscaping Total: City Welcome Sign Improvements Off-Ramp Landscape Improvements Peach Hill Wash Channel Improvements Trail Connection to Conejo Open Space (80 Acre Parcel) Develop Site Plan (80 Acre Parcel) Passive Recreation Uses (Meridian Hills Open Space) Property Acquisition (Waste Management Open Space) Develop Site Plan (Waste Management Open Space) 202585 Program Funding Source: Fiscal Years 2017/18 - 2024/25 1000:2004:2006:2007:2010:2011:2013:2018:2300:2302:2307:2310:2312:2315:2322:3001:3003:2001:2409:2411:2412:2414: Project General Library Tree &Art In Public Community Park Imp.Park Imp.Endowment 84-2 84-2 84-2 84-2 Mtn 84-2 Country Moorpark City Hall Equipment Traffic Sys Federal TDA TDA TDA Code Project Name Number Fund Facilities Landscape Places Wide Dev.Zone 2017-1 Zone 3 Fund Citywide Steeple Hill LA Ave Meadows Carlsberg Club Estates Highlands Improvement Replacement Mgmt Grant Article 3 Article 8A Article 8C Undetermined Total PARKS (900) Arroyo Vista Community Park 901 Ball Field Lighting $2,500,000 $2,500,000 902 Water Spray Attraction $665,000 $665,000 903 Pedestrian Bridge Lighting $170,000 $170,000 904 Walkway/Bike Path from Mountain Trail Street $573,000 $573,000 905 Softball Fencing Improvements $20,000 $20,000 906 Slope Landscaping $55,000 $55,000 907 Lease SCE Property $2,500,000 $2,500,000 908 New Pedestrian Bridge $375,000 $375,000 909 Sand Volleyball Court $60,000 $60,000 Arroyo Vista Community Park Total:$0 $0 $0 $0 $4,418,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $2,500,000 $6,918,000 Campus Canyon Park 910 Basketball Court Improvements $12,000 $12,000 911 Replace Playground Equipment $175,000 $175,000 912 Parking Lot $206,000 $206,000 Campus Canyon Park Total:$0 $0 $0 $0 $0 $218,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $175,000 $0 $0 $0 $0 $0 $0 $393,000 Campus Park 913 Restroom Improvements $203,000 $203,000 914 Pavilion Improvements $10,000 $10,000 915 Replace Playground Equipment $175,000 $175,000 Campus Park Total:$0 $0 $0 $0 $0 $213,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $175,000 $0 $0 $0 $0 $0 $0 $388,000 College View Park 916 Sand Volleyball Court $45,000 $45,000 917 Basketball Court Improvements $87,000 $87,000 918 Dog Park Lighting $83,000 $83,000 919 Park Improvements $27,000 $27,000 920 New Park Sign $35,000 $35,000 College View Park Total:$0 $0 $0 $0 $0 $277,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $277,000 Community Center Park 921 Replace Playground Equipment $125,000 $125,000 Country Trail Park 922 Park Improvements & ADA Access $21,508 $21,508 923 Restroom Addition $285,000 $285,000 924 Landscape Improvements $25,000 $25,000 Country Trail Park Total:$0 $0 $0 $0 $0 $0 $331,508 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $331,508 Glenwood Park 925 Basketball Court Lighting $71,000 $71,000 926 Sand Volleyball Court $45,000 $45,000 927 Install Trail $12,000 $12,000 928 Replace Playground Equipment $250,000 $250,000 929 New Park Sign $35,000 $35,000 Glenwood Park Total:$0 $0 $0 $0 $0 $0 $163,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $250,000 $0 $0 $0 $0 $0 $0 $413,000 Magnolia Park 930 Replace Playground Equipment $175,000 $175,000 203586 Program Funding Source: Fiscal Years 2017/18 - 2024/25 1000:2004:2006:2007:2010:2011:2013:2018:2300:2302:2307:2310:2312:2315:2322:3001:3003:2001:2409:2411:2412:2414: Project General Library Tree &Art In Public Community Park Imp.Park Imp.Endowment 84-2 84-2 84-2 84-2 Mtn 84-2 Country Moorpark City Hall Equipment Traffic Sys Federal TDA TDA TDA Code Project Name Number Fund Facilities Landscape Places Wide Dev.Zone 2017-1 Zone 2017-2 Fund Citywide Steeple Hill LA Ave Meadows Carlsberg Club Estates Highlands Improvement Replacement Mgmt Grant Article 3 Article 8A Article 8C Undetermined Total Mammoth Highlands Park 931 Sand Volleyball Court $45,000 $45,000 932 Basketball Court Lighting Improvements $39,500 $39,500 933 Expand Trail $25,000 $25,000 Mammoth Highlands Park Total:$0 $0 $0 $0 $0 $109,500 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $109,500 Miller Park 934 Lighting Addition $25,000 $25,000 935 Loop Trail $45,000 $45,000 936 Replace Playground Equipment $250,000 $250,000 Miller Park Total:$0 $0 $0 $0 $0 $0 $70,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $250,000 $0 $0 $0 $0 $0 $0 $320,000 Monte Vista Nature Park 937 Lighting Improvements $25,000 $25,000 938 Shade Structure $30,000 $30,000 939 Landscape Improvements $300,000 $300,000 940 Trail System Improvements $150,000 $150,000 Monte Vista Nature Park Total:$0 $0 $0 $0 $0 $0 $505,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $505,000 Mountain Meadows 941 Handball Wall C0045 $34,600 $7,324 $41,924 942 Loop Trail $35,000 $35,000 943 Replace Playground Equipment $225,000 $225,000 Mountain Meadows Total:$0 $0 $0 $0 $34,600 $0 $42,324 $0 $0 $0 $0 $0 $0 $0 $0 $0 $225,000 $0 $0 $0 $0 $0 $0 $301,924 Peach Hill Park 944 Lighting Upgrades & Additions $300,000 $300,000 945 Picnic Pavilion Improvements $75,000 $75,000 946 Loop Trail $45,000 $45,000 947 Sand Play Area $25,300 $25,300 948 Replace Playground Equipment $135,000 $135,000 Peach Hill Park Total:$0 $0 $0 $0 $0 $0 $445,300 $0 $0 $0 $0 $0 $0 $0 $0 $0 $135,000 $0 $0 $0 $0 $0 $0 $580,300 Poindexter Park 949 Security Camera Improvements $35,000 $35,000 950 Skate Park Fencing $30,000 $30,000 951 Park Amenity Improvements $30,000 $30,000 952 Pathway Improvements $65,000 $65,000 Poindexter Park Total:$0 $0 $0 $0 $30,000 $130,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $160,000 Tierra Rejada Park 953 Lighting Additions $85,000 $85,000 954 Tennis Court Addition $70,000 $70,000 955 Parking Lot Expansion $106,000 $106,000 956 Replace Playground Equipment $400,000 $400,000 Tierra Rejada Park Total:$0 $0 $0 $0 $0 $0 $261,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $400,000 $0 $0 $0 $0 $0 $0 $661,000 Villa Campesina Park 957 Security Improvements $55,000 $55,000 958 Replace Playground Equipment $250,000 $250,000 Villa Campesina Park Total:$0 $0 $0 $0 $0 $0 $55,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $250,000 $0 $0 $0 $0 $0 $0 $305,000 204587 Program Funding Source: Fiscal Years 2017/18 - 2024/25 1000:2004:2006:2007:2010:2011:2013:2018:2300:2302:2307:2310:2312:2315:2322:3001:3003:2001:2409:2411:2412:2414: Project General Library Tree &Art In Public Community Park Imp.Park Imp.Endowment 84-2 84-2 84-2 84-2 Mtn 84-2 Country Moorpark City Hall Equipment Traffic Sys Federal TDA TDA TDA Code Project Name Number Fund Facilities Landscape Places Wide Dev.Zone 2017-1 Zone 2017-2 Fund Citywide Steeple Hill LA Ave Meadows Carlsberg Club Estates Highlands Improvement Replacement Mgmt Grant Article 3 Article 8A Article 8C Undetermined Total Virginia Colony Park 959 Basketball Court Addition $55,000 $55,000 960 Replace Playground Equipment $200,000 $200,000 Virginia Colony Park Total:$0 $0 $0 $0 $0 $55,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $200,000 $0 $0 $0 $0 $0 $0 $255,000 Walnut Acres Park 961 Security Cameras $10,000 $10,000 Citywide Parks 962 Central Irrigation System C0019 $156,599 $33,111 $34,466 $61,937 $92,406 $378,519 963 Lighting Upgrades $555,000 $555,000 964 ADA Improvements $60,000 $60,000 965 Universally Accessible Playground Equipment $350,000 $350,000 966 BMX/Free Style Bicycle Facility $850,000 $850,000 967 Sensory Garden $295,000 $295,000 968 Disc Golf Course $150,000 $150,000 969 Electronic Marquees $275,000 $275,000 970 Permanent Game Equipment $30,000 $30,000 971 Baseball Field $260,000 $260,000 972 Bocce Ball Court $10,000 $10,000 973 Ball Wall $35,000 $35,000 974 Update Park Features $175,000 $175,000 975 Additional Exercise Equipment $150,000 $150,000 976 Parkour Training Circuit $175,000 $175,000 977 Community Pool $3,000,000 $3,000,000 978 $75,000 $75,000 Citywide Parks Total:$156,599 $0 $0 $0 $0 $0 $0 $0 $0 $33,111 $0 $0 $34,466 $61,937 $92,406 $0 $0 $0 $0 $0 $0 $0 $6,445,000 $6,823,519 Parks Total:$156,599 $0 $0 $0 $4,482,600 $1,012,500 $1,873,132 $0 $0 $33,111 $0 $0 $34,466 $61,937 $92,406 $0 $2,360,000 $0 $0 $0 $0 $0 $8,945,000 $19,051,751 TRAILS (1000) 1001 Zone 15 Trail Improvements $1,600,000 $1,600,000 1002 Trails Master Plan $45,000 $45,000 1003 Arroyo Simi Trail Improvements $120,000 $30,000 $150,000 1004 Drain No. 2 Trail $28,554 $28,554 Trails Total:$45,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,600,000 $0 $0 $0 $28,554 $120,000 $0 $30,000 $0 $0 $1,823,554 Total Program Expenditure:$3,798,065 $25,000 $46,281 $397,500 $7,060,600 $1,012,500 $1,873,132 $5,678,172 $1,001,250 $179,410 $155,000 $650,000 $443,216 $2,776,960 $968,430 $31,502,837 $2,565,000 $525,804 $120,000 $130,516 $30,000 $24,710 $38,656,000 $99,620,383 Parks and Recreation Master Plan Update 205588 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 206 Completed Projects Public Works Department The following is a list of known CIP projects constructed subsequent to the incorporation of the City in 1983. Project Name Description 1985 Streets & Trails Sidewalk Construction East Side of Moorpark Avenue, Third Street to Los Angeles Avenue Sidewalk Construction West side of Moorpark Avenue from Community Center to High Street Sidewalk Construction West side of Moorpark Avenue from North of Poindexter Avenue to Third Street Asphalt Overlay Various Streets including High Street, Gabbert Road, Third Street, Bard Street, Sherman Avenue, Second Street and Sarah Avenue 1987 Streets & Trails Asphalt Overlay Spring Road South of Williams Ranch Road (by Developer) Sidewalk Construction South side of Williams Ranch Road (by Developer) Slurry Seal Project Various Streets throughout the City Railroad Crossing Construction of rubberized railroad crossing on Old Los Angeles Avenue (east of College View Avenue) Traffic Signals Los Angeles Avenue & Tierra Rejada Road Construction of a traffic signal at Los Angeles Avenue & Tierra Rejada Road / Gabbert Road 589 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 207 Los Angeles Avenue & Condor Drive Construction of a traffic signal at this intersection Parkways and Medians Campus Park Drive Construction of landscape improvements to medians on Campus Park Drive (two Developers) Tree Replacement Removal and replacement of parkway trees on a number of streets in the downtown area Spring Road & Peach Hill Road Construction of landscape improvements at the southwest corner Spring Road Drainage Improvement Construction of a box culvert on the west side of Spring Road south of Los Angeles Avenue 1988 Streets & Trails Tierra Rejada Bridge Construction of a four lane (with median) bridge across the Arroyo Simi Traffic Signals Traffic Signal: Los Angeles Avenue & Princeton Avenue Construction of a traffic signal at this intersection 1989 Streets & Trails Spring Road Railroad