Loading...
HomeMy WebLinkAboutAGENDA REPORT 1997 0319 CC REG ITEM 10DFROM: DATE: ITEMJOO�D* CITY OF MOORPAR& CAI- IFORNU City Coun '1 Meeting Of -3417 —199 7 ACTION: AGENDA REPORT _ CITY OF MOORPARKBY•'�= The Honorable City Council Kenneth C. Gilbert, Director of Public Works March 10, 1997 (CC Meeting: 3- 19 -97) SUBJECT: Consider Authorization to Advertise for Bids for the Construction of Slope and Pavement Improvements on Wicks Road and Pavement and Drainage Improvements on Valley Road I .Y -1 This report requests authorization to advertise for receipt of bids for the subject combined project. DISCUSSION A. Background 1. Valley Road: In June of 1996, the City Council approved the conceptual design for improvements to Valley Road. That action was based on a recommendation to approve from the Transportation and Streets Committee. Notices were sent to all affected property owners and residents advising them of the general nature of the proposed improvements and that the City Council was being asked to approve the conceptual design. 2. Wicks Road slope stabilization: In late 1994 the City Engineer was authorized to proceed with a geotechnical analysis and evaluation of the condition of the slope supporting Wicks Road. That effort was undertaken and completed. Based on the findings of those investigations, the City Engineer was directed to prepare a design for the construction of recommended slope stabilization measures. The City Engineer was also directed to prepare certain easements required for the construction of those improvements. Those Easements have been obtained and accepted by the City. 000074- wicks.ad CDBG Project March 19, 1997 Page 2 B. Design Services 1. Valley Road: Engineering to the pavement improvements completed. The City retained the services of M3 Civil prepare the design for the reconstruction of and the construction of certain drainage on valley Road. That design has been 2. Wicks Road Slope Stabilization: As stated above, the City Engineer was directed to prepare a design for the construction of certain slope stabilization measures for Wicks Road. That design has been completed. 3. Wicks Road Asphalt overlay: The City also retained the services of the City Engineer to prepare a design for the construction of an asphalt overlay on a portion of Wicks Road. That design is also completed. 4. Combined Project: Due to the nature of the funding for the above described projects, it is recommended that these project be combined into one contract. C. project Scop e of Work 1. Valley Road: a. Remove and replace asphalt pavement and base; b. Construction of a storm drain inlet and a lateral pipe near the south end of valley Road; and, c. Construction of driveway transitions as required. d. The final pavement improvements will be approximately twenty (20) to twenty -five (25) feet wide, within a street right -of -way of forty feet. (401). 2. Wicks Road Slope Stabilization: a. Construction of retaining walls at the toe of the slope located south of the Wicks Road right -of -way (easements have been acquired for this construction); and, b. Construction of berms and other improvements along the south edge of the pavement to divert and control surface drainage i-un- off, 3. Wicks Road Asphalt Overlay: a. Construction of an asphalt overlay and related improvements from Walnut Canyon Road easterly to a point approximately 1,000' east of Walnut Canyon Road; and, b. Construction of berms and other drainage improvements to the north side of the road. aicks.ad 000075 CDBG Project March 19, 1997 Page 3 D. Fiscal Impact 1. costs: A summary of the total estimated cost for this combined project is as follows: 2. Multi -Year costs: The following is a summary of project costs incurred in prior years, anticipated for FY 1996/97 and projected for FY 1997/98. Elesent _.._ Design Construction (incl. contingency) Adain. & Inspection misc. & Contingency Total Multi -Year Expenditure Sunary (All Projects) Prior Years FY 99 7 Project Cost Estivate Total Eleitent _...__. Va le d. Wicks Slone Wicks Arc of Design 4,440 21,000 5,000 30,440 Construction (incl. contingency) 35,000 45,000 37,000 117,000 Admin. & Inspection 3,000 4,500 3,000 10,500 Misc. & Contingency 3,560 _ 4,500 4.000 12.060 46,000 75,000 49,000 170,000 2. Multi -Year costs: The following is a summary of project costs incurred in prior years, anticipated for FY 1996/97 and projected for FY 1997/98. Elesent _.._ Design Construction (incl. contingency) Adain. & Inspection misc. & Contingency Total Multi -Year Expenditure Sunary (All Projects) Prior Years FY 99 7 FY 1 97/98 Total a 21,745 10,255 0 32,000 0 0 117,000 117,000 0 0 10,500 10,500 0 0 12.06 0 IL 6 a 21,745 10,255 139,560 171,560 L149,815 I 170,000 Note: a) Prior Year Costs: Valley Rd = $2,140; Wicks Rd Slope = $19,605. 3. Funding Sources: Community Development Block Grant (CDBG) funds are restricted to construction costs only. The budget provides funding for non - construction costs for the three subject projects from the Moorpark Redevelopment Agency (MRA) . [Note: Non- construction cost for a separate project -- the Everett Basin outlet Drain -- is funded by the Local Transportation Fund.] OW076 vicks.nd CDBG Project March 19, 1997 Page 4 4. Current Year Budget: The following is a summary of the current year budget for CDBG funded Street improvement projects. 5. Budget Amendment: The following is a summary of the estimated amount of a future budget amendment based on the current estimated project costs. FY 1996 /97 Budget Funding Source _^ Current (S ) FY 1996/97 Budget CDBG Project CDBG _LTF . KRA f$) Total Everett Basin Outlet [8007' 80,000 40,000 0 120,000 Wicks Slope [80211 120,000 0 30,000 150,000 Wicks A/C Overlay [8020 41,000 0 99,000 140,000 Valley Road [8019' 70,000 __.__0 100,000 170,000 Total ;11,000 40,000 229,000 580,000 5. Budget Amendment: The following is a summary of the estimated amount of a future budget amendment based on the current estimated project costs. FY 1996 /97 Budget Funding Source _^ Current (S ) Change Revised f S ) CDBG Wicks Slope 120,000 (70,000) 50,000 Wicks A/C Overlay 41,000 (1,000) 40,000 Valley Road 70,000 30 40,000 Sub -Total 231,000 (101,000) 130,000 Everett Basin Outlet 80,000 0 b 80,000 Total 311,000 1101,000) 210,000 LTF Everett Basin Outlet 40,000 0 40,000 M171 Wicks Slope 30,000 (23,000) 7,000 Wicks A/C Overlay 99,000 (92,000) 7,000 Valley Road loom 94 6.000 229,000 {209,000) 20,000 Total 580,000 1310,000) 270,000 Note: b) Future Project. E. Plans and Specifications A set of the plans and specifications for this combined project have been placed in the City Council office for review and comment. wicks.ad ()WO' CDBG Project March 19, 1997 Page 5 F. Schedule It is anticipated that the bids will be presented to the City Council for award of contract in May. Construction should begin in June and be completed by August. Staff recommends that City Council approve the plans and specifications for the subject project and authorize staff to advertise for receipt of bids. aicks.ad 0r " 78