HomeMy WebLinkAboutAGENDA REPORT 1997 0219 CC REG ITEM 10D100 D. AGENDA REPORT CITY O F MOORPARK TO: The Honorable City Council M FROM: Kenneth C. Gilbert, Director of Public Works,1 DATE: February 7, 1997 (Council Meeting 2- 19 -97) SUBJECT: Consider Bids for the Construction of a Paved Road, Bike Path and Related Improvements at Arroyo Vista Community Park. EXECUTIVE SUMMARY This presents the results of the bid opening for the subject project, recommends award of a contract and recommends an amendment tot he Budget to more accurately reflect revised project cost estimates. DISCUSSION A. Grant Last April the City applied for and received approval of a State Bicycle / Pedestrian Facilities Grant (TDA Article 3 Funds) for partial funding of the construction of a paved bicycle path from the easterly end of the existing paved road at Arroyo Vista Community Park, easterly to the paved road to be constructed as a part of pedestrian bridge project. Funding of that project was included in the FY 1996/97 Budget. B. Pedestrian Bridge The pedestrian bridge project will include the construction of a fifteen feet (151) wide paved road from the bridge southerly within an easement across property owned by the Southern California Edison Company (SCE) to the northerly property line of the park. It is anticipated that this paved roadway will be constructed as a part of the bridge project in June or July of 1997. avp_rd.awd 0000SIL Arroyo Vista Community Park Bike Path February 19, 1997 Page 2 C. Subiect Project Design Attached as Exhibit 1 are diagrams showing the location of the proposed park road improvements. Exhibit 1 also includes cross sections showing the design and scope of the proposed roadway improvements for various segments of the work. Those typical designs are described as follows: Limits Description of Improvements Segment A: From the easterly Pavement : 35' wide. terminus of the existing North Side : dirt swale. paved road, easterly to the South Side: curb, gutter and westerly driveway to Parking sidewalk. Lot #2. [See Section A -A on page 2 of Exhibit 1]. Segment B: From the westerly Pavement: 30' wide. driveway for Parking Lot #2, Sides: Dirt swales. westerly to the east end of [See Section B -B on page 2 of to the soccer fields. :Exhibit 11. Segment C: From the east end Pavement : 20' wide. of the soccer fields, Sides: Dirt swales. easterly to the east end of [See Section C -C on page 3 of the project. Exhibit 11. End of Project to Bridge: .Pavement Width: 15' D. Bid Results Bids were received and opened on February 3, 1996. A summary of the bid results is attached as Exhibit 2. E. Qualifications It has been determined that the apparent low bidder, Mendez Concrete, Inc., is qualified to perform the work. Said bidder has confirmed their bid is valid and that they are prepared to proceed with the construction of the subject project. F. Fiscal Impact 1. Construction Cost: The final actual cost will be based on the unit price bids multiplied by the actual quantities of the bid items required to completed the work. Based on the amount of the low bid, an estimate of the final construction cost is as follows: Bid Amount: $187,347.91 Contingency (10 %) $ 18.652.09 $206,000.00 avp_rd.awd Arroyo Vista Community Park Bike Path February 19, 1997 Page 3 2. Total Project Cost Estimate: cost is as follows: Element Design Constr. (Plus Cntgncy) Admin / Insp Total A summary of the total project Total ( S ) 14,220 206,000 _. 