HomeMy WebLinkAboutAGENDA REPORT 1997 0219 CC REG ITEM 10D100 D.
AGENDA REPORT
CITY O F MOORPARK
TO: The Honorable City Council M
FROM: Kenneth C. Gilbert, Director of Public Works,1
DATE: February 7, 1997 (Council Meeting 2- 19 -97)
SUBJECT: Consider Bids for the Construction of a Paved Road, Bike
Path and Related Improvements at Arroyo Vista Community
Park.
EXECUTIVE SUMMARY
This presents the results of the bid opening for the subject
project, recommends award of a contract and recommends an amendment
tot he Budget to more accurately reflect revised project cost
estimates.
DISCUSSION
A. Grant
Last April the City applied for and received approval of a
State Bicycle / Pedestrian Facilities Grant (TDA Article 3
Funds) for partial funding of the construction of a paved
bicycle path from the easterly end of the existing paved road
at Arroyo Vista Community Park, easterly to the paved road to
be constructed as a part of pedestrian bridge project. Funding
of that project was included in the FY 1996/97 Budget.
B. Pedestrian Bridge
The pedestrian bridge project will include the construction of
a fifteen feet (151) wide paved road from the bridge southerly
within an easement across property owned by the Southern
California Edison Company (SCE) to the northerly property line
of the park. It is anticipated that this paved roadway will be
constructed as a part of the bridge project in June or July of
1997.
avp_rd.awd
0000SIL
Arroyo Vista Community Park Bike Path
February 19, 1997
Page 2
C. Subiect Project Design
Attached as Exhibit 1 are diagrams showing the location of the
proposed park road improvements. Exhibit 1 also includes cross
sections showing the design and scope of the proposed roadway
improvements for various segments of the work. Those typical
designs are described as follows:
Limits Description of Improvements
Segment A: From the easterly Pavement : 35' wide.
terminus of the existing North Side : dirt swale.
paved road, easterly to the South Side: curb, gutter and
westerly driveway to Parking sidewalk.
Lot #2. [See Section A -A on page 2 of
Exhibit 1].
Segment B: From the westerly Pavement: 30' wide.
driveway for Parking Lot #2, Sides: Dirt swales.
westerly to the east end of [See Section B -B on page 2 of
to the soccer fields. :Exhibit 11.
Segment C: From the east end Pavement : 20' wide.
of the soccer fields, Sides: Dirt swales.
easterly to the east end of [See Section C -C on page 3 of
the project. Exhibit 11.
End of Project to Bridge: .Pavement Width: 15'
D. Bid Results
Bids were received and opened on February 3, 1996. A summary
of the bid results is attached as Exhibit 2.
E. Qualifications
It has been determined that the apparent low bidder, Mendez
Concrete, Inc., is qualified to perform the work. Said bidder
has confirmed their bid is valid and that they are prepared to
proceed with the construction of the subject project.
F. Fiscal Impact
1. Construction Cost: The final actual cost will be based on
the unit price bids multiplied by the actual quantities of
the bid items required to completed the work. Based on the
amount of the low bid, an estimate of the final construction
cost is as follows:
Bid Amount: $187,347.91
Contingency (10 %) $ 18.652.09
$206,000.00
avp_rd.awd
Arroyo Vista Community Park Bike Path
February 19, 1997
Page 3
2. Total Project Cost Estimate:
cost is as follows:
Element
Design
Constr. (Plus Cntgncy)
Admin / Insp
Total
A summary of the total project
Total ( S )
14,220
206,000
_. 24,780
245,000
3. Bicycle Facilities Grant (Project Related): The City's SB-
821 grant states that grant fund shall be restricted to one -
third (331h %) of the construction costs related to the Bike
Path improvements, not to exceed $54,000. Based on the bids
received, a calculation of the anticipated expenditures
eligible for grant funding is as follows:
Description __. Amount
Area of Bike Path: 29,300 sf
Divided by: _ 69,100 sf
Percent of Construction Related to Bike 42%
Path:
Estimated Construction Costs Related to $85,680
Bike Path [$204,000 x 42 %]
Grant Funded Project Expenses [33' /ao] $28,557
Other Grant Funded Costs '
$25,443
[$54,000 -$28 5571
4. Bicycle Facilities Grant (Other Improvements): As stated
above, not all of the bicycle facilities grant funds will be
expended by this project. It is anticipated the remaining
grant funds will be applied to a portion of the Pedestrian
Bride Project and that the remainder may fund Bike Lane
improvements on Liberty Bell Road north of the bridge. When
those expenses are determined, the surplus grant funds
budgeted to the subject project will be transferred to those
projects. For now it is proposed that the $54,000
appropriation to the subject project from this source remain
unchanged.
