Loading...
HomeMy WebLinkAboutAGENDA REPORT 1997 0604 CC REG ITEM 10DAGENDA REPORT CITY OF MOORPARK TO: The Honorable City Council The Moorpark Redevelopment Agency FROM: Kenneth C. Gilbert, Director of Public DATE: May 23, 1997 (Council Meeting 6 -4 -97) ITEM /Os�. CITY OF MOORPARY, CALIFORNIA City Coun it Meeting of /e -/_ 1997 ACTION: SUBJECT: Consider Bids for the Construction of Slope, Pavement and Drainage Improvements on Wicks Road and on Valley Road and Consider the Adoption Resolutions Amending the City of Moorpark and MRA Budget for FY 1996/97 for Said Projects This presents the result project and recommends the of the project. . .. s of the bid opening for the subject award of a contract for the construction 1. Valley Road: In June of 1996, the City Council approved the conceptual design for improvements to Valley Road. That action was based on a recommendation to approve from the Transportation and Streets Committee. Notices were sent to all affected property owners and residents advising them of the general nature of the proposed improvements and that the City Council was being asked to approve the conceptual design. 2. Wicks Road Slope Stabilization: In late 1994 the City Engineer was authorized to proceed with a geotechnical analysis and evaluation of the condition of the slope supporting Wicks Road. That effort was undertaken and completed. Based on the findings of those investigations, the City Engineer was directed to prepare a design for the construction of recommended slope stabilization measures. The City Engineer was also directed to prepare certain easements required for the construction of those improvements. Those Easements have been obtained and accepted by the City. B. Design Services 1. Valley Road: The City retained the services of M3 Civil Engineering to prepare the design for the reconstruction of wicks. awd 'v 331. -8 -257 Bids: Wicks Rd. / Valley Rd. June 4, 1997 Page 2 2. Wicks Road Slope Stabilization: As stated above, the City Engineer was directed to prepare a design for the construction of certain slope stabilization measures for Wicks Road. That design has been completed. 3. Wicks Road Asphalt Overlay: The City also retained the services of the City Engineer to prepare a design for the construction of an asphalt overlay on a portion of Wicks Road. That design is also completed. 4. Combined Project: Due to the nature of the funding for the above described projects, it is recommended that these project be combined into one contract. C. Authorization to Advertise On March 19, 1997, the City Council authorized staff to advertise for receipt of bids. D. Project Scope of Work 1. Valley Road: a. Remove and replace asphalt pavement and base; b. Construction of a storm drain inlet and a lateral pipe near the south end of Valley Road; and, c. Construction of driveway transitions as required. d. The final pavement improvements will be approximately twenty ( 20 ) to twenty -five ( 25 ) feet wide, within a street right -of -way of forty feet (401). 