Crossing Construction of rubberized railroad crossing on Spring Road Moorpark Avenue Railroad Crossing Construction of rubberized railroad crossing on Moorpark Avenue Curb, Gutter, and S/W North side of High Street, east of Magnolia Street Asphalt Reconstruction & Overlay Various streets including Millard Street, Harry Street, Dorothy, Esther, Roberts Avenues, Laurelhurst Road, Campus Park Drive & Maureen Lane Traffic Signals 590 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 208 Los Angeles Avenue & Science Drive Construction of a traffic signal at this intersection Tierra Rejada Road & Peach Hill Road Construction of a traffic signal at this intersection (Developer) Tierra Rejada Road & Walnut Creek Road Construction of a traffic signal at this intersection (Developer) Tierra Rejada Road & Mt. Meadows Drive Construction of a traffic signal at this intersection (Developer) Storm Drains Moorpark Avenue Construction of storm drain improvements north of High Street (by Caltrans) 1990 Streets & Trails Slurry Seal Project Various streets throughout the City Sidewalk Construction East side of Spring Road, Los Angeles Avenue to Roberts Avenue (by Developer) Sidewalk Reconstruction Replacement of damaged sidewalks (including tree limb and root pruning) throughout the City. Traffic Signals Los Angeles Avenue & Spring Road Major reconstruction of the traffic signal at this intersection (by Developer) Traffic Signal: Campus Park Drive & Delfen St. Construction of a traffic signal at this intersection Parkways and Medians Tierra Rejada Road Median Construction of landscape improvements to Tierra Rejada Road medians from the Edison Easement easterly to a point east of Southhampton Road Tierra Rejada Road Parkway Construction of landscape improvements to the parkway on the north side of Tierra Rejada Road east of Peach Hill Road (Developer) 1991 Streets & Trails 591 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 209 High Street & Spring Road Reconstruction of curb, gutter & sidewalk at southeast corner (by Caltrans) Avenida Colonia & Nogales Street Reconstruction of these two streets including the construction of new curbs, gutters and sidewalks and the construction of a portion of the Happy Camp Canyon covered box culvert to allow for the connection of these two streets Los Angeles Avenue Widening North side street improvements from Liberty Bell Road to Maureen Lane, including an additional westbound travel lane, curb, gutter and sidewalk Sidewalk Construction West side of Spring Road, Los Angeles Avenue to Roberts Avenue Sidewalk Construction North side of Los Angeles Avenue between Spring Road and Millard Street Sidewalk Construction West side of Spring Road between Roberts Avenue and the railroad tracks Handicap Access Ramps Construction of handicap access ramps at various locations throughout the City Traffic Signals First St. / Poindexter Avenue @ Moorpark Avenue Construction of a traffic signal at this intersection to fulfill the City’s portion of a City/State Agreement to signalize both this intersection and Moorpark Avenue / High Street Storm Drains Happy Camp Box Culvert Construction of a covered box culvert for the Happy Camp drain at Los Angeles Avenue crossing (Unit III) and at the intersection of Nogales Street and Avenida Colonia 1992 Streets & Trails Sidewalk Reconstruction The reconstruction of the sidewalk on the east side of Tierra Rejada Road south of Los Angeles Avenue, including the replacement of street trees 592 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 210 High Street Storm Drain and Sidewalks Construction of a storm drain from Walnut Street to Magnolia Street and a sidewalk on the north side of the street between Bard Street and Magnolia Street Charles Street Reconstruction (Ph. I) Reconstruction of the street from Moorpark Avenue to Bard Street, including the construction of a storm drain and new curbs, gutters and sidewalks Traffic Signals Spring Road & Peach Hill Road Construction of a traffic signal at this intersection Collins Dr. & Campus Park Dr. Construction of a traffic signal at this intersection by Caltrans as a part of the freeway construction project High St. & Moorpark Avenue Construction of a traffic signal at this intersection by Caltrans to fulfill Caltrans’ portion of a City/State Agreement to signalize this intersection and Poindexter Avenue/First Street/Moorpark Avenue Peach Hill Rd & Spring Rd Construction of a traffic signal at this intersection Parkways and Medians Williams Ranch Road Landscape Barrier Construction of a landscaped barrier across Williams Ranch Road near the Edison Easement East side Tierra Rejada Road @ Los Angeles Avenue Replacement of the street trees on the east side of the street south of Los Angeles Avenue in conjunction with the reconstruction of sidewalks in that area 1993 Streets & Trails Asphalt Overlay Project Construction of an asphalt overlay on the following streets: 1) Tierra Rejada Road at the Route 23 Freeway; 2) Peach Hill Road; & 3) Campus Park Drive Slurry Seal Project Construction of Slurry Seal on various streets throughout the City 593 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 211 Los Angeles Avenue @ Park Lane, etc. Construction of street improvements, storm drains, traffic signals, landscaping and related improvements on Los Angeles Avenue, Park Lane, Lassen Avenue and Liberty Bell Road required for the construction of the Mission Bell Plaza, funded by Assessment District 92-1 [**CMP]. Peach Hill Road East of Spring Road Extension of Peach Hill Road east of Spring Road to the future Science Drive (constructed by the developer of the Carlsberg Specific Plan to serve the Mesa Verde Middle School) Traffic Signals Tierra Rejada Rd & Spring Rd Street widening project included the construction of a “permanent” traffic signal to replace the temporary traffic signal at this location [**CMP] Los Angeles Ave & Park Lane Construction of a traffic signal at this intersection as a part of the street and storm drain improvements funded by Assessment District 92-1 [**CMP] Los Angeles Avenue & Liberty Bell Road Construction of a traffic signal at this intersection as a part of the off-site and storm drain improvements funded by Assessment District 92-1 [**CMP] Parkways & Medians Sherman Avenue Property Wall Replacement of the rear property walls for the properties on the south side of Sherman Avenue (north side of Los Angeles Avenue between Spring Road and Millard Street) Los Angeles Avenue: Spring Road to Millard Street Construction of parkway landscaping on the north side of Los Angeles Avenue between Spring Road and Millard Street Tierra Rejada Road / Peach Hill Road Slope Repair Repair of a slope failure on the south side of Tierra Rejada Road east of Peach Hill Road Storm Drains Sunnyslope Place Debris Basin Access Road Construction of an access road to facilitate the maintenance of a storm water debris 594 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 212 basin north of Sunnyslope Place 1994 Streets & Trails Lassen Alley Improvements Construction of pavement improvements to complete the drainage improvements at the south end of McFadden Avenue and Cornett Avenue Charles Street Reconstruction (Ph. II) Reconstruction of the street from Bard Street to Spring Road, including the construction of a storm drain and new curbs, gutters and sidewalks Spring Road Berm Construction of an asphalt berm on the east side of the street north of Peach Hill Road in order to prevent erosion of the slope supporting the street Flory Area Sidewalks Construction of sidewalks on certain streets in the vicinity of Flory Elementary School, partially funded by an SB-821 pedestrian facility grant, including Second Street, Bard Street, Third Street, Flory Avenue, Millard Street, Roberts Avenue, and Harry Street Tierra Rejada Road Realignment and Reconstruction Realignment and reconstruction of Tierra Rejada Road east of Spring Road, increasing the roadway to four lanes and adding a center raised median [**CMP] Grimes Canyon Road Street improvements (including widening) near the entrance (Turfway Road) to Tract 4081 (constructed by the developer) Park Lane and Lassen Avenue Improvements to Park Lane north of Los Angeles Avenue and Lassen Avenue, to serve the Mission Bell Plaza Shopping Center (AD 92-1) Traffic Signals Tierra Rejada Road & Mountain Trail Street Construction of a traffic signal at this intersection (Developer) [**CMP] Tierra Rejada Rd & Arroyo Vista Access Rd / Countrywood Drive Construction of a traffic signal at this intersection (Developer) [**CMP] 595 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 213 Tierra Rejada Road @ Shopping Center Entry Construction of a traffic signal at this intersection (Developer) [**CMP] Parkways & Medians Tierra Rejada Rd Median at Spring Rd Installation of landscaping in the extension of the center median in Tierra Rejada Road just west of Spring Road Shasta Avenue / Los Angeles Avenue Wall [NE Corner] Construction of a block wall and landscaping at the northeast corner of Los Angeles Avenue and Shasta Avenue to meet right-of-way acquisition requirements East Side Spring Road South of Peach Hill Road Construction of parkway landscaping on the east side of Spring Road south of Peach Hill Road Los Angeles Avenue @ Shasta Avenue Construction of parkway landscaping on the north side of Los Angeles Avenue at Shasta Avenue Storm Drains AD 92-1 Construction of storm drains along the north side of Los Angeles Avenue, Park Lane, and within easements on the Mission Bell Plaza property 1995 Streets & Trails High Street Decorative Street Lights Installation of underground conduits for electrical, telephone, cable television, street lights and a decorative lighting system, plus the installation of nostalgic decorative street lights on High Street Freeway Connector Project Construction of bridges and related improvements required to connect the Route 23 Freeway to the Route 118 Freeway (Caltrans) [**CMP] City Maintenance Yard Conversion of property at 675 Moorpark Avenue to a City Maintenance facility Metro Link Parking Lot/Driveway Construction of the south Metro Link parking lot and access driveway (SCRRA) [**CMP] Lassen Avenue @ Modifications to Lassen Avenue to provide 596 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 214 Mission Bell Plaza entrances to the north end of the Mission Bell Plaza Shopping Center parking lot from Sierra Avenue and from Park Lane Slurry Seal Project Application of slurry seal and related work to approximately one-third of the residential streets in the City Tecolote, Canario, Etc. Construction of an asphalt overlay on Tecolote Court, Canario Court, and a portion of North Granadilla Drive Walnut Canyon Road @ Casey Road Widening of