Loading...
HomeMy WebLinkAboutAGENDA REPORT 1997 0416 CC REG ITEM 10CAGENDA REPORT City of Moorpark To: The Honorable City Council From: Kenneth Gilbert Director of Public Works Dirk Lovett, Assistant City Engineer Anthony Cooper, Civil Engineer //4, '7o � ITEM /0-0-0 CITY OF MOORPARK, CALTFORNL4 City C,� ..a lvir f 199 Date: April 7, 1997 (Council Meeting of April 16, 1997) Subject: Consider Approval of a Notice of Completion for the Moorpark Avenue / Spring Road Storm Drain and the Adoption of a Resolution Amending the Budget for Said Project to Reflect Projected Actual FY 1996/97 Project Costs EXECUTIVE SUMMARY The construction of the subject project has been completed. This presents a summary of costs and recommends recordation of a Notice of Completion. In addition, a Resolution amending the budget to reflect final costs is also included. DISCUSSION A. Background On April 15, 1996, the City Council awarded a contract to Lash Construction for construction of the Spring Road and Moorpark Avenue storm drains. B. Progress of Work The storm drain project began on May 20, 1996 and final repairs were completed on February 28, 1997. Because Caltrans required that traffic control can be done only on one location at a time, the contractor was required to complete construction on Spring Road before construction on Moorpark Avenue storm drain began. Utility conflicts and relocations caused significant delays to both the Spring Road and Moorpark Avenue storm drain construction. As a result, the contractor was forced to npksd.cnp O0la4 (5?, It Moorpark Avenue / Spring Road Storm Drain April 16, 1997 Page 2 move his construction equipment to different locations of both storm drain projects in order to continue with construction. Redesign of the storm drain on Flinn Avenue and laterals on Spring Road was required to avoid conflict with unmarked Pacific Bell duct structures. An unmarked underground Caltrans signal conduit in the path of construction, at the intersection of Moorpark Avenue and Los Angeles Avenue, caused additional construction delay. This facility was relocated temporarily to overhead poles and will be relocated permanently in April, at the cost of the City. 74INKI-WITUN AL The quantities of bid items required to complete the project was more than the engineer's estimate of quantities stated in the bid documents. The resultant cost increase is summarized as follows: Thirteen (13) construction change orders were issued for this project, totaling $105,487.75. A brief description of these Change Orders is as follows: Moorpark Avenue Approved Final Number Ast. W Cost Description 7 5,000.00 5,000.00 The cost to provide pavement grinding on the east side of Moorpark Avenue, between Third Street and First Street, to match the elevation of the new curb and gutter. 8 (1,571.98) (1,571.98) Reimbursement to City Engineering by the contractor to review a box culvert design alternative and process a Caltrans permit for the box culvert alternative on Moorpark Avenue. [Portion paid by Utility] 9 4,800.00 4,800.00 The additional cost to construct the box culvert on Moorpark Avenue across Los Angeles Avenue at night. mpksd.cmp 00013 -r Moorpark Spring Item Avenue ($) Road ($) Total ($) Bid Amount: 907,122.50 597,447.66 1,504,570.16 Quantity Adjustment: 28,895.64 27,147.97 56,007.61 Adjusted Total: 936,018.14 624,595.63 1,560,577.77 Thirteen (13) construction change orders were issued for this project, totaling $105,487.75. A brief description of these Change Orders is as follows: Moorpark Avenue Approved Final Number Ast. W Cost Description 7 5,000.00 5,000.00 The cost to provide pavement grinding on the east side of Moorpark Avenue, between Third Street and First Street, to match the elevation of the new curb and gutter. 