avp_rd.awd
0000bla
Arroyo Vista Community Park Bike Path
February 19, 1997
Page 4
5. Project Funding: Based on the above analysis, a summary of
the recommended funding for this project is as follows:
Construction
avp_rd.awd
Funding Source
201: Traffic System Management
[201.801.8003.000.9903'
211: L A AOC
[211.901.8003.000.9903
212: Park Improvement
[212.710.7218.000.990,1
242: SB -821 [Project]
[242.801.8003.000.9903
Sub-Total
242: SB -821 [Non - Project
[242.801.8003.000.9903'
Bike Other Non -
Path Costs Constr
5'',123 60,160 19,500
0 0
60,160 19,500
28, 557 _ _ __ U 0
85,680 120,320 39,000
---_. 0 - - - -_ U 0
Total
Notes
136,783
a
0
b
79,660
c
28.557
d
245,000
25,443
e
Total 85,680 120,320 39,000 270,443
Notes: a Bike Path Costs: Total Cost ($85,680 less grant funds [$28,557] = Local Share
[$57,123'
• Non -Bike Path Costs: One -half non -Bike Path construction costs, plus one -half of all
non - construction costs.
b This budget item was for project costs related to that portion of the roadway
improvements across SCE property. Those costs are included in the Pedestrian bridge
project.
c One -half non -Bike Path construction costs, plus one -half non - construction costs. The
other one -half of these costs are charged to TSM funds.
d Project related Bicycle Facilities grant funds.
e Non - Project related Bicycle Facilities grant funds to be transferred to other projects
at a future date.
�A,10b4
Arroyo Vista Community Park Bike Path
February 19, 1997
Page 5
6. Budget: Based on
the above
analysis, a
summary of the
recommended funding
for this project
is as
follows:
Funding Source
Budget
Change
Total Notes
201: Traffic System Management
130,000
10,000
140,000
[201.801.8003.000.9903'
211: L A AOC
16,000
116,000)
0
[211.901.8003.000.9903'
212: Park Improvement
100,000
(20,000)
80,000
[212.710.7218.000.9903'
242: SB -821
54,000
0
54,000 a
[242.801.8003.000.990.3'
Total
300,000
(26,000),
274,000
Notes: a Non - Project Related Bicycle Facilities Grant funds to be transferred to other projects
at a later date.
7. Budget Amendment: A resolution has been prepared amending
the budget to reflect the adjusted funding sources shown
above.
G. Schedule
If a contract is awarded, construction should begin in March
and be completed by May.
H. Access
Vehicular access to the easterly portion of the park will be
curtailed to some degree during construction. To the extent
possible, access will be kept open.
RECWMNDATION (ROLL CALL VOTE)
Staff recommends that the City Council take the following actions:
1. Award a contract to Mendez Concrete, Inc. in the amount of
$187,347.91 for the construction of the subject project.
2. Approve a contingency in the amount of ten percent (10%) of the
bid and authorize the City Manager to approve additional work,
if required, for an amount not to exceed said amount.
3. Authorize the City Manager to sign necessary contract
documents.
4. Adopt the attached Resolution (Exhibit 3) amending the budget
as described in this report.
avp_rd.awd
M
l �
e
J L-)I cQrJa
a�aaL,2 C� Itk i\ m
C131x`d15n:��D 3B Q
j^C, I `�1V�71?1Vd
:7
.l VON(@0® )Wd
K
H
10' 20' 20' 0'
SWALE
5' 15' 8' 2
SHM. P VM T. S/w
M�k .15
YAC VER -'
0.75' 8`Pwe
GRAVEL
.SECTION "A -A"
N. T. S,
i
10' 20' _ 20' 1
SwALE SWALE
5' 15' 15' S'
1 M SHLDR. PVMT PVMT. SHLDR.
0.53
Y -3'AC OVER
1 B" PMB
0.75'
4" GRAVEL--" "
SECTION "B -B"
N.T.S.