2. Wicks Road Slope Stabilization: a. Construction of retaining walls at the toe of the slope located south of the Wicks Road right -of -way (easements have been acquired for this construction); and, b. Construction of berms and other improvements along the south edge of the pavement to divert and control surface drainage run -off. 3. Wicks Road Asphalt Overlay: a. Construction of an asphalt overlay and related improvements from Walnut Canyon Road easterly to a point approximately 1,000' east of Walnut Canyon Road; and, b. Construction of berms and other drainage improvements to the north side of the road. wicks.awd 000aV Bids: Wicks Rd. / Valley Rd. June 4, 1997 Page 3 E. Bid Results Bids for the subject project were received and opened on May 22, 1997. The apparent low bidder for this work is Berry General Engineering, Inc., with a bid in the amount of $147,231.19. A summary of the bid results is attached as Exhibit 1. It has been determined that this bidder is qualified to perform the work. Said bidder has confirmed that their bid is valid and that they are prepared to proceed with the construction of the project. F. Fiscal Impact 1. Costs: A summary of the total estimated cost for this combined project is as follows: Note: a) Includes Wicks Road Slope Stabilization & Wicks Road Asphalt Rehabilitation. 2. Multi -Year Costs: The following is a summary of project costs incurred in prior years, anticipated for FY 1996/97 and projected for FY 1997/98. lenient Construction (incl. contingencyi Design Admin & Insp Total Multi -Year Expenditure Summary Prior Years FY 1996/97 Project Cost Estimate ($) 0 Element __. Valley Rd a Wicks Rd Survey, Etc. Total Construction 33,659 107,771 5,801 147,231 Contingency 3,532 11,237 0 14,769 Total Construction ',191 119,008 5,801 162,000 Design x,000 271000 0 32,000 Adain & Inspection 4,000 12,000 16,000 46,191 158,008 5,801 210,000 Note: a) Includes Wicks Road Slope Stabilization & Wicks Road Asphalt Rehabilitation. 2. Multi -Year Costs: The following is a summary of project costs incurred in prior years, anticipated for FY 1996/97 and projected for FY 1997/98. lenient Construction (incl. contingencyi Design Admin & Insp Total Multi -Year Expenditure Summary Prior Years FY 1996/97 FY 1997/98 Tot 1 0 162,000 0 162,000 b 21,745 10,255 0 32,000 16,000 c 0 16,000 b 21,745 188,255 0 210,000 Note: b) Prior Year Costs: Valley Rd = $2,140; Wicks Rd Slope = $19,605. c) All costs to be encumbered in FY 1996/97, wicks.awd 00039+3 Bids: Wicks Rd. / Valley Rd. June 4, 1997 Page 4 3. Funding Sources: Community Development Block Grant (CDBG) funds are restricted to construction costs only. All non - construction costs are to be funded by the Moorpark Redevelopment Agency (MRA). 4. FY 1996 197 Budget: The following is a summary of the current year budget for the subject projects. FY 1996/97 Budget Project Account Number___-, Wicks A/C Overlay Wicks Slope Work Valley Road Total xxx.801.8020.000.9903 xxx.801.8021.000.9903 xxx.801.8019.000.9903 245 410 41,000 CDBG KRA f S 1 Total 41,000 99,000 140,000 120,000 30,000 150,000 70.000 100,000 170,000 231,000 229,000 460,000 5. Budget Amendment: The following is a summary of the recommended budget amendment for the subject projects. Fundina Source CDBG Wicks A/C Overlay [8020, Wicks Slope Work [8021; Valley Road [8019 NRA Wicks A/C Overlay [8020: Wicks Slope Work [8021; Valley Road [8019' Total F. Schedule FY 1996 /97 Budget Curr nt Change Revised tSl 41,000 0 41,000 120,000 (39,000) 81,000 701000 (30,000) 40,000 231,000 (69,000) 162,000 99,000 (90,000) 9,000 30,000 (20,000) 10,000 100,000 (91,000) 9.000 229,000 (201,000) 28,000 460,000 (270,000) 190,000 It is anticipated that construction of the project will be completed within four