8 (1,571.98) (1,571.98) Reimbursement to City Engineering by the contractor to review a box culvert design alternative and process a Caltrans permit for the box culvert alternative on Moorpark Avenue. [Portion paid by Utility] 9 4,800.00 4,800.00 The additional cost to construct the box culvert on Moorpark Avenue across Los Angeles Avenue at night. mpksd.cmp 00013 -r Moorpark Avenue / Spring Road Storm Drain April 16, 1997 Page 3 Moorpark Avenue Sub-ttl Approved Final Number Amt. M Cost Description 10 0 0.00 Zero cost change order for the approval of the box to avoid a Pacific Bell duct structure. [Portion paid culvert as an alternative to the double 48" diameter by Utility] storm drain. * 11 5,791.13 5,791.13 Extra cost for delays to the storm drain project due to accommodate the storm drain on Flinn Avenue. utility conflicts on Spring Road and Moorpark Avenue. 12 6,873.39 6.873.39 The cost of the contractors overtime to open northbound connection of two existing storm drain laterals not traffic on Moorpark Avenue due to storm drain shown on the plans. construction detour. Sub-ttl 20,892.54 20,892.54 Spring Road 1 53,766.36 53,766.36 Additional design and construction cost on Flinn Avenue to avoid a Pacific Bell duct structure. [Portion paid by Utility] 2 2,400.00 2,400.00 Construction cost to relocate a fire hydrant lateral to accommodate the storm drain on Flinn Avenue. 3 3,846.45 3,846.45 Construction cost for removal of concrete and connection of two existing storm drain laterals not shown on the plans. 4 9,609.40 9,609.40 Additional design and construction cost on Spring Road storm drain laterals to avoid a Pacific Bell duct structure. [Portion paid by Utility] 5 2,742.50 2,742.50 Delay cost during construction to determine if and unmarked Pacific Bell duct structure was to be abandoned. 6 5,220.00 5,220.00 The additional cost to construct Spring Road storm drain across Los Angeles Avenue at night. * 11 3,241.64 3,241.64 Extra cost for delays to the storm drain project due to utility conflicts on Spring Road and Moorpark Avenue. 13 3,768.86 3,768.86 Delay cost by the contractor to wait for Pacific Bell to determine if an unmarked underground cable, in the path of the storm drain, was active or inactive. [Portion paid by Utility] Sub -ttl 8 595.2 84.595.21 Total 105,487.75 105,487.75 mpksd.cmp 00013G Moorpark Avenue / Spring Road Storm Drain April 16, 1997 Page 4 E. Reimbursements from Utilities Certain construction delays and /or re- designs were required by certain utilities. All City costs for this additional work was billed to the utility which caused the delay and /or the re- design. A summary of these efforts is as follows: So, Cal. Gas 69,216.72 65,469.57 F. Fiscal Impact 1. Total Contract/ Actual Construction Cost: The final contract costs and actual construction costs for the project are summarized as follows: Amount Received Actual utility Billed ($) To Date Description Pacific Bell 53,766.36 53,766.36 Re- design cost and increased Bid Amount: 907,122.50 28,895.64 construction cost for the Flinn C.O. # 7 5,000.00 0.00 Avenue storm drain lateral. Pacific Bell 9,609.40 9,609.40 Re- design costs and increased C.O. # 9 4,800.00 0.00 construction cost for storm drain C.O. #10 0.00 0.00 laterals on Moorpark Avenue. Pacific Bell 2,093.81 2,093.81 Costs for contractor delay time C.O. #12 6,873.39 0.00 waiting for Pac. Bell crew to Sub -total 928,015.04 28, 895.64 identify unmarked buried conduit. Pacific Bell 1,968.39 0 Construction delay costs waiting for utility relocation. Shell Oil 867.77 0 Construction delay costs waiting for utility relocation. So. Cal. Gas 910.99 0 Construction delay costs waiting for utility relocation. So, Cal. Gas 69,216.72 65,469.57 F. Fiscal Impact 1. Total Contract/ Actual Construction Cost: The final contract costs and actual construction costs for the project are summarized as follows: mpksd. cmp 000: L,37 Approved Actual Item Amount ($1 .Adjustment ($1 Cost ($l Moorpark Avenue Bid Amount: 907,122.50 28,895.64 935,982.14 C.O. # 7 5,000.00 0.00 5,000.00 C.O. # 8 (1,571.98) 0.00 (1,571.98) C.O. # 9 4,800.00 0.00 4,800.00 C.O. #10 0.00 0.00 0.00 C.O. #11 * 5,791.13 0.00 5,791.13 C.O. #12 6,873.39 0.00 6,873.39 Sub -total 928,015.04 28, 895.64 956, 874.62 mpksd. cmp 000: L,37 Moorpark Avenue / Spring Road Storm Drain April 16, 1997 Page 5 Spring Road Storm Drain Signal Total Bid