CITY OF MOORPARK
AGENDA REPORT
v GF t' , H U-q I
ITEM
3, A .
TO: The Honorable City Council
17
FROM: Christine Adams, Director of Community Service
DATE: March 11, 1996 (Special Meeting of March 13, 1996)
SUBJECT: Consider Transfer of $2.000 to Pay for Repair of Arroyo
Vista Gymnasium Floor.
On Wednesday, February 21, 1996, a pipe connected to one of the
drinking fountains in the gymnasium at Arroyo Vista Recreation
Center, broke during the middle of the night and partially flooded
the gym. The linoleum around the wood gym floor held most of the
water, but some got on the center of the floor and has caused some
damage.
The damage is primarily a warping of the wood near the center of
the court, which has caused a noticible buckling in certain areas.
Areas of the court can still be used for some play, but overall,
the wood court no longer has a consistently smooth surface, and
should be repaired.
Staff contacted Bolster, the original floor installer, who, after
examining the floor, informed staff that the wood flooring would
not need to be replaced. However, the floor would need to be re-
sanded, to removed the warped edges, repainted, and new coats of
urethane finish would need to be applied. The estimate provided by
Bolster to do this work was $ 7,450.
The City's insurance adjuster also examined the floor, and
concurred with the assessment made by Bolster. The adjuster
recommended multiple coats of finish to further protect the floor
in the future. The insurance adjuster estimated that all costs
would be approximately $25,000.
Staff secured another bid from Allsports Flooring, for $7,800.
The City has a deductable on facility damage of $5,000. For the
1995/96 budget, the Council had appropriated $3,000 to refinish
the floor, as part of the annual maintenance, which was to be
scheduled in April. Staff would recommend applying these funds
toward the City's deductable and request that the City Council
further appropriate the balance of $2,000 by transferring $2,000
from the capital outlay account (01.4.149.906).
Staff will work with Bolster on scheduling the floor repair as
soon as possible, and will coordinate all payment processing with
the City's insurance carrier.
• .I Y • .�
Transfer $2,000 from 01.4.149.906 (Capital Outlay) to 0.4.149.658
(Maintenance and Repairs) to fund the balance of the insurance
deductable costs for the repair costs for the gymnasium floor.
MEMO
To: Christine Adams, Director of Community Services
From: Donald P. Reynolds, Jr., Administrative Services Manager,
Subject: AVCR Gym Floor
Date: February 29, 1996
The insurance company's floor representative agreed with our initial assessment after seeing the
damage today. His recommendation is to let the floor dry naturally (two to three weeks). He said
that extra heat in the gym to speed -up the drying time may cause excessive warping. He agreed
that the floor was properly installed, and that insurance should pay for the re- surfacing.
The representative's inspection resulted in a second recommendation to increase the number coats
of varnish being applied. The insurance company will apparently pay for this because it may help
to prevent damage from the next occurrence from being so extensive. His estimate is
approximately $25,000.
I have scheduled a second appointment with the inspector March 18, 1996. At that time, we will
see how the drying affected the floor, and be able to proceed with repairs. Let me know if you
have any questions. We may want to request an additional appropriation from Council to pay the
balance needed for the deductible March 20, or April 3.
CC: Richard Hare, Deputy City Manager
Al Walter, Maintenance and Operations Supervisor
Mar -09 -96 09:34A ALLSPORTS FLOORING 619 477 9665 P.01
ALL5FORT5 FLOORING
BY CHARLIE CLOUGH
March 8, 1996
Moorpark Recreation Department
799 Moorpark Ave
Moorpark, California 93021
Attn: Dale Sumersille
Recreation Supervisor
RE: Moorpark Rec Center Wooden Floor
PROPOSAL
1.Rough sand the floor and let stand for thirty days.
(Recreation staff should remove a couple of sections of threshold on each side
of the floor and set up fans to blow a stream of air under the floor to assist in drying
process.)
2. When the moisture content in the floor equals the reading in the bleachers,procede
with the sanding and refinishing of the floor to include all gamelines and two coats of
urethane finish,
Price $$7,800.00
Terms 2 %10 Days
Thank You
J
501 WEST 28TH 5TKEET, SUITE K • P.O. BOX 1107 NATIONAL CITY, CA 91951
(619) 477 -9663 • (619) 477 -9665 FAX (800) 988 -4103
MAR 08 196 22:25 619 477 9665 PAGE.01
I0'39Ud TOLL 096 BIB
61 :ZZ 96, OT 8OW
SO ?O Vree-clFe, street 917061!818.) 9611- 066)//113.) "6 -1.020
M.F. BOLSTE's R FLOORING Co.
VAX TRANSMITTAL
I
li
DATE:
±w J^
ATTN: J'1�s Iy.,A, S
FAX NO: �%` .•r
FROM:
JOB NAME:
SUBJECT:_L7�Df
SPEC. SECTION:
BID PRICE: !0
CANT. LIM D 289004
SPECIALTY
(MOOD FLOORING
COMMERCIAL
RESIDENTIAL
INMTRIAL
Total number of pages including this cover sheet transmitted
by If you do not receive all pages, please call:
back as as possible.
TELEPHONE NUMBER (818)966 -0661
T /T'd
FAX NUMBER (818)968 -7701
S.00 831SIOE 3H1 b2:60 96, IT 8dW
CITY OF MOORPARK
AGENDA REPORT
TO: The Honorable City Council
FROM: Christine Adams, Director of Community Services
DATE: March 11, 1996 (Special Meeting of March 13, 1996)
SUBJECT: Consider Transfer of S2,000 to Pay for Re-pair of Arroyo
Vista Gymnasium Floor.
On Wednesday, February 21, 1996, a pipe connected to one of the
drinking fountains in the gymnasium at Arroyo Vista Recreation
Center, broke during the middle of the night and partially flooded
the gym. The linoleum around the wood gym floor held most of the
water, but some got on the center of the floor and has caused some
damage.
The damage is primarily a warping of the wood near the center of
the court, which has caused a noticible buckling in certain areas.
Areas of.the court can still be used for some play, but overall,
the wood court no longer has a consistently smooth surface, and
should be repaired.
Staff contacted Bolster, the original floor installer, who, after
examining the floor, informed staff that the wood flooring would
not need to be replaced. However, the floor would need to be re-
sanded, to removed the warped edges, repainted, and new coats of
urethane finish would need to be applied. The estimate provided by
Bolster to do this work was $ 7,450..
The City's insurance adjuster also examined the floor, and
concurred with the assessment made by Bolster. The adjuster
recommended multiple coats of finish to further protect the floor
in the future. The insurance adjuster estimated that all costs
would be approximately $25,000.
Staff secured another bid from Allsports Flooring, for $7,800.
The City has a deductable on facility damage of $5,000. For the
1995/96 budget, the Council had appropriated $3,000 to refinish
the floor, as part of the annual maintenance, which was to be
scheduled in April. Staff would recommend applying these funds
toward the City's deductable and request that the City Council
further appropriate the balance of $2,000 by transferring $2,000
from the capital outlay account (01.4.149.906).