Route 23 by Caltrans to provide a center turning lane at Wicks Road and Casey Road First Street/Bard Street Reconstruction of First Street and Bard Street including reconstruction of pavement, curb, gutter and sidewalks Parkways & Medians Moorpark Estates Entry Installation of entry signs at Shasta Avenue and Los Angeles Avenue and at Poindexter Avenue and Sierra Avenue Shasta Avenue/Los Angeles Avenue Wall [NW Corner] Construction of a block wall and landscaping at the northwest corner of Los Angeles Avenue and Shasta Avenue to meet right-of-way acquisition requirements Poindexter Avenue @ Sierra Avenue Construction of parkway landscaping on the south side of Poindexter Avenue at Sierra Avenue Princeton Avenue Construction of parkway and median landscaping on Princeton Avenue Campus Park Drive Construction of parkway landscaping on the south side of Campus Park Drive east and west of Princeton Avenue Tierra Rejada Road Slope Restoration Restoration of slope slippage on the south side of Tierra Rejada Road near Peach Hill Road Bard Wall Construction of a wall at the north end of Bard Street, just north of First Street Virginia Colony Planter Construction of a landscaped planter at the corner of Virginia Colony Place and Los Angeles Avenue 597 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 215 Irrigation Crossover Conduits Construction of conduits for future irrigation water lines and valve control wires at a number of locations including: Tierra Rejada Road at Courtney Lane; Courtney Lane on the west side of Tierra Rejada Road and Southhampton Road at Tierra Rejada Road Spring Road Parkway Trees Removal and replacement of damaged sidewalks and the installation of tree well grates along the west side of Spring Road south of Peach Hill Road, to preserve existing parkway trees. 1996 Streets & Trails Millard Street Area Sidewalks Construction of sidewalks on Sherman Avenue, Esther Avenue, Roberts Avenue and other streets Poindexter Avenue Complete reconstruction of this street west of Chaparral Middle School Everett Street Complete reconstruction of this street, including curb, gutter and sidewalk Walnut Street Complete reconstruction of this street, including curb, gutter and sidewalk Bard Street Complete reconstruction of this street between Charles Street and High Street Magnolia Street Complete reconstruction of this street north of Charles Street Tierra Rejada Road Construction of an asphalt overlay on this street east of Spring Road Spring Road Construction of an asphalt overlay on this street south of Peach Hill Road Old Los Angeles Avenue Construction of an asphalt overlay on this street east of the rail crossing located east of Collins Drive Flory Avenue Construction of an asphalt overlay on this street Magnolia Street Construction of an asphalt overlay on this street south of Charles Street 598 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 216 Goldman Avenue Construction of an asphalt overlay on this street Spring Road Median / Double Left Turn Lane Construction of modifications to the south leg of the intersection of Spring Road and Los Angeles Avenue to provide for a double left turn lane and a raised center median Painted Sky Street Subsidence Repair Repair of street improvements damaged by a street subsidence Public Works Yard Expansion Construction of additional improvements to expand the City Maintenance Yard at 675 Moorpark Avenue Traffic Signals Collins Drive & Campus Park Drive Construction of a traffic signal at this intersection by Caltrans, as a apart of the Freeway Connector construction project Moorpark Road & Tierra Rejada Road Construction of a traffic signal at this intersection by the City, with partial funding from the County of Ventura Parkways & Medians Home Acres Buffer Area Construction of a landscaped buffer area, including an emergency access road and a flood control maintenance road, at the west end of Shadyridge Drive in Tract 4021 (funded by Zone 8 of AD 84-2) Storm Drains Tierra Rejada Road Sub- Drain System Construction of a sub-drain system along Tierra Rejada Road between Walnut Canyon Road and Mountain Trail Street to convey subsurface water to storm drain inlets Tierra Rejada Road Inlet East of Spring Road Installation of a catch basin on the north side of the center median on Tierra Rejada Road east of Spring Road 599 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 217 1997 Streets & Trails Flinn Avenue Reconstruction Reconstruction of Flinn Avenue east of Spring Road, constructed in conjunction with the Spring Road storm drain project Moorpark Avenue [South] A/C Overlay Construction of an asphalt overlay on this street, constructed in conjunction with the construction of the Moorpark Avenue storm drain project AVCP Access Bridge Construction of a pedestrian, equestrian, emergency access bridge across the Arroyo Simi, to connect Arroyo Vista Community Park to Liberty Bell Road Arroyo Vista Community Park Bike Path Construction of a paved surface between the end of the park access road and the Arroyo Vista Park Access Bridge, partially funded by an SB-821 bicycle facilities grant Storm Drains Moorpark Avenue Storm Drain System Construction of a storm drain system extending from the south side of Los Angeles Avenue northerly to a point north of First Street, with storm drain laterals serving Flory Avenue and the Metro Link parking lot Spring Road Storm Drain System Construction of a storm drain system extending from the south side of Los Angeles Avenue northerly to Flinn Avenue, and then extending easterly on Flinn Avenue 1998 Streets & Trails Downtown Alley Reconstruction Reconstruction of the alleys south of First Street Valley Road Reconstruction of the street Wicks Road Slope Stabilization Construction of retaining walls and related improvements required to provide slope stabilization to support Wicks Road 600 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 218 Wicks Road A/C Overlay Construction of an asphalt overlay on the westerly portion of this street Bonnie View Street A/C Overlay Construction of an asphalt overlay on this street Maureen Lane Reconstruction Reconstruction of Maureen Lane south of Los Angeles Avenue Storm Drains Science Drive Storm Drain System Construction of two storm drain systems serving the Carlsberg Specific Plan (by Developer), one serving the streets and a separate system conveying run-off from common areas to vernal ponds 1999 Streets & Trails Peach Hill Road Widening to the south side of the street east of Spring Road, in order to provide a westbound left-turn lane. Poindexter Avenue Widening to the north side of the street east of Gabbert Road, including new curb, gutter and sidewalk, and the re-striping of the street to provide a painted median and Bike Lanes. New Los Angeles Avenue Widening Widening to the south side of the street to provide six (6) lanes of traffic (by Developer). [**CMP] Spring Road Widening Construction of widening to the east side of Spring Road from Tierra Rejada Road northerly to the Arroyo Simi Bridge (by developer). Casey Road Widening Widening to the south side of the street west of Walnut Canyon Road. Old L.A. Avenue Rail Crossing Surface crossing improvements to the rail crossing (by SCRRA). Gabbert Road Surface crossing improvements to the rail crossing (by Union Pacific). Miller Parkway Construction of a new collector street between Tierra Rejada Road and New Los 601 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 219 Angeles Avenue (by developer). Tierra Rejada Road Improvements to the north side of the street, just west of the freeway (by developer). Traffic Signals Casey Road/Walnut Canyon Road Construction of a traffic signal, funded by the City, Caltrans and the Moorpark Unified School District. [**CMP] Peach Hill Road and Miller Parkway Installation of a new traffic signal at this new intersection (by developer). Tierra Rejada Road and Miller Parkway Installation of a new traffic signal at this new intersection (by developer). [**CMP] Commercial Entry and Miller Parkway Installation of new traffic signal at this new intersection (by developer). This signal is to be made operational when the center is opened. New Los Angeles Avenue & Miller Parkway Modifications to the traffic signal at the intersection of New Los Angeles Avenue and Science Drive, to accommodate the addition of Miller Parkway as the south leg of the intersection. (by developer) [**CMP]. New Los Angeles Avenue at the Route 23 Freeway Installation of traffic signals at the on and off-ramps to the freeway, in order to allow ingress and egress traffic to and from White Sage Road (private) [by Caltrans and the developer]. Parkways & Medians Spring Road Medians and Parkways Construction of new landscaped medians and parkways (east side) from Tierra Rejada Road northerly to the Arroyo Simi Bridge (by developer). 2000 Streets & Trails Spring Road Bridge Reconstruction of the Spring Road Bridge at the Arroyo Simi, to provide sidewalks, bike lanes and a raised median. Asphalt Overlay The construction of an asphalt overlay and related improvements to the following 602 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 220 streets: Talmadge Rd.; Marquette St.; Gabbert Rd. (north of Poindexter Ave.); Spring Road (north of High St.); Fitch Ave.; Minor St.; Robert St.; Harry St.; Ruth Ave.; Dorothy Ave.; Mt. Trail (east of Walnut Creek Rd.); Collins Dr.; Campus Park Dr.; Princeton Ave.; High Street; Spring Road (New L. A Ave. to Bridge); and Christian Barrett Drive. Spring Road Rehabilitation Rehabilitation of Spring Road between New Los Angeles Avenue and High Street. The cost of this project was reimbursed by Caltrans as required by a Highway Relinquishment Agreement. Los Angeles Avenue Rehabilitation Rehabilitation of Los Angeles Avenue between High Street and Princeton Avenue. The cost of this project was reimbursed by Caltrans as required by a Highway Relinquishment Agreement. Upgrades to the middle portion of this street segment are being deferred until the Los Angeles Avenue East project is constructed. Parkways & Medians Freeway Landscaping Installation of freeway landscaping from Collins Drive to a point west of Princeton Avenue (by Caltrans). Storm Drains Tierra Rejada Road Inlets Construction of additional storm drain inlets to better handle peak storm flows. L.A. Ave. Drain Installation of new inlets east of Spring Road to eliminate flooding. 