24,780 245,000 3. Bicycle Facilities Grant (Project Related): The City's SB- 821 grant states that grant fund shall be restricted to one - third (331h %) of the construction costs related to the Bike Path improvements, not to exceed $54,000. Based on the bids received, a calculation of the anticipated expenditures eligible for grant funding is as follows: Description __. Amount Area of Bike Path: 29,300 sf Divided by: _ 69,100 sf Percent of Construction Related to Bike 42% Path: Estimated Construction Costs Related to $85,680 Bike Path [$204,000 x 42 %] Grant Funded Project Expenses [33' /ao] $28,557 Other Grant Funded Costs ' $25,443 [$54,000 -$28 5571 4. Bicycle Facilities Grant (Other Improvements): As stated above, not all of the bicycle facilities grant funds will be expended by this project. It is anticipated the remaining grant funds will be applied to a portion of the Pedestrian Bride Project and that the remainder may fund Bike Lane improvements on Liberty Bell Road north of the bridge. When those expenses are determined, the surplus grant funds budgeted to the subject project will be transferred to those projects. For now it is proposed that the $54,000 appropriation to the subject project from this source remain unchanged. avp_rd.awd 0000bla Arroyo Vista Community Park Bike Path February 19, 1997 Page 4 5. Project Funding: Based on the above analysis, a summary of the recommended funding for this project is as follows: Construction avp_rd.awd Funding Source 201: Traffic System Management [201.801.8003.000.9903' 211: L A AOC [211.901.8003.000.9903 212: Park Improvement [212.710.7218.000.990,1 242: SB -821 [Project] [242.801.8003.000.9903 Sub-Total 242: SB -821 [Non - Project [242.801.8003.000.9903' Bike Other Non - Path Costs Constr 5'',123 60,160 19,500 0 0 60,160 19,500 28, 557 _ _ __ U 0 85,680 120,320 39,000 ---_. 0 - - - -_ U 0 Total Notes 136,783 a 0 b 79,660 c 28.557 d 245,000 25,443 e Total 85,680 120,320 39,000 270,443 Notes: a Bike Path Costs: Total Cost ($85,680 less grant funds [$28,557] = Local Share [$57,123' • Non -Bike Path Costs: One -half non -Bike Path construction costs, plus one -half of all non - construction costs. b This budget item was for project costs related to that portion of the roadway improvements across SCE property. Those costs are included in the Pedestrian bridge project. c One -half non -Bike Path construction costs, plus one -half non - construction costs. The other one -half of these costs are charged to TSM funds. d Project related Bicycle Facilities grant funds. e Non - Project related Bicycle Facilities grant