Loading...
HomeMy WebLinkAboutAGENDA REPORT 1997 0205 CC REG ITEM 10HAGENDA REPORT C = TY O F MOORPARK TO: The Honorable City Council ?"l" "�C'LRcv� FROM: Kenneth C. Gilbert, Director of Public Works ,. DATE: January 27, 1997 (CC Meeting: 2 -5 -97) SUBJECT: Consider Authorization to Advertise for Bids for the Construction of Pavement and Drainage Improvements on Maureen Lane, Bonnie View Street and the Alleys South of First Street f '+iti1'Iia; This report requests authorization to advertise for receipt of bids for the subject combined project. DISCUSSION A. Background 1. The City retained the services of M2 Civil Engineering to prepare the designs for the subject projects. 2. The Transportation and Street Committee has a number of times with the residents and property owners on Maureen Lane to receive input regarding the scope of work most acceptable to them. 3. December 4, 1996, the City Council concurred with staff recommendations that a Special Saturday morning meeting of the Transportation and Street Committee be convened to fully inform the affected property owners and residents of this proposed work. 4. On Saturday, January 11, 1997 at 10:00 a.m. the Transportation and Streets Committee held that special meeting at City Hall to discuss the draft final designs for these three projects. The purpose of that meeting was to allow the owners and residents of properties adjacent to these projects an opportunity to preview the project and to provide input into the designs being proposed. Notices of that meeting were sent to all affected property owners and residents. Those in attendance were supportive of the proposed improvemenmts as designed. meuren4.ed UUU2f S Maureen / Bonnie View/ Alleys February 5, 1997 Page 2 B. Project Designs 1. Maureen Lane: a. Right -of -Way Width: 501. b. Proposed Width of Pavement (Gutter Flow Line to gutter flow line): 241. c. Private Encroachments: The front property line for the properties on Maureen Lane is approximately thirteen feet (131) from the gutter flow line. The driveways, fences, landscaping and other improvements in this area encroach into the street right -of -way. These encroachments are to be left undisturbed, except for the construction of driveway transitions (grade adjustments) as required. d. Scope of Work: 1) Remove and replace asphalt pavement just south of Los Angeles Avenue to eliminate ponding problem; 2) Remove and reconstruct asphalt pavement in other selected areas as required; 3) Construct an asphalt overlay on the remainder of street; 4) Replacement of Storm Drain Inlet at South End of Street; 5) Match existing improvements at Los Angeles Avenue; 6) Construct Concrete Rolled Curbs; and, 7) Construct driveway transitions as required. 2. Bonnie View Street: a. Right -of -Way Width: 20'. b. Proposed Width of Pavement: 15'. c. Scope of Work: 1) Remove and reconstruct asphalt pavement and base; 2) Construct center ribbon gutter; 3) Construct asphalt berms where required; and, 4) Joint existing driveway improvements. 3. Alleys: a. Location: Between First Street and of Flory Avenue. b. Right -of -Way Width: 201. c. Proposed Width of Pavement: 15' - d. Scope of Work: 1) Remove and reconstruct asphalt 2) Construct center ribbon gutter; nnuren0.nd Third Street and west 20' pavement and base; 3) Construct Storm Drain Where Required; 4) Joint existing improvements; and, 5) Construct smooth transitions at alley intersections with streets. Maureen / Bonnie View/ Alleys February 5, 1997 Page 3 C. Combined Project The above described projects are all partially funded by a grant from Cycle 7 of the State -Local Transportation Partnership Program. This grant will fund 12.84% of the construction cost for these improvements. One of the requirements of this grant is that a construction contract be awarded prior to June 30, 1997. It is recommended, therefore, that all three of these projects be advertised, awarded and constructed under one contract. D. Fiscal Impact 1. Costs: A summary of the total estimated cost for this combined project is as follows: maurena.ad 000270 Project Cost Estiiate Elevent Maureen Ln. Bonnie View Alleys Tota Design 6,600 7,600 10,600 24,800 Construction (incl. contingency) 100,000 33,000 206,000 339,000 Adain. & Inspection 10,000 3,500 21,000 34,500 Misc. & Contingency _ 3.400 2,900 8,400 14.700 120,000 47,000 246,000 413,000 maurena.ad 000270 Maureen / Bonnie View/ Alleys February 5, 1997 Page 4 2. Budget: Some of the design costs for these projects were incurred in FY 1995/96. It is possible that some of the construction and inspection costs might be incurred in FY 1997/98. The total anticipated budget for this combined project is as follows: Note: a): Presently there are no funds budgeted from the State -Local Partnership Program for this project. When the project is completed, a portion of the construction costs will be transferred to this source. The amount of the estimated fund transfer is based on the maximum allowable grant share, which is 12.84% of construction costs. E. Plans and Specifications A set of the plans and specifications for this combined project have been placed in the City Council office for review and comment. F. Schedule It is anticipated that the bids will be presented to the City Council for award of contract in March. Construction will start in April and be completed by July. Staff recommends that City specifications for the subject advertise for receipt of bids. neurena.ed Council approve the plans and project and authorize staff to OOO �' L Budget by Funding Source ($) Element Surplus SLTPP a !R_ Total _ Current Budget Maureen Lane 0 150,000 150,000 Bonnie View 0 75,000 75,000 Alleys 0 300,000 300.000 0 525,000 525,000 Estimated Future Final Budget subsequent to Construction Maureen Lane 30,000 12,840 107,160 150,000 Bonnie View 28,000 4,237 42,763 75,000 Alleys 54,000 26,450 219.550 300,000 112,000 43,527 369,473 525,000 I413,000 I Note: a): Presently there are no funds budgeted from the State -Local Partnership Program for this project. When the project is completed, a portion of the construction costs will be transferred to this source. The amount of the estimated fund transfer is based on the maximum allowable grant share, which is 12.84% of construction costs. E. Plans and Specifications A set of the plans and specifications for this combined project have been placed in the City Council office for review and comment. F. Schedule It is anticipated that the bids will be presented to the City Council for award of contract in March. Construction will start in April and be completed by July. Staff recommends that City specifications for the subject advertise for receipt of bids. neurena.ed Council approve the plans and project and authorize staff to OOO �' L