2001 Streets & Trails New Los Angeles Avenue Bridge Widening Widening to the south side of the New Los Angeles Avenue [SR-118] bridge over the Arroyo Simi to provide six (6) lanes of traffic. [**CMP] Los Angeles Avenue: Moorpark Avenue to Widening to the south side of the street to provide three (3) eastbound lanes (by 603 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 221 Park Lane Developer). [**CMP] Los Angeles Avenue: East of Leta Yancy Rd Construction of street widening to the south side of the street at the old Caltrans Maintenance Yard, in order to provide three (3) eastbound lanes, curb, gutter and sidewalk. [**CMP] Traffic Signals Los Angeles Avenue & Tierra Rejada Road Modifications to the striping to provide a double left-turn lane at the east leg of the intersection. [**CMP] Parkways & Medians Los Angeles Avenue Installation of median landscaping and irrigation in the new raised median on Los Angeles Avenue south of the Princeton Avenue freeway ramps. Tierra Rejada Road Installation of parkway landscaping on the north side of Tierra Rejada Road east and west of Southhampton Road, funded by the Zone 2 improvement assessment [AD84-2]. 2002 Streets & Trails Underground Utility District No. 2000-1 The undergrounding of all overheard utilities, other than high voltage electrical lines, on Los Angeles Avenue between Gabbert Road and Millard Street. Project was constructed by SCE and funded by SCE pole replacement monies and Rule 20A undergrounding accruals. Miller Parkway/Peach Hill Road U-Turn Construction of widening at the northeast corner to allow south-to-north U-Turn movements. 2003 Streets & Trails Arroyo Trail Study Feasibility Study and Implementation Plan for an arroyo levee trail from the westerly City limit to Madera Road in the City of Simi Valley. Moorpark Road City costs related to a County of Ventura 604 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 222 Realignment Road Department Project to construct a new, realigned Moorpark Road intersecting Tierra Rejada Road at Miller Parkway. Curb Ramp Project Construction of curb ramps at a number of locations (mainly “T-intersections”) throughout the City. 2003 Slurry Seal Project Application of Slurry Seal to approximately one-third of the streets in the City. 2003 AC Overlay Project Construction of an asphalt overlay on a number of streets throughout the City. GASB-34 Infrastructure Inventory Report Preparation of a study to inventory, quantify, categorize and determine the value of the City’s infrastructure improvements. Depreciation rates and replacement cost estimates were also derived from that effort. Curb / Gutter Repair Project Replacement of damaged curb and gutter at numerous locations throughout the City. Parkways & Medians Peach Hill Road Parkway Construction of parkway landscaping on Peach Hill Road between Mesa Verde Drive and Peach Hill Park. This project was constructed by the Peach Hill HOA Traffic Signals L.A. Avenue at the Marketplace Shopping Center Installation of a new traffic signal by the developer of the shopping center. Miller Parkway & Patriot Drive Installation of a new traffic signal by the developer of the shopping center. 2004 Streets & Trails Flinn Avenue Realignment The realignment of Flinn Avenue to align with Second Street. The project included the widening of Spring Road north of Flinn Avenue, the construction of a raised median on Spring north of Flinn Avenue and the construction of a traffic signal at the intersection of Spring Road and Second Street. 605 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 223 Civic Center Driveway Modification The widening of the driveway into City Hall. Street Light Modification – Millard Tract A CDBG funded project to relocate and add street lights in the neighborhood southeast of Moorpark Avenue and First Street. Traffic Signals Double Left-Turn lane on Spring Rd at Tierra Rejada Rd Construction of improvements to provide a double left-turn lane for southbound traffic. Spring Rd and Second Street Construction of a traffic signal at the intersection of Spring Road and Second Street / Flinn Avenue. Parkways & Medians Spring Road Parkway West side Removal of existing eucalyptus trees and the construction of new tree wells, with deep root irrigation, between Peach Hill Rd. and Christian Barrett Drive. Tierra Rejada Rd Parkway, East side Removal of existing trees and installation of new tree wells, with deep root irrigation, between Harvester and Courtney. Spring Road Median Installation of median landscaping north of Second Street. Storm Drains Loraine Drain Construction of storm drainage facilities northwest of the Spring Road Bridge (by a developer) to meet needs identified in the Master Drainage Study as the “Loraine Drain” or the “No Name Drain”. 2005 Streets & Trails Grimes Canyon Road at Championship Drive Construction of roadway improvements by a Developer. City costs related to the acquisition of needed rights-of-way were reimbursed by the Developer. Traffic Signals Casey Signal Modification The modification of the traffic signal at Casey Road and Walnut Canyon Road [State Route 23] to provide a left-turn arrow for northbound traffic [funded by developer 606 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 224 (Pardee Homes)]. Storm Drains Little Hollow Sub Drain Construction of a sub-drain to intercept subsurface water and convey same to a storm drain in an effort to prevent future damage to the asphalt pavement. 2006 Streets & Trails Los Angeles Avenue Widening at Maureen Lane Construction of roadway widening to the south side of the street, including addition pavement, curb, gutter, sidewalk and property walls, and the construction of a traffic signal at the intersection of Los Angeles Avenue and Maureen Lane. [**CMP] Traffic Signals Los Angeles Avenue at Maureen Lane Construction of a traffic signal at this intersection. [**CMP] Parkways & Medians Tierra Rejada Road Medians Construction of median landscaping on Tierra Rejada Road between Spring Road and the Route 23 freeway. 2007 Streets & Trails Freeway Sign Replacement Replacement of freeway off-ramp signs required by street name changes for New Los Angeles Avenue and Princeton Avenue. Downtown Trail Study The Downtown Trail Study was completed. Future implementation will be considered when and if funding sources are identified. Spring Road Extension Construction of the extension of Spring Road northerly from Charles Street to connect to Walnut Canyon Road. ‘C’ Street (Ridgecrest Drive) Construction of the east-west local collector street (Ridgecrest Drive) along the northerly boundary of the City (Pardee Homes), from Spring Road easterly to the proposed 607 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 225 realigned Route 23. Spring Road Wall Construction of a block wall and landscaping on the west side of Spring Road from Los Angeles Avenue to the railroad crossing. Traffic Signals Campus Park Drive and Collins Drive Signal and striping changes were funded and constructed by the developer of the property at the southwest corner. Spring Road and Charles Street New traffic signal installed by developer. Spring Road and Elk Run Drive New traffic signal installed by developer. Spring Road and Ridgecrest Drive New traffic signal installed by developer. Spring Road and Walnut Canyon Road (SR-23) New traffic signal installed by developer. Traffic Controller and Operations Improvements Construction of controller and other hardware, improvements, and/or for the upgrading of traffic signal operations through improved software, at designated intersections. Parkways & Medians Los Angeles Avenue and Tierra Rejada Rd Parkways Construction of parkway landscaping on the south side of Los Angeles Avenue from Butter Creek Road to Maureen Lane, and the construction of parkway and median landscaping on Tierra Rejada Road south of Los Angeles Avenue. Princeton Avenue Median Modification Modification of the median and median landscaping on Princeton Avenue at Campus Park Drive. 2008 Streets & Trails Lighted Crosswalk on Moorpark Avenue at Second Street Replacement of freeway off-ramp signs required by street name changes for New Los Angeles Avenue and Princeton Avenue. 608 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 226 Asphalt Overlay Projects Construction of an asphalt overlay, and related work, along the entire length of Tierra Rejada Road and on Second Street. Slurry/ARAM Project Pavement rehabilitation of various City streets completed in FY 08/09. Traffic Signals Traffic Signal Interconnect: Los Angeles Avenue Construction of a hardwire traffic signal interconnect system to allow for the coordination of all of the traffic signals along the Los Angeles Avenue corridor (SR- 118). Traffic Signal Interconnect: Tierra Rejada Road Construction of a hardwire traffic signal interconnect system to allow for the coordination of all of the traffic signals along Tierra Rejada Road between Countrywood Drive and the Route 23 freeway. 2009 Streets & Trails Moorpark Road DualLeft Turn Lanes Perform intersection modifications to provide dual left turn lanes on Moorpark Road to Tierra Rejada Road. Lassen Avenue Bikeway/Walkway Construction of a Bikeway/Walkway path extending westerly from Moorpark Avenue near Third Street, within the Lassen Avenue street right-of-way. High Street Rehabilitation Widening and extension of High Street west of Moorpark Avenue and construction of Post Office parking lot. Parkways & Medians Tierra Rejada Road Medians Construction of median landscaping on Tierra Rejada Road between Brennan Road and the Route 23 freeway. Storm Drains Walnut Canyon Drain Improvement Replacement of open channel drain with covered reinforced concrete pipe from the west end of the High Street extension to approximately 350 feet north of High Street 2010 609 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 227 Streets & Trails Mountain Trail Street/ Spring Road Pavement Rehabilitation Pavement rehabilitation and construction of a landscaped median in Mountain Trail Street from Tierra Rejada Road to Country Hill Road, and pavement rehabilitation on Spring Road from Peach Hill Road to a point approximately 2000 feet to the south. Julliard Avenue and Reedley Street Overlay Asphalt overlay of Julliard Avenue from Campus Park Drive to Loyola Street and Reedley Street from Julliard Avenue west to the end due to damage caused by a ruptured waterline. Parkways & Medians City Entry Signs Installation of City Entry Signs on Princeton Avenue on each side of the 118 Freeway; and on Tierra Rejada west of the 23 Freeway. Mountain Trail Street/ Spring Road Pavement Rehabilitation Construction of a landscaped median in Mountain Trail Street from Tierra Rejada Road to Country Hill Road. 2011 Streets & Trails Metrolink Security Wall & Camera System Extension of the security wall along the Metrolink south parking lot property line. Metrolink security camera system completed in FY 07/08. Traffic Signal Collins Drive and University Drive Construction of a traffic signal at the intersection of Collins Drive and University Drive. Los Angeles Avenue and Tierra Rejada Drive Modification of the traffic signal to provide protected phases (Left Green Arrows) for the north and south legs of the intersection, as well as a right green arrow for northbound Tierra Rejada Road [**CMP] 2012 Streets & Trails Alderbrook Street Asphalt Asphalt overlay on Alderbrook Street from 610 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 228 Overlay Honeybrook Court to River grove Court and on Walnut Creek Road from Tierra Rejada to Misty Grove Street. 