funds to be transferred to other projects at a future date. �A,10b4 Arroyo Vista Community Park Bike Path February 19, 1997 Page 5 6. Budget: Based on the above analysis, a summary of the recommended funding for this project is as follows: Funding Source Budget Change Total Notes 201: Traffic System Management 130,000 10,000 140,000 [201.801.8003.000.9903' 211: L A AOC 16,000 116,000) 0 [211.901.8003.000.9903' 212: Park Improvement 100,000 (20,000) 80,000 [212.710.7218.000.9903' 242: SB -821 54,000 0 54,000 a [242.801.8003.000.990.3' Total 300,000 (26,000), 274,000 Notes: a Non - Project Related Bicycle Facilities Grant funds to be transferred to other projects at a later date. 7. Budget Amendment: A resolution has been prepared amending the budget to reflect the adjusted funding sources shown above. G. Schedule If a contract is awarded, construction should begin in March and be completed by May. H. Access Vehicular access to the easterly portion of the park will be curtailed to some degree during construction. To the extent possible, access will be kept open. RECWMNDATION (ROLL CALL VOTE) Staff recommends that the City Council take the following actions: 1. Award a contract to Mendez Concrete, Inc. in the amount of $187,347.91 for the construction of the subject project. 2. Approve a contingency in the amount of ten percent (10%) of the bid and authorize the City Manager to approve additional work, if required, for an amount not to exceed said amount. 3. Authorize the City Manager to sign necessary contract documents. 4. Adopt the attached Resolution (Exhibit 3) amending the budget as described in this report. avp_rd.awd M l � e J L-)I cQrJa a�aaL,2 C� Itk i\ m C131x`d15n:��D 3B Q j^C, I `�1V�71?1Vd :7 .l VON(@0® )Wd K H 10' 20' 20' 0' SWALE 5' 15' 8' 2 SHM. P VM T. S/w M�k .15 YAC VER -' 0.75' 8`Pwe GRAVEL .SECTION "A -A" N. T. S, i 10' 20' _ 20' 1 SwALE SWALE 5' 15' 15' S' 1 M SHLDR. PVMT PVMT. SHLDR. 0.53 Y -3'AC OVER 1 B" PMB 0.75' 4" GRAVEL--" " SECTION "B -B" N.T.S. 0.13' 000(ki r 10' 10' 10' 10' 10' 10' SWAL.E SHLM.- I PVMT. PVMT. I SHLDR. I SWALE 1.15' I 1 1 0.53' YAC OVER 0.75 g' Pie / 4" GRAVEL SECTI ON "C- C" N.T.S. Mqk Exhibit 2 (1 of 6) CITY OF MOORPARK Bidder !JVENDOR 1 -------------------------------- VENDOR 2 BidResults ---------- - - - --lEngineer's-Estimate ---------------------- .j'------------------ - - - - -- -------------------- - - - -�� February 3, 1997 NAME: Mendez Concrete, Inc. J & H Engineering ADDRESS: 1210 Santa Paula Street 79 Daily Dr #169 Arroyo Vista CITY, STATE: Santa Paula, CA 93060 Camarillo, CA 93010 Community Park PHONE NUMBER, IJ(805) 525 -8043 (805) 987 -8414 Access Road Improvements -------------------------- - II ITEM -------------------------- DESCRIPTION Est Qty _ - - - - - - -- - - - -- -- Units' -- I- -------------------- UNIT $ - - -___ _ .- - - -..; TOTAL BID --- - - - - -- ------------------------- UNIT $ 1 _...- - - - - -- TOTAL BID ------- - - - - -- ------------------------ -- UNIT_$__j_ TOTAL BID + ------ - - - - -- 1 1 4" P.C.C. 3,863 SF 4.00 ! 