Overview
MOORPARK
M E M O R A N D U M
The Honorable City Council
Ken Gilbert, Director of Public Works
June 26, 1990
Final Draft Budget for AD 84 -2
for Fiscal Year 1990/91
STEVEN KUENY
City Manager
CHERYL J. KANE
City Attorney
PATRICK RICHARDS, A.I.C.P.
Director of
Community Development
R. DENNIS DELZEIT
City Engineer
JOHN V. GILLESPIE
Chief of Police
RICHARD T. HARE
City Treasurer
Attached is a summary page and back -up worksheets from which
the budget for AD 84 -2 for next Fiscal Year was developed.
Highlights
1. The personnel costs shown are based on a change in the
budget figures previously distributed, to reflect a
reduction in the proposed allocation of the Maintenance
and Operation Supervisor from forty per cent (40 %) to
twenty per cent (20 %). The remaining eighty per cent of
this position is charged to Street Maintenance and
Improvement (Gas Tax). The allocation for the Public
Works Director remains at ten per cent (10 %).
2. Included in the assessment for City wide benefit is an
amount for miscellaneous improvements. The proposed
$15,000 assessment is for the construction of parkway
improvements on Princeton Avenue. The amount of $7,145
carried over from last year is proposed for similar
improvements on Peach Hill Road north of the Park, for
a total of $22,245.
3. The Maintenance and Operations Accounts in the Draft
FY1990/91 Budget (i.e. utilities, supplies, etc.) are
included as contingencies and incorporate the replacement
of irrigation and landscal:inq and other costs shown in
the attached detail.
799 Moorpark Avenue Moorpark California 93021
-- (805) 529 -6864
4. Included in the assessment is a contingency in the amount
of $6,000 for possible rebates.
5. The recommended amount to be assessed is $361,605. This
is a reduction from the previous estimate of ($374,755)
of $13,150 due primarily to a re- calculation of the prior
year carry over and revisions to the personnel costs.
cc: Steven Kueny, City Manager
Richard Hare, Deputy City Manager
Phil Newhouse, Director of Community Services
Craig Phillips, Administrative Assistant
AD 84 -2
June 27,1990
Page 3
ASSESSMENT DISTRICT 84 -2
Summary of Expense
Item
Administration
Personnel
Engineering
Contingency
Street Lights
Landscaping
Zones of Benefit
City wide Benefit
Sub -Total
Less Carry over
Plus Projected Rebates
13,744
4,300
1.956
90,911
88,369
FY 1990/91
Budget
20,000
200,000
179.280
399,280
(43,675)
6,000
Amount to be Assessed 361,605
TOTAL PROJECTED EXPENDITURES
Maintenance & Operations 399,280
Plus Construction Reserve
Tierra Rejada Medians 136,948
Parkways: L A Ave /Shasta
Poindexter /Sierra 17,000
153,948
Total 553,228
Page 1
Fund 23: AD84 -2
Revenue / Expenditure History
------------------- --- -- --- -- ---- --- -- - ---
Description
BEGINNING BALLANCE
Plus REVENUE
Less Refunds
EXPENSES
Street Lights
Landscape Maint.