0.13'
000(ki r
10' 10' 10' 10' 10' 10'
SWAL.E SHLM.- I PVMT. PVMT. I SHLDR. I SWALE
1.15' I 1 1 0.53'
YAC OVER
0.75 g' Pie /
4" GRAVEL
SECTI ON "C- C"
N.T.S.
Mqk
Exhibit 2 (1 of 6)
CITY OF MOORPARK
Bidder
!JVENDOR 1
--------------------------------
VENDOR 2
BidResults
----------
- - - --lEngineer's-Estimate
----------------------
.j'------------------
- - - - --
--------------------
- - - -��
February 3, 1997
NAME:
Mendez Concrete, Inc.
J & H Engineering
ADDRESS:
1210 Santa
Paula Street
79 Daily Dr #169
Arroyo Vista
CITY, STATE:
Santa Paula, CA 93060
Camarillo,
CA 93010
Community Park
PHONE NUMBER,
IJ(805) 525 -8043
(805) 987 -8414
Access Road Improvements
--------------------------
-
II
ITEM
--------------------------
DESCRIPTION
Est Qty _ -
- - - - - --
- - - --
-- Units'
-- I-
--------------------
UNIT $
- - -___ _ .-
- - -..;
TOTAL BID
--- - - - - --
-------------------------
UNIT $ 1
_...- - - - - --
TOTAL BID
------- - - - - --
------------------------
-- UNIT_$__j_
TOTAL BID
+ ------ - - - - --
1 1
4" P.C.C.
3,863
SF
4.00 !
15,452.00
2.06 !
7,957.78
1.75
6,760.25
2
P.C.0 Curb & Gutter
483
LF
12.00
51796.00
I
12.74
6,153.42
13.00
6,279.00
1 3
Processed Misc Base (
1,611
1'
36.00
57,996.001
26.57
42,804.27
36.00
57,996.00
f 4
Adjust Manhole ii
3
EA
300.00
900.00
1 315..00
945.00
275.00
825.00
5
A.C. Pavement
1,223
Tons
45.00
55,035.00
3388
41,435.24
35.00
42,805.00
6
Earthwork
II
1.
-;S
10,000.00
10,000.00
28973.00
28,973.00
10,000.00
10,000.00
7
4" Gravel
966'Y
40.00
38,640.00
28.90
27,917.40
36.00
34,776.00
8
Relocate Meter Box
2
EA,
1,500.00
3,000.00
1.320.00
2,640.00
350.00
1
700.00
9
Relocate Fire H drantl
Y �,
1
EP,
1 000.00
1 000.00
,
I 1100.00
1 100.00
2,500.00
2,500.00
110
Adj Inlet to Grade II
1
EA
500.00
500.00
600.00
600.00
1,000.00
1,000.00
11
Remove Exist. 8" PVC
1
LS
300.00
300.00
300.00
300.00
J
350.00
350.00
12
Relocate Exist. Fenced
1,870
J
10.00
18,700.00
9.14
17,091.80
11.50
21,505.00
�I13
Construction Survey
1
�,S
3,000.00
3,000.00
j 6457.00
6,457.00
3,000.00
3,000.00
H14
Remove Exist. Inlet
1
EA
100.00
100.00
1067.00
1,067.00 ;
1,000.00
1,000.00
�15 i
Relocate Check Valves
1
FA
1,500.00
1,500.00
I
1320.00
1,320.00
500.00
500.00�
1116 !