15,452.00 2.06 ! 7,957.78 1.75 6,760.25 2 P.C.0 Curb & Gutter 483 LF 12.00 51796.00 I 12.74 6,153.42 13.00 6,279.00 1 3 Processed Misc Base ( 1,611 1' 36.00 57,996.001 26.57 42,804.27 36.00 57,996.00 f 4 Adjust Manhole ii 3 EA 300.00 900.00 1 315..00 945.00 275.00 825.00 5 A.C. Pavement 1,223 Tons 45.00 55,035.00 3388 41,435.24 35.00 42,805.00 6 Earthwork II 1. -;S 10,000.00 10,000.00 28973.00 28,973.00 10,000.00 10,000.00 7 4" Gravel 966'Y 40.00 38,640.00 28.90 27,917.40 36.00 34,776.00 8 Relocate Meter Box 2 EA, 1,500.00 3,000.00 1.320.00 2,640.00 350.00 1 700.00 9 Relocate Fire H drantl Y �, 1 EP, 1 000.00 1 000.00 , I 1100.00 1 100.00 2,500.00 2,500.00 110 Adj Inlet to Grade II 1 EA 500.00 500.00 600.00 600.00 1,000.00 1,000.00 11 Remove Exist. 8" PVC 1 LS 300.00 300.00 300.00 300.00 J 350.00 350.00 12 Relocate Exist. Fenced 1,870 J 10.00 18,700.00 9.14 17,091.80 11.50 21,505.00 �I13 Construction Survey 1 �,S 3,000.00 3,000.00 j 6457.00 6,457.00 3,000.00 3,000.00 H14 Remove Exist. Inlet 1 EA 100.00 100.00 1067.00 1,067.00 ; 1,000.00 1,000.00 �15 i Relocate Check Valves 1 FA 1,500.00 1,500.00 I 1320.00 1,320.00 500.00 500.00� 1116 ! Adj Valves to Grade 3 EA 150.00 450.00 !95.00 i 585.00 225.00 675.00 1117 Release on Contract 1 L,S 1.00 1.00 .0000 1.00 1.00 1.00 TOTAL I 212,370.00 � 187,347.91 --------------------- 190,672.25 - - - - -- 000065 Exhibit 2 (2 of 6) CITY OF MOORPARK I Bidder IVENDOR 3 VENDOR 4 - ----------------------------------- VENDOR 5 BidResults --------------------------------------- -- i------------------ - - - - -- ------------------------ �� February 3, 1997 NAME: Berry General Eng D. W. Burhoe R & H Paving it ADDRESS: P. 0. Box 7178 11270 Quail Court 1497 Los Angeles Ave Arroyo Vista CITY, STATE: Oxnard, CA 93031 Santa Paula, CA 93060 Saticoy, CA 93004 Community Park PHONE NUMBER: 485 -9826 ,(805) 525-7474 (805) 647 -3286 Access Road Improvements ,(805) ITEM DESCRIPTION - -- ---- - - -- ----- Est Qt ------ y - - - - - - -- Unitsl - -- - - - - - -- ----- ------------------------ - UNIT -- -- - - - - -- - - -' TOTAL BID - - -------- III- UNIT - - -- - - - - - -- -TOTAL -BID -- ------------------------ -- UNIT -$ -- - -TOTAL -BID -- 1 { 4" P.C.C. ( 3,863 SF 1.80 6,953.40 3.00 11,589.00 2.20 8,498.60 2 ° P.C.0 Curb & Gutter i 483 LF 10.75 5,192.25 12.00 5,796.00 10.40 5,023.20 3 Processed Misc Base 1,611 "Y 19.70 31,736.70 31.00 49,941.00 21.30 34,314.30 4 li Adjust Manhole 3 EA 480.00 1,440.00 1 400.00 1,200.00 340.00 1,020.00 5 A.C. Pavement 1,223 Tons ! 31.50 38,524.50 1j 35.00 42,805.00 34.00 41,582.00 6 ! Earthwork 1 X45,218.65 45,218.65 18000.00 18,000.00 38,200.00 38,200.00 7 4" Gravel 966 'Y 1 29.50 28,497.00 33.50 32,361.00 28.50 27,531.00 8 Relocate Meter Box 2 EA 765.00 1,530.00 I 800.00 1,600.00 825.00 1,650.00 j 9 Relocate FIre Hydrant 1 EA 930.00 930.00 I 1100.00 j 1,100.00 1,000.00 1,000.00 10 Adj Inlet to Grade 1 EA 480.00 480.00 1 600.00 600.00 500.00 500.00 11 Remove Exist. 