CITY OF MOORPARKBY•'�=
The Honorable City Council
Kenneth C. Gilbert, Director of Public Works
March 10, 1997 (CC Meeting: 3- 19 -97)
SUBJECT: Consider Authorization to Advertise for Bids for the
Construction of Slope and Pavement Improvements on Wicks
Road and Pavement and Drainage Improvements on Valley
Road
I .Y -1
This report requests authorization to advertise for receipt of bids
for the subject combined project.
DISCUSSION
A. Background
1. Valley Road: In June of 1996, the City Council approved the
conceptual design for improvements to Valley Road. That
action was based on a recommendation to approve from the
Transportation and Streets Committee. Notices were sent to
all affected property owners and residents advising them of
the general nature of the proposed improvements and that the
City Council was being asked to approve the conceptual
design.
2. Wicks Road slope stabilization: In late 1994 the City
Engineer was authorized to proceed with a geotechnical
analysis and evaluation of the condition of the slope
supporting Wicks Road. That effort was undertaken and
completed. Based on the findings of those investigations,
the City Engineer was directed to prepare a design for the
construction of recommended slope stabilization measures.
The City Engineer was also directed to prepare certain
easements required for the construction of those
improvements. Those Easements have been obtained and
accepted by the City.
000074-
wicks.ad
CDBG Project
March 19, 1997
Page 2
B. Design Services
1. Valley Road:
Engineering to
the pavement
improvements
completed.
The City retained the services of M3 Civil
prepare the design for the reconstruction of
and the construction of certain drainage
on valley Road. That design has been
2. Wicks Road Slope Stabilization: As stated above, the City
Engineer was directed to prepare a design for the
construction of certain slope stabilization measures for
Wicks Road. That design has been completed.
3. Wicks Road Asphalt overlay: The City also retained the
services of the City Engineer to prepare a design for the
construction of an asphalt overlay on a portion of Wicks
Road. That design is also completed.
4. Combined Project: Due to the nature of the funding for the
above described projects, it is recommended that these
project be combined into one contract.
C. project Scop e of Work
1. Valley Road:
a. Remove and replace asphalt pavement and base;
b. Construction of a storm drain inlet and a lateral pipe
near the south end of valley Road; and,
c. Construction of driveway transitions as required.
d. The final pavement improvements will be approximately
twenty (20) to twenty -five (25) feet wide, within a
street right -of -way of forty feet. (401).
2. Wicks Road Slope Stabilization:
a. Construction of retaining walls at the toe of the slope
located south of the Wicks Road right -of -way (easements
have been acquired for this construction); and,
b. Construction of berms and other improvements along the
south edge of the pavement to divert and control surface
drainage i-un- off,
3. Wicks Road Asphalt Overlay:
a. Construction of an asphalt overlay and related
improvements from Walnut Canyon Road easterly to a point
approximately 1,000' east of Walnut Canyon Road; and,
b. Construction of berms and other drainage improvements to
the north side of the road.
aicks.ad 000075
CDBG Project
March 19, 1997
Page 3
D. Fiscal Impact
1. costs: A summary of the total estimated cost for this
combined project is as follows:
2. Multi -Year costs: The following is a summary of project
costs incurred in prior years, anticipated for FY 1996/97
and projected for FY 1997/98.
Elesent _.._
Design
Construction (incl. contingency)
Adain. & Inspection
misc. & Contingency
Total
Multi -Year Expenditure Sunary (All Projects)
Prior Years
FY 99 7
Project Cost Estivate
Total
Eleitent _...__.
Va le d.
Wicks Slone
Wicks Arc
of
Design
4,440
21,000
5,000
30,440
Construction (incl. contingency)
35,000
45,000
37,000
117,000
Admin. & Inspection
3,000
4,500
3,000
10,500
Misc. & Contingency
3,560
_ 4,500
4.000
12.060
46,000
75,000
49,000
170,000
2. Multi -Year costs: The following is a summary of project
costs incurred in prior years, anticipated for FY 1996/97
and projected for FY 1997/98.
Elesent _.._
Design
Construction (incl. contingency)
Adain. & Inspection
misc. & Contingency
Total
Multi -Year Expenditure Sunary (All Projects)
Prior Years
FY 99 7
FY 1 97/98
Total
a 21,745
10,255
0
32,000
0
0
117,000
117,000
0
0
10,500
10,500
0
0
12.06 0
IL 6
a 21,745
10,255
139,560
171,560
L149,815
I
170,000
Note: a) Prior Year Costs: Valley Rd = $2,140; Wicks Rd Slope = $19,605.
3. Funding Sources: Community Development Block Grant (CDBG)
funds are restricted to construction costs only. The budget
provides funding for non - construction costs for the three
subject projects from the Moorpark Redevelopment Agency
(MRA) . [Note: Non- construction cost for a separate project -- the Everett Basin outlet Drain
-- is funded by the Local Transportation Fund.]
OW076
vicks.nd
CDBG Project
March 19, 1997
Page 4
4. Current Year Budget: The following is a summary of the
current year budget for CDBG funded Street improvement
projects.
5. Budget Amendment: The following is a summary of the
estimated amount of a future budget amendment based on the
current estimated project costs.
FY 1996 /97 Budget
Funding Source _^
Current (S )
FY 1996/97
Budget
CDBG
Project
CDBG
_LTF
. KRA f$)
Total
Everett Basin Outlet [8007'
80,000
40,000
0
120,000
Wicks Slope [80211
120,000
0
30,000
150,000
Wicks A/C Overlay [8020
41,000
0
99,000
140,000
Valley Road [8019'
70,000
__.__0
100,000
170,000
Total
;11,000
40,000
229,000
580,000
5. Budget Amendment: The following is a summary of the
estimated amount of a future budget amendment based on the
current estimated project costs.
FY 1996 /97 Budget
Funding Source _^
Current (S )
Change
Revised f S )
CDBG
Wicks Slope
120,000
(70,000)
50,000
Wicks A/C Overlay
41,000
(1,000)
40,000
Valley Road
70,000
30
40,000
Sub -Total
231,000
(101,000)
130,000
Everett Basin Outlet
80,000
0
b 80,000
Total
311,000
1101,000)
210,000
LTF
Everett Basin Outlet 40,000 0 40,000
M171
Wicks Slope 30,000 (23,000) 7,000
Wicks A/C Overlay 99,000 (92,000) 7,000
Valley Road loom 94 6.000
229,000 {209,000) 20,000
Total 580,000 1310,000) 270,000
Note: b) Future Project.
E. Plans and Specifications
A set of the plans and specifications for this combined project
have been placed in the City Council office for review and
comment.
wicks.ad ()WO'
CDBG Project
March 19, 1997
Page 5
F. Schedule
It is anticipated that the bids will be presented to the City
Council for award of contract in May. Construction should
begin in June and be completed by August.
Staff recommends that City Council approve the plans and
specifications for the subject project and authorize staff to
advertise for receipt of bids.
aicks.ad
0r "
78