Adj Valves to Grade
3
EA
150.00
450.00
!95.00
i
585.00
225.00
675.00
1117
Release on Contract
1
L,S
1.00
1.00
.0000
1.00
1.00
1.00
TOTAL
I
212,370.00
�
187,347.91
---------------------
190,672.25
- - - - --
000065
Exhibit 2 (2 of 6)
CITY OF MOORPARK I
Bidder
IVENDOR 3
VENDOR 4
- -----------------------------------
VENDOR 5
BidResults
---------------------------------------
--
i------------------
- - - - --
------------------------
��
February 3, 1997
NAME:
Berry General
Eng
D. W. Burhoe
R & H Paving
it
ADDRESS:
P. 0. Box
7178
11270 Quail Court
1497 Los Angeles Ave
Arroyo Vista
CITY, STATE:
Oxnard, CA
93031
Santa Paula,
CA 93060
Saticoy, CA
93004
Community Park
PHONE NUMBER:
485 -9826
,(805) 525-7474
(805) 647 -3286
Access Road Improvements
,(805)
ITEM DESCRIPTION - -- ----
- - -- -----
Est Qt
------ y - -
- - - - --
Unitsl
- -- -
- - - - -- -----
------------------------
- UNIT -- --
- - - - -- - - -'
TOTAL BID
-
- --------
III- UNIT - - -- -
- - - - --
-TOTAL -BID --
------------------------
-- UNIT -$ -- -
-TOTAL -BID --
1
{ 4" P.C.C. (
3,863
SF
1.80
6,953.40
3.00
11,589.00
2.20
8,498.60
2
° P.C.0 Curb & Gutter
i 483
LF
10.75
5,192.25
12.00
5,796.00
10.40
5,023.20
3
Processed Misc Base
1,611
"Y
19.70
31,736.70
31.00
49,941.00
21.30
34,314.30
4
li Adjust Manhole
3
EA
480.00
1,440.00
1 400.00
1,200.00
340.00
1,020.00
5
A.C. Pavement
1,223
Tons
! 31.50
38,524.50
1j 35.00
42,805.00
34.00
41,582.00
6
! Earthwork
1
X45,218.65
45,218.65
18000.00
18,000.00
38,200.00
38,200.00
7
4" Gravel
966
'Y
1 29.50
28,497.00
33.50
32,361.00
28.50
27,531.00
8
Relocate Meter Box
2
EA
765.00
1,530.00
I
800.00
1,600.00
825.00
1,650.00 j
9
Relocate FIre Hydrant
1
EA
930.00
930.00
I 1100.00 j
1,100.00
1,000.00
1,000.00
10
Adj Inlet to Grade
1
EA
480.00
480.00
1 600.00
600.00
500.00
500.00
11
Remove Exist. 8" PVC
1
L,
780.00
780.00
'� 300.00
800.00
750.00
750.00
I
12
Relocate Exist. Fence
1,870
,J
11.95
22,346.50
12.00 I
22,440.00
12.90
24,123.00
13
Construction Survey
1
�s
5,625.00
5,625.00
) 3800.00
3,800.00
8,500.00
8,500.00
14
Remove Exist. Inlet
l
EA
690.00
690.00
it L10.00
110.00
115.00
115.00
15
Relocate Check Valve
1
EA
2,560.00
2,560.00
2700.00
2,700.00
2,700.00
2,700.00 j
16
Adj Valves to Grade
3
EA.
240.00
720.00
! 200.00
600.00 I
200.00
600.00
17
I1 Release on Contract
1
S
1.00
1.00
1.00
1.00 (
1.00
1.00
TOTAL
193,225.00
195,443.00
196,108.10
OkAJ .f
Exhibit 2 (3 of 6)
CITY OF MOORPARK
Bidder
(VENDOR
VENDOR 7
VENDOR 8
BidResults
-------- -
- - - -- --
-6- -
------------------------
- - - -_ --
---------
- - - - --
------------------------
February 3, 1997
NAME:
lArnco Construction
Sully- Miller
CNN Paving
#449
ADDRESS:
1090 Desea
Ave.