8" PVC 1 L, 780.00 780.00 '� 300.00 800.00 750.00 750.00 I 12 Relocate Exist. Fence 1,870 ,J 11.95 22,346.50 12.00 I 22,440.00 12.90 24,123.00 13 Construction Survey 1 �s 5,625.00 5,625.00 ) 3800.00 3,800.00 8,500.00 8,500.00 14 Remove Exist. Inlet l EA 690.00 690.00 it L10.00 110.00 115.00 115.00 15 Relocate Check Valve 1 EA 2,560.00 2,560.00 2700.00 2,700.00 2,700.00 2,700.00 j 16 Adj Valves to Grade 3 EA. 240.00 720.00 ! 200.00 600.00 I 200.00 600.00 17 I1 Release on Contract 1 S 1.00 1.00 1.00 1.00 ( 1.00 1.00 TOTAL 193,225.00 195,443.00 196,108.10 OkAJ .f Exhibit 2 (3 of 6) CITY OF MOORPARK Bidder (VENDOR VENDOR 7 VENDOR 8 BidResults -------- - - - - -- -- -6- - ------------------------ - - - -_ -- --------- - - - - -- ------------------------ February 3, 1997 NAME: lArnco Construction Sully- Miller CNN Paving #449 ADDRESS: 1090 Desea Ave. i�3555 Vineyard Avenue 2510 "G" Las Posas Rd I Arroyo Vista CITY, STATE: ICamarillo, CA 93020 JOxnard, CA 93030 Camarillo, CA 93010 Community Park PHONE NUMBER: 1(805) 383 -7380 f(805) 981 -4275 (805) 389 -1475 Access Road Improvements -------------------- - - - - -- ----------- ITEM -------------------- DESCRIPTION - - - - -- Est Qty ------------ - - -- -- ------------------- Unitsll UNIT $ --- - - - - -1 TOTAL BID -------------- ------------------ UNIT $ ----------- - - - - -- TOTAL BID ------------------------ UNIT $ - -'I --- - - - - -- TOTAL BID ------- - - - - -- 1 4 P.C.C. 3,863 SF 2.60 10,043.80 I 2.45 9,464.35 �- 2.18 ( 8,421.34 I� 2 P.C.0 Curb & Gutter 483 J 14.50 7,003.50 13.50 6,520.50 14.75 7,124.25 3 Processed Misc Base i 1,611 "Y 27.00 43,497.00 23.50 37,858.50 25.35 40,838.85 4 Adjust Manhole 3 EA 350.00 1,050.00 I I !1 325.00 975.00 400.00 i I 1,200.00 1 5 j A.C. Pavement 1 1,223 Tons 33.00 40,359.00 31.00 37,913.00 36.00 44,028.00 j 6 Earthwork 1 „S X32,458.70 32,458.70 j 41725.00 1 41,725.00 40,000.00 40,000.00 l 7 4" Gravel � 966 'Y 27.00 26,082.00 36.70 35,452.20 36.00 34,776.00 8 Relocate Meter Box 2 EA ?50.00 1,500.00 j 800.00 1,600.00 750.00 1,500.00 �1 9 1 Relocate FIre Hydrantij 1 EA 975.00 975.00 925.00 1 925.00 3,250.00 3,250.00 1110 Ad' Inlet to Grade 1 EA 500.00 500.00 'I 480.00 I 480.00 500.00 500.00 1111 Remove Exist. 8" PVC 1 aS 700.00 700.00 650.00 650.00 500.00 500.00 1112 Relocate Exist. Fences, 1,870 ..F 12.00 22,440.00 12.30 23,001.00 II 13.50 251245.00 1113 1 Construction Survey 1 LS (12,000.00 12,000.00 9080.00 I 9,080.00 3,500.00 3,500.00 1114 Remove Exist. Inlet 1 EA 100.00 100.00 110.00 110.00 400.00 400.00 11115 ii Relocate Check Valve 1 1 EA 2,500.00 2,500.00 , 2550.00 2 550.00 1,200.00 1,200.00 j 16 1 Adj Valves to Grade 3 EA 200.00 600.00 I 200.00 600.00 300.00 900.00 17 Release on Contract 1 S 1.00 1.00 I :.0000 1.00 1.00 I 1.00 11 TOTAL 201,810.00 208,905.55 213,384.44 000WAL Exhibit 2 (4 of 6) ___ __ Driveway Specialists 199 88Gt T. O. Blvd #108 Thousand Oaks, C& 91360 (805) 495-8566 ______________ UNIT $ ________________ CITY OF H0V8PA8K Bidder 14,215.84 VENDOR Y 6,713.70 VENDOR 10 50,988.15 300.00 Bid Results ------------- 48,247.35 --------------- 