months. wicks.awd 0003:94 Bids: Wicks Rd. / Valley Rd. June 4, 1997 Page 5 A. Moorpark Redevelopment Agency: Staff recommends that the Moorpark Redevelopment Agency take the following actions: 1. Adopt Resolution 97 - approving a budget amendment to reduce the MRA appropriation and budget amounts for the subject projects an aggregate amount of $201,000. B. City Council: Staff recommends that the City Council take the following actions 1. Adopt Resolution 97 - approving a budget amendment to reduce the appropriation and budget amounts from City sources for the subject projects an aggregate amount of $69,000. 2. Award a contract to Berry General Engineering, Inc. in the amount of $147,231.19 for the construction of the subject projects. 3. Approve a construction contingency in the amount of $14,769 for the project and authorize the City Manager to approve additional work, if required, for an amount not to exceed ten per cent of the contract; 4. Authorize the City Manager to sign necessary contract documents. wicks.awd 003 d v�JtJ ya. Exhibit 1 (1 of 2) --------------- - - - -- CITY OF MOORPARK Bid Results May 22, 1997 Wicks Road Valley Road --------------- - -- ITEM-- DESCRIPTION A Wicks Road 1 Clearing 2 6" A/C Curb 3 Blue Hyudrant Marker 4 Conc. Retaining Wall 5 Excavation 6 Bakfill 7 Adj Valves 8 Adj Manhole 9 A/C Construction 10 Cold Planing 11 Surface Prep 12 Pavement Fabric 13 Wall Drain 14 Grate Inlet 15 Caltrans Permit Sub -Total 'A' B Valley Road -------------------- 1 Clearing 2 PMB 3 Asphalt 4 A/C Rolled Curb 5 18" RCP 6 Traffic Control 7 Catch Basin 8 PCC Driveway 1 Sub -Total 'B' Constr I D Signs Surveying Release Total Bidder UKI* ADDRESS: Engineer's Estimate CITY, STATE: PHONE NUMBER: CONTACT PERSON: I Est Qty Unitsl UNIT $ I TOTAL BID ------------- _ -------- -- I ----- - - - - -- 1 LS 661 3F 1 EA 107 Y 430 Y 280 "Y 2 EA 2 EA 482 TON 7,970 SF 22,722 SF 2,525 SY 36 LF 2 EA 1 EA 1 LS 6,990 SF 6,990 SF 340 LF 40 LF 1 LS 1 EA 670 SF 2 EA 1 LS 1 f LS 7,000.00 7,000.00 7.50 4,957.50 5.00 5.00 205.00 21,935.00 10.00 4,300.00 8.00 2,240.00 150.00 300.00 300.00 600.00 45.00 21,690.00 0.14 1,115.80 0.20 4,544.40 0.75 l 1,893.75 1.2.00 432.00 200.00 400.00 500.00 ! 500.00 ------ - - - - -- 71,913.45 3,000.00 3,000.00 0.40 2,796.00 0.90 6,291.00 10.00 3,400.00 60.00 2,400.00 1,500.00 1,500.00 4,500.00 4,500.00 4.00 2,680.00 26,567.00 500.00 1,000.00 10,000.00 10,000.00 1.00 1.00 109,481.45 VENDOR 1 Berry General Eng. P. 0. Box 7178 Oxnard, CA 93031 (805) 485 -9826 Dan Berry - UNIT -$ -- TOTAL BID 6,000.00 4.40 17.00 401.56 29.45 31.05 325.00 450.00 38.77 0.68 0.11 1.47 16.06 850.00 375.00 7150.00 0.84 0.85 4.39 91.02 425.00 5560.00 5.34 325.00 5150.00 1.00 6,000.00 2,908.40 17.00 42,966.92 12,663.50 8,694.00 650.00 900.00 18,687.14 5,419.60 2,499.42 3,711.75 578.16 1,700.00 375.00 107,770.89 7,150.00 5,871.60 5,941.50 1,492.60 3,640.80 425.00 5,560.00 3,577.80 33,659.30 650.00 5,150.00 1.00 147,231.19 VENDOR 2 Nye & Nelson P.O.Box 756 Ventura, CA 93002 (805) 654 -1682 Leigh Nelson -- UNIT -$ -- TOTAL BID 10,485.00 4.00 20.00 395.00 29.00 30.00 165.00 190.00 37.50 0.50 0.38 1.25 17.00 850.00 210.00 10,500.00 0.95 0.90 4.00 90.00 2,650.00 5,500.00 7.25 550.00 4,800.00 1.00 I� 10,485.00 2,644.00 20.00 42,265.00 12,470.00 8,400.00 330.00 380.00 18,075.00 3,985.00 8,634.36 3,156.25 612.00 1,700.00 210.00 113,366.61 10,500.00 6,640.50 6,291.00 