Amount: 597,447.66 27,147.97 624,595.63 C.O. # 1 53,766.36 0.00 53,766.36 C.O. # 2 2,400.00 0.00 2,400.00 C.O. # 3 3,846.45 0.00 3,846.45 C.O. # 4 9,609.40 0.00 9,609.40 C.O. # 5 2,742.50 0.00 2,742.50 C.O. # 6 5,220.00 0.00 5,220.00 C.O. #11 * 3,241.64 0.00 3,241.64 C.O. #13 3.768.86 0.00 3,768.86 Sub -total 682,042.87 27,147.97 709,190.84 Total 1,610,057.91 56,007.61 1,666,065.52 2. Moorpark Avenue Los Angeles Avenue Traffic Signal Conduit Relocation: The Moorpark Avenue storm drain line severed a traffic signal conduit across the north leg of the intersection. Temporary aerial wiring was installed to reestablish the electrical connections. By separate contract a replacement conduit will be placed across the east leg of the intersection. 3. Total Project Costs: Total costs for the subject project is summarized as follows: 4 Note: The project costs and budget figures noted above and in the following sections, do not include amounts which have been or which may be reimbursed from certain utilities (see Section E for details regarding reimbursements from utilities.). Those amounts, when and if received, will result in a reduction in project costs and a budget surplus in a like amount. Construction Contingency: The total approved project funding amount authorized by the City Council is as follows: Item Bid Amount: Plus Night Work (if Required) Contingency (10 % ±) Total: Amount ($) 1,504,570.16 100,020.00 160, 810.00 1,765,400.16 mpksd.cmp 000138 Storm Drain Signal Total Element Contract ($1 Conduit Project Design / Other 193,000 4,000 197,000 Construction 1,666,102 6,604 1,672,706 Admin & Inspection 125,000 2,000 127,000 Total 1,984,102 12,604 1,996,706 Note: The project costs and budget figures noted above and in the following sections, do not include amounts which have been or which may be reimbursed from certain utilities (see Section E for details regarding reimbursements from utilities.). Those amounts, when and if received, will result in a reduction in project costs and a budget surplus in a like amount. Construction Contingency: The total approved project funding amount authorized by the City Council is as follows: Item Bid Amount: Plus Night Work (if Required) Contingency (10 % ±) Total: Amount ($) 1,504,570.16 100,020.00 160, 810.00 1,765,400.16 mpksd.cmp 000138 Moorpark Avenue / Spring Road Storm Drain April 16, 1997 Page 6 5. Multi -Year Costs: Costs for this project have been incurred over several years. A breakdown of costs between current year and prior years is as follows: Prior Total Elenent Years 99 97 Project Design 193,000 4,000 197,000 Construction 421,000 1,252,000 1,673,000 Adnin & Inspection 20,000 107,000 127,000 Total 634,000 1,363,000 1,997,000 6. Moorpark / Spring Cost Breakdown: A breakdown of project costs between the Moorpark Road and the Spring Road storm drains is as follows: Moorpark Spring Eleeent Ave. Road of Prior Years Design 139,000 54,000 193,000 Construction 107,000 314,000 421,000 Inspection 5,000 15,000 20,000 251,000 383,000 634,000 FY 1996/97 Design 4,000 0 4,000 Construction 857,000 395,000 1,252,000 Inspection 68,000 39,000 107,000 929,000 434,000 1,363,000 Total 1,180,000 817,000 1,997,000 7. Moorpark Avenue -- Caltrans Share: Pursuant to a Cooperative Agreement between the City and Caltrans, Caltrans will contribute $300,000 to project construction costs. These monies are expected to be received prior to May 1997. 8. Moorpark Avenue -- MetroLink Parking Lot Lateral: The storm drain lateral serving the MetroLink Parking lot is funded by Fund 241: State Transit Assistance Fund. The total cost of that storm drain lateral is $77,000 (Construction: $63,000, plus non- construction: $14,000). mpksd.cnp 000139 Moorpark Avenue / Spring Road Storm Drain April 16, 1997 Page 7 9. Spring Road -- Caltrans Share: As a condition of the development of their new Maintenance facility northeast of Spring Road and Flinn Avenue, Caltrans paid $80,000 toward the cost of the construction of the Spring Road storm drain system. 