i�3555 Vineyard Avenue
2510 "G" Las Posas Rd I
Arroyo Vista
CITY, STATE:
ICamarillo,
CA 93020
JOxnard, CA 93030
Camarillo,
CA 93010
Community Park
PHONE NUMBER:
1(805) 383 -7380
f(805) 981 -4275
(805) 389 -1475
Access Road Improvements
-------------------- - - - - --
-----------
ITEM
--------------------
DESCRIPTION
- - - - --
Est Qty
------------
- - -- -- -------------------
Unitsll UNIT $
---
- - - - -1
TOTAL BID
--------------
------------------
UNIT $
-----------
- - - - --
TOTAL BID
------------------------
UNIT $ - -'I
--- - - - - --
TOTAL BID
------- - - - - --
1
4 P.C.C.
3,863
SF
2.60
10,043.80
I
2.45
9,464.35
�-
2.18
( 8,421.34 I�
2
P.C.0 Curb & Gutter
483
J
14.50
7,003.50
13.50
6,520.50
14.75
7,124.25
3
Processed Misc Base i
1,611
"Y
27.00
43,497.00
23.50
37,858.50
25.35
40,838.85
4
Adjust Manhole
3
EA
350.00
1,050.00
I I
!1 325.00
975.00
400.00
i I
1,200.00
1
5 j
A.C. Pavement 1
1,223
Tons
33.00
40,359.00
31.00
37,913.00
36.00
44,028.00
j
6
Earthwork
1
„S
X32,458.70
32,458.70
j 41725.00 1
41,725.00
40,000.00
40,000.00
l
7
4" Gravel
�
966
'Y
27.00
26,082.00
36.70
35,452.20
36.00
34,776.00
8
Relocate Meter Box
2
EA
?50.00
1,500.00
j 800.00
1,600.00
750.00
1,500.00
�1
9 1
Relocate FIre Hydrantij
1
EA
975.00
975.00
925.00 1
925.00
3,250.00
3,250.00
1110
Ad' Inlet to Grade
1
EA
500.00
500.00
'I 480.00 I
480.00
500.00
500.00
1111
Remove Exist. 8" PVC
1
aS
700.00
700.00
650.00
650.00
500.00
500.00
1112
Relocate Exist. Fences,
1,870
..F
12.00
22,440.00
12.30
23,001.00 II
13.50
251245.00
1113
1
Construction Survey
1
LS
(12,000.00
12,000.00
9080.00
I
9,080.00
3,500.00
3,500.00
1114
Remove Exist. Inlet
1
EA
100.00
100.00
110.00
110.00
400.00
400.00
11115
ii
Relocate Check Valve
1
1
EA
2,500.00
2,500.00
,
2550.00
2 550.00
1,200.00
1,200.00
j
16 1
Adj Valves to Grade
3
EA
200.00
600.00
I
200.00
600.00
300.00
900.00
17
Release on Contract
1
S
1.00
1.00
I
:.0000
1.00
1.00
I
1.00
11 TOTAL
201,810.00
208,905.55
213,384.44
000WAL
Exhibit 2 (4 of 6)
___ __
Driveway Specialists
199 88Gt T.
O. Blvd #108
Thousand Oaks, C& 91360
(805) 495-8566
______________
UNIT $
________________
CITY OF H0V8PA8K
Bidder
14,215.84
VENDOR Y
6,713.70
VENDOR 10
50,988.15
300.00
Bid Results
-------------
48,247.35
---------------
24,750.00
-----------------
46,271.43
1,200.00
|
February ]/ 1997
NAME:
1,40.00 �
� |
J 8 Rental,
Inc
Nye & 8oloOu
300.00 �
15.10
28,237.00 |'
60D88S3:
4,000.00
�
1107 East Chapman #106
P. 0. Box 756
1,700.00
1,700.00 �
Arroyo Vista
CITY, STATE:
Orange, CA
92866
Ventura, C& 93002
Community Park
PB00D 0UN88R�
(714) 744-9293
(805) 664-1182
&ncauo Road Improvements
-------------
--------
ITEM DESCRIPTION
---------
S Qty
------------
Units
- ---
------------|------------
UNIT S
|---------- !-'---------�
TOTAL BID
UNIT $
|------- -------
TOTAL BID
l
1 411 P.C.C.
3,863
8y
!
