Loading...
HomeMy WebLinkAboutAGENDA REPORT 1991 0501 CC REG ITEM 08PTO: _j ITF KA MOORPARK 799 Moorpark Avenue Moorpark, California 93021 (805W64AL►FORNIA CitY Council Meeting of S 199_/ �� MEMORANDUM ACTION: gy, _ The Honorable City Council FROM: Philip E. Newhouse, Director of Community Services DATE: April 25, 1991 SUBJECT: Consider Adding Drains at Peach Hill Park This report is a recommendation to alleviate the flooding of the Peach Hill Park playground. PROBLEM: The playground floods after rain storms and from park irrigation run -off. Water collected in the playground takes approximately three days to drain out. DISCUSSION: As a means to alleviate the time necessary to drain the water in the playground, a "french drain" was installed in 1989. A french drain consists of lengths of perforated plastic pipe placed in the ground approximately 18" in depth which are connected to a drain line to carry off the water. The pipe is covered by a filter cloth which is then covered by six inches of rock. The water percolates down through the rock and filter cloth, into the pipe, and is carried off. Sand cannot penetrate the filter cloth. However, due to the amount of water entering the playground, the french drain has not proven to be sufficient to decrease the time period it takes to drain the playground. ENGINEER REVIEW: The City Engineer, Abbott and Associates, has reviewed the playground and surrounding area with staff to determine water flow direction into the playground. Also, elevations taken by Willdan Associates of the playground and surrounding area were also reviewed. The City Engineer's analysis determined the playground was constructed at a lower elevation than much of the surrounding area and acts as a collection area for water. PAUL W. LAWRASON JR. BERNARDO M. PEREZ SCOTT MONTGOMERY ROY E. TALLEY JR. Mayor JOHN E. WOZNIAK Ma or Pro Tern Counc member Councilmember Counciimember . .. ENGINEER RECOMMENDATION: To correct the current condition, the City Engineer is recommending a three -fold approach: 1. Intercept water flowing into the playground from the softball field by creating a natural earth berm approximately six inches in depth and channel it to the existing catch basin approximately 60 feet north of third base. Location of the earth berm would be on the sloped turf area behind the third base side of the softball field extending to the existing catch basin approximately 60 feet north of the third base fence line. 2. Add a 4" wide slot drain in the sidewalk to the north side of the playground area. 3. Add a 12" square catch basin and concrete curbing to form a retention area in the northeast corner of the playground which would be connected by a 6" line to an existing 18" storm drain line in the playground. (The storm drain line is connected to the City storm drain system at Christian Barrett. STAFF RECOMMENDATION: (Roll Call Vote) 1. Approve the City Engineer's recommendations. 2. Authorize City staff to solicit informal bids for recommended work to be performed. (Estimate work to be under $5,000.00, plus $1,000.00 for inspection and contingency.) 3. Appropriate $6,000.00 from the neighborhood portion of the Peach Hill zone of the Park Improvement Fund. Unaudited fund balance is approximately $79,828. 4. Authorize the City Manager to award bid and sign all contracts on behalf of the City. PEN:db Attachment � I � IN CON S I • • '' ,a \ sWI►t6 De'fA10, TS FoF, Q i i 3�'• -O 1.0 /�� % \� ` � � - 57\ � L /NE d d HiiiGi ��6 ION VAL o I -k- 7LrI?_ I r��'r 5 i, o" C Sfl�1Cn I s R �LpP 11. roEG,o MAIN JG' \ X39 z a�34 Id S Ur I s • q j p - / -t= 1.-_ , _ - -'-� �°, `�R 's I - F f�= 1,40 L- i I d A Exr V 33 -f � >5 O• i i i . + l'i/_- � fWN` 1- .•.i„ i.t C/C'�Gq � �', ° � / � r' _ I }rte J A�� '" 3 °' ( 23 4'.C. t W3 V Q,934, I I.GG -'G �p� •♦< I �R 9a' i='°_ - = =�"_1 Y. - -c NI�Y'OR `0. s 10 I • _ 199! o° I `�� N� e r IT�L ✓JIRE ` a/ - P :•Z-� 4% }