24,750.00 ----------------- 46,271.43 1,200.00 | February ]/ 1997 NAME: 1,40.00 � � | J 8 Rental, Inc Nye & 8oloOu 300.00 � 15.10 28,237.00 |' 60D88S3: 4,000.00 � 1107 East Chapman #106 P. 0. Box 756 1,700.00 1,700.00 � Arroyo Vista CITY, STATE: Orange, CA 92866 Ventura, C& 93002 Community Park PB00D 0UN88R� (714) 744-9293 (805) 664-1182 &ncauo Road Improvements ------------- -------- ITEM DESCRIPTION --------- S Qty ------------ Units - --- ------------|------------ UNIT S |---------- !-'---------� TOTAL BID UNIT $ |------- ------- TOTAL BID l 1 411 P.C.C. 3,863 8y ! 3.0 12,747.90 � 2.30 8,884.90 2 P.C.0 Curb & gutter 483 .1 ! 12.00 5.796.00 lkOO | 6,762.00 } Processed Misc Base 1 1 61 (Y 20.00 i 32,220.00 22.20 1 35,05.0 4 AUiUut Manhole ] S& 500.00 1,500.00 ' 320.80 i \ \ 960.00 5 | A.C. Pavement 1,223 Tons i 34.00 41,582.00 || 34.50 | 42,193.50 ! | 6 Earthwork | l L3 | 157,000.80 | 57,000.00 � ) | '| 48970.00 | 48,970.00 | | 7 � | 4" Gravel 966 {� � } 20.00 10,320.00 41,00 39,606.00 � 8 Relocate Meter Box 2 G4 | 1,200.00 2,400.00 750.00 1,500.00 | 0 Relocate PIre Hydrant l LA | 3,500.08 3,500.00 925.08 i 935.00 | lO 6d' Inlet to Grade l C& 800.00 800.00 475.00 475.00 | Il Remove Exist. 811 PVC 000.00 900.00 675.00 675.00 | 12 | Relocate Exist . Fence � | 1,870 � | 14 . 00 26 , l80. 00 � 12,50 2],]75.00 1113 Construction Survey | l LS 5,000.00 5,000.00 4000.00 4,000.00 14 Remove Exist. Inlet ii l EA 1,000.00 1,000.00 110.00 110.00 16 Relocate Check Vobm l [A 2,000.00 2,000.08 � 2600.08 2,600.00 16 Adh Valves to Grade 3 EA ! 250.00 750.00 190.00 570.00 i 17 � Release on Contract ' l LS � 1.00 . l � . l O0 | ' . � l � � � | | � �� �O��� 2l2 � , .90 217,532.70 2l7,�.70 � 232,524.44 � � | � � VENDOR ll ___ __ Driveway Specialists 199 88Gt T. O. Blvd #108 Thousand Oaks, C& 91360 (805) 495-8566 ______________ UNIT $ ________________ TOTAL BID 3.68 14,215.84 � 13.98 6,713.70 31.65 50,988.15 300.00 900.00 � ! 39.45 | 48,247.35 24,750.00 1 24,750.00 47.00 46,271.43 1,200.00 | 2,600.00 | 1,400.00 | 1,40.00 � � | 1,00.00 1,100.00 00.00 300.00 � 15.10 28,237.00 |' 4,000.00 4,000.00 � 800.00 800.00 | 1,700.00 1,700.00 � 100.00 300.00 � 1.00 1.00 � i0W14 bt8l-42- Exhibit 2 (5 of 6) CITY OF MOORPARK Bidder (VENDOR 12 13 ------------------------------ VENDOR 14 BidResults ------- - - - - --- -- - - - - - -- ----------- - - - - -; (VENDOR ------------------ - - - - -- ------------------------ February 3, 1997 NAME: Mendoza Contracting Granite Costruction Co Excel Paving ADDRESS: 130 Chapparral #205 585 W Beach St 2230 Lemon Ave Arroyo Vista CITY, STATE: Anaheim Hills, CA 92808 Watsonville, CA 95077 -50 Long Beach, CA 90806 Community Park PHONE NUMBER: 1(719) 278 -9077 11(408) 724 -1011 (310) 599 -5841 Access Road Improvements --------------- - - - - -- ITEM DESCRIPTION -------------------- - - - - -- Est Qty ------ - - - - Unitsl -- 1111 UNIT $ _e_ II--- - - - - -- -TOTAL BID- ---- - - - - -- UNIT $ i-- ----------- TOTAL _BID- - - ( -- UNIT _$- ! - - -------- TOTAL BID - - - - -- 1 4" P.C.C. 3,863 SF 3.00 11,589.00 3.00 11,589.00 I 2.00 7,726.00 12 P.C.0 Curb & Gutter 483 LF 13.00 6,279.00 13,00 6,279.00 I 14.00 { 6,762.00 3 Processed Misc Base 1,611 1 23.00 37,053.00 32.00 51,552.00 23.00 37,053.00 4 � Adjust Manhole 3 EA 500.00 1,500.00 346.00 1,038.00 400.00 I 1,200.00 l 5 I A.C. Pavement I 1,223 Tons 33.00 40,359.00 1 41.00 50,143.00 36.50 ! 