2012 Pavement Rehabilitation ARAM and slurry seal of various City Streets. 2012 Sidewalk Reconstruction Replacement of sidewalks, curbs, and gutter at various locations. Spring Road Overlay Asphalt overlay on northbound Spring Road from Flinn Avenue to the railroad crossing. Storm Drains Spring Road Storm Drain Installation of a catch basin on northbound Spring Road at the Police Services Center driveway with a connection to the existing storm drain on the west side of Spring Road. The project included a storm drain connection to the Ruben Castro Human Services Center site. 2013 Streets & Trails SR- 23 FWY Sound wall st Tierra Rejada Construction of freeway sound walls adjacent to the homes on Crab Apple Court at the eastern boundary of Tract 4975 (Toscana at Serenata) within the Carlsberg Specific Plan area, bordering the west side of the SR-23 Freeway 2013 Pavement Markings Replacement of faded pavement striping, arrows and legend at various locations. 2014 Streets & Trails Railroad crossing at Spring Road Street widening and at-grade rail crossing improvements including a center median, four vehicle crossing gates, pedestrian crossing gates, concrete sidewalk, dedicated northbound right turn lane and bike lanes in both directions. Campus Canyon Drive Crosswalk Relocation of the crosswalk on Campus Canyon Drive at Monroe Avenue and Construction of new curb ramps. 611 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 229 2015 Streets & Trails 2015 Pavement Rehabilitation ARAM, slurry seal, and crack-fill of various City Streets. 2016 Streets Los Angeles Avenue Widening at Shasta Avenue Widen south side of Los Angeles Avenue at Shasta Avenue. This project added a third eastbound lane, constructed sidewalk, temporary storm drains, and provided structural protection to Calleguas MWD transmission pipeline. Moorpark Avenue Left- Turn Lane SCRRA’s sealed corridor work widened Moorpark Avenue between Poindexter Avenue and High Street. The crossing received channelizing median and sidewalks, additional safety devices and gates, and improved signal at High Street. 2017 Walkways Lassen Walkway Slurry seal pavement rehabilitation. Traffic Signals Collins Drive Construct traffic signal at eastbound SR-118 ramps at Collins Drive 2018 Streets Asphalt Overlay of Spring Road, Princeton Avenue, Poindexter Avenue, Gabbert Road Asphalt overlay and curb ramp replacements 612 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 230 Completed Projects Parks, Recreation and Community Services Department ACTIVE ADULT CENTER ITEM/DESCRIPTION DATE CENTER EXPANSION 03/2000 KITCHEN AIR CONDITIONING 09/2000 AUTOMATIC SLIDING DOOR 09/2000 KITCHEN RENOVATION (SINKS/OVEN) 06/2015 ARROYO VISTA RECREATION CENTER ITEM/DESCRIPTION DATE GYMNASIUM CONSTRUCTION 01/1993 RECREATION CENTER BUILDING CONSTRUCTION 01/1993 RETAINING WALL, RECREATION CENTER 01/1993 SCOREBOARD (2) FOR GYM 01/1993 LIGHTS, 13 STEEL OUTDOOR 01/1999 LED SCOREBOARD (2) FOR GYM 08/2003 VIDEO MONITORING SYSTEM 09/2004 THEATER SYSTEM 01/2007 RECREATION CENTER BUILDING EXPANSION 08/2008 SOUND SYSTEM & SYNCHRONIZER 11/2011 BASKETBALL BACKBOARDS FOR GYM 09/2014 SCOREBOARD (2), SHOT TIMER, RECEIVERS FOR GYM 09/2014 TELESCOPIC BLEACHERS FOR GYM 01/2015 CITY HALL ITEM/DESCRIPTION DATE CITY HALL BUILDING CONSTRUCTION 01/1988 GENERATOR, BACKUP 01/1990 GENERATOR, EMERGENCY 07/2000 TELEPHONE SYSTEM, CABLE, & CONSULTANT 07/2001 COMPUTER ROOM FIRE SYSTEM 04/2005 613 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 231 CITY HALL AUDIO SYSTEM 08/2005 HEAT PUMP CONDENSING UNIT#1, #2, & #3 03/2011 MODULAR BUILDING - ANNEX 01/1992 ANALYSER, MERCURY VAPOR ANNEX 01/2002 DOSIMETER, PERSONAL ALARM ANNEX 04/2002 ANNEX IMPROVEMENTS 01/2007 MODULAR BUILDING - BREAKROOM/FILE ROOM 09/2010 MODULAR BUILDING - DEVELOPMENT SERVICES 09/2010 FIRE SPRINKLER SYSTEM DEV SVS MODULAR 06/2012 ADA IMPROVEMENTS 2013 COMMUNITY CENTER ITEM/DESCRIPTION DATE COMMUNITY CENTER BUILDING CONSTRUCTION 01/1981* FLAGPOLE 01/1981* LIGHTS, 7 STEEL OUTDOOR 01/1981* PATIO WALL, BLOCK W/STUCCO 01/1981* PAVING, ASPHALT 01/1981* LAND, CIVIC CENTER 05/1984 KITCHEN IMPROVEMENTS 01/1988 A/V IMPROVEMENTS 01/1988 A/V IMPROVEMENTS 01/1995 A/V IMPROVEMENTS 1998-2001 ROOF REPAIR/CONSTRUCTION 02/2000 VIDEO MONITOR, MOTION MEDIA, CAMERA/AUDIO SYSTEMS 04/2002 BROADCASTING SYSTEM & VIDEO SYSTEM REFURBISHMENT 06/2002 PIONEER DUAL DVD RECORDERS (2) 09/2003 WATER HEATER 02/2005 A/V IMPROVEMENTS 2005 LIGHTING SYSTEM 01/2006 SPEAKERS, RACK AND MOUNT 01/2006 PROJECTOR SYSTEM & INSTALL 10/2007 CC VIDEO CTRL RM UPGRADE 06/2008 614 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 232 HEAT/VENT AC #1, 2, 3, 4, 8, 9, & 10 08/2010 A/V IMPROVEMENTS 2010-2015 CAMERA, VIDEO HD (4) & REMOTE CAMERA CONTROLLER 02/2015 PARKING LOT IMPROVEMENTS 12/2015 HIGH STREET ARTS CENTER ITEM/DESCRIPTION DATE BUILDING & LAND PURCHASE 07/2005 SOUND SYSTEM & PROJECTOR 04/2007 MOVING LIGHTS (4) 07/2011 AUDIO WIRELESS PERSONAL MONITOR 04/2012 PROPERTY ACQUISITION (61 HIGH STREET) 01/2016 LIBRARY ITEM/DESCRIPTION DATE LAND, ACCESS RD & PARKING LOT 05/1984 LAND, BUILDING 12/2006 MEDIA DROP 01/2011 POLICE SERVICE CENTER ITEM/DESCRIPTION DATE LAND, POLICE SERVICE CENTER 04/2001 POLICE SERVICE CENTER CONSTRUCTION 06/2006 SECURITY, VIDEO SYSTEM 06/2002 SURVEILLANCE, VIDEO SYSTEM 06/2002 FIRE PROTECTION SYSTEM FM200 12/2010 LIGHTING UPGRADES 5/2014 PARKING LOT PAVING 02/2016 POST OFFICE ITEM/DESCRIPTION DATE LAND PARCEL 08/1993 LAND POST OFFICE DOWNTOWN PARKING LOT 01/2011 POST OFFICE PARKING LOT IMPROVEMENTS 01/2011 615 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 233 PUBLIC SERVICES FACILITY ITEM/DESCRIPTION DATE LAND, MPSF 02/2002 PUBLIC SERVICES FACILITY CONSTRUCTION 04/2007 FENCE, CHAIN LINK 07/2004 IRON FENCE INSTALL & GATE KEYPAD 02/2008 ICE MAKER, CUBE-STYLE 02/2013 CARD READER ENTRY SYSTEM 11/2015 RUBEN CASTRO HUMAN SVC CTR ITEM/DESCRIPTION DATE LAND - 2 ARCE PARCEL MAP 5426 06/2003 LAND, PARKING LOT 05/2010 PUBLIC ART: WE ARE ONE FAMILY 04/2012 CONCRETE FOOTING FOR ART 07/2013 BUILDING B CONSTRUCTION 07/2013 EMERGENCY GENERATOR, ENGINE & ALTERNATOR 07/2013 HEAT/VENT AC UNITS (14 TOTAL) 07/2013 IRRIGATION CONTROLLER 07/2013 PRE-FAB SUNSHADE FOR BUILDING B 08/2014 COURTYARD GATE REPLACEMENT 11/2016 TIERRA REJADA ROAD / MOUNTAIN TRAIL STREET INTERSECTION ITEM/DESCRIPTION DATE 911 MEMORIAL SCULPTURE/FOUNTAIN 03/2002 ARROYO VISTA COMMUNITY PARK ITEM/DESCRIPTION DATE LAND, ACCESS ROAD 07/1/1983 LAND, PARK SITE 05/11/1984 LAND, PARK SITE 01/06/1988 LAND, ACCESS ROAD 09/11/1992 PHASE I CONSTRUCTION 01/01/1993 LAND, ACCESS ROAD 05/06/1996 FOOTBALL FIELD GOAL POST (2 TOTAL) 09/01/1997 616 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 234 MULTI-PURPOSE COURT W/FENCE 01/01/1999 PATIO AND PATHWAYS PAVING, CONCRETE 01/01/1999 TENNIS COURT CONSTRUCTION 12/15/1999 TENNIS COURT SPORTWALL 04/05/2000 CONCEPTUAL DESIGN PHASE II 11/01/2000 POOL CAD MAPPING, TOPO SURVEY, GEOTECHINICAL 12/20/2000 RESTROOM BUILDING (EAST) DESIGN & CONSTRUCTION 06/27/2001 SOCCER GOALS (4 TOTAL) 08/01/2001 DRINKING FOUNTAIN GALVANIZED 11/11/2002 FOOTBALL FIELD FENCE 09/30/2003 PARK ENTRY GUARDRAIL 06/18/2004 PHASE II EXPANSION CONSTRUCTION 11/17/2004 PUMP, SUBMERSIBLE WELL #1 10/31/2008 PLAYGROUND STRUCTURES & SWINGS 07/02/2010 IRRIGATION CONTROL PANEL SYSTEM WELLS #1 & 3 06/13/2014 PUMP, SEWAGE SUBMERSIBLE #1 & #2 06/13/2014 VFD SEWER CONTROL PANEL 06/13/2014 PUBLIC ART: LITHOMOSAICS AND BRONZE TOAD 11/21/2014 PARKING LOT IMPROVEMENTS 12/15/2015 SLOPE RETAINING WALL 2/1/2017 RECREATIONAL TRAIL 6/30/2017 PARKING LOT IMPROVEMENTS 6/30/2017 LIGHTING IMPROVEMENTS 6/30/2017 MULTI-USE COURT IMPROVEMENTS 8/15/2017 ACCESS ROAD IMPROVEMENTS 12/1/2017 BUFFER ZONE ITEM/DESCRIPTION DATE LAND, HOME ACRES BUFFER ZONE 04/05/1994 TURF REPLACEMENT 01/16/2016 617 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 235 BUTTERCREEK PARK ITEM/DESCRIPTION DATE LAND, PARK SITE AT DAISY/PEPPERMILL 05/11/1984 LAND, PARK SITE AT PEPPERMILL ST 05/11/1984 CAMPUS CANYON PARK ITEM/DESCRIPTION DATE LAND, PARK SITE 10/1986 RETAINING WALL, BLOCK 04/1990 SOFTBALL FIELD BACKSTOP 01/1994 DRINKING FOUNTAINS 01/1994 FENCE, BALLFIELD 01/1994 FENCE, STEEL BAR & BLOCK 01/1994 LIGHTS, 5 STEEL OUTDOOR 01/1994 PAVING, CONCRETE GROUP 01/1994 PICNIC PAVILION 01/1994 SAND PIT FOR PLAYGROUND 01/1994 RESTROOM 01/1994 RETAINING WALL, BLOCK/STUCCO 01/1994 FENCE, REPLACE WROUGHT IRON 02/2000 PLAYGROUND EQUIPMENT 09/2000 SURFACE, PLAYGROUND 10/2000 DRINKING FOUNTAIN GALVANIZED 03/2003 5' BLACK IRON FENCE 11/2008 CAMPUS PARK ITEM/DESCRIPTION DATE LAND, PARK SITE 05/1984 LAND, PARK SITE 10/1987 DRINKING FOUNTAIN 01/1988 FENCE, REAR PERIMITER 01/1988 LIGHTS, 5 STEEL OUTDOOR 01/1988 PAVING, PAVILION AND BASKETBALL COURT 01/1988 618 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 236 PICNIC PAVILION 01/1988 SAND PIT FOR PLAYGROUND 01/1988 RESTROOM BUILDING 01/1988 PLAYGROUND EQUIPMENT 07/2001 PARK MONUMENT SIGN (CONCRETE) 04/2003 PARK TABLES & BENCHES 04/2008 LIGHTING UPGRADES 05/2014 COLLEGE VIEW PARK ITEM/DESCRIPTION DATE LAND, PARK SITE 05/1984 DRINKING FOUNTAINS 01/1990 FENCE, CHAIN LINK 01/1990 LIGHTS, 11 STEEL OUTDOOR 01/1990 PAVING, CONCRETE 01/1990 PICNIC PAVILION 01/1990 SAND AND WOODCHIP PITS FOR PLAYGROUND 01/1990 PLAYGROUND STRUCTURE 01/1990 RESTROOM BUILDING 01/1990 SIGN, PARK 01/1990 TABLE, PICNIC W/BENCHES (13 TOTAL) 01/1990 PLAYGROUND EQUIPMENT 08/1999 COLLEGE VIEW PARK MONUMENT 07/2003 PARK TABLES & BENCHES 07/2007 SECURITY LIGHTS (6) INSTALL 06/2008 BASKETBALL COURT LIGHTS 09/2009 PLAYGROUND EQUIPMENT & INSTALLATION 06/2010 DOG PARK ADDITION 09/2010 BENCH, CONCRETE 06/2015 619 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 237 COMMUNITY CENTER PARK ITEM/DESCRIPTION DATE PERIMETER FENCE, STEEL 01/1981* DRINKING FOUNTAIN 01/1988 SAND PIT FOR PLAYGROUND 01/1998 PLAYGROUND STRUCTURE & SWINGS 01/1998 TABLE, PICNIC, W/BENCHES (7) 01/1998 DRINKING FOUNTAIN GALVANIZED 11/2002 PLAYGROUND STRUCTURE 12/2002 PARKING LOT IMPROVEMENT 12/2015 COUNTRY TRAIL PARK ITEM/DESCRIPTION DATE LAND, PARK SITE 11/1995 DRINKING FOUNTAIN 01/1997 FENCE, STEEL BAR & STONE 01/1997 LIGHTS, 6 STEEL OUTDOOR 01/1997 PAVING, ASPHALT 01/1997 PAVING, CONCRETE 01/1997 SAND PITS FOR PLAYGROUND 01/1997 PLAYGROUND STRUCTURES (2), EQUIPMENT & SWINGS 01/1997 