Loading...
HomeMy WebLinkAboutAGENDA REPORT 1997 0416 CC REG ITEM 09B7a,5.�3 ITEM 9. 80 aff OF MOORPARK, CALIFORNIA AGENDA REPORT City Coun it Meeting C ='I'Y OF MOORPARnf 199 7 ACTION:�2�%7�P�.= TO: The Honorable City Council FROM: Kenneth C. Gilbert, Director of PublicB J DATE: April 7, 1997 (Council Meeting 4- 16 -97) SUBJECT: Consider Approval of a Change to the Design for the Widening of Los Angeles Avenue West of South Condor Drive [Los Angeles Avenue - East] EXECUTIVE SUMMARY This requests approval of change to the design for the subject project to provide a paved surface for bicycles and pedestrians. DISCUSSION A. Background la_est5 In June of 1996 the City Council took the following actions with respect to the subject project: 1. Approved the future roadway alignment for Los Angeles Avenue East to shift the centerline to the north (Alt. #2); 2. Approved a corridor width for this street segment of eighty -eight feet (881) -- a street width wide enough to accommodate possible ultimate street improvements to include the following: • four 12' wide travel lanes; • one 14' wide raised / landscaped center median; • two 8' wide Bike Lanes; • curb and gutter; and, • two 5' wide sidewalks; 3. Approved the conceptual design for the construction of earthwork and retaining walls for the project, sufficient to accommodate the above described ultimate improvements; 4. Directed the City Engineer to proceed with the preparation of a preliminary design for the required earthwork and retaining walls, in order to determine the limits of the right -of -way acquisition required for the project. ot"zo Los Angeles Avenue East Widening April 1997 Page 2 5. Also directed the City Engineer to proceed with the preliminary design for the construction of street improvements within the above described corridor, to provide for only one travel lane in each direction, said street improvements more particularly described as following: • two 12' wide travel lanes; • one 14' wide center paved median (total pavement width of 38'); and, • two 8' wide unpaved shoulders; 6. Directed staff to proceed with the title work, engineering work and appraisal work necessary to prepare the final Deeds for all of the right -of -way required, and to determine estimated cost of said acquisition; and, 7. Directed staff to report back to the City Council when these efforts are completed, to seek authorization to proceed with right -of -way acquisition. B. Proposed Added Pavement Width An additional eight feet (81) of pavement in each direction, located outside of the painted side lines, would provide a paved surface for pedestrians and bicycles through this segment of street. The estimated cost of this additional construction is approximately $200,000. This added work increases the estimated cost of construction for the proposed realigned two lane road (plus center paved median) from approximately $2,000,000 to approximately $2,200,000. The estimated cost for re- design efforts for the preliminary design now being prepared for the proposed initial street improvements, is approximately $3,500. It should be noted that this additional pavement width, and cost for same, would be deleted from the scope of work and cost of a possible future project to widen the roadway to accommodate four lanes of traffic. This additional pavement width is proposed to be constructed with the construction of the initial two lane roadway improvements for the following reasons: 1. It is not known when street improvements beyond those described above in Section A -5 will be constructed. It is even possible that widening to four lanes may never occur. The initial street improvements call for only two travel lanes, a center paved median and gravel shoulders. No provisions are made for bicycle or pedestrian traffic. la_est5 00010 -1