3.0
12,747.90
�
2.30
8,884.90
2
P.C.0 Curb & gutter
483
.1
! 12.00
5.796.00
lkOO |
6,762.00
}
Processed Misc Base 1
1 61
(Y
20.00 i
32,220.00
22.20 1
35,05.0
4
AUiUut Manhole
]
S&
500.00
1,500.00
' 320.80 i
\ \
960.00
5
| A.C. Pavement
1,223
Tons
i 34.00
41,582.00
|| 34.50 |
42,193.50
!
| 6
Earthwork |
l
L3
|
157,000.80 |
57,000.00
� ) |
'| 48970.00 |
48,970.00
|
| 7
�
| 4" Gravel
966
{�
�
} 20.00
10,320.00
41,00
39,606.00
� 8
Relocate Meter Box
2
G4
| 1,200.00
2,400.00
750.00
1,500.00
| 0
Relocate PIre Hydrant
l
LA
| 3,500.08
3,500.00
925.08 i
935.00
| lO
6d' Inlet to Grade
l
C&
800.00
800.00
475.00
475.00
| Il
Remove Exist. 811 PVC
000.00
900.00
675.00
675.00
| 12
|
Relocate Exist . Fence
� |
1,870
�
|
14 . 00
26 , l80. 00
�
12,50
2],]75.00
1113
Construction Survey |
l
LS
5,000.00
5,000.00
4000.00
4,000.00
14
Remove Exist. Inlet ii
l
EA
1,000.00
1,000.00
110.00
110.00
16
Relocate Check Vobm
l
[A
2,000.00
2,000.08
�
2600.08
2,600.00
16
Adh Valves to Grade
3
EA
! 250.00
750.00
190.00
570.00 i
17
�
Release on Contract '
l
LS
� 1.00
.
l �
.
l O0
| '
. �
l �
� � |
| �
�� �O��� 2l2
� , .90 217,532.70 2l7,�.70 � 232,524.44 � �
| � �
VENDOR ll
___ __
Driveway Specialists
199 88Gt T.
O. Blvd #108
Thousand Oaks, C& 91360
(805) 495-8566
______________
UNIT $
________________
TOTAL BID
3.68
14,215.84
� 13.98
6,713.70
31.65
50,988.15
300.00
900.00
� !
39.45 |
48,247.35
24,750.00 1
24,750.00
47.00
46,271.43
1,200.00
|
2,600.00
|
1,400.00
|
1,40.00 �
� |
1,00.00
1,100.00
00.00
300.00 �
15.10
28,237.00 |'
4,000.00
4,000.00
�
800.00
800.00 |
1,700.00
1,700.00 �
100.00
300.00 �
1.00
1.00
� i0W14 bt8l-42-
Exhibit 2 (5 of 6)
CITY OF MOORPARK
Bidder
(VENDOR 12
13
------------------------------
VENDOR 14
BidResults
------- - -
- - --- --
- - - - - -- -----------
- - - - -;
(VENDOR
------------------
- - - - --
------------------------
February 3, 1997
NAME:
Mendoza Contracting
Granite Costruction Co
Excel Paving
ADDRESS:
130 Chapparral #205
585 W Beach
St
2230 Lemon
Ave
Arroyo Vista
CITY, STATE:
Anaheim Hills,
CA 92808
Watsonville,
CA 95077 -50
Long Beach,
CA 90806
Community Park
PHONE NUMBER:
1(719) 278 -9077 11(408)
724 -1011
(310) 599 -5841
Access Road Improvements
--------------- - - - - --
ITEM DESCRIPTION
-------------------- - - - - --
Est Qty
------ - - - -
Unitsl
-- 1111
UNIT $ _e_
II--- - - - - --
-TOTAL BID-
---- - - - - --
UNIT $ i--
-----------
TOTAL _BID-
-
-
( -- UNIT _$- !
- - --------
TOTAL BID
- - - - --
1
4" P.C.C.
3,863
SF
3.00
11,589.00
3.00
11,589.00 I
2.00
7,726.00
12
P.C.0 Curb & Gutter
483
LF
13.00
6,279.00
13,00
6,279.00 I
14.00 {
6,762.00
3
Processed Misc Base
1,611
1
23.00
37,053.00
32.00
51,552.00
23.00
37,053.00
4
� Adjust Manhole
3
EA
500.00
1,500.00
346.00
1,038.00
400.00
I
1,200.00
l 5
I
A.C. Pavement
I
1,223
Tons
33.00
40,359.00
1 41.00
50,143.00
36.50 !