SIGN, PARK CONCRETE 01/1997 TABLE, PICNIC W/BENCHES 01/1997 PLAYGROUND FENCE, WROUGHT IRON 05/2001 IRRIGATION CONTROLLER 08/2012 PLAYGROUND STRUCTURE REPAIRS 09/2012 CONCRETE PARK BENCHES (8) & PICNIC TABLES (8) 07/2013 PARKING LOT IMPROVEMENTS 12/2015 GLENWOOD PARK ITEM/DESCRIPTION DATE LAND, PARK SITE 05/1984 BASKERBALL COURT & PATHWAYS PAVING 01/1994 620 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 238 DRINKING FOUNTAIN 01/1994 LIGHTS, 5 STEEL OUTDOOR 01/1994 PERIMITER FENCE, CHAIN LINK 01/1994 PICNIC PAVILION 01/1994 SAND PITS FOR PLAYGROUND (3 TOTAL) 01/1994 PLAYGROUND STRUCTURES (2) & SWINGS 01/1994 SIGN, PARK CONCRETE 01/1994 PICNIC TABLES WITH BENCHES (6 TOTAL) 01/1994 PLAYGROUND STRUCTURE 06/2006 CONCRETE PARK TABLES 01/2009 RESTROOM BUILDING 03/2011 SWING - 4 SEAT 11/2013 TABLE, PICNIC CONCRETE (2 TOTAL) 06/2015 LANDSCAPED PARKWAYS ITEM/DESCRIPTION DATE WATERSCAPE - TIERRA REJADA AT MOUNTAIN TRAIL 02/2002 SIGNS STEEPLE HILL ENTRY 05/2003 IRRIGATION CONTROLLERS (38 TOTAL) 08/2011 IRRIGATION CONTROLLER 04/2014 MAGNOLIA PARK ITEM/DESCRIPTION DATE LAND, PARK SITE 06/2003 LAND, PARK SITE 10/2003 FENCE, WROUGHT IRON 10/2007 PARK BENCHES AND TABLES 10/2007 PARK CONSTRUCTION 10/2007 PLAYGROUND EQUIPMENT & SWINGS 10/2007 MAMMOTH HIGHLANDS PARK ITEM/DESCRIPTION DATE LAND, PARK SITE 12/2005 MAMMOTH ART BONE SCULPTURES 07/2009 621 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 239 PARK CONSTRUCTION 07/2009 IRRIGATION CONTROLLERS 08/2011 MILLER PARK ITEM/DESCRIPTION DATE LAND, PARK SITE 06/2000 LAND, PARK SITE 06/2000 BACKSTOP 09/2000 BALLFIELD BLEACHER, ALUMINUM 09/2000 BALLFIELD FENCE, CHAIN LINK 09/2000 BASKETBALL COURT PAVING 09/2000 DRINKING FOUNTAIN 09/2000 LIGHTS, 14 STEEL OUTDOOR 09/2000 PAVILION/PLAYGROUND FENCE, STEEL 09/2000 SAND PIT FOR PLAYGROUND 09/2000 PLAYGROUND STRUCTURES (2) AND EQUIPMENT 09/2000 SIGN, PARK W/LIGHTS 09/2000 SOCCER GOAL 09/2000 PICNIC TABLES (17 TOTAL) 09/2000 TENNIS COURT FENCE, CHAIN LINK 09/2000 TENNIS COURT WITH LIGHTS 09/2000 TENNIS SCREEN 09/2000 PICNIC PAVILION 10/2000 RESTROOM BUILDING 10/2000 SWING SETS 06/2008 BASKETBALL COURT LIGHTS 09/2009 INSTALL CONCRETE FIXTURES (REPLACE METAL) 04/2012 PARKING LOT IMPROVEMENTS 12/2015 MONTE VISTA NATURE PARK ITEM/DESCRIPTION DATE LAND, PARK SITE 02/1990 DRINKING FOUNTAIN 01/1990 622 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 240 PAVING, ASPHALT 01/1990 PICNIC TABLE WITH BENCHES (2 TOTAL) 01/1990 PARKING LOT IMPROVEMENTS 12/2015 MOUNTAIN MEADOWS PARK ITEM/DESCRIPTION DATE LAND, PARK SITE 03/1987 BACKSTOPS (2 TOTAL) 01/1992 BALLFIELD FENCE, CHAIN LINK 01/1992 BLEACHER, ALUMINUM 01/1992 DRINKING FOUNTAINS (3 TOTAL) 01/1992 LIGHTS, 6 STEEL OUTDOOR 01/1992 PAVING, ASPHALT 01/1992 PAVING, CONCRETE 01/1992 PERIMITER FENCE, CHAIN LINK 01/1992 PICNIC PAVILION 01/1992 PLAYGROUND STRUCTURES (2) & SWINGS 01/1992 RESTROOM BUILDING 01/1992 SIGN, PARK 01/1992 PICNIC TABLES WITH BENCHES (12 TOTAL) 01/1992 PARK MONUMENT SIGN (CONCRETE) 03/2003 PLAYGROUND STRUCTURE 06/2006 PARK TABLES & BENCHES 04/2008 BASKETBALL COURT LIGHTS 09/2009 OPEN SPACE ITEM/DESCRIPTION DATE OPEN SPACE LAND: TIERRA REJADA ROAD 02/2011 PEACH HILL PARK ITEM/DESCRIPTION DATE LAND, PARK SITE 05/1984 BACKSTOP 01/1992 BALLFIELD FENCE, CHAIN LINK 01/1992 623 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 241 BALLFIELD LIGHTS, 6 STEEL OUTDOOR 01/1992 BASKETBALL COURT & PATHWAY PAVING, CONCRETE 01/1992 BLEACHER, ALUMINUM (2 TOTAL) 01/1992 LIGHTS 14 STEEL OUTDOOR 01/1992 PARKING LOT PAVING, ASPHALT 01/1992 PICNIC PAVILION 01/1992 SAND/WOOD CHIP PIT FOR PLAYGROUND 01/1992 PLAYGROUND FENCE, WOOD RAIL 01/1992 RESTROOM BUILDING 01/1992 PICNIC TABLES WITH BENCHES (13 TOTAL) 01/1992 DRINKING FOUNTAIN 09/2000 PLAYGROUND STRUCTURE & SWINGS 09/2000 PICNIC TABLES & BENCHES 08/2007 PLAYGROUND EQUIPMENT & INSTALLATION 06/2010 IRRIGATION CONTROLLERS 08/2011 PLAYGROUND STRUCTURE 02/2013 PARKING LOT IMPROVEMENT 12/2015 SOFTBALL BLEACHERS 6/2017 POINDEXTER PARK ITEM/DESCRIPTION DATE LAND, PARK SITE 12/1996 BACKSTOPS 01/1996 BLEACHER, ALUMINUM (4 TOTAL) 01/1996 FENCE, BALLFIELD & PAVILION, CHAIN LINK 01/1996 FENCE, BRICK/STEEL BAR (BTWN PARK & SHOPS) 01/1996 FENCE, PERIMITER 01/1996 DRINKING FOUNTAIN 01/1996 FLAGPOLE 01/1996 GAZEBOS (2) 01/1996 LIGHTS, 32 STEEL OUTDOOR 01/1996 PARKING LOT LIGHTS, 8 STEEL OUTDOOR 01/1996 PAVILION PAVING, CONCRETE 01/1996 624 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 242 PAVING, ASPHALT 01/1996 PICNIC PAVILION 01/1996 RESTROOM BUILDING 01/1996 SIGN, PARK CNCRT/STONE W/LGHTS 01/1996 GAZEBO, METAL 8' SIDES (2) 02/2002 LAND, PARK SITE (FOR EXPANSION) 02/2004 TABLE, PICNIC W/BENCHES 03/2006 SKATE PARK 12/2009 LIGHTING UPGRADES (LED) 05/2014 PLAYGROUND EQUIPMENT & STRUCTURES 04/2015 PARKING LOT IMPROVEMENTS 12/2015 DRAINAGE IMPROVEMENTS 04/2017 TIERRA REJADA PARK ITEM/DESCRIPTION DATE LAND, PARK SITE 01/1992 BASKETBALL AND TENNIS COURT PAVING, CONCRETE 01/1995 PAVING, ASPHALT 01/1995 DRINKING FOUNTAINS (3 TOTAL) 01/1995 LIGHTS, 8 STEEL OUTDOOR 01/1995 PERMIITER FENCE, STEEL BAR & STONE 01/1995 PICNIC PAVILION 01/1995 SAND PITS FOR PLAYGROUND 01/1995 RESTROOM BUILDING 01/1995 PICNIC TABLES WITH BENCHES (9 TOTAL) 01/1995 TENNIS COURTS 01/1995 SIGN, PARK 01/1995 SCREEN, TENNIS COURT 04/2001 INTERIOR FENCE, WROUGHT IRON 06/2001 PLAYGROUND FENCE (REPLACEMENT) 09/12/2001 PARK MONUMENT SIGNS (CONCRETE) 03/2003 BOCCE BALL COURT 03/2003 STORAGE BOX 06/2004 625 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 243 PLAYGROUND STRUCTURE AND EQUIPMENT 06/2007 PARK TABLES & BENCHES 08/2007 PARK BENCHES CONCRETE (11 TOTAL) 07/2013 BENCH, CEDAR 10/2014 PARK BENCH, CONCRETE 02/2015 PICKLEBALL COURT 08/2017 VETERANS MEMORIAL PARK ITEM/DESCRIPTION DATE LAND, PARK SITE 04/2001 VETERANS MEMORIAL PARK CONSTRUCTION 05/2009 VILLA CAMPESINA PARK ITEM/DESCRIPTION DATE LAND, PARK SITE 08/1998 LIGHTS, 8 STEEL OUTDOOR 09/1996 FENCE, CHAIN LINK 09/1998 DRINKING FOUNTAIN 04/2002 PARK MONUMENT SIGN (CONCRETE) 04/2003 PLAYGROUND STRUCTURE 04/2004 PLAYGROUND SURFACING & BASE 06/2004 BASKETBALL COURT EQUIPMENT 06/2004 BASKETBALL COURT PAVING 06/2004 GRADING, TRENCHING 06/2004 SIDEWALK, ENTRY, & STEEL BOLLARDS 06/2004 VIRGINIA COLONY PARK ITEM/DESCRIPTION DATE LAND, PARK SITE 01/1996 DRINKING FOUNTAIN 01/1988 SAND/WOOD CHIP PIT FOR PLAYGROUND 01/1988 PLAYGROUND STRUCTURE 01/1988 SIGN, PARK 01/1988 FENCE, CHAIN LINK 09/1993 626 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 244 DRINKING FOUNTAIN GALVANIZED 11/2002 PLAYGROUND STRUCTURE 06/2006 WALNUT ACRES PARK ITEM/DESCRIPTION DATE LAND,161 SECOND STREET 02/2011 PARK CONSTRUCTION 10/2015 *Information on file for projects completed prior to City incorporation. Dates to be verified prior to publication. 627 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 245 Description of Funds Fund Remarks 1000 – General Fund: Revenues derived from property tax, sales tax, motor vehicle in lieu fees and other non-restricted sources. It should be noted that State law requires the City to maintain an established level of effort of General Fund expenditures for streets [called a Maintenance of Effort (MOE)], in order to continue to receive certain State grant funds. The current MOE amount is $342. 2000 – Traffic Safety Fund: Revenues derived from vehicle code fines, which are restricted to construction / maintenance of traffic control devices, streets, equipment, and supplies for traffic enforcement, accident prevention and crossing guards. Revenue to this Fund is only about $125,000 per year. In recent years this fund has been used primarily to fund the Crossing Guard program. 2001 – Traffic Systems Management: Revenues derived from fees based on the air quality impacts of land development projects. Said funds are to be used on projects or programs designed to mitigate those air quality impacts. The purpose of this Fund is finance system improvements that improve circulation and reduce emissions. 2002 – Citywide Traffic Mitigation: Revenues derived from development fees to fund mitigation measures to better accommodate the increased traffic flow generated by those development projects. The purpose of this fund is to improve circulation by constructing major capacity enhancement projects. 2006 – Tree and Landscape Fund: Fees to provide landscaping and trees in public areas resulting from the increase in demand from additional 628 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 246 Fund Remarks development. 2007 – Art In Public Places: Fees to provide art in public areas resulting from the demand for additional art from new development. The purpose of this fund is to fund projects that provide art in public areas. 2010-2013 – Park Improvement Fund: Quimby act fees from developers in lieu of dedicating park land. For use for the construction of park facilities as a result of increased demand for parks resulting from new development.. 2014 – Los Angeles Avenue AOC: Revenues derived from fees paid by land development projects located within a designated area, for the purpose of constructing roadway improvements within that area. The properties subject to this fee consist of all of the areas of the City located north of the Arroyo Simi, plus the property south of the Arroyo and east of the freeway [S.D.I. Property]. Various projects to be financed by this Fund include: 1) a number of projects required in order to provide six (6) lanes of traffic along the New Los Angeles Avenue /Los Angeles Avenue corridor, and 2) the reconstruction and realignment of Princeton Avenue east of High Street. 2018 – Endowment Fund: Development fee paid by a developer as a condition of the issuance of a building permit for each residential or institutional use within the boundaries of the specific plan. The development fee may be expended by the City in its sole and unfettered discretion. Project 804, Waste Management Open Space acquisition, is partially funded by grant funding from the County of Ventura. 2150 – Trees and Landscaping: Revenues derived from development fees to fund various landscape improvements. 2300-2332 – Assessment Districts: Revenues derived from maintenance & Project 111, the Los Angeles Avenue Undergrounding Project, is partially funded by Fund 2330 [AD92-1: Mission 629 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 247 Fund Remarks improvement district assessments, which have been earmarked for improvement projects. A separate Fund has been established for each District and/or Zone within a District. Also included in this category are Community Facility District Funds. Bell Plaza]. 2409 – Other State/Federal Grants Fund: Includes grant monies from various State and Federal grants including, Supplemental Law Enforcement Grants, CHP Grant, Technology Grant, LLEBG and American Recovery and Reinvestment Act 2009 (ARRA). Funds are used to support police services and other grant specific approved projects. 