Zones of Benefit
City Wide Benefit
Construction:
Tierra Rejada Medians
L A Ave /Shasta /Sierra /Poindexter
Administration
Less TOTAL EXPENSES
PEAR END TOTAL
ASSESSMENTS
Total Annual Expenses
Less Construction Reserve
Tierra Rejada Medians
L A Ave /Shasta /Sierra /Poindexter
LESS CARRY OVER
PLUUS Projected Rebates
27- Jun -90
416,440 553,228
(136,948)
(17,000)
(40,000) (43,675)
6,000
Total Assessments 376,440 361,605
Notes:
a) Portion of Tierra Rejada Median Design & Warmington Buy -out
b) Portion of Tierra Rejada Median construction costs
c) Developer deposit for parkway construction at:
L. A. Ave / Shasta and at Sierra / Poindexter
FY 1989/90
FY 1990/91
FY----
--- ------
-------- ---- - -----
Preliminary
1988/89
Budget
Proj Act ACTUAL
Budget
50,330
195,519
195,519
250,132
418,902
376,439
376,439
361,605
(5,911)
370,528
192,000
185,000
200,000
57,251
55,092
90,911
86,008
44,492
88,369
57,000
7,150 s
136,948 b
17,000 c
--- - - -- --
24,181
--- - - - - --
24,181
-- - - -- - --
20,000
273.713
416,440
--- - - - - --
315,915 n
-- -- - - - ---
553,228
--- - - - - --
195,519
--- - - - - --
155,518
--- - - - - --
250,132 0
58,509
416,440 553,228
(136,948)
(17,000)
(40,000) (43,675)
6,000
Total Assessments 376,440 361,605
Notes:
a) Portion of Tierra Rejada Median Design & Warmington Buy -out
b) Portion of Tierra Rejada Median construction costs
c) Developer deposit for parkway construction at:
L. A. Ave / Shasta and at Sierra / Poindexter
Page 2
Landscape Maintenance Costs Analysis
Fiscal Year 1989/90
-------------------------------------
No. Description
ZONES OF BENEFIT
----------------
1A T2851: Bambi /Benwood /Pecan
1B T2851: Flood Control Channel
T2865: Medians (Tierra Rejada Rd)
3A Christian Barrett & Spring
3B T. R. Slope /Streeet (Pacifica)
30 T. R. Slope /Streeet (Pardee)
3D Peach Hill (East Side)
4 T 3032: Buttercreek Entry
7 3032: Peppermill
T3271, Williams Ranch Rd
6r - 3e19/T3025 (T. R. Slope /St.scape)
6B 7 3019/T3025 (Peach Hill - W /S)
5', 1, Pnriavp,
WIDE BENEFIT
1 Campus Pk Med & Collins (T2851)
2 Campus Park Median (T4170)
3 Campus Park Med (Marq, to Jul'rd)
4 Spring & Peach Hill
5 T. R. Medians (N /O Harvester)
6 T. R. Meds (Spring to Peach Hill)
7 T. R. Meds (Peach Hill to Edison)
8 T. R. Meds (Harvester to Bridge)
9 Pepper Tree Spraying
10 Tree Removal / Replacement
11 Tree Trimming
1L Weed Abatement
13 Miscellaneous Improvements
FY1989/90 Anticipated Costs
-------------------------------------------
FY1989/90 Contract Ldscp Repl Carry
Budget Costs Utilities Costs Total Over
3,532
1,941
57,000
3,295
4,713
22,070
1,767
1,886
3,415
11,820
1,767
045
114,251
(57,000)
57,251
1,766
1,766
0
876
2,245
7,320
90
4,500
30,000
15,000
5,500
16,945
86,008
143,259
3,394
2,256
7,150 a
3,048
11,568
2,500 b
500 b
876
625
2,976
2,600 c
276
625
38,394
2,232
876
4368
876
0
0
0
0
3,500
4,600
8,700
4,600
9,800 d
39,552
77,946
2,040
1,488
1,020
6,500
2,490
240
240
300
620
800
210
30V
16,248
1,200
450
1440
450
0
0
0
0
3,540
19,788
500
1,500
300
200
250
800
2,400
0
200
50
7,600
1,000
100
200
100
0
0
0
0
1,400
9,000
6,234
4,344
7,150 a
4,568
19,568
5,290
940
1,366
1,725
5,996
3,400
686
975
62,242
(7,150)
55,092
4,432
1,426
6,008
1,426
0
0
0
0
3,500
4,600
8,700
4,600
9,800
44,492
99,584
(2,702)
(2,403)
(1,273)
(14,855)
16,780
827
520
(1,725)
(2,581)
8,420
1 '081
7u
2,159
(2,666)
340
(6,008)
(550)
2,245
7,320
0
90
1,000
25,400
6,300
900
7,145
41,516
43,675
06/27/90
Remarks
a) TR Med: 4650
Wmngtn: 2500
b) : 2 1 /2mos.
C) . 2 1 /2mos.