44,639.50
6
I
1 Earthwork
I
1
'
L'S
167,000.00
67,000.00
55698.00
55,698.00 1
76,500.00 1
76,500.00
7
j 4" Gravel (
966
11
30.00
28,980.00
34.50
33,327.00
47.50
45,885.00
8
1 Relocate Meter Box
2
EA
1,500.00
3,000.00
265.00
530.00
800.00
1,600.00
9
Relocate FIre Hydrant
1
EA
1,500.00
1,500.00
1089.00
1,089.00
4,400.00
4,400.00
�10
1 Adj Inlet to Grade
1
EA
1,000.00
1,000.00
786.00
586.00
1,650.00
1,650.00
1111
Remove Exist. 8" PVC
1
_S
1,500.00
1,500.00
1 468.00
468.00
550.00
550.00
I
1 12
;
Relocate Exist. Fence
1
1,870
LF
15.00
28,050.00
( 12.00
22,440.00
12.50
231375.00
1113
1 Construction Survey
1
i,S
2,500.00
2,500.00
1070.00
1,070.00
9,500.00
9,500.00
1114
p Remove Exist. Inlet 1
1
EA
1,500.00
1,500.00
662.00
662.00 ;I
830.00
830.00
1115
II
1 Relocate Check Valve
1
EA
1,500.00
1,500.00
1' 148.00
1,748.00 l'
1,650.00
1,650.00
16
II
Adj Valves to Grade
3
i
EA
250.00
750.00
I
352.00
I
1,056.00
166.00
498.00
11117
Release on Contract
1
LS
1.00
1100
.0000
1.00
1.00
1.00
I'
TOTAL
234,061.00
239,276.00
263,819.50
0U0033
Exhibit 2 (6 of 6)
CITY OF MOORPARK Bidder IVENDOR 15
BidResults ---------- - - - - -- ------------------------- ii -------------------- - - - -I�
February 3, 1997 NAME: IA & R Construction li
ADDRESS: 11655 Sheffield Way II
Arroyo Vista CITY, STATE: Northridge, CA 91326
Community Park PHONE NUMBERi 1(818) 366 -8626
Access Road Improvements
-------------------- - - - - -- -------- - - - - -- ----------------- - - - - -- j�------------------ - - - - -- ------------------- - - - - -�
ITEM DESCRIPTION Est Qty Units UNIT $ TOTAL BID UNIT $ TOTAL BID UNIT $ TOTAL BID
-------------------- - - - - -- ---------- - -.. -- --- - - - - -- ..._--- - - - - -- ...-- - - - - -- ------- - - - - -- ---- - - - - -- ------- - - - - --
1 4" P.C.C. j 3,863 SF 6.00 23,178.00
2 j P.C.0 Curb & Gutter 483 il 25.00 12,075.00 I�
3 Processed Misc Base 1,611 "Y 40.00 64,440.00 !�
4 1 Adjust Manhole ! 3 FA 500.00 1,500.00 �)
5 A.C. Pavement 1,223 Tons j 50.00 61,150,00
6 1 Earthwork 1 S X60,000.00 60,000.00 it
7 1 4" Gravel 966 '1 56.00 54,096.00 i
8 1 Relocate Meter Box y 2 EA 250.00 500.00 !
9 Relocate FIre Hydrant 1 EA 2,000.00 2,000.00
�I I it
10 Adj Inlet to Grade 1 EA ! 1889.00 1,889.00
�
11 j Remove Exist. 8" PVC I E.S 500.00 500.00 (j
12 Relocate Exist. Fence 1,870 J 1 6.00 11,220.00 j
I I)
13 Construction Survey j i �,S 1 3,250.00 3,250.00
14 I Remove Exist. Inlet 1 EA i 200.00 200.00
15 ( Relocate Check Valve 1 EA 2,500.00 2,500.00
16 Adj Valves to Grade 3 EA 500.00 1,500.00 j
jl
17 Release on Contract 1 �s j 1.00 L.00
lI f i
--------------__ _______________________________
TOTAL 299,999.00
0000!34
RESOLUTION NO. 97 -
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF MOORPARK, CALIFORNIA, AUTHORIZING A
BUDGET AMENDMENT TO THE FISCAL YEAR 1996/97
ADOPTED BUDGET FOR THE ARROYO VISTA PARK
ACCESS ROAD / BIKE PATH PROJECT [PROJECT NO.