2411-2414 – Local Transportation Development Act Fund (Articles 8a, 8c, 3 & 6.5): Local transportation fund derived from 1/4 cent of general sales tax collected by Statewide and allocated to the City by Ventura County Transportation Commission (VCTC). Transportation and street/road maintenance related expenses. 2415 – Gas Tax: Revenues derived from a tax on motor vehicle fuel sales, apportioned to local agencies based on a formula using population, road miles and other factors. These revenues are restricted to expenditures for street maintenance and related costs. 2502 – Spring Road/Tierra Rejada Road AOC: Revenues Projects funded or partially funded by this source include the Tierra Rejada 630 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 248 Fund Remarks derived from fees paid by land development projects located within a designated area, for the purpose of constructing roadway improvements within that area. The properties subject to this fee consist of all of the area of the City located south of the Arroyo Simi. Traffic Signal Interconnect System and the Tierra Rejada Road median landscaping project. 2503 – Casey Rd/Gabbert Rd AOC: Revenues derived from fees paid by land development projects located in that area generally located northwest of Walnut Canyon Road (Moorpark Avenue) and the rail corridor, for the purpose of constructing roadway improvements within that area. No appropriations have yet been made to projects from this Fund. 631 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 249 2602 – TDA Article 3: A portion of State sales tax revenues which is restricted to the construction or improvement of pedestrian and/or bicycle facilities. These funds are allocated to the cities in the County by the Ventura County Transportation Commission (VCTC) via a competitive grant process. 2603 – TDA Article 8A: TDA Article 8 monies are derived from a portion of State sales tax revenue, which is apportioned to each city based on population. The City allocates these monies between TDA Article 8C funds, which become revenues to the City’s Transit Fund (Fund 5000), and TDA Article 8A funds, which become revenues to the Local Transportation Fund [LTF] (Fund 2603) to fund street improvement and maintenance. Historically, these monies have been used to fund major street improvement and maintenance projects, such as slurry seal application and asphalt overlay projects. 2604 – Federal Grants: Revenues received via various federal grant programs, including: the Surface Transportation Program (STP) and Congestion Mitigation Air Quality (CMAQ). 2605 – Gas Tax: Revenues derived from a tax on motor vehicle fuel sales, apportioned to local agencies based on a formula using population, road miles and other factors. These revenues are restricted to expenditures for street maintenance and related costs. 632 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 250 3001 – City Hall Improvement: Funds come from developers through various special agreements. Funds are used for the purpose of building a new Civic Center Complex. 3003 – Equipment Replacement: Funds are transferred from the General Fund for the acquisition of the City-owned equipment and vehicles. Funds are used to finance and account for the acquisition/replacement of equipment and vehicles. 633 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 251 Potential Projects: Public Works Department 100 - Streets 1 Evaluate options for Bus turn-outs on Los Angeles Avenue (SR118). 2 Modernize bus shelters 3 Modify the intersection of Condor Drive (south), Princeton Avenue, and Virginia Colony Place. 4 Widen Science Drive at Los Angeles Avenue (SR-118) to provide a dedicated right turn lane. 5 Widen north side of Unidos Avenue. 6 Update the pavement management system. 7 Evaluate feasibility of relocating the Metrolink layover facility and work with VCTC and SCRRA to construct a screen wall on north and east sides of Metrolink layover facility. 8 Evaluate construction of Lassen Avenue from Park Lane to Moorpark Avenue to create a four-way intersection at Third Street. 9 Evaluate cost benefit for potential use of cold in place recycling of asphalt concrete (AC) and warm mix AC for streets and parking lots, and permeable surfaces for parking lots and bike paths. 10 Evaluate feasibility of widening the eastside of Princeton Avenue to provide a dedicated right-turn lane from the Condor Drive traffic signal to the eastbound SR-118 on ramp. 11 Reduce the pavement width and add landscaping on Park Crest Lane, Moorpark Avenue south of SR-118, Ridgecrest Drive, and Elk Run Loop. 12 Evaluate benefits of revising current street standards to narrow the street width but not the right-of-way to encourage more landscaping and reduce future and pavement maintenance costs. 13 Evaluate feasibility of adding second southbound travel lane on Collins Drive from University Drive traffic signal to Benwood Road and a 634 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 252 dedicated right turn lane onto Campus Park Drive. 14 Evaluate feasibility of adding a second on-ramp lane from southbound Collins Drive to the westbound SR-118. 15 Construct dedicated right and left-turn lanes for westbound Second Street at Moorpark Avenue (SR-23). 16 Construct dedicated right and shared left/through lanes for westbound Charles Street at Moorpark Avenue (SR-23). 17 Consider name change for Spring Road from Tierra Rejada Road to Walnut Canyon Road. 18 Construct a permanent truck scale facility west of the City limits. 19 Work with Caltrans to permit installation of City identification sign on Collins Drive overpass bridge and City entry statements in Caltrans right-of-way at selected locations. 20 Ensure City Ventures Project makes improvements on Wicks Road. 21 Evaluate acquisition costs and benefits of acquiring SCE street lights, or, in the alternative, convert the lights to more efficient LED lights. 200 - Walkways 1 Evaluate feasibility of pedestrian bridge over Poindexter Avenue and Union Pacific Railroad (UPRR) from Specific Plan No. 1. 2 Evaluate feasibility of pedestrian bridge on Los Angeles Avenue (SR-118) in vicinity of Moorpark Avenue. 3 Evaluate feasibility of constructing a bridge over the Arroyo and under the railroad west of Virginia Colony. Using prior studies, evaluate the feasibility of constructing Arroyo Simi pathway and bikeway 4 Evaluate feasibility of trail connection from College Heights Drive across future SR 23 Alternate Route to Moorpark Highlands trails. 5 Evaluate feasibility of trail from Valley Road to Waterworks District No. 1 offices at Spring Road / Elk Run Loop intersection (will require ability to go under future North Hills Parkway to be constructed by Tract 5130, City Ventures). 635 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 253 6 Evaluate feasibility of connecting the Moorpark Country Club equestrian staging area and the Meridian Hills equestrian staging area with a loop multi-use trail. 7 Evaluate feasibility of a walkway and bike path from Mountain Trail Street (through portion of Moorpark High School) to Arroyo Vista Community Park. 8 Evaluate constructing a West loop trail. 9 Evaluate feasibility of a multi-use trail between Spring Road, Calleguas Water District Pump Station, and Miller Parkway through Tract 4980 / Serenata HOA. 10 Evaluate feasibility of constructing a sidewalk on Arroyo Drive from Collins Drive to east City limits, and in conjunction with City of Simi Valley and County of Ventura, investigate pedestrian and bike connections between Collins Drive and Madera Road. Evaluate feasibility of planting drought tolerant landscaping on north side of Arroyo Drive between rail crossing and City boundary. 11 Construct a trail that connects the Moorpark Highlands to the Happy Camp Regional Park. 12 Construct sidewalks on one side of certain streets in industrial zoned areas to provide a safe path for pedestrians and to encourage walking. 13 Install Lassen pathway lighting. 14 Install AVRC Pedestrian Bridge security lighting 15 Evaluate options for providing a continuous Class 1 bike lane on Campus Park Drive, including a reduction of the number of travel lanes and attendant increase in landscaping and use of Caltrans/SCE right-of-way between Princeton Avenue and Collins Drive. 16 Evaluate potential uses for APN 513-0-010-225 (formerly referred to as Crawford Canyon) on north side of Princeton Avenue including possible trail connection to Moorpark Highlands. 17 Carry out regular bridge inspections and develop plan for rehabilitation of the Tierra Rejada Road, Spring Road, and Arroyo 636 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 254 Simi Pedestrian bridges. 300 – Traffic Signals 1 Evaluate need for a traffic signal at Arroyo Drive and the entrance to Villa Del Arroyo Mobile Home Park. 2 Evaluate need for a traffic signal at Princeton Avenue and Nogales Street. 3 Evaluate need for a traffic signal at Campus Canyon Drive and Collins Drive. 4 Evaluate need to modify the Princeton Avenue and Condor Drive traffic signal to provide a protected/permissive left turn movement from southbound Princeton Avenue to eastbound Condor Drive. 5 Evaluate need for radar speed display sign on eastbound Tierra Rejada Road between Peach Hill Road and Southhampton Road. 6 Evaluate need to modify the Spring Road and Princeton Avenue traffic signal to provide a protected left turn movement from westbound Princeton Avenue to southbound Spring Road. 7 Evaluate feasibility and cost for modifying traffic signal pedestrian crossing devices for use by vision impaired and physically disabled persons as well as upgrading to include time display/countdown timers. 8 Evaluate feasibility and cost of installation of “Blue Lights” (also known as “Tattletale Lights”) on selected traffic signals to enhance traffic enforcement of red light violations. 9 Install protected/permissive left-turn at various intersections. 10 Prepare a Traffic Study for the Los Angeles Avenue (SR 118) corridor to determine ultimate locations of traffic signals and other improvements to optimize traffic flow and minimize impacts on adjacent residential streets. 11 Coordinate with Caltrans to improve traffic signal synchronization for Princeton Avenue/SR-118 ramps and Condor Drive. 12 Evaluate the development of a policy for installation of traffic calming devices, including speed humps. 637 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 255 13 Evaluate and develop plan to update traffic signal equipment and software programming. 14 Develop new design for City street name signs and a standard design for street identification signs in medians. 15 Develop formal traffic policies. 