44,639.50 6 I 1 Earthwork I 1 ' L'S 167,000.00 67,000.00 55698.00 55,698.00 1 76,500.00 1 76,500.00 7 j 4" Gravel ( 966 11 30.00 28,980.00 34.50 33,327.00 47.50 45,885.00 8 1 Relocate Meter Box 2 EA 1,500.00 3,000.00 265.00 530.00 800.00 1,600.00 9 Relocate FIre Hydrant 1 EA 1,500.00 1,500.00 1089.00 1,089.00 4,400.00 4,400.00 �10 1 Adj Inlet to Grade 1 EA 1,000.00 1,000.00 786.00 586.00 1,650.00 1,650.00 1111 Remove Exist. 8" PVC 1 _S 1,500.00 1,500.00 1 468.00 468.00 550.00 550.00 I 1 12 ; Relocate Exist. Fence 1 1,870 LF 15.00 28,050.00 ( 12.00 22,440.00 12.50 231375.00 1113 1 Construction Survey 1 i,S 2,500.00 2,500.00 1070.00 1,070.00 9,500.00 9,500.00 1114 p Remove Exist. Inlet 1 1 EA 1,500.00 1,500.00 662.00 662.00 ;I 830.00 830.00 1115 II 1 Relocate Check Valve 1 EA 1,500.00 1,500.00 1' 148.00 1,748.00 l' 1,650.00 1,650.00 16 II Adj Valves to Grade 3 i EA 250.00 750.00 I 352.00 I 1,056.00 166.00 498.00 11117 Release on Contract 1 LS 1.00 1100 .0000 1.00 1.00 1.00 I' TOTAL 234,061.00 239,276.00 263,819.50 0U0033 Exhibit 2 (6 of 6) CITY OF MOORPARK Bidder IVENDOR 15 BidResults ---------- - - - - -- ------------------------- ii -------------------- - - - -I� February 3, 1997 NAME: IA & R Construction li ADDRESS: 11655 Sheffield Way II Arroyo Vista CITY, STATE: Northridge, CA 91326 Community Park PHONE NUMBERi 1(818) 366 -8626 Access Road Improvements -------------------- - - - - -- -------- - - - - -- ----------------- - - - - -- j�------------------ - - - - -- ------------------- - - - - -� ITEM DESCRIPTION Est Qty Units UNIT $ TOTAL BID UNIT $ TOTAL BID UNIT $ TOTAL BID -------------------- - - - - -- ---------- - -.. -- --- - - - - -- ..._--- - - - - -- ...-- - - - - -- ------- - - - - -- ---- - - - - -- ------- - - - - -- 1 4" P.C.C. j 3,863 SF 6.00 23,178.00 2 j P.C.0 Curb & Gutter 483 il 25.00 12,075.00 I� 3 Processed Misc Base 1,611 "Y 40.00 64,440.00 !� 4 1 Adjust Manhole ! 3 FA 500.00 1,500.00 �) 5 A.C. Pavement 1,223 Tons j 50.00 61,150,00 6 1 Earthwork 1 S X60,000.00 60,000.00 it 7 1 4" Gravel 966 '1 56.00 54,096.00 i 8 1 Relocate Meter Box y 2 EA 250.00 500.00 ! 9 Relocate FIre Hydrant 1 EA 2,000.00 2,000.00 �I I it 10 Adj Inlet to Grade 1 EA ! 1889.00 1,889.00 � 11 j Remove Exist. 