80031 FOR THE TRAFFIC SYSTEM MANAGEMENT
FUND [FUND 2011, THE LOS ANGELES AVENUE AOC
ACCOUNT [ACCOUNT NO. 211.9011 AND THE PARK
IMPROVEMENT FUND [ FUND 2121
WHEREAS, on June 19, 1996, the City Council adopted the Budget for Fiscal Year
1996/97; and,
WHEREAS, a staff report has been presented to the City Council requesting a budget
amendment for the Arroyo Vista Community Park Access Road / Bike Path Project to decrease
the aggregate amount $26,000; and,.
WHEREAS, Exhibit "A," attached hereto and made a part hereof, describes said budget
amendment and its resultant impacts to the budget line item(s) for the project and projected year
end fund balance(s) for the Traffic System Management Fund [Fund 2011, the Los Angeles
Avenue AOC Account JAccount No 211.9011 and the Park Improvement Fund [Fund 212.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF MOORPARK,
CALIFORNIA, DOES HEREBY RESOLVE AS FOLLOWS:
SECTION 1. That a Budget amendment in the amount of ($26,000) to the funding
sources described in Exhibit "A." is hereby approved
SECTION 2. That a change in the amount of an interfund loan, in the amount of
$(20,000), from Fund 100 to Fund 212, as described in Exhibit "B," is hereby approved.
PASSED AND ADOPTED this 19th day of February. 1997.
ATTESTED:
City Clerk
Mayor, City of Moorpark, California
0000bol
Resolution No. 97 -
Exhibit "A"
SUPPLEMENTAL APPROPRIATIONS BY ACCOUNT NUMBER
ACCOUNT
CURRENT
SUBJECT
REVISED
NUMBER
APPROPRIATION
APPROPRIATION
APPROPRIATION
211.901: L A AOC
$4,018,525
/ (REDUCTION)
** $4,034,525
Traffic System
$130,000.00
$10,000.000
$140,000.00
Management
$(26,000)
201.801.8003.000.9903
Los Angeles Avenue
$16,000.00
$(16,000.00)
0.00
AOC
211.901.8003.000.9903
Park Improvement
$100,000.00
$(20,000.00)
$80,000.00
212.801.8003.804.9903
TOTALS:
$246,000.00
$(26,000.00)
$220,000.00
EFFECT OF PROPOSED SUPPLEMENTAL APPROPRIATIONS TO FUND BALANCES
FUND/ ACCOUNT
CURRENT
PROJECTED
FY 96/97 YEAR END
BALANCE
SUPPLEMENTAL
APPROPRIATION
REVISED
PROJECTED
FY %/97 YEAR
END BALANCE
201: Traf Sys Mngmnt
$874,020
$10,000
$864,020
211.901: L A AOC
$4,018,525
$(16,000)
** $4,034,525
212: Park Impr
$507,870
$(20,000)
$527,870
TOTALS:
$(26,000)
Note: ** Account No. 211.901 (1. A Ave. AOC) Fund Balance includes $1,997,526 in
accounts receivables
006W)6
Resolution No. 97 -
Exhibit "B"
RECOGNITION OF INTER -FUND LOAN
LENDING FUND
FUND
CURRENT
ADDITIONAL
REVISED
NUMBER
LOAN AMOUNT
PRINCIPAL
LOAN AMOUNT
INCREASE /
DECREASE
100 (General)
$100,000.00
$(20,000.00)
$80,000.00
TOTALS:
$(20,000.00)
BORROWING FUND
FUND
CURRENT
ADDITIONAL
REVISED
NUMBER
LOAN AMOUNT
PRINCIPAL
LOAN AMOUNT
INCREASE /
DECREASE
212
$100, 000
$(20,000)
$120, 000
(Park Improvement)
TOTALS:
$(20,000)
Note: Original $100,000 loan was approved via Resolution No. 96 -1207 (the Budget
adoption Resolution) on June 19, 1996
'�'C��.b09'�'o