16 Accomplish a walkway study in vicinity of Collins Drive. 17 Modify signals on High Street, Princeton Avenue and Spring Road. 18 Design and install crosswalks with flashing lights at various locations, including: Princeton/Campus Park; Third/Moorpark; Charles/Moorpark; and High/Bard. 400 – Medians and Parkways 1 Install landscaping on the north side of Poindexter Avenue along railroad tracks. 2 Install landscaping on the south east corner of Tierra Rejada Road and Moorpark Road. 3 Install landscaping in excess right-of-way on southeast corner of Tierra Rejada Road and Moorpark Road and install standard curb and gutter. 4 Install monument sign at southwest corner of High Street and Moorpark Avenue for post office and public parking. 5 Install parkway trees on the west side of Spring Road north of Peach Hill Road. 6 Install raised median landscaping on Princeton Avenue from Spring Road to approximately 1,500 feet east of Spring Road. 7 Install missing sidewalk and plant parkway trees and landscaping on both sides of Princeton Avenue, from Spring Road to approximately 1,500 ft. east. 8 Install sidewalk and parkway landscaping on south side of Princeton Avenue west of Sharma. 9 Install parkway landscaping and enhanced pavement on collector and arterial streets that lack such improvements, including the south side of Peach Hill Road west of Rolling Knoll Road and north side 638 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 256 of Peach Hill Road west of Bella Vista Drive and consider possible use of Xeriscape landscaping. 10 Install enhanced entry statements at Spring Road and Roberts Street, and Spring Road and Second Street. 11 Install raised landscaped median on Collins Drive from Campus Park Drive to University Drive. 12 Evaluate feasibility and interest from property owners for a possible property-owner funded sound wall on south side of Los Angeles Avenue (SR 118) between the City Limits and Butter Creek Road as well as between Butter Creek Road and Maureen Lane. 13 Evaluate feasibility of modifying certain existing streets to increase landscaping and reduce the amount of asphalt to be maintained. 14 Modify and upgrade wall treatment and enhance landscaping on north side of Los Angeles Avenue (SR 118) between Millard Street and Spring Road. 15 Obtain ownership of sidewalks on the collector streets in the Mountain Meadows area from various HOAs. 16 Evaluate obtaining license agreement from private property owners to allow installing and maintaining drought tolerant landscaping on privately owned slopes on west side of Spring Road north of Monte Vista Nature Park (Tract 3096) and between the Arroyo Simi and Tract 4037. 17 Evaluate feasibility of installing raised median on Poindexter Avenue and on Gabbert Road south of Poindexter Avenue. 18 Improve freeway landscaping on Princeton Avenue. 19 Improve Roberts Avenue and Second Street parkways from Spring Road to Harry Street. 20 Develop design plan to refurbish median landscaping and hardscape on Tierra Rejada Road from Spring Road to Los Angeles Avenue and Campus Park Drive from Princeton Avenue to Collins Drive including cost estimates, financing, phasing and water conservation measures. 21 Construct wall and landscaping improvements on north side of SR 639 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 257 118 between Millard Avenue and Spring Road. 22 Work with U.S. Postal Service and homeowner’s associations to relocate group mail boxes to maximize on-street parking. 23 Evaluate obtaining license agreements from private property owners to allow installing and maintaining drought tolerant landscaping on privately owned slopes on the north side of Princeton Avenue east of Spring Road (Tract 2723). 24 Extend Tierra Rejada raised median to east City limit. 500 – Storm Drains 1 Storm drain on Poindexter Avenue and Gabbert Road. 2 Evaluate feasibility of relocating the storm drain system on Poindexter Avenue just west of Endeavor Court. 3 Remove hump on Poindexter Avenue at former railroad spur crossing to improve drainage. 4 Evaluate need for improvements to the Everett Street drainage basin. 5 Extend the Fremont Avenue drain north of SR-118 640 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 258 Potential Projects: Parks, Recreation and Community Services Department Location Title Description Active Adult Center Citrus Room Conversion Make the Citrus Room a formal part of the Active Adult Center upon completion of the new City Hall building. Arroyo Vista Community Park AVCP Access Point Prepare a feasibility study on a second access point for Arroyo Vista Community Park. Buttercreek Park site Buttercreek Park Determine disposition of Buttercreek Park site. Objective V.A.15 Campus Canyon Park Basketball Court Lights Evaluate installing lights at the basketball court. College View Park Soccer Field Addition Select a location to potentially add a soccer field. College View Park Fire Station Evaluate the feasibility of constructing a fire station on a portion of the park. Glenwood Park Restroom Privacy Explore options to increase privacy at the Glenwood Park restroom. Glenwood Park Park Expansion Evaluate options for potential expansion of Glenwood Park. Miller Park Sports Field Alternate Use Evaluate alternative uses for the sports field. Objective V.A.21 Monte Vista Nature Park Security Improvements Add security features at Laurelhurst Road entrance. Park TBD Tennis Court Select a park site to locate a tennis court in the Campus Park area. Parks TBD Security Cameras Evaluate parks for installation of security cameras. Objective V.A.14 641 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 259 Parks TBD Community Garden Evaluate parks/open space for development of a Community Garden. Objective VI.B.5 Parks TBD Dog Park Evaluate potential locations for a second dog park. Parks TBD Amphitheater Evaluate installation of an outdoor performance venue/amphitheater. Peach Hill Park Driveway Addition Evaluate adding a second driveway to the parking lot off Christian Barrett Drive. Poindexter Park Additional Park Amenity Determine alternative uses for turf area adjacent to the basketball court. Post Office Park Site Potential Park Facility Evaluate feasibility of constructing park facilities on remnant property west of post office. Objective V.A.16 Ridgecrest Drive Alternative Uses Evaluate potential park and recreation uses for the asphalt area at the terminus of Ridgecrest Drive. Tierra Rejada Park Volleyball Court Evaluate the feasibility of installing a volleyball court option to the basketball court at Tierra Rejada Park. Library Generator Evaluate the feasibility of installing a generator. Open Space: Crawford Canyon Passive Recreation Uses Evaluate potential passive recreation uses and enhancements for open space at Crawford Canyon. Open Space: SDI Property Passive Recreation Uses Evaluate potential passive recreation uses for the SDI property. Objective VI.A.11 Facility Location TBD Additional recreation center Evaluate the feasibility of constructing a teen center or second recreation center. 642 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 260 LA Avenue Medians Install landscaping within future medians on LA Avenue. Arroyo Simi Bike Path Evaluate feasibility of constructing an improved bike path on the north side of the Arroyo Simi from AVCP pedestrian bridge to the east side of Sprint Road. Objective VI.B.4 Arroyo Simi Trail System Evaluate the feasibility of constructing a trail along the levee road of the Arroyo Simi, from the westerly City limit to Madera Road in Simi Valley. Equestrian Staging Areas Trail Connection Evaluate feasibility of connecting Moorpark Country Club equestrian staging area and the Meridian Hills equestrian staging area with a loop multi- use trail. Objective IV.B.6 Highlands Trails Possible Trail Connections Evaluate possible uses for alternate State Route 23 and North Hills Pkwy rights-of-way, including possible trail connection to College Heights Dr. and Happy Camp Regional Park. Objective V.A.21 High Street Art Art In Public Places Consider future location for public art project on High Street. 643 CITY OF MOORPARK CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2017/18 TO 2024/25 261 Approving Resolution 2018-xx 644 RESOLUTION NO. 2018-_____ A RESOLUTION OF CITY COUNCIL OF THE CITY OF MOORPARK, CALIFORNIA, APPROVING THE SEVEN YEAR CAPITAL IMPROVEMENT PROGRAM FOR FISCAL YEAR 2017-2018 – 2024/2025 WHEREAS, a proposed Seven Year Capital Improvement Program (CIP) for FY 2017/2018 – 2024/2025 has been presented to City Council; and WHEREAS, the CIP is a planning and programming tool to identify the City’s capital projects related to Public Works, Parks, Recreation and Community Services, and their funding sources; and WHEREAS, pursuant to California Government Code Section 65401, on May 22, 2018, the Moorpark Planning Commission found the CIP to be in conformance with the Moorpark General Plan, with the exception of the Moorpark Avenue Widening project which includes a second southbound lane from Casey Road to Third Street that is not identified in the General Plan Circulation Element; and WHEREAS, pursuant to California Government Code Section 65402, on May 22, 2018, the Moorpark Planning Commission also found the planned acquisition of street right-of-way for certain specified projects described in the CIP to be in conformance with the Moorpark General Plan, with the exception of the Moorpark Avenue Widening project which includes a second southbound lane from Casey Road to Third Street that is not identified in the General Plan Circulation Element. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF MOORPARK DOES HEREBY RESOLVE AS FOLLOWS: SECTION 1. The May 22, 2018 finding of the Moorpark Planning Commission that the Seven Year CIP is in conformance with the Moorpark General Plan, with the exception of the Moorpark Avenue Widening project, pursuant to California Government Code Section 65401, is adopted. SECTION 2. The May 22, 2018 finding of the Moorpark Planning Commission that the planned acquisition of street right-of-way for certain specified projects described in the CIP is in conformance with the Moorpark General Plan, with the exception of the Moorpark Avenue Widening project, pursuant to California Government code Section 65402, is adopted. SECTION 3. The Seven Year Capital Improvement Program for FY 2017/2018 – FY 2024/2025 is approved. Attachment 2 645 Resolution No. 2018-_____ Page 2 SECTION 4. The City Clerk shall certify to the adoption of this resolution and shall cause a certified resolution to be filed in the book of original resolutions. PASSED AND ADOPTED this 20th day of June, 2018 Janice S. Parvin, Mayor ATTEST: Maureen Benson, City Clerk 646