10. Spring Road -- Flinn Avenue Lateral: The cost of the Flinn Avenue storm drain and street improvements are to be split 150 - 50] between the Gas Tax fund and the Moorpark Redevelopment Agency. The total cost of that work is $222,000 (Construction: $193,000, plus non - construction: $29,000). 11. Project Funding Summary: A breakdown of the funding sources for this project is as follows: ** Current estimate of prorated costs for storm drain construction, per LDM92 -1 Agreement. mpksd. cmp 000140 Moorpark Spring Funding Source Notes Avenue Road Total L. A. Ave AOC a 603,000 211.901.8011.000.9903 b 595,000 1,198,000 Gas Tax c 0 111,000 111,000 240.801.8011.000.9903 STA d 77,000 0 77,000 241.801.8011.000.9903 KRA a 500,000 410.801.8011.000.9903 f 1111000 611,000 Total 1,180,000 817,000 1,997,000 Notes: a Caltrans: $300,000 Other: $303,000 $603,000 b Caltrans: $ 80,000 Andersen ( * *): $ 90,817 Other: S424,183 $595,000 c Fifty percent (50 %) of Flinn Ave.: $111,000 [$222,000 / 2 = $111,000) d MetroLink Parking Lot Lateral: $ 77,000 e Maximum MRA costs $500,000 f Fifty percent of Flinn Ave.: $111,000 [$222,000 / 2 = $111,000) ** Current estimate of prorated costs for storm drain construction, per LDM92 -1 Agreement. mpksd. cmp 000140 Moorpark Avenue / Spring Road Storm Drain April 16, 1997 Page 8 12. Multi -Year Funding: A breakdown of the above project funding summary between prior year costs and costs incurred this fiscal year is as follows: Revised Funding Source Prior Change (S) Funding Source Years FY1996 97 Total L A a0C 621,500 576,500 1,198,000 Gas Tax 0 111,000 111,000 STA 0 77,000 77,000 Path 12,500 598,500 611,000 Total 634,000 1,357,000 1,997,000 (50,200) 13. Contingency: It is recommended that an adjustment to the budget for this project include a contingency for unanticipated costs. Accordingly, the funding level from the Los Angeles Avenue AOC recommended below is more than the estimated year -end estimated costs summarized in Section F12 [$576,500 + $23,500 = $600,0001. 14. Budget Adjustment: It is the intent of staff to prepare a resolution adjusting the FY 1996/97 Budget to reflect actual costs and funding sources for this project A summary of that future proposed action is as follows: RIERM 1711: ITFITt The City Engineer has completed a final inspection of the project and has found the work to be acceptable. At this time it would be appropriate for the City Council to accept the project as completed, direct the City Clerk to file a Notice of Completion and authorize release of the retention. lipksd.cmp 00014. Current Proposed Revised Funding Source B d t Change (S) Bud et L. A. De AOC 516,300 83,700 600,000 211.901.8011.000.9903 Gas Tax 182,500 (71,500) 111,000 240.801.8011.000.9903 STA 127,200 (50,200) 77,000 241.801.8011.000.9903 Sub -Total 826,000 (38,000) 788,000 RRA 682,300 (83,800) 598,500 410.801.8011.000.9903 Total 1,508,300 (121,800) 1,386,500 RIERM 1711: ITFITt The City Engineer has completed a final inspection of the project and has found the work to be acceptable. At this time it would be appropriate for the City Council to accept the project as completed, direct the City Clerk to file a Notice of Completion and authorize release of the retention. lipksd.cmp 00014. Moorpark Avenue / Spring Road Storm Drain April 16, 1997 Page 9 RECOMMENDATION (Roll Cali Vote) Staff recommends that the City Council take the following actions: 1. Accept the work as complete; 2. Instruct the City Clerk to file a Notice of Completion for the project; 3. Authorize the release of the retention upon satisfactory clearance of the thirty five (35) day lien period; and, 4. Adopt Resolution 97 - approving a budget amendment to revise the appropriation and Budget amount for the subject project as follows: • L A Ave AOC [211.901.8011.000.9903]: from $516,300 to $600,000 ($83,700 increase) • Gas Tax [240.801.8011.000.9903]: from $182,500 to $111,000 ($71,500 decrease); • STA [241.801.8011.000.9903]: from $127,200 to $77,000 ($50,200 decrease). Note: Adjustment of the MRA Budget for this project will be presented to the Moorpark Redevelopment Agency for approval. 000:.42 mpksd.cmp