8" PVC I E.S 500.00 500.00 (j 12 Relocate Exist. Fence 1,870 J 1 6.00 11,220.00 j I I) 13 Construction Survey j i �,S 1 3,250.00 3,250.00 14 I Remove Exist. Inlet 1 EA i 200.00 200.00 15 ( Relocate Check Valve 1 EA 2,500.00 2,500.00 16 Adj Valves to Grade 3 EA 500.00 1,500.00 j jl 17 Release on Contract 1 �s j 1.00 L.00 lI f i --------------__ _______________________________ TOTAL 299,999.00 0000!34 RESOLUTION NO. 97 - A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MOORPARK, CALIFORNIA, AUTHORIZING A BUDGET AMENDMENT TO THE FISCAL YEAR 1996/97 ADOPTED BUDGET FOR THE ARROYO VISTA PARK ACCESS ROAD / BIKE PATH PROJECT [PROJECT NO. 80031 FOR THE TRAFFIC SYSTEM MANAGEMENT FUND [FUND 2011, THE LOS ANGELES AVENUE AOC ACCOUNT [ACCOUNT NO. 211.9011 AND THE PARK IMPROVEMENT FUND [ FUND 2121 WHEREAS, on June 19, 1996, the City Council adopted the Budget for Fiscal Year 1996/97; and, WHEREAS, a staff report has been presented to the City Council requesting a budget amendment for the Arroyo Vista Community Park Access Road / Bike Path Project to decrease the aggregate amount $26,000; and,. WHEREAS, Exhibit "A," attached hereto and made a part hereof, describes said budget amendment and its resultant impacts to the budget line item(s) for the project and projected year end fund balance(s) for the Traffic System Management Fund [Fund 2011, the Los Angeles Avenue AOC Account JAccount No 211.9011 and the Park Improvement Fund [Fund 212. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF MOORPARK, CALIFORNIA, DOES HEREBY RESOLVE AS FOLLOWS: SECTION 1. That a Budget amendment in the amount of ($26,000) to the funding sources described in Exhibit "A." is hereby approved SECTION 2. That a change in the amount of an interfund loan, in the amount of $(20,000), from Fund 100 to Fund 212, as described in Exhibit "B," is hereby approved. PASSED AND ADOPTED this 19th day of February. 1997. ATTESTED: City Clerk Mayor, City of Moorpark, California 0000bol Resolution No. 97 - Exhibit "A" SUPPLEMENTAL APPROPRIATIONS BY ACCOUNT NUMBER ACCOUNT CURRENT SUBJECT REVISED NUMBER APPROPRIATION APPROPRIATION APPROPRIATION 211.901: L A AOC $4,018,525 / (REDUCTION) ** $4,034,525 Traffic System $130,000.00 $10,000.000 $140,000.00 Management $(26,000) 201.801.8003.000.9903 Los Angeles Avenue $16,000.00 $(16,000.00) 0.00 AOC 211.901.8003.000.9903 Park Improvement $100,000.00 $(20,000.00) $80,000.00 212.801.8003.804.9903 TOTALS: $246,000.00 $(26,000.00) $220,000.00 EFFECT OF PROPOSED SUPPLEMENTAL APPROPRIATIONS TO FUND BALANCES FUND/ ACCOUNT CURRENT PROJECTED FY 96/97 YEAR END BALANCE SUPPLEMENTAL APPROPRIATION REVISED PROJECTED FY %/97 YEAR END BALANCE 201: Traf Sys Mngmnt $874,020 $10,000 $864,020 211.901: L A AOC $4,018,525 $(16,000) ** $4,034,525 212: Park Impr $507,870 $(20,000) $527,870 TOTALS: $(26,000) Note: ** Account No. 211.901 (1. A Ave. AOC) Fund Balance includes $1,997,526 in accounts receivables 006W)6 Resolution No. 97 - Exhibit "B" RECOGNITION OF INTER -FUND LOAN LENDING FUND FUND CURRENT ADDITIONAL REVISED NUMBER LOAN AMOUNT PRINCIPAL LOAN AMOUNT INCREASE / DECREASE 100 (General) $100,000.00 $(20,000.00) $80,000.00 TOTALS: $(20,000.00) BORROWING FUND FUND CURRENT ADDITIONAL REVISED NUMBER LOAN AMOUNT PRINCIPAL LOAN AMOUNT INCREASE / DECREASE 212 $100, 000 $(20,000) $120, 000 (Park Improvement) TOTALS: $(20,000) Note: Original $100,000 loan was approved via Resolution No. 96 -1207 (the Budget adoption Resolution) on June 19, 1996 '�'C��.b09'�'o