1,360.00 3,600.00 2,650.00 5,500.00 4,857.50 41,399.00 1,100.00 4,800.00 1.00 160,666.61 000396 Exhibit 1 (2 of 2) CITY OF MOORPARK Bid Results May 19, 1997 Maureen Lane Bonnie View Alleys -------------------- - - - - -- ITEM DESCRIPTION -------------------------- A Wicks Road -------------------- 1 Clearing 2 6" A/C Curb 3 Blue Hyudrant Marker 4 Conc. Retaining Wall 5 Excavation 6 Bakfill 7 8 9 10 11 12 13 14 15 Adj Valves Adj Manhole A/C Construction Cold Planing Surface Prep Pavement Fabric Wall Drain Grate Inlet Caltrans Permit Sub -Total 'A' B Valley Road -------------------- 1 Clearing 2 PMB 3 Asphalt 4 5 6 7 8 A/C Rolled Curb 18" RCP Traffic Control Catch Basin PCC Driveway Sub -Total 'B' Bidder NAME: ADDRESS: CITY, STATE: PHONE NUMBER: CONTACT PERSON: Est Qty Units ---------- - - - - -- VENDOR 3 CNM Paving fl 2510 -G Las Posas (14491 I� Camarillo, CA 93010 (805) 398 -1475 Matt Ludlow i UNIT TOTAL BID -- ( - -UNIT $ I - TOTAL BID 1 LS 12,750.00 12,750.00 661 SF 5.25 3,470.25 1 EA 25.00 25.00 107 CY 550.00 58,850.00 430 CY 39.00 16,770.00 280 CY 46.00 12,880.00 2 EA 350.00 700.00 2 EA 425.00 850.00 482 TON 49.00 23,618.00 7,970 22,722 2,525 36 2 1 SF SF Sy LF EA EA 1 LS 6,990 SF 6,990 SF 340 LF 40 LF 1 LS 1 EA 670 SF 0.50 0.04 1.25 20.00 350.00 1,000.00 9,500.00 0.465 0.90 5.00 65.00 1,250.00 6,500.00 4.50 3,985.00 908.88 3,156.25 720.00 700.00 1,000.00 140,383.38 9,500.00 3,250.35 6,291.00 1,700.00 2,600.00 1,250.00 6,500.00 3,015.00 34,106.35 ------------------------ - UNIT $ 1 TOTAL BID Constr I D Signs 2 EA 500.00 1,000.00 Surveying 1 LS 2,750.00 2,750.00 Release 1 LS 1.00 1.00 ---- - - - - -- --------------------------------------- Total (I 178,240.73 Ij 11 000337 RESOLUTION NO. 97 _. A RESOLUTION OF THE MOORPARK REDEVELOPMENT AGENCY AUTHORIZING A BUDGET AMENDMENT TO THE FISCAL YEAR 1996/97 ADOPTED BUDGET FOR MOORPARK REDEVELOPMENT AGENCY FUND (FUND 410) WHEREAS, on June 19, 1996, the Moorpark Redevelopment Agency (MRA) adopted the MRA Budget for Fiscal Year 1996/97; and, WHEREAS, a staff report has been presented to the MRA requesting a budget amendment in the aggregate amount of $(201,000); and, WHEREAS, Exhibit "A," attached hereto and made a part hereof, describes said budget amendment and its resultant impacts to the budget line item(s) and projected year end fund balance(s). NOW, THEREFORE, THE MOORPARK REDEVELOPMENT AGENCY DOES HEREBY RESOLVE AS FOLLOWS: SECTION 1. That a Budget amendment in the amount of $(201,000) to Fund 410, as more particularly described in Exhibit "A. " is hereby approved. PASSED AND ADOPTED this 4th day of June, 1997. Patrick Hunter, Chairman ATTESTED: Lillian Hare, Agency Secretary 000338 Resolution No. 97 - Exhibit "A" SUPPLEMENTAL APPROPRIATIONS BY ACCOUNT NUMBER ACCOUNT CURRENT SUBJECT REVISED NUMBER APPROPRIATION APPROPRIATION APPROPRIATION 96/97 YEAR END / (REDUCTION) 96/97 YEAR END Wicks Road A/C $99,000 ($90,000) $9,000 410.801.8020.000.9903 $7,651,524 $(201,000) $7,852,524 Wicks Rd Slope $30,000 ($20,000) $10,000 410.801.8021.000.9903 Valley Rd. $100,000 ($91,000) $9,000 410.801.8019.000.9903 TOTALS: $229,000 $(201,000) $28,000 EFFECT OF PROPOSED SUPPLEMENTAL APPROPRIATIONS TO FUND BALANCES FUND CURRENT SUPPLEMENTAL REVISED PROJECTED FY APPROPRIATION PROJECTED FY 96/97 YEAR END 96/97 YEAR END BALANCE BALANCE 410 Redevelopment Fund $7,651,524 $(201,000) $7,852,524 TOTALS: $(201,000) 000339