3,500
R ,, ou` (900;
2,600
C.H. Pkw 4,800
Cmp Pk 5,000
d:...... -9,800
Page 3
Landscape Maintenance Costs Projection
Fiscal Year 1990/91
------------------ ----- ------ -- - - - ---
No. Description
ZONES OF BENEFIT
1A T2851: Bambi /Benwood /Pecan
1B T2851: Flood Control Channel
2 T2865: Medians (Tierra Rejada Rd)
3A Christian Barrett & Spring
3B T. R. Slope /Streeet (Pacifica)
3C T. R. Slope /Streeet (Pardee)
3D Peach Hill (East Side)
3E R. Parkway (S /S) (Pardee)
4 7 3032: Buttercreek Entry
T 3032: Peppermill
T327i, Wi I I i ams Ranch Rd
3019/T3025 (T. R. Slope /St.scape)
FE 3C19/T3025 (Peach Hi - 'w /S
7!1F ^ I gnh a.,,nr
Tota!
Maint ONLY..
iir 'WIDE BENEFIT
-----------------
1 Campus Pk Med & Collins (T2851)
2 Campus Park Median (T4170)
3 Campus Park Mad (Marq. to Jul'rd)
4 Spring & Peach Hill
5 T. R. Medians (N /O Harvester)
6 T. R. Meds (Spring to Peach Hill)
7 T. R. Meds (Peach Hill to Edison)
8 T. R. Meds (Harvester to Bridge)
9 Pepper Tree Spraying
10 Tree Removal / Replacement
11 Tree Trimming
12 Weed Abatement
13 Miscellaneous Improvements
---------------------------------------------
FY 1990/91
Recommended
Budget
Contract
Replacement
Total
Less
Recommended
Costs
Utilities
Costs
Cost
Carry Over
-- - - - - --
Assessment
----- - - - -__
3,564
2,250
350
6,164
(2,702)
8,866
2,369
1,550
100
4,019
(2,403)
6,422
136,948
0
0
136,948 a
0 ;
0
0
0
3,192
11050
500
4,742
0
(1,273) ;
0
6,015
12,150
7,450
800
20,400
(14,855) ;
35,255
13,325
6,500
800
20,625
16,780
3,845
895
280
300
1,475
827
648
1,680
500
200
2,380
0
0 b
920
280
100
1,300
520
780
685
280
200
1,165
(1,725)
2,890
3,125
650
500
4,275
0
(2,581;
C
6,856
19,600
1,700
800
22,100
C
8,420
C
13,680
920
240
100
1,260
1,081
179
656
30(
SC,
.006
0
70
0 '
936
- - - --
-- - - - - -- _
=m_ - - --
0
0
200,029
23,030
4,800
--- - - - ---
227,859
- - - - -- --
0
--- - - - - --
86,372 ;
(136,948)
(136,948)
0
63,081 90,911
2,344
920
4586
920
882
3,062 c
4,637 c
1,143 c
4,000
12,000
15,000
6,000
22,145 d
77,639
277,668
1,260
500
1510
500
1,260
2,000
2,000
450
9,480
32,510
100
100
200
50
100
500
150
50
1,250
6,050
3,704
1,520
6,296
1,470
2,242
5,562
6,787
1,643
4,000
12,000
15,000
6,000
22,145
88,369
179,280
2,159
0
0
(2,666)
340
(6,008)
(550)
2,245
7,320
0
90
1,000
25,400
6,300
900
7,145 e
41,516
0
43,675
88,752
0
0
6,370
1,180
12,304
2,020
(1,758)
6,787
1,553
3,000
(13,400)
8,700
5,100
15,000 d
46,853
0
135,605
27- Jun -90
Remarks
a: 144,098
-- (7,150)
136,948
b: To be
paid by
developer
c) 6 months
C) 6 months
c) 6 months
d) 15,000
for Princeton
e) 7,145
for Peach Hil
Parkway
+ 17,000
for LA /Shasta
Poind /Sierra
Tot 39,145
Page 4
Administration and Overhead
A. Engineering ................................................ ...............................
B. Personnel
Fringes Salary & AD 84 -2
Annual ----------- - - - - -- Fringes Usage Personnel
Position Salary Rate Amount Total Factor Costs
------- ------- - - - --- - - - - -- - -- - -- -- -- - - -- --- - --- -- - - - - - -- --- -- ----
Director 42,016 0.45 18,907 60,923 0.1 6,092
Maintenance Worker 26,386 0.45 11,874 38,260
Sub -Total
Contingency
TOTAL
0.2 7,652
13,744 ...,
27- Jun -90
TOTAL
4,300
13.744
18,044
1,956
20,000